1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | MARUTI POLYMERS | (b)Name of the Company / Organisation | M/S. MARUTI POLYMERS | (c)Registered Address | Plot 423/1, Opp. Kartvya Farm, Ravdapura, Anand (Gujarat),,Anand,Gujarat-388360 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | SOHAM PATEL | (b)Designation (Owner/ Partner/ CEO) | PARTNER | (c)Address | Plot 423/1, Ravdapura, Anand,,Anand,Anand,Gujarat-388360 | (d)Pin code | 388360 | (e)E-mail | soham002@gmail.com | (f)STD Code. | 2692(f)Telephone No. | 239137 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/149160/2018 | (d)Master Proposal Number(Single Window) | SW/148980/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot 423/1 | (b)Pincode | 388121 | (c)Bounded Latitudes (North) | | From | | Degree | 22.594700 | Minutes | | Second | | From | | Degree | 22.594861 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.960128 | Minutes | | Second | | From | | Degree | 72.960628 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43G14 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 120 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 40 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/88/2018-IA-II(I) | (b)Date of Apply of TOR | 07 Mar 2018 | (c)Date of Issue of TOR / Standard ToR | 08 Apr 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 27 Feb 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0.0 |
| Project Site, Maruti Polymers, Plot No. 423/1, Opp. Kartavya Farm, Village Ravdapura, Ta. & Dist. Anand | State : | Gujarat | District : | Anand | Tehsil : | Anand | Village : | Ravadapura |
| 77 | Issues regarding 1) Employment & 2) Education of poor children of surrounding villages of project site | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Reactor | 3 Nos. of 5 KL | SS Reactor, SS column and SS condenser | (2.) | Blender | 3 Nos. of 10 KL | MS/SS Vessel | (3.) | Hoist | 2 Nos. 2MT/M | Electric flameproof hoist | (4.) | Storage Tank | 3 Nos. of 25 KL | Styrene, MTO, Xylene | (5.) | Blender | 2 Nos. of 20 KL | MS/SS Vessel | (6.) | Boiler | 1 Nos. | Steam Boiler | (7.) | Boiler | 2 Nos. 5 lakh Kcal/hr | Thermic fluid heater | (8.) | Reactor | 2 Nos. of 10 KL | SS Reactor, SS column and SS condenser | (9.) | Filter | 2 Nos. 16 plates | Sparkler filter | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Alkyd Resin(Soya long oil, D.C.O long oil, D.C.O rosinated,Linseed long oil) | 200 | Others | MT/Month | Road | | (2.) | Acrylic Based Emulsion (Styrene acrylic emulsion,Pure acrylic emulsion,Vinyl acrylic emulsion) | 250 | Others | MT/Month | Road | | (3.) | Amino Resin(Melamine formaldehyde) | 30 | Others | MT/Month | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 4 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.65 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.10 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.10 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 4877 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 4877 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Methyl Methacrylate Monomer | 147 | Tons per Annum | | Local Supplier | Road | | 50 | Open Market | | Copy of Linkage | (2.) | Linseed oil | 163.2 | Tons per Annum | | Local Supplier | Road | | 50 | Open Market | | Copy of Linkage | (3.) | Surfactant | 7.8 | Tons per Annum | | Local Supplier | Road | | 50 | Open Market | | Copy of Linkage | (4.) | ammonia | 3.12 | Tons per Annum | | Local Supplier | Road | | 50 | Open Market | | Copy of Linkage | (5.) | Butanol | 31.2 | Tons per Annum | | Local Supplier | Road | | 50 | Open Market | | Copy of Linkage | (6.) | Styrene Monomer | 588 | Tons per Annum | | Local Supplier | Road | | 50 | Open Market | | Copy of Linkage | (7.) | D.C.O | 528 | Tons per Annum | | Local Supplier | Road | | 50 | Open Market | | Copy of Linkage | (8.) | Lithium hydroxide | 0.12 | Tons per Annum | | Local Supplier | Road | | 50 | Open Market | | Copy of Linkage | (9.) | Formaldehyde | 17.52 | Tons per Annum | | Local Supplier | Road | | 50 | Open Market | | Copy of Linkage | (10.) | Penta Erythritol | 252 | Tons per Annum | | Local Supplier | Road | | 50 | Open Market | | Copy of Linkage | (11.) | Melamine | 72 | Tons per Annum | | Local Supplier | Road | | 50 | Open Market | | Copy of Linkage | (12.) | Mix Xylene | 48 | Tons per Annum | | Local Supplier | Road | | 50 | Open Market | | Copy of Linkage | (13.) | Phthalic Anhydride | 811 | Tons per Annum | | Local Supplier | Road | | 50 | Open Market | | Copy of Linkage | (14.) | Glycerine | 45.6 | Tons per Annum | | Local Supplier | Road | | 50 | Open Market | | Copy of Linkage | (15.) | Rosin Solution | 40.8 | Tons per Annum | | Local Supplier | Road | | 50 | Open Market | | Copy of Linkage | (16.) | Vinyl acrylate monomer | 29.4 | Tons per Annum | | Local Supplier | Road | | 50 | Open Market | | Copy of Linkage | (17.) | Potassium per sulphate | 7.8 | Tons per Annum | | Local Supplier | Road | | 50 | Open Market | | Copy of Linkage | (18.) | Butyl Acrylate monomer | 764.4 | Tons per Annum | | Local Supplier | Road | | 50 | Open Market | | Copy of Linkage | (19.) | Acrylic acid | 8.36 | Tons per Annum | | Local Supplier | Road | | 50 | Open Market | | Copy of Linkage | (20.) | Soya Oil | 744 | Tons per Annum | | Local Supplier | Road | | 50 | Open Market | | Copy of Linkage | (21.) | Mix Xylene/Toluene/MTO | 7.2 | Tons per Annum | | Local Supplier | Road | | 50 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 May 2018 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 94.8 | 46.1 | 93.3 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 43.6 | 21.2 | 42.9 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 10.4 | 5.1 | 10.3 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 19.9 | 9.7 | 19.6 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.82 | 7.13 | 7 | 8.5 | (2.) | Fluoride | | | mg/l | | 0.45 | 0.28 | 0.1 | 1.5 | (3.) | Chlorides | | | mg/l | | 394 | 200 | 250 | 1000 | (4.) | TSS | | | mg/l | | 3 | 1 | 10 | 10 | (5.) | TDS | | | mg/l | | 1836 | 1237 | 500 | 2000 | (6.) | Total Hardness | | | mg/l | | 580 | 385 | 300 | 600 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.82 | 7.32 | D | (2.) | DO | | mg/l | | 4.3 | 2.4 | D | (3.) | BOD | | mg/l | | 8 | 4 | D | (4.) | COD | | mg/l | | 32 | 16 | D | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 64.8 | 47.1 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 54.1 | 36.2 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | Electric Conductivity | Millisiemens per Centimetre | | 703 | 412 | (2.) | N(Nitrogen) | Percent | | 0.44 | 0.1 | (3.) | P(Phosphorus) | Percent | | 0.00 | 0.00 | (4.) | K(Potassium) | Milligram per Kilogram | | 0.02 | 0.01 | (5.) | pH | | | 7.83 | 7.25 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 20 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Local Supplier | 11.03 | 2 | Copy of Permission Letter | Pipeline | | Others | Tanker | 00 | 28 Aug 2017 | 5 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 0.324 | 1 | Soak pit | Others | Soak pit | 0 | 0.324 | (2.) | Industrial | 1.31 | 5 | Primary Treatment followed by evaporation | Others | ZLD | 0 | 1.31 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1.634 | (b)Total Discharged Water (Kilolitre per Day) | 1.634 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ETP sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.18 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Used/Spent oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.02 | Kilolitre | 50 | Road | | Authorized Recyclers | | (3.) | Distilled Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 5.4 | Tons | 50 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (4.) | Discarded container | Plastic Waste | | 0.5 | Tons | 0 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 59.7 | 0.2 | 0.7 | 60.5 | 100 | (2.) | NOx | | Microgram per Meter Cube | 12.5 | 0.2 | 0.49 | 13.0 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 27.5 | 0.2 | 0.7 | 28.3 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 6.6 | 0.2 | 0.23 | 6.84 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Thermic Fluid Heater | Biocoal / Briqquetes | 11 | 0.18 | Others | PM, SO2, NOx | PM < 150 mg/m3, SO2< 100 PPM, NOx < 50 PPM | (2.) | Boiler | Bio-coal / Briquettes | 11 | 0.18 | Others | PM, SO2, NOx | PM < 150 mg/m3, SO2, <100 PPM, NOx <50 PPM | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 56 | (b)Source | Madhya Gujarat Vij Company Limited | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | DG Set (30 kVA) | (e)Stack Height (in m) | 4 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0.1225 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 0.1225 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 23374.19 | (b)Waste/Barren Land (ha.) | 222.62 | (c)Grazing/ Community Land (ha.) | 310 | (d)Surface Water Bodies (ha.) | 272.76 | (e)Settlements (ha.) | 1578.24 | (f)Industrial (ha.) | 710.69 | (g)Forest (ha.) | 0.0 | (h)Mangroves (ha.) | 0.0 | (i)Marine Area (ha.) | 0.0 | (j)Others (ha.) : others | 4947 | Total (ha.) | 31415.5000 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.01582 | | (2.) | Green belt | | 0.04042 | | (3.) | Built Up Area | | 0.03984 | | (4.) | Others | Other | 0.02642 | Road | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Wildlife Corridors | Jessore Sloth Bear Sanctuary | 250 | NONE WITHIN 10 KM | (2.) | Corridors | Delhi Mumbai Industrial Corridor | 50 | NONE WITHIN 10 KM | (3.) | Critically Polluted Area | Ahemdabad | 40 | NONE WITHIN 10 KM | (4.) | WLS | Jambughoda Wildlife Sanctury | 80 | NONE WITHIN 10 KM | (5.) | ESZs | Nalsarovar Bird Sanctuary | 110 | NONE WITHIN 10 KM | (6.) | ESAs | Nalsarovar Bird Sanctuary | 110 | NONE WITHIN 10 KM | (7.) | NPA | Gir national park | 277 | NONE WITHIN 10 KM | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Polo forest | 145 | None within 10 km | (2.) | Defence Installations | | Ahmedabad cantonment | 77 | None within 10 km | (3.) | Archaeological Sites | | Champaner-Pavagadh Archaeological Park | 60 | None within 10 km | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.12 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | sq.m | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Vehrai Mata Talav | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 4.33 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 5 | (b)Permanent Employment-During Operation | 9 | (c)Temporary Employment- During Construction | 5 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 330 | (f)Total Manpower | 19 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.04 | (b)Percentage of Total Project Area | 32.65 | (c)No. of Plants to be Planted | 62 | (d)Funds Allocated for Plantation | 45000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employment generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/IA0029 | (ii)Name of the EIA Consultant | Green Circle Inc. Vadodara | (iii)Address | Green Circle Inc., Green Empire, Above Axis Bank, Near Yash Complex, Main Gotri Road, Vadodara Pin Code 390021 | (iv)Mobile No. | 9898246340 | (v)Landline No. | 0265237126 | (vi)Email Id | info@greencircleinc.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 08 Dec 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1)
(ii) Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details.
(iii) Proposed Green belt development programe along-with time line and budgetary allocation needs to be provided
(iv) PP mentioned very less incremental value for PM10 & PM2.5 & SOX, PM2.5 in Form 2. Air Quality Impact Prediction mentioned (18.1 of form 2) is inadequate kindly correct it.
(v) All old CTOs not uploaded to verify the violation, if any done by PP.
(vi) Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2)
(vii) PH was conducted in February 2019, however, PP has now submitted the EC application in March 2020. Please submit the reason why delay in submission of application.
(viii) PP in form 2 (S.No. 23.1& 23.2-Details of Ecological Sensitivity), mentioned for all ecological sensitivity, the distance is 100 Km. PP/Consultant has submitted wrong information.
(ix) PP in form 2 (S.No. 27) has not adequately mentioned the details of R&R. Everything mentioned zero.
(x) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. | 19 Apr 2020 | 2. | NA | The correction have been made as per the instruction received | 25 May 2020 | 3. | NA | 1 EDS
1. Please read the earlier EDS sought by the Ministry. The matter was again examined and noted that PP has not revised the Form 2 and not uploaded the requisite information on Parivesh Portal.
2. It is pertain to mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action.
3. It is also mentioned that after acceptance the Form 2 and EIA/EMP report can not be revise. Therefore, PP/Consultant is again requested to kindly do needful. | 26 Jun 2020 | 4. | NA | The correction have been made as per the instruction received | 02 Jul 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | SOHAM PATEL | Designation | PARTNER | Name of Company (Applicant Name should not be given here) | M/S. MARUTI POLYMERS | Address | Plot 423/1, Opp. Kartvya Farm, Ravdapura, Anand (Gujarat) |
|