1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed Expansion of Existing Unit | (b)Name of the Company / Organisation | KUMAR ORGANIC PRODUCTS LIMITED | (c)Registered Address | Plot no. 379, 377, Canal Road, Luna Village, Maitri Marg, Padra Taluk, Vadodara District,,Vadodara,Gujarat-391440 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | A K Singh | (b)Designation (Owner/ Partner/ CEO) | GM | (c)Address | Plot no.379, 377, Canal Road, Luna Village, Padra Taluka, Vadodara,,Padra,Vadodara,Gujarat-391440 | (d)Pin code | 391440 | (e)E-mail | gm_baroda@kumarorganic.net | (f)STD Code. | 26(f)Telephone No. | 2615155 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| (b)Category | A | (c)Proposal Number | IA/GJ/IND2/53481/2009 | (d)Master Proposal Number(Single Window) | SW/148753/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot no 379 & 395, canal road, Village - Luna, Tal | (b)Pincode | 391440 | (c)Bounded Latitudes (North) | | From | | Degree | 22.155482 | Minutes | | Second | | From | | Degree | 22.16171 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.21346 | Minutes | | Second | | From | | Degree | 73.21373 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43G15, F43G16, F4H3, F4H4 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 30.60 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 13 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/118/2009-IA.II(I) | (c)Date of Issue of TOR | 31 Mar 2009 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 17 Aug 2009 | (c)Date of Issue of EC | 28 Oct 2009 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 03 Jan 2020 | Distance of Public Hearing Venue from the Proposed Project : | 0.1 |
| Block no: 381, Canal Road, Vill: Luna - 391440 Tal: Padra, Dist.: Vadodara, Gujarat (Adjacent to project site) | State : | Gujarat | District : | Vadodara | Tehsil : | Vadodara | Village : | Luna |
| 39 | Issues raised were air-water-waste-Noise issues, implementation of Padra Policy, Employment to local people, installation of Rainwater Harvesting system, CSR Activity, Greenbelt Development, etc. | Others | Resident Addl. Collector and Additional District Magistrate, Vadodara | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 5-80/2018(ENV)/401 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Aug 11 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Sodium Thioglycolate | 180 | 360 | 540 | Tons per Annum(TPA) | | Road | | (2.) | Potassium Thioglycolate 100% | 180 | 360 | 540 | Tons per Annum(TPA) | | Road | | (3.) | Calcium Thioglycolate | 180 | 360 | 540 | Tons per Annum(TPA) | | Road | | (4.) | Sodium Thioglycolate | 180 | 360 | 540 | Tons per Annum(TPA) | | Road | | (5.) | Zinc Pyrithione | 1200 | 0 | 1200 | Tons per Annum(TPA) | | Road | | (6.) | Ammonium Thioglycolate 50% | 0 | 540 | 540 | Tons per Annum(TPA) | | Road | | (7.) | Sodium Pyrithione 40% | 0 | 300 | 300 | Tons per Annum(TPA) | | Road | | (8.) | Benzalkonium Chloride 80% | 0 | 300 | 300 | Tons per Annum(TPA) | | Road | | (9.) | Sodium Acetate | 216 | 0 | 216 | Tons per Annum(TPA) | | Road | | (10.) | Copper Pyrithione | 350.04 | 0 | 350.04 | Tons per Annum(TPA) | | Road | | (11.) | Para Chloro Meta Xylanol - Brown | 0 | 2004 | 2004 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | SS Reactor | -- | 6 KL x 2 Nos. + 8 KL x 3 Nos. | 6 KL x 2 Nos. + 8 KL x 3 Nos. | | (2.) | MSFRP Reactor | 4 KL x 1 No. | -- | 4 KL x 1 No. | | (3.) | GLR Reactor | 1 KL x 1 No. + 2 KL x 1 Nos. + 1.6 KL x 1 No. | -- | 1 KL x 1 No. + 2 KL x 1 Nos. + 1.6 KL x 1 No. | | (4.) | Condenser | -- | 10 m2 x 8 Nos. | 10 m2 x 8 Nos. | | (5.) | Ejector | -- | 10 m3 x 3 Nos. | 10 m3 x 3 Nos. | | (6.) | PPFRP storage vessel | 4 KL x 1 No. | 5 KL x 2 Nos. | 4 KL x 1 No. + 5 KL x 2 Nos. | | (7.) | FPS collection tank | 1 KL x 1 No. | 1 KL x 1 No. | 1 KL x 2 Nos. | | (8.) | PPFRP collection tank | 1 KL x 3 No. + 30KL X 1 No. | 1 KL x 5 Nos. + 30 KL X 1 No. | 1 KL x 8 Nos. + 30 KL X 2 No. | | (9.) | HDPE Formulation Vessel | 500 L x 1 No. | 500 L x 1 No. | 500 L x 2 No. | | (10.) | HDPE Preparation vessel | 1 KL x 1 No. | 1 KL x 1 No. | 1 KL x 2 No. | | (11.) | ETP process Tank | 15 KL x 2 Nos. | 15 KL x 5 Nos. | 15 KL x 7 Nos. | | (12.) | Open nutsch filter | 1 KL x 1 No. | 1 KL x 2 Nos. | 1 KL x 3 Nos. | | (13.) | PPFRP R.O. Water Storage Tank | 10 KL x 1 No. | 10 KL x 1 No. | 10 KL x 2 No. | | (14.) | ANF | 10 KL x 2 Nos. | 5 KL x 1 No. | 10 KL x 2 Nos. + 5 KL x 1 No. | | (15.) | Multi mill | 20 Kg/Hr x 1 No. | 50 kg/Hr x 2 Nos. | 20 Kg/Hr x 1 No. + 50 kg/Hr x 2 Nos. | | (16.) | Air Jet mill | 10 Kg/Hr x 1 No. | -- | 10 Kg/Hr x 1 No. | | (17.) | Air compressor | 250 CFM x 1 No. + 223 CFM x 1 No. | 300 CFM x 1 No. | 250 CFM x 1 No. + 223 CFM x 1 No. + 300 CFM x 1 No | | (18.) | Chiller | 8 TR x 1 No. + 20 TR x 1 No. | 8 TR x 1 No. + 20 TR x 1 No. | 8 TR x 2 No. + 20 TR x 1 No. | | (19.) | Cooling Tower | 120 TR x 1 No. | 350 TR x 1 No. | 120 TR x 1 No. + 350 TR x 1 No. | | (20.) | Boiler | 850 Kg/h x 1 No. | 4 TON x 2 Nos. | 4 TON x 2 Nos. | | (21.) | Filter Press | 3000L/h x 1 No. | 4000 L/hr x 1 No. + 3000 L/hr x 2 Nos. | 4000 L/hr x 1 No. + 3000 L/hr x 3 Nos. | | (22.) | Shear Mixer | 2 KL x 1 No. | 2 KL x 1 No. | 2 KL x 2 Nos. | | (23.) | DG Set | 320 KVA x 1 No. | 400 KVA x 1 No. | 320 KVA x 1 No. + 400 KVA x 1 No. | | (24.) | SS Reactor | 1 KL x 1 No. + 5 KL x 1 No. | 5 KL x 1 No. | 1 KL x 1 No. + 5 KL x 2 Nos. | | (25.) | HDPE Waste water collection tank | 20 KL x 2 Nos. | 20 KL x 3 Nos. | 20 KL x 5 Nos. | | (26.) | DM water storage tank | 2 KL x 1 No. | 5 KL x 3 Nos. | 2 KL x 1 No. + 5 KL x 3 Nos. | | (27.) | PPFRP Reactor | 3 KL x 1 No. + 1 KL x 3 Nos. + 4 KL x 2 Nos. | -- | 3 KL x 1 No. + 1 KL x 3 Nos. + 4 KL x 2 Nos. | | (28.) | GLR Reactor | -- | 5 KL x 2 Nos. | 5 KL x 2 Nos. | | (29.) | MS Waste water collection tank | 30 KL x 1 No. + 20 KL x 1 No. | 30 KL x 2 Nos. + 20 KL x 1 No. | 30 KL x 3 Nos. + 20 KL x 2 Nos. | | (30.) | PPFRP Soft water storage tank | 10 KL x 1 No. | 10 KL x 1 No. | 10 KL x 2 Nos. | | (31.) | Centrifuge | 48” x 1 No. | 48” x 6 Nos. | 48” x 7 Nos. | | (32.) | FO Tank | 30 KL x 3 No. + 1.5 KL X 1 No. | -- | 30 KL x 3 No. + 1.5 KL X 1 No. | | (33.) | RCC Raw storage tank | 200 KL x 1 No. | -- | 200 KL x 1 No. | | (34.) | PPFRP Formulation vessel-02 | 4 KL x 1 No. | 4 KL x 2 No. | 4 KL x 3 No. | | (35.) | STP | -- | 5 M3/hr x 1 No. | 5 M3/hr x 1 No. | | (36.) | Dyno mill | KD-60 x 1 No. + KD-25 x 1 No. + KD-100 x 1 No. | -- | KD-60 x 1 No. + KD-25 x 1 No. + KD-100 x 1 No. | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 28 May 2019 | (iv)Valid Upto | 31 Mar 2024 | (v)File No. | AWH-101976 | (vi)Application No. | 156824 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 10.01 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.916 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.25 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.439 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 38885.52 | (b)Existing quantity of raw material/fuel | 4898.04 | (c)Total quantity of raw material/fuel | 43783.56 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | refer attachment | 43783.56 | Tons per Annum | | Open Market | Road | | 80 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 03 Dec 2018 To 28 Feb 2019 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 09 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 117.3 | 40.8 | 104.03 | 100 | (2.) | Others | CO | Mili Gram per Meter Cube | 1.3 | 0.3 | 1.11 | 2 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 66.7 | 12.4 | 57.96 | 60 | (4.) | SO2 | | Micro Gram per Meter Cube | 38.6 | 4.4 | 27.31 | 80 | (5.) | NOx | | Micro Gram per Meter Cube | 39.7 | 6.4 | 35.07 | 80 | |
14.2. No. of Ground Water monitoring locations : 09 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 6380 | 1180 | 500 | 2000 | (2.) | Fluoride | | | mg/l | | 0.71 | 0.36 | 1 | 1.5 | (3.) | TSS | | | mg/l | | 21 | 9 | 0 | 0 | (4.) | Others | Sulphate | | mg/l | | 246 | 32 | 200 | 400 | (5.) | Total Hardness | | | mg/l | | 1440 | 276.3 | 200 | 600 | (6.) | pH | | | NA | | 8.53 | 6.77 | 6.5 | 8.5 | (7.) | Chlorides | | | mg/l | | 964 | 126 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 08 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 20 | 08 | C | (2.) | COD | | mg/l | | 82 | 32 | C | (3.) | pH | | NA | | 9.18 | 7.73 | D | (4.) | DO | | mg/l | | 7.2 | 4.7 | B | |
14.4. No. of Ambient Noise monitoring locations : 08 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 63 | 54 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 53 | 43 | 45 | |
14.5. No. of Soil Sample Monitored locations : 09 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.75 | 7.82 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 0.35 | 0.11 | (3.) | N(Nitrogen) | Milligram per Kilogram | | 148 | 126 | (4.) | P(Phosphorus) | Milligram per Kilogram | | 26 | 14 | (5.) | K(Potassium) | Milliequivalents per 100 Gram | | 0.58 | 0.28 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 35 To 55 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 25 To 50 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 44 | 1 | Copy of Permission Letter | Pipeline | | Others | Borewell | 21-4/2331/GJ/IND/2017 | 05 Jun 2017 | 93.4 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 101 | 110 | ETP, RO & MEE | Others | Sent to M/s. EICL, Umraya | 55.8 | 45.2 | (2.) | Domestic | 6.0 | 6.0 | STP | Green Belt Renewal Plant | | 6.0 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 107 | (b)Total Discharged Water (Kilolitre per Day) | 45.2 | (c)Total Reused Water (Kilolitre per Day) | 61.8 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Used or Spent Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1 | Kilolitre | 0 | Road | | Others | Selling to registers re-refiners/ reuse | (2.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 50 | Tons | 18 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Spent Charcoal/ Hyflow | Industrial Waste | | 53.76 | Tons | 18 | Road | | Others | Sent for reactivation/ sent at NECL, Nandesari | (4.) | Fly Ash | Industrial Waste | | 160 | Tons | 45 | Road | | Others | Sale to brick manufacture | (5.) | MEE Salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 180 | Tons | 18 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (6.) | Discarded Container/Bags/Liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 67.58 | Tons | 18 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 93.4 | 0 | 0.4 | 93.81 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 18.1 | 2.63 | 0.5 | 18.63 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 0.1 | 0 | (4.) | NOx | | Microgram per Meter Cube | 24.2 | 1.15 | 0.58 | 24.8 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler | Agro-waste/Briquette | 30 | 0.8 | SO2 | | 0.72 | (2.) | Boiler | Agro-waste/Briquette | 30 | 0.8 | PM10 | | 0.47 | (3.) | Process vent of PCMX | None | 15 | 0.3 | Others | HCl | 0.0007 | (4.) | Boiler | Agro-waste/Briquette | 30 | 0.8 | NOx | | 0.47 | (5.) | Process vent of PCMX | None | 15 | 0.3 | Others | Cl2 | 0.0006 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 500 | (b)Source | Madhya Gujarat Vij Company Limited | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 320 KVA x 1 No. + 400 KVA x 1 No. | (e)Stack Height (in m) | 11 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 1.217 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 1.217 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 21770 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 551.13 | (e)Settlements (ha.) | 1058.11 | (f)Industrial (ha.) | 349.21 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Other Land | 8204.65 | Total (ha.) | 31933.1 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 0.411 | | (2.) | Built Up Area | | 0.519 | | (3.) | Others | Open and Road Area | 0.287 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | Jambughoda Wild Life Sanctuary | 70.65 | ENE | (2.) | Critically Polluted Area | Nandesari & PCCI Estate | 18 | NNE | (3.) | WLS | Jambughoda Wild Life Sanctuary | 70.65 | ENE | (4.) | ESZs | Thol Bird Sanctuary | 117.24 | NNW | (5.) | Corridors | Gir National Park | 261.54 | SW | (6.) | NPA | Jambughoda Wild Life Sanctuary | 70.65 | ENE | (7.) | Wildlife Corridors | Gir National Park | 261.54 | SW | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Shoolpaneshwar Wildlife Sanctuary | 81.11 | SE | (2.) | Archaeological Sites | | Fresco Rooms in Bhau Tambekar's Wada | 17.15 | ENE | (3.) | Defence Installations | | Makarpura AFS | 16.80 | ESE | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 1.22 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Indian Peafowl | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 150000 | (iii)Period of Implementation | 5 Years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | 1. Narmada Canal 2. Mahi River | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Muval | (ii)Direction of Water Bodies in Buffer Area | South West | (iii)Distance of Water Bodies in Buffer Area | 12.68 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 12 | (b)Permanent Employment-During Operation | 34 | (c)Temporary Employment- During Construction | 32 | (d)Temporary Employment- During Operation | 42 | (e)No. of working days | 340 | (f)Total Manpower | 120 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 3000 | 1109 | 4109 | (2.) | Percentage of Total Project Area | 24.65 | 9.11 | 33.76 | (3.) | No. of Plants | 280 | 730 | 1010 | (4.) | Funds Allocated | 50000 | 300000 | 350000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employment generation, CSR activities | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | Yes | (b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | All Notices and replies are uploaded | (c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | Copy of Direction Issued | (d)Compliance status of the directions | Complied | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Stay Order against the NABET/QCI | (ii)Name of the EIA Consultant | Aryan Greens | (iii)Address | 401, Sakar Complex, Above Union Bank, Near Saradar Estate, New VIP Road, Vadodara | (iv)Mobile No. | 9712000535 | (v)Landline No. | 0265251615 | (vi)Email Id | info@aryangreens.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 15 Apr 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1)
(ii) Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details.
(iii) TOR Compliance is vogue, only references are there. EIA report to be revised as per the terms of reference granted for the project, and shall conform to Appendix III of the EIA Notification, 2006. PP needs to revise the TOR compliances.
(iv) Effluent treatment mechanism with plan for Zero Liquid Discharge needs to be submitted.
(v) Proposed Green belt development programe along-with time line and budgetary allocation needs to be provided
(vi) As per s.no. 28 of form 2, Schedule I species reported. But the submission of conservation plan to CWLW has not been submitted/uploaded. Details of approval regarding to conservation plan needs to be uploaded.
(vii) Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2)
(viii) On examination it is noted that there are 5 show cause notices issued by SPCB, however S.No. 37 of form 2 mentioned NIL. PP has conceal the information. In this regard details action taken by SPCB needs to submitted and accordingly revise the Form 2 and uploaded.
(ix) Updated status of water approval
(x) In view of the above, PP/Consultant are requested to revise the application for grant of EC and accordingly revise the Form 2 alongwith EIA/EMP Report. The EIA/EMP Report shall match with the information as filled in Form 2. On examination it is observed that the Consultant has not adequately submitted the application as per the provisions of the EIA Notification, 2006. Consultant has to read the documents before uploading the information in Form 2 /EIA/EMP report. | 24 Mar 2020 | 2. | NA | (i) Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1)
(ii) Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details.
(iii) TOR Compliance is vogue, only references are there. EIA report to be revised as per the terms of reference granted for the project, and shall conform to Appendix III of the EIA Notification, 2006. PP needs to revise the TOR compliances.
(iv) Effluent treatment mechanism with plan for Zero Liquid Discharge needs to be submitted.
(v) Proposed Green belt development programe along-with time line and budgetary allocation needs to be provided
(vi) As per s.no. 28 of form 2, Schedule I species reported. But the submission of conservation plan to CWLW has not been submitted/uploaded. Details of approval regarding to conservation plan needs to be uploaded.
(vii) Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2)
(viii) On examination it is noted that there are 5 show cause notices issued by SPCB, however S.No. 37 of form 2 mentioned NIL. PP has conceal the information. In this regard details action taken by SPCB needs to submitted and accordingly revise the Form 2 and uploaded.
(ix) Updated status of water approval
(x) In view of the above, PP/Consultant are requested to revise the application for grant of EC and accordingly revise the Form 2 alongwith EIA/EMP Report. The EIA/EMP Report shall match with the information as filled in Form 2. On examination it is observed that the Consultant has not adequately submitted the application as per the provisions of the EIA Notification, 2006. Consultant has to read the documents before uploading the information in Form 2 /EIA/EMP report. | 24 Mar 2020 | 3. | NA | (i) Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1)
(ii) Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details.
(iii) TOR Compliance is vogue, only references are there. EIA report to be revised as per the terms of reference granted for the project, and shall conform to Appendix III of the EIA Notification, 2006. PP needs to revise the TOR compliances.
(iv) Effluent treatment mechanism with plan for Zero Liquid Discharge needs to be submitted.
(v) Proposed Green belt development programe along-with time line and budgetary allocation needs to be provided
(vi) As per s.no. 28 of form 2, Schedule I species reported. But the submission of conservation plan to CWLW has not been submitted/uploaded. Details of approval regarding to conservation plan needs to be uploaded.
(vii) Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2)
(viii) On examination it is noted that there are 5 show cause notices issued by SPCB, however S.No. 37 of form 2 mentioned NIL. PP has conceal the information. In this regard details action taken by SPCB needs to submitted and accordingly revise the Form 2 and uploaded.
(ix) Updated status of water approval
(x) In view of the above, PP/Consultant are requested to revise the application for grant of EC and accordingly revise the Form 2 alongwith EIA/EMP Report. The EIA/EMP Report shall match with the information as filled in Form 2. On examination it is observed that the Consultant has not adequately submitted the application as per the provisions of the EIA Notification, 2006. Consultant has to read the documents before uploading the information in Form 2 /EIA/EMP report. | 24 Mar 2020 | 4. | NA | The correction have been made as per the instruction received | 04 Apr 2020 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | NA | 04 Aug 2020 | 2. | NA | The project/activity is covered under category A of item 5(f) ‘Synthetic organic chemicals industry’ of the schedule to the Environment Impact Assessment (EIA) Notification, 2006 and requires appraisal at central level by sectoral Expert Appraisal Committee (EAC) in the Ministry.
The standard terms of references (TORs) for the Project was granted by the Ministry on 8th October, 2018.
The EAC, during deliberation observed that the environmental clearance was granted for manufacturing of specialty chemicals of capacity 129.17 TPM, however, the proposal has been submitted for expansion from 162.17 TPM to 409.17 TPM, the same reveals that the project proponent has increased the production capacity without prior permission. The EAC suggested to the project proponent to submit clarification with proper proof to establish that existing unit is operating with proper prior permission and to confirm that unit is not violating the provision contained in EIA Notification, 2006.
The EAC therefore deferred the proposal. | 26 May 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | A K Singh | Designation | GM | Name of Company (Applicant Name should not be given here) | KUMAR ORGANIC PRODUCTS LIMITED | Address | Plot no. 379, 377, Canal Road, Luna Village, Maitri Marg, Padra Taluk, Vadodara District |
|