Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development of Satellite Town Ring Road (STRR) Phae-III
(b)Name of the Company / Organisation NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU BANGALORE EXPRESSWAY
(c)Registered Address 718, 11th Cross, 20th Main, Padmanabha Nagara, Bengaluru,,Bangalore Urban,Karnataka-560070
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant S P Somashekar
(b)Designation (Owner/ Partner/ CEO) Project Director
(c)Address Sy. no .13, 14th km, Nagasandra, Bengaluru - Tumkur Road (NH-4) , Bengaluru 560073,PIU Banglore,Bangalore North,Bangalore Urban,Karnataka-560073
(d)Pin code 560073
(e)E-mail piubngexpressway2022@gmail.com
(f)STD Code. 80(f)Telephone No. 26694383
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(f) Highways
Minor Activity
(b)Category A
(c)Proposal Number IA/TN/MIS/75239/2018
(d)Master Proposal Number(Single Window) SW/149217/2020
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 179
(b)Pincode 635114
(c)Bounded Latitudes (North)
From
Degree 12.636267
Minutes
Second
From
Degree 12.871289
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 77.738461
Minutes
Second
From
Degree 77.889678
Minutes
Second
(e)Survey of India Topo Sheet No. 3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 942.25
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Tamil Nadu
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Tamil NaduKrishnagiriHosur
(2.)Madhya PradeshSingrouliSingrauliJhalari and 8 others
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-35/2018-IA.III
(c)Date of Apply of TOR 06 Jun 2018
(d)Date of Issue of TOR / Standard ToR 23 Jan 2019
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :30 Apr 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :31 May 2019
Distance of Public Hearing Venue from the Proposed Project :8
Krishangiri
State :Tamil Nadu
District :Krishnagiri
Tehsil :Hosur
Village :MATHIGIRI
200R&R and Land RelatedDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)NANA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)NA0OthersNAOthersNA
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 756.68
(b) Funds Allocated for Environment Management (Capital) (in Crores) 8.68
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 6.07
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.35
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA0OthersNANARoad0 OthersNACopy of Linkage
(2.)Steel15Tons per AnnumOpen MarketRoad200 Open MarketCopy of Linkage
(3.)Borrow Earth8742Cubic Meter per DayLocal QueryRoad10 MoUCopy of Linkage
(4.)Bitumen11000Tons per AnnumRefineryRoad300 Open MarketCopy of Linkage
(5.)Water130Kilo Litre per DayLocalRoad50 MoUCopy of Linkage
(6.)Aggregate1900Cubic Meter per DayLocal QueryRoad50 Open MarketCopy of Linkage
(7.)Coarse Sand650Cubic Meter per DayLocal RiverRoad50 Open MarketCopy of Linkage
(8.)Cement160Cubic Meter per DayOpen MarketRoad200 Open MarketCopy of Linkage
(9.)Fly Ash813Cubic Meter per DayThermal Power PlantRoad300 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jun 2018 To 30 Jun 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube22.4414.6122.4480
(2.)SO2Micro Gram per Meter Cube96.188.9880
(3.)OthersCOMili Gram per Meter Cube0.80.180.732
(4.)PM2.5Micro Gram per Meter Cube20.26.9819.6560
(5.)PM10Micro Gram per Meter Cube76.335.271.07100
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l0000
(2.)Chloridesmg/l0000
(3.)pHNA0000
(4.)Total Hardnessmg/l0000
(5.)TSSmg/l0000
(6.)Fluoridemg/l0000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.34.6A
(2.)pHNA7.977.85A
(3.)CODmg/l6452A
(4.)BODmg/l2218A
    14.4.     No. of Ambient Noise monitoring locations : 4
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))52.641.145
(2.)Leq(Day)A-weighted decibels(dB(A))57.748.655
    14.5.     No. of Soil Sample Monitored locations : 2
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare164.96123.72
(2.)pH8.137.10
(3.)N(Nitrogen)Kilogram per hectare252.69242.69
(4.)K(Potassium)Kilogram per hectare67.262.72
(5.)Electric ConductivityMillisiemens per Centimetre169.661.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.50 To 9.90
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.00 To 9.90
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface276010 Not Appliacble modeOtherstankersTube WellNA23 Mar 20202760
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Septic Tank0.80Transportation by tankers at nearest CSTPOthersCSTP0.80
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0.8
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0.8
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MSWMunicipal Solid Waste2.1Tons10RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube110.20.2512.0560
(2.)NOxMicrogram per Meter Cube160.2925.1680
(3.)PM10Microgram per Meter Cube480.20.2548.85100
(4.)SO2Microgram per Meter Cube00.20180
(5.)Others(Specify)COMicrogram per Meter Cube460.00.292.0552.202000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00OthersNANA
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1200
(b)Source DG Set
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 348.29
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 348.29
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 348.29
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 348.29
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersCamp0
Total (ha.) 0
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0NA
(2.)Critically Polluted AreaNA0NA
(3.)CorridorsNA0NA
(4.)ESAsNA0NA
(5.)NPANA0NA
(6.)Wildlife CorridorsNA0NA
(7.)ESZsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Defence InstallationsNA0NA
(3.)Archaeological SitesNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 1367
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 348.29
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 24
(b)No. of Households 102
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 410
(e)Funds Allocated for R&R(in INR) (in Lacs) 236.23
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 1177
(b)Permanent Employment-During Operation 23
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 730
(f)Total Manpower 1200
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0
(b)Percentage of Total Project Area 0.00
(c)No. of Plants to be Planted 12111
(d)Funds Allocated for Plantation 18337265
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalAll Environmental Infrastructure shall be provided
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 0
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 0
(d)Total plot area (sqm) 0
(e)Total built up area (sqm) 0
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 80
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking Bus and Truck Lay bye provisions
5.
Energy Saving Measures:
(a)Source/Mode Energy efficient lighting system
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Partial impact on Ponds
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment 39.969
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
(a)Total No. of Bridges 13
(b)Total No. of ROB 0
(c)Total No. of Interchanges 4
(d)Total No. of Flyovers 0
(e)Total No. of Vehicle Underpass 3
(f)Total No. of Pedestrian Underpass 0
(g)Details of other utilities rail and road corridors 0
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ EIA/ ACO/19/1150
(ii)Name of the EIA Consultant Louis Berger
(iii)Address 5th Floor, Tower B, Surinder Jhakhar Bhawan (IFFCO), Plot No-3, Sector -32, Gurgaon, Haryana
(iv)Mobile No. 9560678639
(v)Landline No. 4578200
(vi)Email Id Moakhtar@louisberger.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 01 May 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAIt is observed that irrelevant documents have been uploaded on PARIVESH portal at the time of submitting application. Provide following information/documents: 1. A document mentioning Not Applicable has been uploaded in the place of copy of document in support of the competence/authority. Upload the copy of documents in support of the competence/authority. 2. A copy of attendance sheet (in regional language) has been submitted in place of Public Hearing details. Upload the copy of Public Hearing document, i.e., proceedings. 3. A document mentioning Not Applicable has been uploaded in place of the copy of details of Tree Cutting and Planting of Trees. Upload the relevant document. 4. Arrangement with Forest Department has been provided in place of the copy of details of Green belt plan. Upload the relevant document in this regard. 5. Simple traffic data has been submitted in place of copy of Details of Traffic Density Impact Assessment and Modelling Study. Please upload the proper report as mentioned above. 6. The EIA/EMP report does not have a cover page. Also, it is nowhere mentioned in the report that it is final EIA report. 7. The QCI/NABET accreditation of EIA Consultant has expired on 01.03.2020 and this application for seeking EC has been submitted on 24.03.2020. Furnish a detailed clarification for submitting the application without having a valid accreditation or extension and misleading the Ministry in this regard. 01 Apr 2020
2.NAThe correction have been made as per the instruction received 11 May 2020
3.NACovering letter has been uploaded in the place of copy of document in support of the competence/authority. Upload the copy of documents in support of the competence/authority. Also, please provide the copy of National Highway notification issued by the MoRTH. 12 May 2020
4.NAThe correction have been made as per the instruction received 14 May 2020
5.NAThe copy of document in support of competence/authority and MoRTH Notification should be uploaded separately at appropriate places. MoRTH Notification should be uploaded as additional document. Please upload these documents again separately and at appropriate places 15 May 2020
6.NAThe correction have been made as per the instruction received 18 May 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantS P Somashekar
DesignationProject Director
Name of Company (Applicant Name should not be given here)NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU BANGALORE EXPRESSWAY
Address718, 11th Cross, 20th Main, Padmanabha Nagara, Bengaluru