Form-2 | APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE | | 1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of onshore oil & gas processing plant at Uran by establishing Additional Cogeneration Unit GT-IV and Enhanced Reactive Thermal Oxidizer (ERTO) within the existing Uran Plant, Uran, Maharasht | (b)Name of the Company / Organisation | OIL AND NATURAL GAS CORPORATION LIMITED | (c)Registered Address | Deendayal Urja Bhavan, 5, Nelson Mandela Marg, Vasant Kunj,,South West,Delhi-110070 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
| 2. | Address for the correspondence: | (a)Name of the Applicant | Rajeeva Kumar | (b)Designation (Owner/ Partner/ CEO) | General Manager | (c)Address | Deendayal Urja Bhavan, 5, Nelson Mandela Marg, Vasant Kunj,,Vasant Vihar,Ramanathapuram,Tamil Nadu-110070 | (d)Pin code | 110070 | (e)E-mail | head_env@ongc.co.in | (f)STD Code. | 11(f)Telephone No. | 26753163 | (g)Fax No. | 01126129067 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(c) Petro-chemical complexes (industries based on processing of
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MH/IND2/148052/2018 | (d)Master Proposal Number(Single Window) | SW/147560/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
| 4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 101/102 | (b)Pincode | 400702 | (c)Bounded Latitudes (North) | | From | | Degree | 185120 | Minutes | | Second | | From | | Degree | 185223 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 725527 | Minutes | | Second | | From | | Degree | 725602 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | E43G13 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 15 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 10 | (j)Seismic Zone | 3 | |
| 5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
| | Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | | | 6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/635/2008-IA.II(I) | (c)Date of Issue of TOR | 22 Mar 2018 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 30 Apr 2020 | (c)Date of Issue of EC | 13 Oct 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
| 7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
| 7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 27 Aug 2019 | Distance of Public Hearing Venue from the Proposed Project : | 1 |
| ONGC Colony | State : | Maharashtra | District : | Raigad | Tehsil : | Uran | Village : | Nagaon |
| 200 | CSR Fund, Project Affected Persons, Local Employment, Training, Pollution | Others | Additional District Magistrate | | 8. | Details of Project Configuration/Product: | Details Not Applicable | |
| 9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | 5-52/2010(ENV)/3200 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | May 19 2016 12:00AM | (b)Details of Capacity Expansion | |
| S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Crude oil | 20 | 0 | 20 | Others | MMT | Others | Pipeline | (2.) | LPG | 0.625 | 0 | 0.625 | Others | MMTPA | Others | Pipeline | (3.) | Natural Gas | 16 | 0 | 16 | Others | MMSCMD | Others | Pipeline | (4.) | Power | 58.8 | 20 | 78.8 | Mega Watt(MW) | | Others | Internal use | (5.) | Steam | 330 | 60 | 390 | Others | TPH | Others | Internal use | (6.) | C2C3 | 0.625 | 0 | 0.625 | Others | MMTPA | Others | Pipeline | (7.) | Naphtha | 0.33 | 0 | 0.33 | Others | MMTPA | Others | Pipeline | | | (c)Details of Configuration | |
| S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | New GT | NA | 20 MW Power 60 TPH Steam | NA | | | 9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 07 Jan 2020 | (iv)Valid Upto | 31 Aug 2021 | (v)File No. | 2001000532 | (vi)Application No. | 0000072719 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
| | 10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 268.95 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.66 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 2.27 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.55 | |
| 11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | | 12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | | 13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 385 | (b)Existing quantity of raw material/fuel | 0 | (c)Total quantity of raw material/fuel | 385 | |
|   13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Natural Gas | 385 | Others | Sm3/MWH | Internally available | Others | Internally available | 0 | Linkage | | Copy of Linkage | | | 14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2017 To 31 May 2017 | (b)Season | Summer | |
| 14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 9.4 | 5.2 | 8.2 | 80 | (2.) | NOx | | Micro Gram per Meter Cube | 34.4 | 13.2 | 28.9 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 63.8 | 42.8 | 62.2 | 100 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 34.9 | 18.4 | 31.8 | 60 | | 14.2. No. of Ground Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8 | 7.6 | 6.5 | 8.5 | (2.) | Total Hardness | | | mg/l | | 5560 | 224 | 200 | 600 | (3.) | TSS | | | mg/l | | 25 | 15 | 30 | 50 | (4.) | Fluoride | | | mg/l | | 1.5 | 1.1 | 1 | 1.5 | (5.) | Heavy Metals | | As | mg/l | | 0.03 | 0.03 | 0.01 | 0.05 | (6.) | TDS | | | mg/l | | 11780 | 472 | 500 | 2000 | (7.) | Chlorides | | | mg/l | | 2300 | 92 | 250 | 1000 | (8.) | Heavy Metals | | Lead | mg/l | | 0.01 | 0.01 | 0.01 | 0.01 | | 14.3. No. of Surface Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.9 | 7.7 | C | (2.) | DO | | mg/l | | 6.8 | 6 | C | (3.) | BOD | | mg/l | | 3 | 2 | C | (4.) | COD | | mg/l | | 20 | 15 | C | | 14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 52.4 | 36.2 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 63.6 | 39.2 | 75 | | 14.5. No. of Soil Sample Monitored locations : 4 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.8 | 7.2 | (2.) | Electric Conductivity | Others | s/cm | 329 | 80 | (3.) | N(Nitrogen) | Kilogram per hectare | | 489 | 201 | (4.) | P(Phosphorus) | Kilogram per hectare | | 2.4 | 1.7 | (5.) | K(Potassium) | Kilogram per hectare | | 212 | 84 | | | 14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 4 To 8 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1 To 3.5 | (c)Whether Ground Water Intersection will be there ? | No | |
| 15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | MIDC | 16500 | 1 | Copy of Permission Letter | Pipeline | | Others | Pipeline from MIDC | Annexure A of Agreement | 02 Feb 2012 | 17000 | | | 15.1. | (a)Whether Desalination is proposed | No | |
| 16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Scrubbing liquid waste water | 100 | 100 | Dilution with treated ETP effluent | Discharge into Seawater Body | | | 100 | | | 16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 100 | (b)Total Discharged Water (Kilolitre per Day) | 100 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
| 17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Non hazardous solid waste | Industrial Waste | | 0 | Tons | 0 | Others | Not Applicable | Others | Not Applicable | | | | 18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 9.4 | 0.1 | 1.44 | 10.85 | 80 | (2.) | PM2.5 | | Microgram per Meter Cube | 34.9 | 0 | 0 | 34.95 | 60 | (3.) | NOx | | Microgram per Meter Cube | 33.5 | 0.5 | 1.52 | 35.03 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 63.6 | 0 | 0 | 63.7 | 100 | | | 18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | GT-IV | Natural Gas | 40 | 3 | NOx | | 5.14 | (2.) | GT-IV | Natural Gas | 40 | 3 | SO2 | | 0.28 | (3.) | ERTO | Acid Gas | 50 | 1.17 | NOx | | 0 | (4.) | ERTO | Acid Gas | 50 | 1.17 | SO2 | | 1.18 | | | 19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 750 | (b)Source | Internal generation | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1 | (e)Stack Height (in m) | 10 | |
| 20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 112 | Total Land (ha.) | 112 | |
| 21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 112 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Other | 0 | Total (ha.) | 112 | |
| 22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 111.34 | | (2.) | Green belt | | 0.66 | | | | | 23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
| 23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | No | 0 | Not Applicable | (2.) | Critically Polluted Area | No | 0 | Not Applicable | (3.) | WLS | No | 0 | Not Applicable | (4.) | NPA | No | 0 | Not Applicable | (5.) | ESAs | No | 0 | Not Applicable | (6.) | ESZs | No | 0 | Not Applicable | (7.) | Wildlife Corridors | No | 0 | Not Applicable | | 23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | No | 0 | Not Applicable | (2.) | Defence Installations | | No | 0 | Not Applicable | (3.) | Archaeological Sites | | No | 0 | Not Applicable | | | 23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
| 24. | Forest Land: | Whether any Forest Land involved? | No | |
| 25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
| 26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 112 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | In possession | |
| 27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
| 28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
| 29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Sea water | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
| 30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
| 31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 200 | (d)Temporary Employment- During Operation | 20 | (e)No. of working days | 333 | (f)Total Manpower | 220 | |
| | S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Percentage of Total Project Area | 0.66 | 0 | 0.66 | (2.) | No. of Plants | 2234 | 0 | 2234 | (3.) | Funds Allocated | 0 | 8000000 | 8000000 | (4.) | Total Area of Green Belt | 0.74 | 0 | 0.74 | | | 33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Reduction in H2S Emission | | | 34. CRZ Specific Details : Not Applicable | 35. Sector Specific Details : NOT APPLICABLE | 35. Sector Specific Details For Industrial Projects - 2 | | | 36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
| 37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
| 38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | QCI/NABET/EIA/ACO/20/1241 | (ii)Name of the EIA Consultant | Engineers India Limited | (iii)Address | EWS Division, Tower-I, Ground floor, EIL-Office complex, Gurugram (On NH-48), Haryana-122001 | (iv)Mobile No. | 9818669575 | (v)Landline No. | 1243802035 | (vi)Email Id | jk.joshi@eil.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 18 May 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
| | Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1)
(ii) Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details.
(iii) This is an expansion proposal. PP needs to be uploaded certified compliance report of earlier EC issued by RO MoEFCC. However PP only uploaded the actions on non-compliances of earlier EC. Pl check and upload the adequate documents in Form 2.
(iv) Proposed Green belt development programe along-with time line and budgetary allocation needs to be provided (PP mentioned 0.66% of Green belt in SNo. 32 of Form 2)
(v) PP mentioned Zero incremental value for PM10 & PM2.5 in Form 2. Air Quality Impact Prediction mentioned (18.1 of form 2) is inadequate kindly correct it.
(vi) EIA/EMP Report and covering letter are not opening. Please check and upload the correct documents.
(vii) All old CTOs not uploaded to verify the violation, if any done by PP.
(viii) Details Product list for which EC is required may kindly be provided in the Form-2 of s. No. 8.2 product wise and individual capacity wise. PP has mentioned the categories, but as per requirement PP needs to submit the details of product for which EC application has been made.
(ix) PH was conducted in August 2019, however, PP has now submitted the EC application in March 2020. Please submit the reason why delay in submission of application.
(x) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. | 02 Apr 2020 | 2. | NA | (i) Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1)
(ii) Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details.
(iii) This is an expansion proposal. PP needs to be uploaded certified compliance report of earlier EC issued by RO MoEFCC. However PP only uploaded the actions on non-compliances of earlier EC. Pl check and upload the adequate documents in Form 2.
(iv) Proposed Green belt development programe along-with time line and budgetary allocation needs to be provided (PP mentioned 0.66% of Green belt in SNo. 32 of Form 2)
(v) PP mentioned Zero incremental value for PM10 & PM2.5 in Form 2. Air Quality Impact Prediction mentioned (18.1 of form 2) is inadequate kindly correct it.
(vi) EIA/EMP Report and covering letter are not opening. Please check and upload the correct documents.
(vii) All old CTOs not uploaded to verify the violation, if any done by PP.
(viii) Details Product list for which EC is required may kindly be provided in the Form-2 of s. No. 8.2 product wise and individual capacity wise. PP has mentioned the categories, but as per requirement PP needs to submit the details of product for which EC application has been made.
(ix) PH was conducted in August 2019, however, PP has now submitted the EC application in March 2020. Please submit the reason why delay in submission of application.
(x) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. | 02 Apr 2020 | 3. | NA | (i) Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1)
(ii) Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details.
(iii) This is an expansion proposal. PP needs to be uploaded certified compliance report of earlier EC issued by RO MoEFCC. However PP only uploaded the actions on non-compliances of earlier EC. Pl check and upload the adequate documents in Form 2.
(iv) Proposed Green belt development programe along-with time line and budgetary allocation needs to be provided (PP mentioned 0.66% of Green belt in SNo. 32 of Form 2)
(v) PP mentioned Zero incremental value for PM10 & PM2.5 in Form 2. Air Quality Impact Prediction mentioned (18.1 of form 2) is inadequate kindly correct it.
(vi) EIA/EMP Report and covering letter are not opening. Please check and upload the correct documents.
(vii) All old CTOs not uploaded to verify the violation, if any done by PP.
(viii) Details Product list for which EC is required may kindly be provided in the Form-2 of s. No. 8.2 product wise and individual capacity wise. PP has mentioned the categories, but as per requirement PP needs to submit the details of product for which EC application has been made.
(ix) PH was conducted in August 2019, however, PP has now submitted the EC application in March 2020. Please submit the reason why delay in submission of application.
(x) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. | 02 Apr 2020 | 4. | NA | (i) Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1)
(ii) Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details.
(iii) This is an expansion proposal. PP needs to be uploaded certified compliance report of earlier EC issued by RO MoEFCC. However PP only uploaded the actions on non-compliances of earlier EC. Pl check and upload the adequate documents in Form 2.
(iv) Proposed Green belt development programe along-with time line and budgetary allocation needs to be provided (PP mentioned 0.66% of Green belt in SNo. 32 of Form 2)
(v) PP mentioned Zero incremental value for PM10 & PM2.5 in Form 2. Air Quality Impact Prediction mentioned (18.1 of form 2) is inadequate kindly correct it.
(vi) EIA/EMP Report and covering letter are not opening. Please check and upload the correct documents.
(vii) All old CTOs not uploaded to verify the violation, if any done by PP.
(viii) Details Product list for which EC is required may kindly be provided in the Form-2 of s. No. 8.2 product wise and individual capacity wise. PP has mentioned the categories, but as per requirement PP needs to submit the details of product for which EC application has been made.
(ix) PH was conducted in August 2019, however, PP has now submitted the EC application in March 2020. Please submit the reason why delay in submission of application.
(x) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. | 02 Apr 2020 | 5. | NA | (i) Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1)
(ii) Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details.
(iii) This is an expansion proposal. PP needs to be uploaded certified compliance report of earlier EC issued by RO MoEFCC. However PP only uploaded the actions on non-compliances of earlier EC. Pl check and upload the adequate documents in Form 2.
(iv) Proposed Green belt development programe along-with time line and budgetary allocation needs to be provided (PP mentioned 0.66% of Green belt in SNo. 32 of Form 2)
(v) PP mentioned Zero incremental value for PM10 & PM2.5 in Form 2. Air Quality Impact Prediction mentioned (18.1 of form 2) is inadequate kindly correct it.
(vi) EIA/EMP Report and covering letter are not opening. Please check and upload the correct documents.
(vii) All old CTOs not uploaded to verify the violation, if any done by PP.
(viii) Details Product list for which EC is required may kindly be provided in the Form-2 of s. No. 8.2 product wise and individual capacity wise. PP has mentioned the categories, but as per requirement PP needs to submit the details of product for which EC application has been made.
(ix) PH was conducted in August 2019, however, PP has now submitted the EC application in March 2020. Please submit the reason why delay in submission of application.
(x) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. | 02 Apr 2020 | 6. | NA | (i) Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1)
(ii) Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details.
(iii) This is an expansion proposal. PP needs to be uploaded certified compliance report of earlier EC issued by RO MoEFCC. However PP only uploaded the actions on non-compliances of earlier EC. Pl check and upload the adequate documents in Form 2.
(iv) Proposed Green belt development programe along-with time line and budgetary allocation needs to be provided (PP mentioned 0.66% of Green belt in SNo. 32 of Form 2)
(v) PP mentioned Zero incremental value for PM10 & PM2.5 in Form 2. Air Quality Impact Prediction mentioned (18.1 of form 2) is inadequate kindly correct it.
(vi) EIA/EMP Report and covering letter are not opening. Please check and upload the correct documents.
(vii) All old CTOs not uploaded to verify the violation, if any done by PP.
(viii) Details Product list for which EC is required may kindly be provided in the Form-2 of s. No. 8.2 product wise and individual capacity wise. PP has mentioned the categories, but as per requirement PP needs to submit the details of product for which EC application has been made.
(ix) PH was conducted in August 2019, however, PP has now submitted the EC application in March 2020. Please submit the reason why delay in submission of application.
(x) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. | 02 Apr 2020 | 7. | NA | (i) Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1)
(ii) Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details.
(iii) This is an expansion proposal. PP needs to be uploaded certified compliance report of earlier EC issued by RO MoEFCC. However PP only uploaded the actions on non-compliances of earlier EC. Pl check and upload the adequate documents in Form 2.
(iv) Proposed Green belt development programe along-with time line and budgetary allocation needs to be provided (PP mentioned 0.66% of Green belt in SNo. 32 of Form 2)
(v) PP mentioned Zero incremental value for PM10 & PM2.5 in Form 2. Air Quality Impact Prediction mentioned (18.1 of form 2) is inadequate kindly correct it.
(vi) EIA/EMP Report and covering letter are not opening. Please check and upload the correct documents.
(vii) All old CTOs not uploaded to verify the violation, if any done by PP.
(viii) Details Product list for which EC is required may kindly be provided in the Form-2 of s. No. 8.2 product wise and individual capacity wise. PP has mentioned the categories, but as per requirement PP needs to submit the details of product for which EC application has been made.
(ix) PH was conducted in August 2019, however, PP has now submitted the EC application in March 2020. Please submit the reason why delay in submission of application.
(x) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. | 02 Apr 2020 | 8. | NA | (i) Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1)
(ii) Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details.
(iii) This is an expansion proposal. PP needs to be uploaded certified compliance report of earlier EC issued by RO MoEFCC. However PP only uploaded the actions on non-compliances of earlier EC. Pl check and upload the adequate documents in Form 2.
(iv) Proposed Green belt development programe along-with time line and budgetary allocation needs to be provided (PP mentioned 0.66% of Green belt in SNo. 32 of Form 2)
(v) PP mentioned Zero incremental value for PM10 & PM2.5 in Form 2. Air Quality Impact Prediction mentioned (18.1 of form 2) is inadequate kindly correct it.
(vi) EIA/EMP Report and covering letter are not opening. Please check and upload the correct documents.
(vii) All old CTOs not uploaded to verify the violation, if any done by PP.
(viii) Details Product list for which EC is required may kindly be provided in the Form-2 of s. No. 8.2 product wise and individual capacity wise. PP has mentioned the categories, but as per requirement PP needs to submit the details of product for which EC application has been made.
(ix) PH was conducted in August 2019, however, PP has now submitted the EC application in March 2020. Please submit the reason why delay in submission of application.
(x) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. | 02 Apr 2020 | 9. | NA | The correction have been made as per the instruction received | 30 Apr 2020 | | Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Additional Details sought by EAC | 01 Jul 2020 | 2. | NA |
The EAC during deliberations noted that the proposed project/activity is not leading to any expansion in production in the plant. However, these units shall be installed in the plant leading to overall expansion in the uran plant complex. The Committee observed that considering the location of the project site adjacent to the coastal area, the proposed project/activity or the entire project area shall require CRZ clearance. The Committee has also desired that the project proponent needs to submit proposal with production details/utilities of the entire complex for better management and compliance.
The Committee after detailed deliberations desired for additional information/inputs in respect of the following:
(i). Revised proposal combining the production/Utilities in the plant complex.
(ii). Requirement of CRZ clearance for the project/plant and the pipeline.
(iii). CRZ map of the plant area in 1:4000 scale.
(iv). Recent baseline data collected from the existing detectors in the plant and adjoining area for the critical parameters.
(v). Sources of emissions in the plant and details of detectors based on 3 D assessment.
(vi). Management of odopur/ Hydrogen Sulphide emission
(vii). Plan for recovery of 75% of the effluent disposed to the sea.
(viii). Safety audit of the unit.
(ix). Public hearing issues, action plan along with budget provisions.
(x). Detailed CER plan with provisions for improvement of fishery/fishermen in the study area.
(xi). Compliance status of the existing EC conditions.
(xii). Plan for installation of solar power and utilization in the plant
(xiii). Details of wildlife sanctuary/ESA within 10 km of the project site.
(xiv). Details of greenbelt development in the plant, around the periphery and outside.
The proposal was therefore deferred for the needful.
| 29 Jun 2020 | | | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. | | Name of Applicant | Rajeeva Kumar | Designation | General Manager | Name of Company (Applicant Name should not be given here) | OIL AND NATURAL GAS CORPORATION LIMITED | Address | Deendayal Urja Bhavan, 5, Nelson Mandela Marg, Vasant Kunj |
|
|
|