1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/UP/IND2/30838/2014    ii. MoEFCC File No. : J-11011/30/2014-IAII(I)    iii.Short narrative of the project: Proposed Expansion of Ammonia-Urea Fertilizer Plant & CPP at Udyog Nagar Industrial Area, Panki, Kanpur, UP    iv. Project Sector : Industrial Projects-2    v. Company/Proponent : KANPUR FERTILIZERS AND CEMENT LIMITED
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.Uttar PradeshKanpur NagarKanpur
 
vii. Uploaded EC Compliance report by rigional office of MoEFCC: NIL viii. Certified Monitoring report by RoMoEF: Annexure-Uploaded Monitoring report    ix.Date of TOR Granted 25 Nov 2014 x.TOR letter issued by Ministry: Annexure-TOR letter ix.Date of Submission for EC: 14 Jan 2016 x.Project Type: Expansion
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 14 Jul 2015   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: Annexure-Additional Report/Study/Document   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: NIL
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NAThe proposal considered in 6th EAC meeting held during 30th March- 2nd April, 2016. After detailed deliberation, Committee sought following additional information: i. GLC of SO2 from proposed expansion is reported to be 20.24 µg/m3, which is due use of coal as fuel and seems to be in higher side. Therefore, the Committee advised them to rework on the use of natural gas instead coal as fuel for CPP. ii. To bring down the water requirement of existing and proposed unit upto 6 m3 per MT of urea production. iii. Detailed plan to be drawn for water conservation measures including rainwater harvesting. iv. Greenbelt layout plan of the existing and proposed plant to drawn. The proposal is deferred till the desired information is submitted on Ministry's Website. 05 May 2016
2. ADS LetterAdditional information submission, for reconsideration of the proposal, as dersired by EAC during its 6th meeting held on 30th March, 2016, regarding grant of Environmental Clearance to the project 06 Oct 2016
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : 64    iii. Name of Consultant: EQMS INDIA PRIVATE LIMITED   iv. Address : 304-305 RISHAB CORPORATE TOWER, KARKARDOOMA NEW DELHI   v. Mobile No.: 8826191660   vi. Landline No.: 1130003200   vii. Email Id: manoj.gaur@jalindia.co.in
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : Manoj    ii. Designation : Chairman    iii. Name of Company(Applicant Name should not be given here) : KANPUR FERTILIZERS AND CEMENT LIMITED    iv. Address : M/s Kanpur Fertilizers & Cement Limited v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: NIL