Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) MARUTI POLYMERS
(b)Name of the Company / Organisation M/S. MARUTI POLYMERS
(c)Registered Address Plot 423/1, Opp. Kartvya Farm, Ravdapura, Anand (Gujarat),,Anand,Gujarat-388360
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant SOHAM PATEL
(b)Designation (Owner/ Partner/ CEO) PARTNER
(c)Address Plot 423/1, Ravdapura, Anand,,Anand,Anand,Gujarat-388360
(d)Pin code 388360
(e)E-mail soham002@gmail.com
(f)STD Code. 2692(f)Telephone No. 239137
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/149160/2018
(d)Master Proposal Number(Single Window) SW/148980/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot 423/1
(b)Pincode 388121
(c)Bounded Latitudes (North)
From
Degree 22.594700
Minutes
Second
From
Degree 22.594861
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.960128
Minutes
Second
From
Degree 72.960628
Minutes
Second
(e)Survey of India Topo Sheet No. F43G14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 120
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 40
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/88/2018-IA-II(I)
(b)Date of Apply of TOR 07 Mar 2018
(c)Date of Issue of TOR / Standard ToR 08 Apr 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :25 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :27 Feb 2019
Distance of Public Hearing Venue from the Proposed Project :0.0
Project Site, Maruti Polymers, Plot No. 423/1, Opp. Kartavya Farm, Village Ravdapura, Ta. & Dist. Anand
State :Gujarat
District :Anand
Tehsil :Anand
Village :Ravadapura
77Issues regarding 1) Employment & 2) Education of poor children of surrounding villages of project siteOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Reactor3 Nos. of 5 KLSS Reactor, SS column and SS condenser
(2.)Blender3 Nos. of 10 KLMS/SS Vessel
(3.)Hoist2 Nos. 2MT/MElectric flameproof hoist
(4.)Storage Tank3 Nos. of 25 KLStyrene, MTO, Xylene
(5.)Blender2 Nos. of 20 KLMS/SS Vessel
(6.)Boiler1 Nos.Steam Boiler
(7.)Boiler2 Nos. 5 lakh Kcal/hrThermic fluid heater
(8.)Reactor2 Nos. of 10 KLSS Reactor, SS column and SS condenser
(9.)Filter2 Nos. 16 platesSparkler filter
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Alkyd Resin(Soya long oil, D.C.O long oil, D.C.O rosinated,Linseed long oil)200OthersMT/MonthRoad
(2.)Acrylic Based Emulsion (Styrene acrylic emulsion,Pure acrylic emulsion,Vinyl acrylic emulsion)250OthersMT/MonthRoad
(3.)Amino Resin(Melamine formaldehyde)30OthersMT/MonthRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 4
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.65
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.10
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.10
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 4877
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 4877
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Methyl Methacrylate Monomer147Tons per AnnumLocal SupplierRoad50 Open MarketCopy of Linkage
(2.)Linseed oil163.2Tons per AnnumLocal SupplierRoad50 Open MarketCopy of Linkage
(3.)Surfactant7.8Tons per AnnumLocal SupplierRoad50 Open MarketCopy of Linkage
(4.)ammonia3.12Tons per AnnumLocal SupplierRoad50 Open MarketCopy of Linkage
(5.)Butanol31.2Tons per AnnumLocal SupplierRoad50 Open MarketCopy of Linkage
(6.)Styrene Monomer588Tons per AnnumLocal SupplierRoad50 Open MarketCopy of Linkage
(7.)D.C.O528Tons per AnnumLocal SupplierRoad50 Open MarketCopy of Linkage
(8.)Lithium hydroxide0.12Tons per AnnumLocal SupplierRoad50 Open MarketCopy of Linkage
(9.)Formaldehyde17.52Tons per AnnumLocal SupplierRoad50 Open MarketCopy of Linkage
(10.)Penta Erythritol252Tons per AnnumLocal SupplierRoad50 Open MarketCopy of Linkage
(11.)Melamine72Tons per AnnumLocal SupplierRoad50 Open MarketCopy of Linkage
(12.)Mix Xylene48Tons per AnnumLocal SupplierRoad50 Open MarketCopy of Linkage
(13.)Phthalic Anhydride811Tons per AnnumLocal SupplierRoad50 Open MarketCopy of Linkage
(14.)Glycerine45.6Tons per AnnumLocal SupplierRoad50 Open MarketCopy of Linkage
(15.)Rosin Solution40.8Tons per AnnumLocal SupplierRoad50 Open MarketCopy of Linkage
(16.)Vinyl acrylate monomer29.4Tons per AnnumLocal SupplierRoad50 Open MarketCopy of Linkage
(17.)Potassium per sulphate7.8Tons per AnnumLocal SupplierRoad50 Open MarketCopy of Linkage
(18.)Butyl Acrylate monomer764.4Tons per AnnumLocal SupplierRoad50 Open MarketCopy of Linkage
(19.)Acrylic acid8.36Tons per AnnumLocal SupplierRoad50 Open MarketCopy of Linkage
(20.)Soya Oil744Tons per AnnumLocal SupplierRoad50 Open MarketCopy of Linkage
(21.)Mix Xylene/Toluene/MTO7.2Tons per AnnumLocal SupplierRoad50 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube94.846.193.3100
(2.)PM2.5Micro Gram per Meter Cube43.621.242.960
(3.)SO2Micro Gram per Meter Cube10.45.110.380
(4.)NOxMicro Gram per Meter Cube19.99.719.680
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.827.1378.5
(2.)Fluoridemg/l0.450.280.11.5
(3.)Chloridesmg/l3942002501000
(4.)TSSmg/l311010
(5.)TDSmg/l183612375002000
(6.)Total Hardnessmg/l580385300600
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.827.32D
(2.)DOmg/l4.32.4D
(3.)BODmg/l84D
(4.)CODmg/l3216D
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))64.847.175
(2.)Leq(Night)A-weighted decibels(dB(A))54.136.270
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityMillisiemens per Centimetre703412
(2.)N(Nitrogen)Percent0.440.1
(3.)P(Phosphorus)Percent0.000.00
(4.)K(Potassium)Milligram per Kilogram0.020.01
(5.)pH7.837.25
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersLocal Supplier11.032Copy of Permission LetterPipelineOthersTanker0028 Aug 20175
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic0.3241Soak pitOthersSoak pit00.324
(2.)Industrial1.315Primary Treatment followed by evaporationOthersZLD01.31
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1.634
(b)Total Discharged Water (Kilolitre per Day) 1.634
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP sludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.18Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Used/Spent oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.02Kilolitre50RoadAuthorized Recyclers
(3.)Distilled ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5.4Tons50RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Discarded containerPlastic Waste0.5Tons0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube59.70.20.760.5100
(2.)NOxMicrogram per Meter Cube12.50.20.4913.080
(3.)PM2.5Microgram per Meter Cube27.50.20.728.360
(4.)SO2Microgram per Meter Cube6.60.20.236.8480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Thermic Fluid HeaterBiocoal / Briqquetes110.18OthersPM, SO2, NOxPM < 150 mg/m3, SO2< 100 PPM, NOx < 50 PPM
(2.)BoilerBio-coal / Briquettes110.18OthersPM, SO2, NOxPM < 150 mg/m3, SO2, <100 PPM, NOx <50 PPM
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 56
(b)Source Madhya Gujarat Vij Company Limited
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) DG Set (30 kVA)
(e)Stack Height (in m) 4
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.1225
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.1225
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 23374.19
(b)Waste/Barren Land (ha.) 222.62
(c)Grazing/ Community Land (ha.) 310
(d)Surface Water Bodies (ha.) 272.76
(e)Settlements (ha.) 1578.24
(f)Industrial (ha.) 710.69
(g)Forest (ha.) 0.0
(h)Mangroves (ha.) 0.0
(i)Marine Area (ha.) 0.0
(j)Others (ha.) : others 4947
    Total (ha.) 31415.5000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.01582
(2.)Green belt0.04042
(3.)Built Up Area0.03984
(4.)OthersOther0.02642Road
Total (ha.) 0.1225
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Wildlife CorridorsJessore Sloth Bear Sanctuary250NONE WITHIN 10 KM
(2.)CorridorsDelhi Mumbai Industrial Corridor50NONE WITHIN 10 KM
(3.)Critically Polluted AreaAhemdabad40NONE WITHIN 10 KM
(4.)WLSJambughoda Wildlife Sanctury80NONE WITHIN 10 KM
(5.)ESZsNalsarovar Bird Sanctuary110NONE WITHIN 10 KM
(6.)ESAsNalsarovar Bird Sanctuary110NONE WITHIN 10 KM
(7.)NPAGir national park277NONE WITHIN 10 KM
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestPolo forest145None within 10 km
(2.)Defence InstallationsAhmedabad cantonment77None within 10 km
(3.)Archaeological SitesChampaner-Pavagadh Archaeological Park60None within 10 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.12
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired sq.m
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Vehrai Mata Talav
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 4.33
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 9
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 19
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.04
(b)Percentage of Total Project Area 32.65
(c)No. of Plants to be Planted 62
(d)Funds Allocated for Plantation 45000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/IA0029
(ii)Name of the EIA Consultant Green Circle Inc. Vadodara
(iii)Address Green Circle Inc., Green Empire, Above Axis Bank, Near Yash Complex, Main Gotri Road, Vadodara Pin Code 390021
(iv)Mobile No. 9898246340
(v)Landline No. 0265237126
(vi)Email Id info@greencircleinc.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 08 Dec 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i) Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1) (ii) Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details. (iii) Proposed Green belt development programe along-with time line and budgetary allocation needs to be provided (iv) PP mentioned very less incremental value for PM10 & PM2.5 & SOX, PM2.5 in Form 2. Air Quality Impact Prediction mentioned (18.1 of form 2) is inadequate kindly correct it. (v) All old CTOs not uploaded to verify the violation, if any done by PP. (vi) Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2) (vii) PH was conducted in February 2019, however, PP has now submitted the EC application in March 2020. Please submit the reason why delay in submission of application. (viii) PP in form 2 (S.No. 23.1& 23.2-Details of Ecological Sensitivity), mentioned for all ecological sensitivity, the distance is 100 Km. PP/Consultant has submitted wrong information. (ix) PP in form 2 (S.No. 27) has not adequately mentioned the details of R&R. Everything mentioned zero. (x) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. 19 Apr 2020
2.NAThe correction have been made as per the instruction received 25 May 2020
3.NA1 EDS 1. Please read the earlier EDS sought by the Ministry. The matter was again examined and noted that PP has not revised the Form 2 and not uploaded the requisite information on Parivesh Portal. 2. It is pertain to mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. 3. It is also mentioned that after acceptance the Form 2 and EIA/EMP report can not be revise. Therefore, PP/Consultant is again requested to kindly do needful. 26 Jun 2020
4.NAThe correction have been made as per the instruction received 02 Jul 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSOHAM PATEL
DesignationPARTNER
Name of Company (Applicant Name should not be given here)M/S. MARUTI POLYMERS
AddressPlot 423/1, Opp. Kartvya Farm, Ravdapura, Anand (Gujarat)