|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | Yes | Details of Project: | Type of Appraised | Select | Details of Project: | Type of Violation | Started the work onsite without prior EC under EIA notification,2006. | Details of Violation | D u r i n g t h e 3 3 rd m e e ti n g o f E A C f o r a p p r a i s a l o f n o n - c o a l m i n i n g , t h e c o m m it t e e deliberated the project is violation case and to be referred to violation sector. It was mentioned that KMML started mining without obtaining EC. CC has asked for an EDS mentioning the project attracts provisions of the Notification S.O 804(E) dated 14.03.17 and is to be considered as violation case | Upload document of Damage Assessment Report | Annexure-Damage Assessment Report | Upload document of Remediation Plan and Natural & Community augmentation plan | Annexure-Remediation Plan and Natural & Community augmentation plan | Upload TOR Letter(if issued earlier) | Annexure-Uploaded TOR Letter | Upload EC Letter(if issued earlier) | Annexure-Uploaded EC Letter | Details of Project: | (a)Name of the project(s) | EIA study for renewal of mining lease of KMML block-III | (b)Name of the Company / Organisation | KERALA MINERALS AND METALS LTD | (c)Registered Address | MINERAL SEPARATION UNIT
KMML, KOVILTHOTTAM,
CHAVARA,,Kollam,Kerala-691583 | (d)Legal Status of the Company | State PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | JYOTHI CS | (b)Designation (Owner/ Partner/ CEO) | DGM | (c)Address | MINERAL SEPARATION UNIT KMML, KOVILTHOTTAM,CHAVARA,,,Kollam,Kerala-691583 | (d)Pin code | 691583 | (e)E-mail | dgmms@kmml.com | (f)STD Code. | 476(f)Telephone No. | 2680047 | (g)Fax No. | 04762686442 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/KL/MIN/149876/2019 | (d)Master Proposal Number(Single Window) | SW/149545/2020 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 1-121, 31-632 | (b)Pincode | 691583 | (c)Bounded Latitudes (North) | | From | | Degree | 8.99194444 | Minutes | | Second | | From | | Degree | 9.0177778 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 76.51916667 | Minutes | | Second | | From | | Degree | 76.52277778 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 58D/9 58C/8 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 2 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 3 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Kerala | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Kerala | Quilon | No Data | Karunagapally | (2.) | Assam | North Cachar Hills | Umrangso | New umrangshu | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | F. No. J-11015/245/2014-IA.II (M) | (b)Date of Apply of TOR | 01 Oct 2019 | (c)Date of Issue of TOR / Standard ToR | 01 Oct 2019 | (d)Date of Apply of EC | | (e)Date of Issue of EC | | (f)Previous TOR Letter | Copy of Previous TOR letter | (g)Previous EC Letter | NA | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 25 Mar 2017 | Distance of Public Hearing Venue from the Proposed Project : | 15 |
| Collectorate conference hall, Kollam | State : | Kerala | District : | Quilon | Tehsil : | No Data | Village : | Karunagapally |
| 100 | 1. Community health centre should be upgraded to level of super specialty hospital
2. More effective measures should be taken for drinking water problems
3. Actions should unemployment
be taken f | Others | Additional District magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | CPCB | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | NIL | (iii)Letter No. | PCB/RO/KLM/KMML/2017 | (iv)Status of Compliance | Partially Complied | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Feb 11 2020 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Raw sand mining | 250000 | 500000 | 750000 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | MSP | Physical process | - | - | - | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | Copy of Consent to Operate | (iii)Date of Issue | 27 Feb 2017 | (iv)Valid Upto | 31 Jul 2020 | (v)File No. | PCB/HO/KLM/ICO/08/08 | (vi)Application No. | 735027 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 27.70 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 11 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.12 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 500000 | (b)Existing quantity of raw material/fuel | 250000 | (c)Total quantity of raw material/fuel | 750000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Sand | 750000 | Tons per Annum | | Mine lease | Road | | 1.2 | Captive | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 15 Oct 2019 To 15 Feb 2020 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 46.93 | 30.67 | 46.93 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 22.5 | 15.11 | 22.5 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 10 | 5 | 10 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 10 | 5 | 10 | 80 | |
14.2. No. of Ground Water monitoring locations : 31 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Others | Manganese | | Others | ppb | 18753 | 0.44 | 100 | 300 | (2.) | Chlorides | | | mg/l | | 14985 | 20 | 250 | 1000 | (3.) | Others | Calcium | | mg/l | | 240 | 8 | 75 | 200 | (4.) | TSS | | | mg/l | | 460 | 0 | 500 | 500 | (5.) | pH | | | NA | | 8 | 6 | 6.5 | 8.5 | (6.) | TDS | | | mg/l | | 16900 | 2 | 500 | 2000 | (7.) | Others | Alkalinity | | mg/l | | 180 | 14 | 200 | 600 | (8.) | Others | Magnesium | | mg/l | | 874 | 0 | 30 | 100 | (9.) | Others | Iron | | mg/l | | 2.3 | 0 | 0.3 | 0.3 | (10.) | Total Hardness | | | mg/l | | 3200 | 20 | 200 | 600 | (11.) | Fluoride | | | mg/l | | 0.16 | 0.10 | 1 | 1.5 | (12.) | Others | Zinc | | Others | ppb | 1926 | 2.02 | 5000 | 15000 | |
14.3. No. of Surface Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 8.12 | 6.15 | B | (2.) | COD | | mg/l | | 9.6 | 4.8 | B | (3.) | pH | | NA | | 8.11 | 7.36 | B | (4.) | BOD | | mg/l | | 2.84 | 0.81 | B | |
14.4. No. of Ambient Noise monitoring locations : 18 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 79.4 | 57 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 79.4 | 57 | 70 | |
14.5. No. of Soil Sample Monitored locations : 14 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.22 | 5.1 | (2.) | N(Nitrogen) | Percent | | 5.79 | 0.04 | (3.) | Electric Conductivity | Others | micro siemens/cm | 240.4 | 45.6 | (4.) | P(Phosphorus) | Percent | | 2.68 | 0.32 | (5.) | K(Potassium) | Percent | | 0.73 | 0.09 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.78 To 2.80 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.44 To 0.61 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | GKT/1226/19 | (f)Date of Issue | 10 Jun 2019 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | NO freshwater | 0 | 0 | Copy of Permission Letter | modeOthers | -- | Others | -- | -- | 17 Jul 2020 | 0 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | No wastewater generation | 0 | 0 | ---- | Others | NO wastewater generation | 0 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 0 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | No solid waste generation | Others | No solid waste generation | 0 | Tons | 0 | Others | NO solid waste generation | Others | no solid waste generation | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 41.7 | 0.25 | 32.9 | 75 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 20.60 | 0.20 | 2.5 | 23.2 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 5 | 0.20 | 4 | 10 | 80 | (4.) | NOx | | Microgram per Meter Cube | 5 | 0.2 | 4 | 10 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | No stack in the mine lease | - | 0 | 0 | PM10 | | - | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 9000 | (b)Source | Kerala State Electricity Board | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | No DG sets for MSP | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 85.180 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 2.939 | Total Land (ha.) | 88.119 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 43.859 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 9.06 | (e)Settlements (ha.) | 1.5 | (f)Industrial (ha.) | 6 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 13.7 | (j)Others (ha.) : Vegetation | 14 | Total (ha.) | 88.1190 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 6 | MSP is situated in ML area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | No ecologically sensitive corridors | 0 | No ecologically sensitive corridors | (2.) | ESAs | No ESAs in the study area | 0 | No ESAs in the study area | (3.) | NPA | No NPA in the study area | 0 | No NPA in the study area | (4.) | WLS | No WLS in the study area | 0 | No WLS in the study area | (5.) | Critically Polluted Area | No critically polluted area exists | 0 | No critically polluted area exists | (6.) | ESZs | No ESZs in the study area | 0 | No ESZs in the study area | (7.) | Wildlife Corridors | No wildlife corridor exists | 0 | No wildlife corridor exists | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | No archeological sites | 0 | No archeological sites | (2.) | Defence Installations | | NO defence installation | 0 | No defence installation | (3.) | Forest | | NO forest land in the arer | 0 | No forest land exists | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 170 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 85.18 | (b)Land yet to be acquired(Ha) | 2.93 | (c)Status of Land acquisition if not acquired | 85.18 Ha is possessed by KMML | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 1 | (b)No. of Households | 32 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 8 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 20 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | These water bodies are mine pits which will be simultaneously refilled | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Ashtamudi Kayal | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 6 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 3051 | (e)No. of working days | 300 | (f)Total Manpower | 3051 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 0 | 3.65 | 3.65 | (2.) | Percentage of Total Project Area | 0 | 4.15 | 4.15 | (3.) | Funds Allocated | 0 | 0.9 | 0.9 | (4.) | No. of Plants | 0 | 800 | 800 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | 1. Increase in financial transactions due to increase in infrastructural facilities. | (2.) | Environmental | 1. Improvement in greenery of the area. | (3.) | Social | 1. Generation of Employment.
2. Creation of infrastructural facilities. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 4 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Ilmenite | Major | (2.) | Silimanite | Major | (3.) | Zircon | Major | (4.) | Rutile | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 750000 TPA | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | AMD/KMML/MP/203.802 Ha | (b)Date of Approval | 06 Mar 2020 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | Department of atomic energy | (e)Approved Mining Lease Area | 203.802 | (f)Approved Capacity | 750000 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 6.273 | (b)Mineable Reserves (Million Ton) | 4.907 | (c)Extractable Reserves(Million Ton) | 4.907 | (d)Percent(%) of Extraction | 78.22 | (e)Grade of Coal /Ore /Mineral | 17.21 | (f)Stripping Ratio | 0 : 0 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | Not applicable | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 8 years | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | Yes | (b)Beneficiation / Washing Technology | upgradation of sand with physical processes . The | (c)Capacity | 3.6 | (d)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 88.119 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 25 Nov 2019 | (iii)Validity of LOI | 20 | (iv)Reference No. of LOI | GO(MS) No. 104/2019/ID | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | - | (d)Whether Lease Deed Renewed ? | Yes | |
|
8.1. Earlier Renewals: |
---|
S. No. | Lease Details | Date of Renewal | Period | Copy of Earlier Lease | Letter No. | Area | Remarks |
---|
(1.) | Renewal | 12 Aug 2010 | From : 12 Aug 2010 To : 11 Aug 2030 | Copy of Earlier Lease | GO(MS) No. 175/2020/ID | 203.802 | - | (2.) | Renewal | 10 Dec 2018 | From : 10 Dec 2018 To : 11 Dec 2038 | Copy of Earlier Lease | GO(MS) NO 90/2018/ID | 203.802 | - | (3.) | Renewal | 25 Nov 2019 | From : 25 Nov 2019 To : 24 Nov 2039 | Copy of Earlier Lease | GO(MS)NO. 104/2019/ID | 203.802 | - | (4.) | Renewal | 19 May 2014 | From : 19 May 2014 To : 18 May 2034 | Copy of Earlier Lease | GO(MS) No. 61/2014/ID | 203.802 | - | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 1 | (b)Depth (in meter) | 8 | (c)Volume (in Million Cubic meter) | 0.08 | |
|
12. | Details of Quarry: | (a)Final Void of 0.5 (hectare) at a Depth of 1 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 20.6 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | nil | (b)Surface to Siding/Loading | nil | (c)Transportation / Conveyor Details | Transportation through tippers in the mine lease a | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | SURFACE WATER BODIES | | 21.11 | 0 | 21.11 | (2.) | SETTLEMENTS | | 15.90 | 0 | 15.9 | (3.) | FOREST LAND | | 0 | 0 | 0 | (4.) | GRAZING LAND | | 0 | 0 | 0 | (5.) | AGRICULTURE LAND | | 0 | 0 | 0 | (6.) | WASTE LAND | | 17.63 | 0 | 17.63 | (7.) | OTHERS(Specify) | barriers, BW collection,dredge | 70 | 0.0 | 70 | |
TOTAL | 124.64 | 0 | 124.64 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | GREEN BELT | | 3.65 | 0 | 0 | | 3.65 | (2.) | EXCAVATION/QUARRY | | 0 | 0 | 0 | | 0 | (3.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (4.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (5.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | (6.) | ROADS | | 0 | 0 | 0 | | 0 | (7.) | Other | none | 0 | 0 | 0 | | 0 | (8.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (9.) | BUILT UP AREA (COLONY/OFFICE) | | 47.25 | 0 | 0 | | 47.25 | |
TOTAL | 50.9 | 0 | 0 | 0 | 50.9 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 0 | (d)Safety Zone(in hectare) | 31.34 | (e)Final Void of 1 (hectare) at a Depth of 1 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 20 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 3.65 | |
|
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 1996 | 66660.00 | 66660.00 | 66660.00 | 46572.00 | 0 | (2.) | 1997 | 66660.00 | 66660.00 | 66660.00 | 54602.00 | 0 | (3.) | 1998 | 66660.00 | 66660.00 | 66660.00 | 48226.00 | 0 | (4.) | 2000 | 66660.00 | 66660.00 | 66660.00 | 49896.00 | 0 | (5.) | 2002 | 66660.00 | 66660.00 | 66660.00 | 124204.250 | 57544.25 | (6.) | 1994 | 66660.00 | 66660 | 66660 | 66660 | 0 | (7.) | 1995 | 66660.00 | 66660.00 | 66660.00 | 54061.00 | 0 | (8.) | 1999 | 66660.00 | 66660.00 | 66660.00 | 49896.00 | 0 | (9.) | 2001 | 66660.00 | 66660.00 | 66660.00 | 48091.00 | 0 | (10.) | 2003 | 66660.00 | 66660.00 | 66660.00 | 188898.000 | 122238.00 | (11.) | 2008 | 66660.00 | 66660.00 | 66660.00 | 281539.893 | 214879.89 | (12.) | 2009 | 66660.00 | 66660.00 | 66660.00 | 267417.196 | 200757.20 | (13.) | 2014 | 66660.00 | 66660.00 | 66660.00 | 707233.925 | 640573.93 | (14.) | 2015 | 66660.00 | 66660.00 | 66660.00 | 592142.124 | 525482.12 | (15.) | 2017 | 66660.00 | 66660.00 | 66660.00 | 65197.070 | 0 | (16.) | 2012 | 66660.00 | 66660.00 | 66660.00 | 273591.101 | 206931.10 | (17.) | 2004 | 66660.00 | 66660.00 | 66660.00 | 201463.000 | 134803.00 | (18.) | 2005 | 66660.00 | 66660.00 | 66660.00 | 256545.133 | 189885.13 | (19.) | 2006 | 66660.00 | 66660.00 | 66660.00 | 279426.835 | 212766.84 | (20.) | 2007 | 66660.00 | 66660.00 | 66660.00 | 265724.365 | 199064.37 | (21.) | 2010 | 66660.00 | 66660.00 | 66660.00 | 270292.757 | 203632.76 | (22.) | 2011 | 66660.00 | 66660.00 | 66660.00 | 228984.994 | 162324.99 | (23.) | 2013 | 66660.00 | 66660.00 | 66660.00 | 494641.810 | 427981.81 | (24.) | 2016 | 66660.00 | 66660.00 | 66660.00 | 205952.845 | 139292.85 | (25.) | 2018 | 66660.00 | 66660.00 | 66660.00 | 433562.306 | 366902.31 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | Yes | (b)Name of the Court | High Courts | (c)Name of the Sub Court | Kerala | (d)Case No. | WP No.33196/2009 | (e)Orders/Directions of the court ,if any and its relevance with the proposed project | The case came up for hearing on 07-08-2015, on whi | (f)Case Details | Public Interest Litigation, petitioner praying for | (g)Uploaded Court Order | Copy of Court Order | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | QCI/NABET/EIA/ACO/19/1017 | (ii)Name of the EIA Consultant | CSIR-National Institute for Interdisciplinary Scie | (iii)Address | CSIR-NIIST, Industrial estate, Pappanamcode. Thiruvananathapuram, Kerala | (iv)Mobile No. | 9447206472 | (v)Landline No. | 0471251537 | (vi)Email Id | ansari@niist.res.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 30 Apr 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | JYOTHI CS | Designation | DGM | Name of Company (Applicant Name should not be given here) | KERALA MINERALS AND METALS LTD | Address | MINERAL SEPARATION UNIT
KMML, KOVILTHOTTAM,
CHAVARA |
|