Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Addition of 20 MW Turbine & Standby Flare System with Carbon Black Manufacturing Facility
(b)Name of the Company / Organisation BALKRISHNA INDUSTRIES LIMITED
(c)Registered Address BKT House, C/15, Trade World, Kamala Mills Compound,,Senapati Bapat Marg, Lower Parel,Mumbai City,Maharashtra-400013
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Narendra Kumar
(b)Designation (Owner/ Partner/ CEO) President (Operations)
(c)Address Village Paddhar,,,,kutch,Madhya Pradesh-370105
(d)Pin code 370105
(e)E-mail narendra.kumar@bkt-tires.com
(f)STD Code. 0(f)Telephone No. 248300
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(e) Petrochemical based processing (processes other than cracking &
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/150565/2020
(d)Master Proposal Number(Single Window) SW/150563/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 470, 471, 539/1, 539/2, 541, 543, 544/P1,
(b)Pincode 370105
(c)Bounded Latitudes (North)
From
Degree 2570504.54
Minutes
Second
From
Degree 2571334.92
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 587348.57
Minutes
Second
From
Degree 589334.55
Minutes
Second
(e)Survey of India Topo Sheet No. 41E/15, 41E/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 124
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.81
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 5-95/2018(Env)117
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 3 2020 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Captive Power Plant202040Mega Watt(MW)OthersNot Applicable
(2.)Tyre & Tube Manufacturing Plant10000500015000OthersTonnes per MonthRoadNot Applicable
(3.)Carbon Black Manufacturing Plant11500011500OthersTonnes per MonthRoad,OthersNot Applicable
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Boiler2x66 , 2x20 , 1x2.8 , 1x95 , 1x45 , 4x2.502x66 , 2x20 , 1x2.8 , 1x95 , 1x45 , 4x2.5Unit- TPH ; Number-12
(2.)Turbine202040Unit-MW
(3.)Mixing Unit8513Number-13
(4.)DG Sets2x250 , 1x20002x2500 , 1x125 , 1x202x250 , 1x2000 , 2x2500 , 1x125 , 1x20Unit- kVA
(5.)Calendering UnitCapable to produce 10,000 TPM5000Capable to produce 15,000 TPM-
(6.)ExtrudersCapable to produce 10,000 TPM5000Capable to produce 15,000 TPM-
(7.)Tire Building MachinesCapable to produce 10,000 TPM5000Capable to produce 15,000 TPM-
(8.)Curing PressesCapable to produce 10,000 TPM5000Capable to produce 15,000 TPM-
(9.)DG Sets1x4.201x4.2Unit-MW
(10.)Flare System01,00,0001,00,000Unit- Nm3/hr
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 19 Sep 2019
(iv)Valid Upto 01 Dec 2021
(v)File No. AWH-104067
(vi)Application No. 160843
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 25
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.25
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1652.12
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1652.12
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Steel Cord38Tons per AnnumLocalOthersTruck10 LinkageCopy of Linkage
(2.)Textiles63Tons per AnnumLocal/ImportOthersTruck/Ship10 LinkageCopy of Linkage
(3.)Potassium Nitrate1Tons per AnnumLocalOthersTruck10 LinkageCopy of Linkage
(4.)Beard Wires44Tons per AnnumLocalOthersTruck10 LinkageCopy of Linkage
(5.)Indian Coal (100%)1980Tons per AnnumLocalOthersTruck10 LinkageCopy of Linkage
(6.)Chemicals150Tons per AnnumLocal/ImportOthersTruck/Ship10 LinkageCopy of Linkage
(7.)Lignite396Tons per AnnumLocalOthersTruck10 LinkageCopy of Linkage
(8.)Carbon Black Feedstock (CBFS)398Tons per AnnumLocal/ImportOthersTanker/Ship10 LinkageCopy of Linkage
(9.)Molasses1Tons per AnnumLocalOthersTankers10 LinkageCopy of Linkage
(10.)Processing Oil60Tons per AnnumLocal/ImportOthersTruck/Ship10 LinkageCopy of Linkage
(11.)Carbon334Tons per AnnumLocal/ImportOthersTruck/Ship10 LinkageCopy of Linkage
(12.)Rubber563Tons per AnnumLocal/ImportOthersShip/Truck10 LinkageCopy of Linkage
(13.)Imported Coal1580Tons per AnnumImportOthersShip10 LinkageCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.20 To 53.64
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.65 To 98.80
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater3190.1Copy of Permission LettermodeOthersBorewellOthersBorewellCGWA/NOC/IND/ORIG/2019/541428 May 2019319
(2.)Surface55000.1Copy of Permission LetterPipelineOthersPipelineNo/GWIL/Kutch/renewal/2016-17/202817 Oct 20165500
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic & Drinking568600Sewage Treatment PlantReuse within the Plant & Recycling,Green Belt Renewal Plant,OthersWater Loss-28 KLD5680
(2.)Processing, Washing,Boiler, Cooling etc.13631410Effluent Treatment PlantReuse within the Plant & Recycling,Green Belt Renewal Plant,OthersWater Loss- 3 KLD13630
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1931
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1931
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Biodegradable WasteMunicipal Solid Waste777Tons0.1RoadOthersOrganic Waste Convertor
(2.)Non-Biodegradable WasteMunicipal Solid Waste518Tons0.1RoadAuthorized Recyclers
(3.)Discarded Container Barrel (Category-33.1)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)425Tons0.1RoadAuthorized Recyclers
(4.)Paint & Waste Residue (Category-21.1)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)43.8Tons0.1RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Oily Cotton Waste (Category-33.2)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)7Tons2RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Spent/Used Oil (Category-5.1)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)421Tons2RoadAuthorized Recyclers
(7.)MEE Salt (Category-35.2)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)1543Tons2RoadTreatment, Storage and Disposal Facility(TSDF)
(8.)Electronic WasteE Waste0.12Tons0.1RoadAuthorized Recyclers
(9.)ETP Chemical Sludge (Category-33.2)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)1510Tons2RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube77.150.90.0177.17100
(2.)Others(Specify)Carbon MonoxideMicrogram per Meter Cube4700.90.25470.262000
(3.)PM2.5Microgram per Meter Cube34.640.90.0135.6560
(4.)SO2Microgram per Meter Cube9.910.90.019.9380
(5.)NOxMicrogram per Meter Cube23.420.90.0123.4480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Sets (1X125 kVA)HSD110.3PM100.049
(2.)DG Sets (1x125 kVA)HSD110.3OthersCO0.138
(3.)DG Sets (1x125 kVA)HSD110.3OthersCO0.138
(4.)DG Sets (1x20kVA)HSD110.3PM100.036
(5.)DG Sets (1x20 kVA)HSD110.3OthersCO0.085
(6.)DG Sets (1x125 kVA)HSD110.3SO20.018
(7.)DG Sets (1z125 kVA)HSD110.3OthersPM2.50.02
(8.)DG Sets (2x2500 kVA)HSD110.3OthersPM2.50.129
(9.)DG Sets (2x2500 kVA)HSD110.3PM100.245
(10.)DG Sets (1x125 kVA)HSD110.3NOx0.085
(11.)Flaring SystemOffgas550.08PM100.52
(12.)DG Sets (1x20 kVA)HSD110.3OthersPM2.50.035
(13.)DG Sets (1x20 kVA)HSD110.3SO20.03
(14.)DG Sets (2x2500 kVA)HSD110.3SO20.376
(15.)DG Sets (2x2500 kVA)HSD110.3NOx0.154
(16.)DG Sets (2x2500 kVA)HSD110.3OthersCO0.295
(17.)DG Sets (1x20 kVA)HSD110.3NOx0.083
(18.)Flare SystemOffgas550.08OthersPM2.50.3
(19.)Flare SystemOffgas550.08NOx2.52
(20.)Flare SystemOffgas550.08SO20.01
(21.)Flare SystemOffgas550.08OthersCO6.1
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 42222.22
(b)Source Paschim Gujarat Vij Company Limited/Captive Power
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2x250 kVA, 1X4.2 MW, 2x2500 kVA, 1x125 kVA, 1x20 k
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 121.256
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 121.256
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 27297.79
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 43.62
(e)Settlements (ha.) 2337.05
(f)Industrial (ha.) 0
(g)Forest (ha.) 386.61
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Scrubland 7015.35
    Total (ha.) 37080.4200
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt40.3727
(2.)OthersOpen & Road Area and Area for future development33.9578
(3.)Main Plant46.9255
Total (ha.) 121.256
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANone0None
(2.)ESAsNone0None
(3.)CorridorsNone0None
(4.)Wildlife CorridorsNone0None
(5.)Critically Polluted AreaNone0None
(6.)WLSNone0None
(7.)ESZsNone0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestKatlivadi Reserve Forest3.71It is 3.71 km in NW direction of the site
(2.)Archaeological SitesNone0None
(3.)Defence InstallationsNone0None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 121.26
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Peafowl, Indian Monitor Lizard, Indian Python, Desert Cat or Asiatic Wild Cat
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 10 Lakhs
(iii)Period of Implementation 5 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Artificial Rainwater Harvesting Pond of total volume- 4050 cum (Size- 180m x 5m x 4.5 m) is existing as part of the current plant operations.
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Pond near Mamuara
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 2.81
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 2950
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 2000
(e)No. of working days 365
(f)Total Manpower 5050
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt40.38040.38
(2.)Percentage of Total Project Area33033
(3.)No. of Plants38645038645
(4.)Funds Allocated12.23012.23
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialRevenue collection and Employment for local people
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court NGT
(c)Name of the Sub Court NGT Western Zone
(d)Case No. 32/2018
(e)Orders/Directions of the court ,if any and its relevance with the proposed project Case has been transferred to NGT Western Zone from
(f)Case Details Case has been transferred to NGT Western Zone from
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/SA 103
(ii)Name of the EIA Consultant Wolkem India Limited
(iii)Address Wolkem house E-101 Mewar Industrial Area, Madri, Udaipur- 313003
(iv)Mobile No. 9415550525
(v)Landline No. 0294249260
(vi)Email Id wcs@wolkem.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 04 Feb 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i) Details of earlier production of various products with financial years needs to submit to check violation, if any. (ii) All old CTOs not uploaded to verify the violation, if any done by PP. (iii) Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2) (iv) On examination it is noted that there are show cause notices issued by SPCB, however S.No. 37 of form 2 mentioned NIL. PP has conceal the information. In this regard details action taken by SPCB needs to submitted and accordingly revise the Form 2 and uploaded. Kindly revise the form 2 and upload the correct action plan on the direction and what is status of such direction. (v) There is NGT case, pp needs to submit the compliances and details of Court case. (vi) What is status report on the compliances of Action paln submitted earlier for issues raised during PH. Kindly upload the details of PH and completed actions in S.No. 7.1 of Form 2 alongwith other requisite details. (vii) PP submitted very less incremental value for PM10 & PM2.5 & SOx. Air Quality Impact Prediction mentioned (18.1 of form 2) is inadequate kindly check and correct it accordingly. (viii) As per s.no. 28 of form 2, Schedule I species reported. But the approval of conservation plan to CWLW has not been submitted/uploaded. Details of approval regarding to conservation plan needs to be uploaded. (ix) Details of Project name is not submitted in Form 2. (x) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore 22 Apr 2020
2.NAThe correction have been made as per the instruction received 20 May 2020
3.NA(i) Pl provide current status of the court case ie. NGT. (ii) Applicability of para 7(ii) of EIA notifn. 2006. 28 May 2020
4.NAThe correction have been made as per the instruction received 29 May 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNarendra Kumar
DesignationPresident (Operations)
Name of Company (Applicant Name should not be given here)BALKRISHNA INDUSTRIES LIMITED
AddressBKT House, C/15, Trade World, Kamala Mills Compound,