1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Mangal Murti Bio-Chem Pvt. Ltd. | (b)Name of the Company / Organisation | MANGAL MURTI BIO-CHEM PVT. LTD. | (c)Registered Address | Survey No. 311/2, Block No. 261, At & PO: Nana Borasara-394125, Taluka Mangrol, Dist. Surat, Gujarat,,Surat,Gujarat-394125 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Bharat Tank | (b)Designation (Owner/ Partner/ CEO) | ExecutiveDirector | (c)Address | Survey No. 311/2, Block No. 261, At and PO Nana Borsara-394125, Taluka Mangrol, Dist. Surat, Gujarat,,Mangrol,Surat,Gujarat-394125 | (d)Pin code | 394125 | (e)E-mail | sharma_mangalmurti@yahoo.com | (f)STD Code. | 261(f)Telephone No. | 254888 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations) 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/146898/2017 | (d)Master Proposal Number(Single Window) | SW/146895/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Survey No. 311/2, Block No. 261, At & PO: Nana Bor | (b)Pincode | 394125 | (c)Bounded Latitudes (North) | | From | | Degree | 21.5283 | Minutes | | Second | | From | | Degree | 21.5289 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.0025 | Minutes | | Second | | From | | Degree | 73.0036 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43N2 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 36 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 17 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | IA-J-11011/536/2017-IA-II(I) | (c)Date of Issue of TOR | 09 Dec 2017 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 22 Apr 2020 | (c)Date of Issue of EC | 05 Jan 2021 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 02 Nov 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Survey No. 311/2, Block No. 261, At & Po: Nana Borsara,Tal: Mangrol, Dist. Surat, Gujarat- 394125 | State : | Gujarat | District : | Surat | Tehsil : | Mangrol | Village : | Nana Borasara |
| 97 | Pollution arising from the industry | Others | Residental Additional Collector & Additional District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | SPCB | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | | (iii)Letter No. | AWH-94647 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Dec 9 2017 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Inorganic Chemical (Liquid Bromine) | 50 | 0 | 50 | Others | MT/Month | Road | | (2.) | Ammonium Sulphate | 52 | 0 | 52 | Others | MT/Month | Road | | (3.) | Ethion, Permethrin, Cypermethrin, MPBD, MPBA | 0 | 633 | 633 | Others | MT/Month | Road | | (4.) | PesticideFormulationandPacking(Dichlorovos, etc) | 0 | 357.5 | 357.5 | Others | MT/Month | Road | | (5.) | Bulk Repacking (Atrazine, Sulphur, Trizophos) | 0 | 195 | 195 | Others | MT/Month | Road | | (6.) | NPK Fertilizer | 3000 | 0 | 3000 | Others | MT/Month | Road | | (7.) | Mono Ammonium Phosphate | 20 | 0 | 20 | Others | MT/Month | Road | | (8.) | Calcium Nitrate | 20 | 0 | 20 | Others | MT/Month | Road | | (9.) | Tri Sodium Phosphate | 50 | 0 | 50 | Others | MT/Month | Road | | (10.) | Mono Potassium Phosphate | 20 | 0 | 20 | Others | MT/Month | Road | | (11.) | Magnesium Sulphate | 462 | 0 | 462 | Others | MT/Month | Road | | (12.) | Speciality Chemicals (Streneted Phenol, etc) | 0 | 451 | 451 | Others | MT/Month | Road | | (13.) | Di Ammonium Phosphate | 51 | 0 | 51 | Others | MT/Month | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | IBR Boiler | 1 | 0 | 1 | 2 TPH | (2.) | S. S. Reactor | 4 | 4 | 8 | 5 KL | (3.) | S. S. Reactor | 0 | 12 | 12 | 6.3 KL | (4.) | S. S. Reactor | 0 | 2 | 2 | 10 KL | (5.) | S.S. Sheet and Tube Condensor | 2 | 20 | 22 | 10 to 15M3 | (6.) | HDPE Storage Tank | 7 | 11 | 18 | 5KL to 40KL | (7.) | D. G. Set | 1 | 1 | 2 | 250 and 500KVA | (8.) | IBR Boiler | 0 | 1 | 1 | 5 TPH | (9.) | M.S. Glass Lined Reactor | 1 | 4 | 5 | 5 KL | (10.) | M.S. Glass Lined Reactor | 4 | 10 | 14 | 6.3 KL | (11.) | M.S.Glass Lined Reactor | 0 | 2 | 2 | 16 KL | (12.) | MEE and ATFD System | 0 | 1 | 1 | 120 KL/Day | (13.) | Borosilicate Glass Assly | 3 | 17 | 20 | 10M3 | (14.) | Bromine ISO Tank | 0 | 1 | 1 | 4 KL | (15.) | Electricals Panel | 1 | 1 | 2 | 300 AMP & 2000 AMP | (16.) | M.S.Glass Lined Reactor | 0 | 2 | 2 | 10 KL | (17.) | S. S. Reactor | 0 | 2 | 2 | 16 KL | (18.) | Lab Instruments and Glass Ware | 1 | 4 | 5 | N/R | (19.) | Chilling plant /Brine Plant | 1 | 1 | 2 | 80 TR & 150 TR | (20.) | Vaccume System | 1 | 2 | 3 | 01 TORR. | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 18 Jul 2018 | (iv)Valid Upto | 25 Mar 2023 | (v)File No. | GPCB/CCA-SRT-1439(2)/ID-35078 | (vi)Application No. | AWH-94647 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 31.5694 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 2.8210 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.66 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.2 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 38175 | (b)Existing quantity of raw material/fuel | 48550 | (c)Total quantity of raw material/fuel | 86725 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Methanol | 2814.24 | Tons per Annum | | GNFC/ Local | Road | | 30 | Open Market | | Copy of Linkage | (2.) | Phenol | 5704.5 | Tons per Annum | | Import | Others | Sea/Road | 350 | Open Market | | Copy of Linkage | (3.) | Caustic lye | 2772.54 | Tons per Annum | | GACL | Road | | 80 | Open Market | | Copy of Linkage | (4.) | Para Nitro Toluene | 6765 | Tons per Annum | | Import | Others | Sea | 350 | Open Market | | Copy of Linkage | (5.) | Phosphoric Acid | 420 | Tons per Annum | | GACL | Road | | 80 | Open Market | | Copy of Linkage | (6.) | Phosphoric Acid (85%) | 526.32 | Tons per Annum | | GACL | Road | | 80 | Open Market | | Copy of Linkage | (7.) | Bromine | 5856.48 | Tons per Annum | | Solaris/ Agrocell | Road | | 350 | Open Market | | Copy of Linkage | (8.) | Aluminum chloride | 6046.47 | Tons per Annum | | Local | Road | | 15 | Open Market | | Copy of Linkage | (9.) | Acetic acid | 1723.29 | Tons per Annum | | Kanoria/ Local | Road | | 40 | Open Market | | Copy of Linkage | (10.) | Acetonitrile | 8009.76 | Tons per Annum | | Import | Others | Sea/Road | 350 | Open Market | | Copy of Linkage | (11.) | Dilute Sulfuric Acid | 13530 | Tons per Annum | | Local | Road | | 30 | Open Market | | Copy of Linkage | (12.) | Toluene | 9471 | Tons per Annum | | Import | Others | Sea/ Road | 350 | Open Market | | Copy of Linkage | (13.) | Hydrochloric Acid | 3696.4 | Tons per Annum | | GNFC/ GACL | Road | | 80 | Open Market | | Copy of Linkage | (14.) | Ethyl Acetate | 3734.28 | Tons per Annum | | Import | Others | Sea/ Road | 350 | Open Market | | Copy of Linkage | (15.) | Isopropyl Alcohol | 8532 | Tons per Annum | | Import/ Local | Others | Sea/ Road | 350 | Open Market | | Copy of Linkage | (16.) | Benzene | 3604.32 | Tons per Annum | | Local | Road | | 75 | Open Market | | Copy of Linkage | (17.) | Benzaldehyde | 7596 | Tons per Annum | | Local | Road | | 30 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2017 To 31 May 2017 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 28.53 | 18.63 | 25.12 | 80 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 51.28 | 43.55 | 50.79 | 60 | (3.) | PM10 | | Micro Gram per Meter Cube | 95.94 | 74.91 | 83.54 | 100 | (4.) | SO2 | | Micro Gram per Meter Cube | 26.72 | 15.75 | 23.15 | 80 | |
14.2. No. of Ground Water monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 1910 | 372 | 500 | 2000 | (2.) | pH | | | NA | | 8.02 | 7.37 | 6.5 | 8.5 | (3.) | Total Hardness | | | mg/l | | 753 | 165.3 | 300 | 600 | (4.) | Chlorides | | | mg/l | | 267.4 | 98.55 | 250 | 1000 | (5.) | Heavy Metals | | Iron | mg/l | | 22.08 | 0.23 | 0.3 | 1 | (6.) | TSS | | | mg/l | | 92 | 2 | 50 | 100 | (7.) | Fluoride | | | mg/l | | 0 | 0 | 1 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 0 | 0 | B | (2.) | COD | | mg/l | | 12.43 | 12.43 | B | (3.) | DO | | mg/l | | 5.42 | 5.42 | B | (4.) | pH | | NA | | 8.33 | 8.33 | B | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 55 | 46 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 45 | 37 | 70 | |
14.5. No. of Soil Sample Monitored locations : 9 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Milligram per Kilogram | | 1082 | 260 | (2.) | pH | | | 8.16 | 7.32 | (3.) | N(Nitrogen) | Milligram per Kilogram | | 245.2 | 94.8 | (4.) | P(Phosphorus) | Milligram per Kilogram | | 132.3 | 28.5 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 2.34 | 1.21 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 30 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 20 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | GIDC Water Supply | 319.7 | 5 | Copy of Permission Letter | Pipeline | | Others | Pipeline + Reuse | NO/GIDC/DEE/PNL/1796 | 01 Sep 2017 | 300 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 87.9 | 87.9 | ETP, RO & MEE | Others | ETP, RO & MEE | 86 | 1.9 | (2.) | Domestic | 6.5 | 6.5 | Septic Tank/ Soak Pit | Others | Septic Tank/ Soak Pit | 0 | 6.5 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 94.4 | (b)Total Discharged Water (Kilolitre per Day) | 8.4 | (c)Total Reused Water (Kilolitre per Day) | 86 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Ortho Dichloro Benzene | Industrial Waste | | 42 | Tons | 14 | Road | | Others | Captive consumption or Sell to end user | (2.) | Spent Acetic Acid | Industrial Waste | | 66 | Tons | 11 | Road | | Others | Captive consumption or Sell to end user | (3.) | Poly Aluminium Chloride | Industrial Waste | | 55.44 | Tons | 14 | Road | | Others | Captive consumption or Sell to end user | (4.) | Spent Ethyl Acetate | Industrial Waste | | 17.64 | Tons | 10 | Road | | Others | Captive consumption or Sell to end user | (5.) | Distillation Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 90 | Tons | 8 | Road | | Others | CHWIF Site | (6.) | HCl Solution (30%) | Industrial Waste | | 3636 | Tons | 7 | Road | | Others | Captive consumption or Sell to end user | (7.) | AlCl3 Solution | Industrial Waste | | 7236 | Tons | 7 | Road | | Others | Captive consumption or Sell to end user | (8.) | NaBr Solution (30%) | Industrial Waste | | 1776 | Tons | 4 | Road | | Others | Captive consumption or Sell to end user | (9.) | Dilute Sulphuric Acid (70%) | Industrial Waste | | 1320 | Tons | 5 | Road | | Others | Captive consumption or Sell to end user | (10.) | Sodium Dichromate | Industrial Waste | | 300 | Tons | 15 | Road | | Others | Captive consumption or Sell to end user | (11.) | Spent trichloro carbonilide | Industrial Waste | | 36 | Tons | 12 | Road | | Others | Captive consumption or Sell to end user | (12.) | Process Waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 6 | Tons | 8 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (13.) | 10% HBr in Spent Sulphuric | Industrial Waste | | 1800 | Tons | 11 | Road | | Others | Captive consumption or Sell to end user | (14.) | Calcium Diphosphate | Industrial Waste | | 55.2 | Tons | 9 | Road | | Others | Captive consumption or Sell to end user | (15.) | Used Oil | Industrial Waste | | 0.6 | Tons | 5 | Road | | Others | Sell to registered refiners | (16.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 240 | Tons | 8 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (17.) | KCl Powder | Industrial Waste | | 1584 | Tons | 8 | Road | | Others | Captive consumption or Sell to end user | (18.) | MEE Salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 798 | Tons | 8 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (19.) | Discarded Containers/ barrels/ liners | Industrial Waste | | 60 | Tons | 11 | Road | | Others | Sell to GPCB authorized vendor | (20.) | Date expired/ Off specification products | Industrial Waste | | 0.1 | Tons | 7 | Road | | Others | Re-used back in process or CHWIF Site | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 74.91 | 8.7 | 0.01 | 75.42 | 80 | (2.) | PM2.5 | | Microgram per Meter Cube | 49.87 | 8.7 | 0.01 | 50.1 | 60 | (3.) | NOx | | Microgram per Meter Cube | 28.53 | 8.7 | 0.00 | 28.93 | 80 | (4.) | SO2 | | Microgram per Meter Cube | 26.72 | 8.7 | 0.01 | 26.8 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Steam Boiler (2 TPH) | Bio Coal | 33 | 0.6 | PM10 | | SPM 150, SO2 262, NOx 94 | (2.) | Hot Air Generator (0.3 TPH) | Bio Coal | 11 | 0.3 | PM10 | | SPM 150, SO2 262, NOx 94 | (3.) | Closed Furnace | Bio Coal | 23 | 0.5 | PM10 | | SPM 150, SO2 262, NOx 94 | (4.) | D.G. Set (250 KVA) | Diesel | 11 | 0.15 | PM10 | | SPM 150, SO2 262, NOx 94 | (5.) | Boiler (5 TPH) | Bio Coal | 33 | 0.6 | PM10 | | SPM 150, SO2 262, NOx 94 | (6.) | D.G. Set (500 KVA) | Diesel | 6 | 0.15 | PM10 | | SPM 150, SO2 262, NOx 94 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 750 | (b)Source | DGVCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1 DG Set * 500 KVA + 1 DG Set * 250 KVA | (e)Stack Height (in m) | 6 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 2.3427 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 2.3427 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 80.32 | (b)Waste/Barren Land (ha.) | 135.48 | (c)Grazing/ Community Land (ha.) | 20 | (d)Surface Water Bodies (ha.) | 3.1 | (e)Settlements (ha.) | 11.34 | (f)Industrial (ha.) | 10.37 | (g)Forest (ha.) | 10 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0.74 | (j)Others (ha.) : Miscelleanous land, Open land, Marshy land | 42.88 | Total (ha.) | 314.22999999999996 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.9112 | Admin & Lab area, Process & Storage area | (2.) | Green belt | | 1.2 | | (3.) | Others | ETP, Parking area, Internal Approach road | 0.2315 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESZs | NA | 0 | NA | (2.) | WLS | NA | 0 | NA | (3.) | NPA | NA | 0 | NA | (4.) | ESAs | NA | 0 | NA | (5.) | Corridors | NA | 0 | NA | (6.) | Wildlife Corridors | NA | 0 | NA | (7.) | Critically Polluted Area | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 0 | NA | (2.) | Others | NA | NA | 0 | NA | (3.) | Forest | | NA | 0 | NA | (4.) | Defence Installations | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 2.34 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Land already acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Presence of 12 Schedule-I species. Conservation plan for 3 species. | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 307500 | (iii)Period of Implementation | 1 year | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 35 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 60 | (e)No. of working days | 330 | (f)Total Manpower | 95 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 0.73 | 0.47 | 1.2 | (2.) | Percentage of Total Project Area | 31.07 | 20.15 | 51.22 | (3.) | No. of Plants | 1456 | 944 | 2400 | (4.) | Funds Allocated | 1600000 | 1050000 | 2650000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | CSR & CER | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Stay Order Against QCI NABET | (ii)Name of the EIA Consultant | Aqua-Air Environmental Engineers Pvt. Ltd. | (iii)Address | 403, Centre Point, Nr. Kadiwala School, Ring Road, Surat- 395002 | (iv)Mobile No. | 9904433995 | (v)Landline No. | 0261246124 | (vi)Email Id | aqua_eia@yahoo.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 07 Apr 2016 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) This is an expansion proposal and as per TOR no. 3(x)(b) for expansion project, the PP shall submit the compliance report to the conditions of consents from the SPCB. However PP has not submitted the certified compliance report from SPCB as per TOR granted to PP in year 2017. (S.No 9 of Form 2 has to revised and uploaded),
(ii) Details Product list for which EC is required may kindly be provided in the Form-2 of s. No. 8.2 product wise and individual capacity wise . PP has mentioned the categories, but as per requirement PP needs to submit the details of product for which EC application has been made.
(iii) PH was conducted in 2018, however, PP has now submitted the EC application in March 2020. Please submit the reason why delay in submission of application.
(iv) Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details.
(v) All old CTOs not uploaded to verify the violation, if any done by PP.
(vi) As per s.no. 28 of form 2, 12 Schedule I species reported. But the submission of conservation plan to CWLW has not been submitted/uploaded. Details of approval regarding to conservation plan needs to be uploaded.
(vii) Effluent treatment mechanism with plan for Zero Liquid Discharge for the complete plant (existing and proposed) needs to be submitted.
(viii) Details of earlier production capacity needs to be authenticated and uploaded to check the violation, if any.
(ix) In view of the above, PP/Consultant are requested to revise the application for grant of EC and accordingly revise the Form 2 alongwith EIA/EMP Report. The EIA/EMP Report shall match with the information as filled in Form 2. On examination it is observed that the Consultant has not adequately submitted the application as per the provisions of the EIA Notification, 2006. Consultant has to read the documents before uploading the information in Form 2 /EIA/EMP report. | 23 Mar 2020 | 2. | NA | The correction have been made as per the instruction received | 22 Apr 2020 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Additional Information of Mangal Murti as per the 24th Minutes of EAC meeting is attached herewith | 03 Dec 2020 | 2. | NA | The EAC has made a deliberated on the proposal. The Committee has noted that the existing fertilizer project of the proponent required environmental clearance for its operations. The Committee has been informed that there is no window available now for consideration of such proposals. The Committee observed that the PP has been operating the unit with valid CTO from the State PCB and as such, this type of noncompliances of the Rules shall happen due to lack of knowledge and also due to absence of proper directions from the SPCBs. The Committee was of the considered view that the such proposals coming for EC shall be considered on merit on case to case basis, after taking proper action under the E(P) Act, 1986, and as per the rules/guidelines framed under the Ministry’s Notification S.O.804 (E) dated 14th March, 2017.
The Committee, at the first instance opined that the matter may be examined by the Ministry and accordingly the proposal shall be considered by the EAC based on the decisions taken.
The proposal was accordingly deferred for the needful. | 29 Oct 2020 | 3. | ADS Reply Letter | Additional Details as per the Minutes of the 20th Meeting of the Expert Appraisal Committee (Industry-2 Sector-Chemical Based) held during June 15-17, 2020 | 23 Sep 2020 | 4. | NA | The EAC, during deliberations noted that the project proponent was unable to establish that existing products does not requires prior EC. The EAC, after detailed deliberations decided to defer the proposal for clarification/inputs, in respect of the following:-
(i) The EAC observed that the project proponent is producing DAP since 2018. The PP need to clarify whether the said Fertilizer i.e. Di Ammonium Phosphate requires prior EC or not. Clarification in respect of manufacturing of DAP without obtaining prior EC needs to be submitted.
(ii) Detailed rain water harvesting plan needs to be submitted. Fresh water requirement shall be reduced utilizing the harvested rain water. Accordingly, revised water balance shall be submitted.
(iii) The Committee noted that the PP needs to conduct the process safety and Risk assessment studies using advanced/3D modeling and the mitigating measures needs to be analyzed along with the action plan.
(iv) Commitment for inventory for raw materials, products and by-products for 3 days.
(v) Copy of submission of conservation plan for schedule-I species to CWLW of the State Government as there are 12 schedule-I species are reported in the study area. | 26 Jun 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Bharat Tank | Designation | ExecutiveDirector | Name of Company (Applicant Name should not be given here) | MANGAL MURTI BIO-CHEM PVT. LTD. | Address | Survey No. 311/2, Block No. 261, At & PO: Nana Borasara-394125, Taluka Mangrol, Dist. Surat, Gujarat |
|