|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Development of Satellite Town Ring Road (STRR) Phae-III | (b)Name of the Company / Organisation | NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU BANGALORE EXPRESSWAY | (c)Registered Address | 718, 11th Cross, 20th Main, Padmanabha Nagara, Bengaluru,,Bangalore Urban,Karnataka-560070 | (d)Legal Status of the Company | Central Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | S P Somashekar | (b)Designation (Owner/ Partner/ CEO) | Project Director | (c)Address | Sy. no .13, 14th km, Nagasandra, Bengaluru - Tumkur Road (NH-4) , Bengaluru 560073,PIU Banglore,Bangalore North,Bangalore Urban,Karnataka-560073 | (d)Pin code | 560073 | (e)E-mail | piubngexpressway2022@gmail.com | (f)STD Code. | 80(f)Telephone No. | 26694383 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(f) Highways
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/TN/MIS/75239/2018 | (d)Master Proposal Number(Single Window) | SW/149217/2020 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 179 | (b)Pincode | 635114 | (c)Bounded Latitudes (North) | | From | | Degree | 12.636267 | Minutes | | Second | | From | | Degree | 12.871289 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 77.738461 | Minutes | | Second | | From | | Degree | 77.889678 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 942.25 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Tamil Nadu | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Tamil Nadu | Krishnagiri | Hosur | | (2.) | Madhya Pradesh | Singrouli | Singrauli | Jhalari and 8 others | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | 10-35/2018-IA.III | (c)Date of Apply of TOR | 06 Jun 2018 | (d)Date of Issue of TOR / Standard ToR | 23 Jan 2019 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 31 May 2019 | Distance of Public Hearing Venue from the Proposed Project : | 8 |
| Krishangiri | State : | Tamil Nadu | District : | Krishnagiri | Tehsil : | Hosur | Village : | MATHIGIRI |
| 200 | R&R and Land Related | District Collector | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | NA | NA | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | NA | 0 | Others | NA | Others | NA | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 756.68 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 8.68 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 6.07 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.35 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | NA | 0 | Others | NA | NA | Road | | 0 | Others | NA | Copy of Linkage | (2.) | Steel | 15 | Tons per Annum | | Open Market | Road | | 200 | Open Market | | Copy of Linkage | (3.) | Borrow Earth | 8742 | Cubic Meter per Day | | Local Query | Road | | 10 | MoU | | Copy of Linkage | (4.) | Bitumen | 11000 | Tons per Annum | | Refinery | Road | | 300 | Open Market | | Copy of Linkage | (5.) | Water | 130 | Kilo Litre per Day | | Local | Road | | 50 | MoU | | Copy of Linkage | (6.) | Aggregate | 1900 | Cubic Meter per Day | | Local Query | Road | | 50 | Open Market | | Copy of Linkage | (7.) | Coarse Sand | 650 | Cubic Meter per Day | | Local River | Road | | 50 | Open Market | | Copy of Linkage | (8.) | Cement | 160 | Cubic Meter per Day | | Open Market | Road | | 200 | Open Market | | Copy of Linkage | (9.) | Fly Ash | 813 | Cubic Meter per Day | | Thermal Power Plant | Road | | 300 | MoU | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Jun 2018 To 30 Jun 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 22.44 | 14.61 | 22.44 | 80 | (2.) | SO2 | | Micro Gram per Meter Cube | 9 | 6.18 | 8.98 | 80 | (3.) | Others | CO | Mili Gram per Meter Cube | 0.8 | 0.18 | 0.73 | 2 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 20.2 | 6.98 | 19.65 | 60 | (5.) | PM10 | | Micro Gram per Meter Cube | 76.3 | 35.2 | 71.07 | 100 | |
14.2. No. of Ground Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 0 | 0 | 0 | 0 | (2.) | Chlorides | | | mg/l | | 0 | 0 | 0 | 0 | (3.) | pH | | | NA | | 0 | 0 | 0 | 0 | (4.) | Total Hardness | | | mg/l | | 0 | 0 | 0 | 0 | (5.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (6.) | Fluoride | | | mg/l | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 5.3 | 4.6 | A | (2.) | pH | | NA | | 7.97 | 7.85 | A | (3.) | COD | | mg/l | | 64 | 52 | A | (4.) | BOD | | mg/l | | 22 | 18 | A | |
14.4. No. of Ambient Noise monitoring locations : 4 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 52.6 | 41.1 | 45 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 57.7 | 48.6 | 55 | |
14.5. No. of Soil Sample Monitored locations : 2 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Kilogram per hectare | | 164.96 | 123.72 | (2.) | pH | | | 8.13 | 7.10 | (3.) | N(Nitrogen) | Kilogram per hectare | | 252.69 | 242.69 | (4.) | K(Potassium) | Kilogram per hectare | | 67.2 | 62.72 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 169.6 | 61.6 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.50 To 9.90 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.00 To 9.90 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 2760 | 10 | Not Appliacble | modeOthers | tankers | Tube Well | | NA | 23 Mar 2020 | 2760 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Septic Tank | 0.8 | 0 | Transportation by tankers at nearest CSTP | Others | CSTP | 0.8 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 0.8 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 0.8 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | MSW | Municipal Solid Waste | | 2.1 | Tons | 10 | Road | | Sanitary Landfills | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 11 | 0.2 | 0.25 | 12.05 | 60 | (2.) | NOx | | Microgram per Meter Cube | 16 | 0.2 | 9 | 25.16 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 48 | 0.2 | 0.25 | 48.85 | 100 | (4.) | SO2 | | Microgram per Meter Cube | 0 | 0.2 | 0 | 1 | 80 | (5.) | Others(Specify) | CO | Microgram per Meter Cube | 460.0 | 0.2 | 92.0 | 552.20 | 2000 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NA | NA | 0 | 0 | Others | NA | NA | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 1200 | (b)Source | DG Set | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | NA | (e)Stack Height (in m) | 6 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 348.29 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 348.29 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 348.29 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 348.29 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Camp | 0 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | NA | 0 | NA | (2.) | Critically Polluted Area | NA | 0 | NA | (3.) | Corridors | NA | 0 | NA | (4.) | ESAs | NA | 0 | NA | (5.) | NPA | NA | 0 | NA | (6.) | Wildlife Corridors | NA | 0 | NA | (7.) | ESZs | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 0 | NA | (2.) | Defence Installations | | NA | 0 | NA | (3.) | Archaeological Sites | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 348.29 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 24 | (b)No. of Households | 102 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 410 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 236.23 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 1177 | (b)Permanent Employment-During Operation | 23 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 730 | (f)Total Manpower | 1200 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0 | (b)Percentage of Total Project Area | 0.00 | (c)No. of Plants to be Planted | 12111 | (d)Funds Allocated for Plantation | 18337265 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | All Environmental Infrastructure shall be provided | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 0 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 0 | (d)Total plot area (sqm) | 0 | (e)Total built up area (sqm) | 0 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 80 | (d)Capacity | 0 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | Bus and Truck Lay bye provisions | |
|
5. | Energy Saving Measures: | (a)Source/Mode | Energy efficient lighting system | (b)Percentage | 0 | (c)Quantity | 0 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | 39.969 | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | (a)Total No. of Bridges | 13 | (b)Total No. of ROB | 0 | (c)Total No. of Interchanges | 4 | (d)Total No. of Flyovers | 0 | (e)Total No. of Vehicle Underpass | 3 | (f)Total No. of Pedestrian Underpass | 0 | (g)Details of other utilities rail and road corridors | 0 | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | QCI/NABET/ EIA/ ACO/19/1150 | (ii)Name of the EIA Consultant | Louis Berger | (iii)Address | 5th Floor, Tower B, Surinder Jhakhar Bhawan (IFFCO), Plot No-3, Sector -32, Gurgaon, Haryana | (iv)Mobile No. | 9560678639 | (v)Landline No. | 4578200 | (vi)Email Id | Moakhtar@louisberger.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 01 May 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | It is observed that irrelevant documents have been uploaded on PARIVESH portal at the time of submitting application. Provide following information/documents: 1. A document mentioning Not Applicable has been uploaded in the place of copy of document in support of the competence/authority. Upload the copy of documents in support of the competence/authority. 2. A copy of attendance sheet (in regional language) has been submitted in place of Public Hearing details. Upload the copy of Public Hearing document, i.e., proceedings. 3. A document mentioning Not Applicable has been uploaded in place of the copy of details of Tree Cutting and Planting of Trees. Upload the relevant document. 4. Arrangement with Forest Department has been provided in place of the copy of details of Green belt plan. Upload the relevant document in this regard. 5. Simple traffic data has been submitted in place of copy of Details of Traffic Density Impact Assessment and Modelling Study. Please upload the proper report as mentioned above. 6. The EIA/EMP report does not have a cover page. Also, it is nowhere mentioned in the report that it is final EIA report. 7. The QCI/NABET accreditation of EIA Consultant has expired on 01.03.2020 and this application for seeking EC has been submitted on 24.03.2020. Furnish a detailed clarification for submitting the application without having a valid accreditation or extension and misleading the Ministry in this regard. | 01 Apr 2020 | 2. | NA | The correction have been made as per the instruction received | 11 May 2020 | 3. | NA | Covering letter has been uploaded in the place of copy of document in support of the competence/authority. Upload the copy of documents in support of the competence/authority.
Also, please provide the copy of National Highway notification issued by the MoRTH. | 12 May 2020 | 4. | NA | The correction have been made as per the instruction received | 14 May 2020 | 5. | NA | The copy of document in support of competence/authority and MoRTH Notification should be uploaded separately at appropriate places.
MoRTH Notification should be uploaded as additional document.
Please upload these documents again separately and at appropriate places | 15 May 2020 | 6. | NA | The correction have been made as per the instruction received | 18 May 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | S P Somashekar | Designation | Project Director | Name of Company (Applicant Name should not be given here) | NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU BANGALORE EXPRESSWAY | Address | 718, 11th Cross, 20th Main, Padmanabha Nagara, Bengaluru |
|