Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Natural Gas Distribution network by PE pipeline in Union Territory Dadara & Nagar Haveli GA covering approx length 27km having 90mm to 160mm Diameter
(b)Name of the Company / Organisation GUJARAT GAS LIMITED
(c)Registered Address 9th Floor Avdhesh House, Opposite Shri Guru Govindwara, S. G. Highway,,Ahmedabad,Gujarat-380054
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Anish Parikh
(b)Designation (Owner/ Partner/ CEO) DM
(c)Address 9th Floor, Avdhesh House, Opp. Shri Govind Gurudwara, S.G Highway, Ahmedabad,,Ahmedabad City,Ahmedabad,Gujarat-380054
(d)Pin code 380054
(e)E-mail anish.parikh@gujaratgas.com
(f)STD Code. 79(f)Telephone No. 26737557
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity6(a) Oil & gas transportation pipe line (crude and refinery/ petrochemical
Minor Activity6(a) Oil & gas transportation pipe line (crude and refinery/ petrochemical
(b)Category A
(c)Proposal Number IA/DN/IND2/147592/2019
(d)Master Proposal Number(Single Window) SW/147572/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Natural Gas distribution pipeline network along th
(b)Pincode 380054
(c)Bounded Latitudes (North)
From
Degree 2223425.00
Minutes
Second
From
Degree 2233485.38
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 292343.00
Minutes
Second
From
Degree 293334.30
Minutes
Second
(e)Survey of India Topo Sheet No. F43S16, F43T4
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 53
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Dadra and Nagar Haveli
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA/DN/IND2/89957/2018
(b)Date of Apply of TOR 04 Jan 2019
(c)Date of Issue of TOR / Standard ToR 08 Feb 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :16 Jan 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 Feb 2020
Distance of Public Hearing Venue from the Proposed Project :0.0
Panchayat Town Hall, Near Gram Panchayat office, Amboli village, Union Territory of Dadara & Nagar Haveli, Silvaasa
State :Dadra and Nagar Haveli
District :Silvassa
Tehsil :Dadra and Nagar Haveli
Village :Amboli
69i. Shri.Pravinbhai, Sarpanch Amboli Village 1. Pipeline which takes off from Surangi and terminate at Kherdi not included Velu village. 2. Will Door to Door connection be given? ii. Shri. SubhashbhaiOthersRDC Khanvel
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Natural Gas Distribution network by PE pipelineLinearNot applicable
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Natural Gas Distribution network by PE pipeline0.09OthersMMSCMDOthersNatural Gas distribution network by PE pipeline
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 4.193
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.043
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.043
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.043
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Natural Gas0.09OthersMMSCMDNot applicableOthersNatural Gas Distribution by PE pipeline0.0 OthersNot ApplicableCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube27.323.32560
(2.)NOxMicro Gram per Meter Cube22.411.713.580
(3.)PM10Micro Gram per Meter Cube68.458.465100
(4.)SO2Micro Gram per Meter Cube10.38.89.780
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l10200
(2.)pHOthersNA7.727.217.58.5
(3.)TDSmg/l12482655002000
(4.)Total Hardnessmg/l500178200600
(5.)Chloridesmg/l165352501000
(6.)Heavy MetalsZincmg/l0.120.08515
(7.)Fluoridemg/l0.00.01.01.5
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHOthersNA7.207.12A
(2.)BODmg/l22A
(3.)DOmg/l6.56.4A
(4.)CODmg/l168A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))58.649.355
(2.)Leq(Night)A-weighted decibels(dB(A))44.840.145
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.526.84
(2.)N(Nitrogen)Milligram per Kilogram317309
(3.)K(Potassium)Milligram per Kilogram8969
(4.)Electric ConductivityOthersMili mho0.40.2
(5.)P(Phosphorus)Milligram per Kilogram16.1713.17
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 03.60 To 10.81
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 01.75 To 07.96
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersNearby Municipal Source02.00.50 Not Appliacble modeOthersRoad TankerOthersSoak pit via septic tankNot Applicable01 Mar 20200.0
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Not Applicable0.00.0Not ApplicableOthersNo Disposal Required0.00.0
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Not applicableOthersNot Applicable0.0Tons0.0RoadOthersNot Applicable
(2.)Not ApplicableConstruction & Demolition Waste0.0Tons0.0RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Not ApplicableOthersNot Applicable0.0Tons0.0OthersNot ApplicableTreatment, Storage and Disposal Facility(TSDF)
(4.)Not ApplicableOthersNot Applicable0.0Tons0.0RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Not ApplicableOthersNot Applicable0Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube64.382500.2065.0100
(2.)SO2Microgram per Meter Cube9.72500.5110.380
(3.)PM2.5Microgram per Meter Cube25.42500.3026.360
(4.)NOxMicrogram per Meter Cube15.22500.4516.280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Not ApplicableNot Applicable0.00.0OthersNot ApplicableNot Applicable
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3
(b)Source DG Set during laying of pipeline
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) Not required
(e)Stack Height (in m) 3.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0.0
(b)Private Land (ha.) 0.0
(c)Government Land (ha.) 0.0
(d)Revenue Land (ha.) 0.0
(e)Other Land (ha.) 0.0
    Total Land (ha.) 0.0
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0.0
(b)Waste/Barren Land (ha.) 0.0
(c)Grazing/ Community Land (ha.) 0.0
(d)Surface Water Bodies (ha.) 0.0
(e)Settlements (ha.) 0.0
(f)Industrial (ha.) 0.0
(g)Forest (ha.) 0.0
(h)Mangroves (ha.) 0.0
(i)Marine Area (ha.) 0.0
(j)Others (ha.) : Not applicable 0.0
    Total (ha.) 0.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.0No permanent land acquisition in this project.
Total (ha.) 0
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsDadara & Nagar Haveli National Park0.0Proposed pipeline passes through ESZ of DNH NP for length 3.0301km
(2.)ESAsDadara & Nagar Haveli National Park0.0Proposed pipeline passes through ESZ of DNH NP for length 3.0301km
(3.)CorridorsNot Applicable0.0Not applicable
(4.)Critically Polluted AreaNot Applicable0.0Proposed pipeline does not pass through any critically polluted area
(5.)WLSDadara & Nagar Haveli National Park0.0Proposed pipeline passes through DNH NP for length 3.2046km
(6.)NPADadara & Nagar Haveli National Park0.0Proposed pipeline passes through DNH NP for length 3.2046km
(7.)Wildlife CorridorsNot Applicable0.0Not applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNot applicable0.0Not applicable
(2.)OthersNot applicableNot applicable0.0Not applicable
(3.)Defence InstallationsNot applicable0.0Not applicable
(4.)ForestRoad side protected forest area0.0Proposed pipeline route passes through road side protected forest area within existing road RoW without cutting trees.
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? Yes
(i)Status of NBWL NIL
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Under Process(Stage-II)
(b)Legal Status of Forest Land Protected
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.0
(b)Land yet to be acquired(Ha) 0.0
(c)Status of Land acquisition if not acquired Not required
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 40
(d)Temporary Employment- During Operation 0
(e)No. of working days 180
(f)Total Manpower 40
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.01
(b)Percentage of Total Project Area Infinity
(c)No. of Plants to be Planted 0
(d)Funds Allocated for Plantation 1781097
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalNatural Gas is uses as a low carbon cooking and transportation fuel compared to alternative fuels like LPG, Petrol, Diesel and other traditional fuels.
(2.)SocialCGD networks ensure uninterrupted supply of ecofriendly cooking fuel in form of PNG and transportation fuel to vehicle in the form of CNG and thus benefiting public health at large.
(3.)FinancialOne of the additional advantages of pipeline transportation is that the scope of economic offences like theft / pilferage and adulteration of products would be almost negligible.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/IA0029
(ii)Name of the EIA Consultant Green Circle,Inc.
(iii)Address Green Empire(Anupushpam),Above Axis Bank, Near Yash Complex, Gotri Main Road, Vadodara
(iv)Mobile No. 9898246340
(v)Landline No. 0265237126
(vi)Email Id info@gccipl.net
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 04 Jun 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. On perusal Form 2, it is noted that PH notice was given on 22.01.2020 and PH was held on 18.02.2020, it seems that 30 days notice to the Public has not be given. Please clarify. 2. Public hearing proceedings to be forwarded by the Member Secretary, SPCB/PCC along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1) 3. Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details. 4. Updated status of Stage I FC & NBWL Clearance needs to be uploaded. 5. Consultant has to revise the form 2 and accordingly upload the requisite documents. 6. Consultant has not properly filled the required data in form 2, it seems that in many places data is mentioned 0 or nil. 7. PP uploaded the EIA Report of March 2019, however PH held in Feb 2020, it seems that PP has uploaded draft EIA/EMP Report. 25 Mar 2020
2.NA1. On perusal Form 2, it is noted that PH notice was given on 22.01.2020 and PH was held on 18.02.2020, it seems that 30 days notice to the Public has not be given. Please clarify. 2. Public hearing proceedings to be forwarded by the Member Secretary, SPCB/PCC along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1) 3. Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details. 4. Updated status of Stage I FC & NBWL Clearance needs to be uploaded. 5. Consultant has to revise the form 2 and accordingly upload the requisite documents. 6. Consultant has not properly filled the required data in form 2, it seems that in many places data is mentioned 0 or nil. 7. PP uploaded the EIA Report of March 2019, however PH held in Feb 2020, it seems that PP has uploaded draft EIA/EMP Report. 25 Mar 2020
3.NAThe correction have been made as per the instruction received 30 Apr 2020
4.NA(i) Pl provide the status of application of Forest Clearance and Wildlife Clearance. (ii)As M/s SECON PVt Ltd has prepared the EIA/EMP report, Pl submit the accreditation certificate (iii)PH is to be forwarded by MS UT PCC to this MInistry.Further PH issues,action Plan along with budgetary provision shall be also provided. 28 May 2020
5.NAThe correction have been made as per the instruction received 12 Jun 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAnish Parikh
DesignationDM
Name of Company (Applicant Name should not be given here)GUJARAT GAS LIMITED
AddressShanti Sadan Soc.,Opp. Parimal Garden, Nr. Ellis Bridge
Print