EC Report
1.
Project Details
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? :
No
1.
Project Details
i. Proposal No. :
IA/GJ/MIS/27227/2015
ii. MoEFCC File No. :
11-13/2015-IA-III
iii.Short narrative of the project:
Development of Integrated facilities (stage II) within the existing Kandla Port Trust Limit at Kutch district of Gujarat. (1.Setting up of Oil Jetty No.7. 2. Setting up of Barge jetty at Jafarwadi 3.Setting up of Barge port at Veera; 4.Administrative office building at Tuna Tekra; 5. Road connecting from Veera barge jetty to Tuna gate
iv. Project Sector :
Infrastructure and Miscellaneous Projects & CRZ
v. Company/Proponent :
Kandla Port Truts
vi.Details of State of the project
Details of State of the project
S.no.
State Name
District Name
Tehsil Name
1.
Gujarat
kutch
Gandhidham
vii.Date of TOR Granted
23 Jun 2015
viii.TOR letter issued by Ministry:
Annexure-TOR letter
ix.Date of Submission for EC:
01 Jul 2016
x.Project Type:
New
2.
Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP:
Annexure-EIA/EMP
ii.Risk Assessment:
Annexure-Risk Assessment
iii.Public Hearing:
Annexure-Public Hearing
iv. Date of Public Hearing:
01 Jan 1900
v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC:
Annexure-Additional Report/Study/Document
vi. Uploaded Cover Letter:
Annexure-Cover Letter
vii.Remarks:
Recommendation letter of GCZMA issued by Director (Environment) & Additional Secretary, Forest & Env. dept., GoG, vide letter no. ENV-10-2015-251-E ( T cell) dated 29/6/2016 is uploaded for further consideration of the proposal.
3.
Additional Detail Sought
Additional Detail Sought
Sno.
ADS Letter
Remarks
Date of ADS
1.
NA
The proposal was deferred till the desired information is submitted through online. The above information shall be provided with the uploading of minutes on the website.
10 Aug 2016
2.
ADS Letter
Reply of the observations of 8th EAC (INFRA-2) are uploaded.
04 Jan 2017
3.
NA
As per uploaded information, certified compliance report form the regional office, Bhopal is not submitted. Pl. upload the same.
01 Feb 2017
4.
ADS Letter
Submission of ADS Compliance raised dt 01.02.2017.
08 May 2017
5.
NA
See minutes of the same
17 Jul 2017
6.
ADS Letter
Reply of the observation of 19th EAC (Infra-2)
14 Oct 2017
7.
NA
As per 25 EAC minutes kindly see the minutes
11 Dec 2017
8.
ADS Letter
Compliance of EAC observations uploaded for consideration please
13 Dec 2017
9.
NA
Kindly upload point wise reply to the observation/quary raised by EAC Infra-2 in its meeting held on 29-30 Nov. 2017.
05 Jan 2018
10.
ADS Letter
Point wise reply to the observation/quary raised by EAC Infra-2 in its meeting held on 29-30 Nov. 2017
09 Jan 2018
4.
Accredited Consultant Details
i. Accreditation status :
Yes
ii. Accreditation No. :
100
iii. Name of Consultant:
Mantec Consultants Pvt Ltd
iv. Address :
D-36, SECTOR-06, NOIDA 201301
v. Mobile No.:
9868118054
vi. Landline No.:
1204215000
vii. Email Id:
kptemc@gmail.com
5.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
i. Name of Applicant :
R Murugadoss
ii. Designation :
chief Engineer
iii. Name of Company(Applicant Name should not be given here) :
Kandla Port Truts
iv. Address :
NIL
v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
NIL
Print