1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Natural Gas Distribution network by PE pipeline in Union Territory Dadara & Nagar Haveli GA covering approx length 27km having 90mm to 160mm Diameter | (b)Name of the Company / Organisation | GUJARAT GAS LIMITED | (c)Registered Address | 9th Floor Avdhesh House, Opposite Shri Guru Govindwara, S. G. Highway,,Ahmedabad,Gujarat-380054 | (d)Legal Status of the Company | State Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Anish Parikh | (b)Designation (Owner/ Partner/ CEO) | DM | (c)Address | 9th Floor, Avdhesh House, Opp. Shri Govind Gurudwara, S.G Highway, Ahmedabad,,Ahmedabad City,Ahmedabad,Gujarat-380054 | (d)Pin code | 380054 | (e)E-mail | anish.parikh@gujaratgas.com | (f)STD Code. | 79(f)Telephone No. | 26737557 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 6(a) Oil & gas transportation pipe line (crude and refinery/ petrochemical
| Minor Activity | 6(a) Oil & gas transportation pipe line (crude and refinery/ petrochemical
| (b)Category | A | (c)Proposal Number | IA/DN/IND2/147592/2019 | (d)Master Proposal Number(Single Window) | SW/147572/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Natural Gas distribution pipeline network along th | (b)Pincode | 380054 | (c)Bounded Latitudes (North) | | From | | Degree | 2223425.00 | Minutes | | Second | | From | | Degree | 2233485.38 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 292343.00 | Minutes | | Second | | From | | Degree | 293334.30 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43S16, F43T4 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 53 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.0 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Dadra and Nagar Haveli | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA/DN/IND2/89957/2018 | (b)Date of Apply of TOR | 04 Jan 2019 | (c)Date of Issue of TOR / Standard ToR | 08 Feb 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 18 Feb 2020 | Distance of Public Hearing Venue from the Proposed Project : | 0.0 |
| Panchayat Town Hall, Near Gram Panchayat office, Amboli village, Union Territory of Dadara & Nagar Haveli, Silvaasa | State : | Dadra and Nagar Haveli | District : | Silvassa | Tehsil : | Dadra and Nagar Haveli | Village : | Amboli |
| 69 | i. Shri.Pravinbhai, Sarpanch Amboli Village 1. Pipeline which takes off from Surangi and terminate at Kherdi not included Velu village. 2. Will Door to Door connection be given? ii. Shri. Subhashbhai | Others | RDC Khanvel | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Natural Gas Distribution network by PE pipeline | Linear | Not applicable | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Natural Gas Distribution network by PE pipeline | 0.09 | Others | MMSCMD | Others | Natural Gas distribution network by PE pipeline | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 4.193 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.043 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.043 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.043 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Natural Gas | 0.09 | Others | MMSCMD | Not applicable | Others | Natural Gas Distribution by PE pipeline | 0.0 | Others | Not Applicable | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2019 To 31 May 2019 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 27.3 | 23.3 | 25 | 60 | (2.) | NOx | | Micro Gram per Meter Cube | 22.4 | 11.7 | 13.5 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 68.4 | 58.4 | 65 | 100 | (4.) | SO2 | | Micro Gram per Meter Cube | 10.3 | 8.8 | 9.7 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 10 | 2 | 0 | 0 | (2.) | pH | | | Others | NA | 7.72 | 7.21 | 7.5 | 8.5 | (3.) | TDS | | | mg/l | | 1248 | 265 | 500 | 2000 | (4.) | Total Hardness | | | mg/l | | 500 | 178 | 200 | 600 | (5.) | Chlorides | | | mg/l | | 165 | 35 | 250 | 1000 | (6.) | Heavy Metals | | Zinc | mg/l | | 0.12 | 0.08 | 5 | 15 | (7.) | Fluoride | | | mg/l | | 0.0 | 0.0 | 1.0 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | Others | NA | 7.20 | 7.12 | A | (2.) | BOD | | mg/l | | 2 | 2 | A | (3.) | DO | | mg/l | | 6.5 | 6.4 | A | (4.) | COD | | mg/l | | 16 | 8 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 58.6 | 49.3 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 44.8 | 40.1 | 45 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.52 | 6.84 | (2.) | N(Nitrogen) | Milligram per Kilogram | | 317 | 309 | (3.) | K(Potassium) | Milligram per Kilogram | | 89 | 69 | (4.) | Electric Conductivity | Others | Mili mho | 0.4 | 0.2 | (5.) | P(Phosphorus) | Milligram per Kilogram | | 16.17 | 13.17 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 03.60 To 10.81 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 01.75 To 07.96 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Nearby Municipal Source | 02.0 | 0.50 | Not Appliacble | modeOthers | Road Tanker | Others | Soak pit via septic tank | Not Applicable | 01 Mar 2020 | 0.0 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Not Applicable | 0.0 | 0.0 | Not Applicable | Others | No Disposal Required | 0.0 | 0.0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 0 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Not applicable | Others | Not Applicable | 0.0 | Tons | 0.0 | Road | | Others | Not Applicable | (2.) | Not Applicable | Construction & Demolition Waste | | 0.0 | Tons | 0.0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Not Applicable | Others | Not Applicable | 0.0 | Tons | 0.0 | Others | Not Applicable | Treatment, Storage and Disposal Facility(TSDF) | | (4.) | Not Applicable | Others | Not Applicable | 0.0 | Tons | 0.0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (5.) | Not Applicable | Others | Not Applicable | 0 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 64.38 | 250 | 0.20 | 65.0 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 9.7 | 250 | 0.51 | 10.3 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 25.4 | 250 | 0.30 | 26.3 | 60 | (4.) | NOx | | Microgram per Meter Cube | 15.2 | 250 | 0.45 | 16.2 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Not Applicable | Not Applicable | 0.0 | 0.0 | Others | Not Applicable | Not Applicable | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 3 | (b)Source | DG Set during laying of pipeline | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | Not required | (e)Stack Height (in m) | 3.5 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0.0 | (b)Private Land (ha.) | 0.0 | (c)Government Land (ha.) | 0.0 | (d)Revenue Land (ha.) | 0.0 | (e)Other Land (ha.) | 0.0 | Total Land (ha.) | 0.0 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0.0 | (b)Waste/Barren Land (ha.) | 0.0 | (c)Grazing/ Community Land (ha.) | 0.0 | (d)Surface Water Bodies (ha.) | 0.0 | (e)Settlements (ha.) | 0.0 | (f)Industrial (ha.) | 0.0 | (g)Forest (ha.) | 0.0 | (h)Mangroves (ha.) | 0.0 | (i)Marine Area (ha.) | 0.0 | (j)Others (ha.) : Not applicable | 0.0 | Total (ha.) | 0.0000 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.0 | No permanent land acquisition in this project. | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESZs | Dadara & Nagar Haveli National Park | 0.0 | Proposed pipeline passes through ESZ of DNH NP for length 3.0301km | (2.) | ESAs | Dadara & Nagar Haveli National Park | 0.0 | Proposed pipeline passes through ESZ of DNH NP for length 3.0301km | (3.) | Corridors | Not Applicable | 0.0 | Not applicable | (4.) | Critically Polluted Area | Not Applicable | 0.0 | Proposed pipeline does not pass through any critically polluted area | (5.) | WLS | Dadara & Nagar Haveli National Park | 0.0 | Proposed pipeline passes through DNH NP for length 3.2046km | (6.) | NPA | Dadara & Nagar Haveli National Park | 0.0 | Proposed pipeline passes through DNH NP for length 3.2046km | (7.) | Wildlife Corridors | Not Applicable | 0.0 | Not applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | Not applicable | 0.0 | Not applicable | (2.) | Others | Not applicable | Not applicable | 0.0 | Not applicable | (3.) | Defence Installations | | Not applicable | 0.0 | Not applicable | (4.) | Forest | | Road side protected forest area | 0.0 | Proposed pipeline route passes through road side protected forest area within existing road RoW without cutting trees. | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | Yes | (i)Status of NBWL | NIL | |
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Under Process(Stage-II) | (b)Legal Status of Forest Land | Protected | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.0 | (b)Land yet to be acquired(Ha) | 0.0 | (c)Status of Land acquisition if not acquired | Not required | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 40 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 180 | (f)Total Manpower | 40 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.01 | (b)Percentage of Total Project Area | Infinity | (c)No. of Plants to be Planted | 0 | (d)Funds Allocated for Plantation | 1781097 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Natural Gas is uses as a low carbon cooking and transportation fuel compared to alternative fuels like LPG, Petrol, Diesel and other traditional fuels. | (2.) | Social | CGD networks ensure uninterrupted supply of ecofriendly cooking fuel in form of PNG and transportation fuel to vehicle in the form of CNG and thus benefiting public health at large. | (3.) | Financial | One of the additional advantages of pipeline transportation is that the scope of economic offences like theft / pilferage and adulteration of products would be almost negligible. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/IA0029 | (ii)Name of the EIA Consultant | Green Circle,Inc. | (iii)Address | Green Empire(Anupushpam),Above Axis Bank, Near Yash Complex, Gotri Main Road, Vadodara | (iv)Mobile No. | 9898246340 | (v)Landline No. | 0265237126 | (vi)Email Id | info@gccipl.net | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 04 Jun 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | 1. On perusal Form 2, it is noted that PH notice was given on 22.01.2020 and PH was held on 18.02.2020, it seems that 30 days notice to the Public has not be given. Please clarify.
2. Public hearing proceedings to be forwarded by the Member Secretary, SPCB/PCC along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1)
3. Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details.
4. Updated status of Stage I FC & NBWL Clearance needs to be uploaded.
5. Consultant has to revise the form 2 and accordingly upload the requisite documents.
6. Consultant has not properly filled the required data in form 2, it seems that in many places data is mentioned 0 or nil.
7. PP uploaded the EIA Report of March 2019, however PH held in Feb 2020, it seems that PP has uploaded draft EIA/EMP Report. | 25 Mar 2020 | 2. | NA | 1. On perusal Form 2, it is noted that PH notice was given on 22.01.2020 and PH was held on 18.02.2020, it seems that 30 days notice to the Public has not be given. Please clarify.
2. Public hearing proceedings to be forwarded by the Member Secretary, SPCB/PCC along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1)
3. Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details.
4. Updated status of Stage I FC & NBWL Clearance needs to be uploaded.
5. Consultant has to revise the form 2 and accordingly upload the requisite documents.
6. Consultant has not properly filled the required data in form 2, it seems that in many places data is mentioned 0 or nil.
7. PP uploaded the EIA Report of March 2019, however PH held in Feb 2020, it seems that PP has uploaded draft EIA/EMP Report. | 25 Mar 2020 | 3. | NA | The correction have been made as per the instruction received | 30 Apr 2020 | 4. | NA | (i) Pl provide the status of application of Forest Clearance and Wildlife Clearance.
(ii)As M/s SECON PVt Ltd has prepared the EIA/EMP report, Pl submit the accreditation certificate
(iii)PH is to be forwarded by MS UT PCC to this MInistry.Further PH issues,action Plan along with budgetary provision shall be also provided. | 28 May 2020 | 5. | NA | The correction have been made as per the instruction received | 12 Jun 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Anish Parikh | Designation | DM | Name of Company (Applicant Name should not be given here) | GUJARAT GAS LIMITED | Address | Shanti Sadan Soc.,Opp. Parimal Garden, Nr. Ellis Bridge |
|