Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Dyes Intermediates by Colorband Dyestuff Pvt. Ltd.
(b)Name of the Company / Organisation COLORBAND DYESTUFF P LTD
(c)Registered Address Plot No.-J 2327, Phase III, Notified Industrial Area, GIDC Vapi, Ta: Pardi,,Valsad,Gujarat-396195
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Hareshwar M Upadhyay
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Plot No.-J 2327, Phase III, Notified Industrial Area, GIDC Vapi, Ta-Pardi,,Pardi,Valsad,Gujarat-396195
(d)Pin code 396195
(e)E-mail ram@colorbandindia.com
(f)STD Code. 22(f)Telephone No. 40186666
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category B1
   Reason for Applying at Ministry general
(c)Proposal Number IA/GJ/IND2/150213/2019
(d)Master Proposal Number(Single Window) SW/149279/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. J-2317
(b)Pincode 396195
(c)Bounded Latitudes (North)
From
Degree 20.371014
Minutes
Second
From
Degree 20.371142
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.949178
Minutes
Second
From
Degree 72.949511
Minutes
Second
(e)Survey of India Topo Sheet No. F43T3 & F43S15&S11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 99
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 5.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number No.IA-J-11011/246/2019-IA-II(I)
(c)Date of Issue of TOR 13 Sep 2019
(f)Previous TOR Letter NA
(b)Date of Apply of EC 02 Aug 2020
(c)Date of Issue of EC 15 Feb 2021
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Proposed Expansion will be done in Notified Industrial Area GIDC Vapi.
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. GPCB/CCA-VSD-548(2)ID:24418/
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 12 2020 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)(N-N Di Ethyl) Meta Amino Methane Sulpfonylide1.1-1.10OthersTPMRoad
(2.)EBA Oil (Benzoyl Aceto Acetate)1.0-1.00OthersTPMRoad
(3.)N-N Di Cyano Ethyl Aniline1.0-1.00OthersTPMRoad
(4.)(OR) N,N-Diethyl Meta Toluidine(DEMT)01010OthersTPMRoad
(5.)(OR) 3-N,N-(Diallyl)4-Methoxy Acetanilide(M-29)01010OthersTPMRoad
(6.)(OR)1Ethyl-3Cyano-4Methyl-6Hydroxy-2Pyridinone(EP)01010OthersTPMRoad
(7.)N-[(3-Diethylamino)Phenyl]MethaneSulpfoamide,M-34B01010OthersTPMRoad
(8.)(OR) 3-Acetylamino-N,N-Diethyl Aniline(M-12)01010OthersTPMRoad
(9.)(OR) N-Cyanoethyl,N-Benzyl Aniline(M-38)01010OthersTPMRoad
(10.)N-N Di Hexyl Meta Toludine1.0-1.00OthersTPMRoad
(11.)(OR) MetaaminoPhenylBenzeneSulphonate(Y-114 Amine)01010OthersTPMRoad
(12.)N,N-Bis(2-Cyanoethyl)Benzenamine(M-22)01010OthersTPMRoad
(13.)(OR) M-3901010OthersTPMRoad
(14.)(OR)N,N-Bis(3Methoxy-3oxypropyl)Benzenamide(M-19)01010OthersTPMRoad
(15.)BA-04SH055OthersTPMRoad
(16.)(OR) 2:6-Di-Bromo-4-Methyl Aniline(DBPT)055OthersTPMRoad
(17.)2:4-Di Bromo Propionyl Chloride(DBPC)055OthersTPMRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Steam boiler (TPH)0.600.6Natural Gas fired
(2.)D G set, kVA07575
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 21 Apr 2017
(iv)Valid Upto 31 Dec 2021
(v)File No. AWH-85399
(vi)Application No. 119696
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 4.5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.20
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.09
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.1635
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 265.15
(b)Existing quantity of raw material/fuel 8.78
(c)Total quantity of raw material/fuel 273.92999999999995
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Aniline12.14OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(2.)Boric Acid1.31OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(3.)Methyl Cyano Acetate1.52OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(4.)Sulfuric Acid1.83OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(5.)Hydro Quinone0.11OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(6.)Caustic lye8.51OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(7.)Sodium bi carbonate2.35OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(8.)Soda ash26.84OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(9.)Meta amino phenol2.98OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(10.)Acetic acid6.99OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(11.)Allyl Chloride4.91OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(12.)Oleum1.59OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(13.)AB-40 Powder0.49OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(14.)ICE47.73OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(15.)HCl20.63OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(16.)Para Toludine1.25OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(17.)Methane Sulphonyl Chloride3.92OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(18.)N- Ethyl Amine1.21OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(19.)Hydrogen Peroxide0.94OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(20.)Thionyl chloride1.93OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(21.)Magnesium oxide0.5OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(22.)Zinc chloride1.25OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(23.)Acrylic acid0.78OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(24.)Toluene2.13OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(25.)Acetic anhydride6.87OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(26.)Catalyst0.04OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(27.)Benzene Sulfonyl Chloride4.89OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(28.)Meta- Toluidine6.59OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(29.)3 Amino 4 Methoxy acetanilide7.06OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(30.)Methyl Acrylate8.42OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(31.)Bromine4.13OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(32.)Meta Phenylene Diamine6.9OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(33.)Liq. Ammonia0.83OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(34.)Methyl Chloro Acetate3.2OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(35.)Di ethyl sulphate47.11OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(36.)Benzyl Chloride10.63OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(37.)methyl aceto acetate1.89OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(38.)Aluminum chloride0.95OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
(39.)Acrylo Nitrile10.58OthersTPMindigenousRoad100 OthersLocal dealerCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2019 To 31 Dec 2019
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube16.57.913.980
(2.)PM10Micro Gram per Meter Cube87.160.378.4100
(3.)PM2.5Micro Gram per Meter Cube47.731.240.560
(4.)NOxMicro Gram per Meter Cube21.613.218.480
(5.)OthersCOMicro Gram per Meter Cube592332495.82000
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)TDSmg/l10327045002000
(3.)Chloridesmg/l3061842501000
(4.)Total Hardnessmg/l624324200600
(5.)pHOtherspH unit7.627.1888
(6.)Fluoridemg/l0.70.51.01.5
(7.)Heavy MetalsZincmg/l0.20.11515
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l64E
(2.)CODmg/l1812E
(3.)DOmg/l6.25.7E
(4.)pHOtherspH unit7.547.18E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))56.44270
(2.)Leq(Day)A-weighted decibels(dB(A))62.249.875
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Othersmg/100g15.29.6
(2.)K(Potassium)Othersmg/100g1.81.4
(3.)N(Nitrogen)Percent0.080.06
(4.)Electric ConductivityOthersdS/m1.861.0
(5.)pHOtherspH unit7.687.42
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Water Supply11.8810Copy of Permission LetterPipelineOthersGIDC PipelineNO.GIDC/RM/VPI/ALT/PLT/208617 Jul 201512
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic effluent12septic tank/soak pitOthersseptic tank/soak pit01
(2.)Industrial Effluent5.9410ETP/CMEEDischarge into Seawater Body5.94
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 6.94
(b)Total Discharged Water (Kilolitre per Day) 6.94
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Waste from ETPHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2.0Tons50RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Discarded ContainersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2.0Tons20RoadAuthorized Recyclers
(3.)HCl(30%) from scrubberHazardous Waste (as per Hazardous and Other Waste Management rules 2016)31.3Tons50RoadOthersRecycle in process
(4.)Spent solventHazardous Waste (as per Hazardous and Other Waste Management rules 2016)26.44Tons50RoadOthersRecycle in process
(5.)Used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.01Tons50RoadAuthorized Recyclers
(6.)Bleed liquor from scrubberHazardous Waste (as per Hazardous and Other Waste Management rules 2016)40.89Tons50RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube21.50.052.1723.6880
(2.)SO2Microgram per Meter Cube16.400.050.0716.4880
(3.)PM2.5Microgram per Meter Cube45.80.05045.960
(4.)PM10Microgram per Meter Cube86.40.05086.5100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Steam BoilerNatural Gas110.3OthersSO2, NOX0.0004,0.05
(2.)Reaction Vessel of Product-(BA-04SH, DBPT,DBPC)Water and alkali110.15OthersSO2,HBr,HCl,Br20.0003,0.0002,0.0001,0.00002
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 400
(b)Source Dakshin Gujarat Veej Co. Ltd.
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) One D.G. set of 75 kVA
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0.0583
    Total Land (ha.) 0.0583
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 18809
(b)Waste/Barren Land (ha.) 276
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1223
(e)Settlements (ha.) 4357
(f)Industrial (ha.) 1325
(g)Forest (ha.) 149
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Open Vegetation, Plantation, Scrub Land 5261
    Total (ha.) 31400.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.0272
(2.)Green belt0.0233
(3.)OthersStorage area and open space0.0053
(4.)Area for Solid Waste Management0.0025
Total (ha.) 0.0583
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaGIDC Vapi2Project located in GIDC Vapi
(2.)CorridorsNIL0NIL
(3.)WLSNIL0NIL
(4.)NPANIL0NIL
(5.)ESAsNIL0NIL
(6.)ESZsNIL0NIL
(7.)Wildlife CorridorsNIL0NIL
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNIL0NIL
(2.)Archaeological SitesNIL0NIL
(3.)Defence InstallationsNIL0NIL
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.06
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pavo cristatus/Indian Peafowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Rs. 1.50 lakhs
(iii)Period of Implementation After getting EC from Authority
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. ---
(iii)Date of issue 19 Jun 2020
(iv)Recommendation Acknowledgment is uploaded in approval tab.
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Daman Ganga river
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 5.01
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 10
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt16073233
(2.)Percentage of Total Project Area27.4412.5239.96
(3.)No. of Plants402060
(4.)Funds Allocated01010
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Sociallocal people will get employment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/SA 085
(ii)Name of the EIA Consultant Eco Chem Sales and Services
(iii)Address Office Floor, Ashoka Pavillion – A, Opp. Kapadia Health Club, Surat – 395 001
(iv)Mobile No. 9825123805
(v)Landline No. 0261223622
(vi)Email Id eco@ecoshripad.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 26 Oct 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i) This is an expansion proposal and as per TOR for expansion project, the PP shall submit the compliance report to the conditions of consents from the SPCB. However PP has not submitted the certified compliance report from SPCB as per TOR granted to PP. (S.No 9 of Form 2 has to revised and uploaded), (ii) PP in SNo. 6 of Form 2 mentioned that EC was granted in 13.09.2019, however copy of EC is not uploaded in SNo. 6. (iii) S. no. 23.1 of form 2 (CPA) mentioned; However PP has not submitted the Report as per the Ministry’s office memorandum 31st October, 2019 regarding projects located in Critically Polluted Area. (iv) All old CTOs not uploaded to verify the violation, if any done by PP. (v) Details of earlier production of various products with financial years needs to submit to check violation, if any. (vi) PP submitted zero incremental value for PM10 & PM2.5 & SOx. Air Quality Impact Prediction mentioned (18.1 of form 2) is inadequate kindly check and correct it accordingly. (vii) Effluent treatment mechanism with plan for Zero Liquid Discharge for the complete plant needs to be submitted (viii) PP in form 2 (S.No. 23.1& 23.2-Details of Ecological Sensitivity), mentioned for all ecological sensitivity, the distance is zero Km. PP/Consultant has submitted wrong information. (ix) PP in form 2 (S.No. 27) has not adequately mentioned the details of R&R. Everything mentioned zero. (x) As per s.no. 28 of form 2, Schedule I species reported. But the approval of conservation plan to CWLW has not been submitted/uploaded. Details of approval regarding to conservation plan needs to be uploaded. (xi) Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2) (xii) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. 22 Apr 2020
2.NA(i) This is an expansion proposal and as per TOR for expansion project, the PP shall submit the compliance report to the conditions of consents from the SPCB. However PP has not submitted the certified compliance report from SPCB as per TOR granted to PP. (S.No 9 of Form 2 has to revised and uploaded), (ii) PP in SNo. 6 of Form 2 mentioned that EC was granted in 13.09.2019, however copy of EC is not uploaded in SNo. 6. (iii) S. no. 23.1 of form 2 (CPA) mentioned; However PP has not submitted the Report as per the Ministry’s office memorandum 31st October, 2019 regarding projects located in Critically Polluted Area. (iv) All old CTOs not uploaded to verify the violation, if any done by PP. (v) Details of earlier production of various products with financial years needs to submit to check violation, if any. (vi) PP submitted zero incremental value for PM10 & PM2.5 & SOx. Air Quality Impact Prediction mentioned (18.1 of form 2) is inadequate kindly check and correct it accordingly. (vii) Effluent treatment mechanism with plan for Zero Liquid Discharge for the complete plant needs to be submitted (viii) PP in form 2 (S.No. 23.1& 23.2-Details of Ecological Sensitivity), mentioned for all ecological sensitivity, the distance is zero Km. PP/Consultant has submitted wrong information. (ix) PP in form 2 (S.No. 27) has not adequately mentioned the details of R&R. Everything mentioned zero. (x) As per s.no. 28 of form 2, Schedule I species reported. But the approval of conservation plan to CWLW has not been submitted/uploaded. Details of approval regarding to conservation plan needs to be uploaded. (xi) Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2) (xii) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. 22 Apr 2020
3.NA(i) This is an expansion proposal and as per TOR for expansion project, the PP shall submit the compliance report to the conditions of consents from the SPCB. However PP has not submitted the certified compliance report from SPCB as per TOR granted to PP. (S.No 9 of Form 2 has to revised and uploaded), (ii) PP in SNo. 6 of Form 2 mentioned that EC was granted in 13.09.2019, however copy of EC is not uploaded in SNo. 6. (iii) S. no. 23.1 of form 2 (CPA) mentioned; However PP has not submitted the Report as per the Ministry’s office memorandum 31st October, 2019 regarding projects located in Critically Polluted Area. (iv) All old CTOs not uploaded to verify the violation, if any done by PP. (v) Details of earlier production of various products with financial years needs to submit to check violation, if any. (vi) PP submitted zero incremental value for PM10 & PM2.5 & SOx. Air Quality Impact Prediction mentioned (18.1 of form 2) is inadequate kindly check and correct it accordingly. (vii) Effluent treatment mechanism with plan for Zero Liquid Discharge for the complete plant needs to be submitted (viii) PP in form 2 (S.No. 23.1& 23.2-Details of Ecological Sensitivity), mentioned for all ecological sensitivity, the distance is zero Km. PP/Consultant has submitted wrong information. (ix) PP in form 2 (S.No. 27) has not adequately mentioned the details of R&R. Everything mentioned zero. (x) As per s.no. 28 of form 2, Schedule I species reported. But the approval of conservation plan to CWLW has not been submitted/uploaded. Details of approval regarding to conservation plan needs to be uploaded. (xi) Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2) (xii) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. 22 Apr 2020
4.NA(i) This is an expansion proposal and as per TOR for expansion project, the PP shall submit the compliance report to the conditions of consents from the SPCB. However PP has not submitted the certified compliance report from SPCB as per TOR granted to PP. (S.No 9 of Form 2 has to revised and uploaded), (ii) PP in SNo. 6 of Form 2 mentioned that EC was granted in 13.09.2019, however copy of EC is not uploaded in SNo. 6. (iii) S. no. 23.1 of form 2 (CPA) mentioned; However PP has not submitted the Report as per the Ministry’s office memorandum 31st October, 2019 regarding projects located in Critically Polluted Area. (iv) All old CTOs not uploaded to verify the violation, if any done by PP. (v) Details of earlier production of various products with financial years needs to submit to check violation, if any. (vi) PP submitted zero incremental value for PM10 & PM2.5 & SOx. Air Quality Impact Prediction mentioned (18.1 of form 2) is inadequate kindly check and correct it accordingly. (vii) Effluent treatment mechanism with plan for Zero Liquid Discharge for the complete plant needs to be submitted (viii) PP in form 2 (S.No. 23.1& 23.2-Details of Ecological Sensitivity), mentioned for all ecological sensitivity, the distance is zero Km. PP/Consultant has submitted wrong information. (ix) PP in form 2 (S.No. 27) has not adequately mentioned the details of R&R. Everything mentioned zero. (x) As per s.no. 28 of form 2, Schedule I species reported. But the approval of conservation plan to CWLW has not been submitted/uploaded. Details of approval regarding to conservation plan needs to be uploaded. (xi) Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2) (xii) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. 22 Apr 2020
5.NAThe correction have been made as per the instruction received 02 Jul 2020
6.NA1. Please read the earlier EDS sought by the Ministry earlier. The matter was again examined and noted that PP has not revised the Form 2 and not uploaded the requisite information on Parivesh Portal (For eg. Certified compliance report on CTO, as per TOR, has not uploaded in Form 2, only letter uploaded. PP/consultant has not uploaded the document on PH forwarded by SPCB to MoEFCC) Form 2 (S.no. 7.1) 2. It is pertain to mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action 3. It is also mentioned that after acceptance the Form 2 and EIA/EMP report can not be revise. Therefore, PP/Consultant is again requested to kindly do needful. 28 Jul 2020
7.NAThe correction have been made as per the instruction received 02 Aug 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterPlease find herewith attached legible Certified CCA Report as per ADS generated on 29.12.2020. 29 Dec 2020
2.NAOn examination it is noted that the some of the part of the report uploaded is not legible. Kindly upload the legible report so that the proposal may be placed before the EACV for appraisal. 29 Dec 2020
3. ADS Reply LetterWe have received certified CCA compliance report from GPCB and the same is enclosed herewith. We request you to kindly consider our proposal in the next EAC Meeting 23 Dec 2020
4.NA

 

The project proponent, vide email dated 02.09.2020, has requested to postponed the project appraisal as the certified compliance report of existing project is still awaited from the Gujarat Pollution Control Board. The Committee accepted the request of Project Proponent and deferred the proposal accordingly.

29 Sep 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantHareshwar M Upadhyay
DesignationDirector
Name of Company (Applicant Name should not be given here)COLORBAND DYESTUFF P LTD
AddressPlot No.-J 2327, Phase III, Notified Industrial Area, GIDC Vapi, Ta: Pardi
Print