Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Pesticide Project
(b)Name of the Company / Organisation M/s AMBAY LABORATORIES PVT LTD.
(c)Registered Address SP 1-5, Riicco industrial area, Rajasthan,,Alwar,Rajasthan-301701
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ghulam Rabbani
(b)Designation (Owner/ Partner/ CEO) Vice President
(c)Address Ambay Laboratories Private Limited Head office - G-2,43/1. Ambay House East Punjabi Bagh, New Delhi - 110026,Ambay Laboratories Private Limited Registered address - SP 1-5 Riico Industrial area Sotanala Tehsil Behror, District Alwar,Behror,Alwar,Rajasthan-301701
(d)Pin code 301701
(e)E-mail ambaylab@gmail.com
(f)STD Code. 11(f)Telephone No. 30003200
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Minor Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
(b)Category A
(c)Proposal Number IA/RJ/IND2/146355/2005
(d)Master Proposal Number(Single Window) SW/146318/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. SP1-5, RIICO Industrial Area, Sotanala
(b)Pincode 110026
(c)Bounded Latitudes (North)
From
Degree 27.831519
Minutes
Second
From
Degree 27.833428
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.265228
Minutes
Second
From
Degree 76.265319
Minutes
Second
(e)Survey of India Topo Sheet No. G-43 E/1, E/2, E/5, E/6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 326
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/361/2005-IA
(c)Date of Issue of TOR 04 Oct 2005
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 07 Jul 2020
(c)Date of Issue of EC 24 Dec 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason The project lies in Notified Industrial Area, therefo
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. IV/ENV/Raj-45/373/2005/144
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Apr 16 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Clodinofop Propargyl Chloride05050OthersMTPARoad
(2.)2,4-D Acid84511552000OthersMTPARoad
(3.)2,4-D Ethyl Ester600200800OthersMTPARoad
(4.)2,4-D Amine Salt60024003000OthersMTPARoad
(5.)Lambda Cyhalothrin05050OthersMTPARoad
(6.)Cypermethrin0250250OthersMTPARoad
(7.)Alphamethrin05050OthersMTPARoad
(8.)Cypermethrin Acid Chloride (CMAC)010001000OthersMTPARoad
(9.)Meta phenoxy Benzaldehyde (MPB)0720720OthersMTPARoad
(10.)Glyphosate0200200OthersMTPARoad
(11.)Metribuzin05050OthersMTPARoad
(12.)Mancozeb036003600OthersMTPARoad
(13.)Ziram0100100OthersMTPARoad
(14.)Thiram0100100OthersMTPARoad
(15.)Propineb05050OthersMTPARoad
(16.)Ethion05050OthersMTPARoad
(17.)Imazethapyr0100100OthersMTPARoad
(18.)Propizonazole0100100OthersMTPARoad
(19.)Bispyribac Sodium05050OthersMTPARoad
(20.)Carbendazim05050OthersMTPARoad
(21.)Quizalofop Ethyl04747OthersMTPARoad
(22.)Acephate09898OthersMTPARoad
(23.)Pretilachlor024002400OthersMTPARoad
(24.)2,4-D Sodium Salt104029604000OthersMTPARoad
(25.)Propargite05050OthersMTPARoad
(26.)Deltamethrin05050OthersMTPARoad
(27.)R&D055OthersMTPARoad
(28.)Buprofezin0100100OthersMTPARoad
(29.)Fipronil0200200OthersMTPARoad
(30.)Glufosinate Ammonium05050OthersMTPARoad
(31.)Pendimethalin0150150OthersMTPARoad
(32.)Azoxystrobin05050OthersMTPARoad
(33.)Ethepon05050OthersMTPARoad
(34.)Tebuconazole0100100OthersMTPARoad
(35.)Metalaxyl05050OthersMTPARoad
(36.)Diafenaconazole05050OthersMTPARoad
(37.)Hexaconazole0250250OthersMTPARoad
(38.)Atrazine0300300OthersMTPARoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Boiler2 TPH2 TPH4 TPHNA
(2.)DG Sets1x500 kVA1x200 kVA1x500 kVA & 1x200 kVANA
(3.)Total Plot Area2.0135196 Ha.02.0135196 Ha.NA
(4.)Processing Area0.377743 Ha0.4111932 Ha0.789675 HaNA
(5.)Non-Processing Area0.30 Ha0.15932 Ha0.45932 HaNA
(6.)Greenbelt Area0.664507 Ha0.10 Ha0.764507 HaNA
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 20 Feb 2020
(iv)Valid Upto 30 Jun 2024
(v)File No. F(PLG)/Alwar(Behror)/15(1)/2017-2018/5169-5172
(vi)Application No. 2019-2020/PDF/3961
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 100
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.2
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.14
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1
(b)Existing quantity of raw material/fuel 1
(c)Total quantity of raw material/fuel 2
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sodium Hydroxide65OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(2.)Thionyl chloride10OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(3.)Ethanol28OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(4.)MEG (107-21-1)10OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(5.)Tetra Butyl Ammonium Bromide10OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(6.)Sodium Carbonate10OthersMT - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(7.)MONO CHLROACETIC ACID20OthersMT - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(8.)Hydroxy-phenocy Propoinic Acid10OthersMT - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(9.)Sodium Bicarbonate10OthersMT - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(10.)Sodium Hypochloride10OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(11.)1,2,4 TRIAZOLE10OthersMT - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(12.)Methanol28OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(13.)Dichloromethane10OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(14.)Isopropyl Alcohol10OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(15.)Petroleum Ether10OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(16.)Bromine1OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(17.)1-Tetra Butyl10OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(18.)N-chloro n-phenyl carbamye chloride (MPC)10OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(19.)Iso Butylene10OthersMT - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(20.)Potassium Carbonate10OthersMT - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(21.)Toluene28OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(22.)Hexane28OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(23.)Sulphuric Acid20OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(24.)2,4-Dichloro velorophenone10OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(25.)DimethylFormamide10OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(26.)Sodium Cyanide10OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(27.)Phenol80OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(28.)Di-methyl sulphide10OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(29.)Chlorine129.6OthersMT - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(30.)Hydrochloric Acid50OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(31.)Dimethyl Amine32OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(32.)Trifluoro acetic acid10OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(33.)Carbon Tetra Chloride10OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(34.)Diisopropyl amine10OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(35.)Cyanuric Chloride10OthersMT - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(36.)Cyhalothric Acid10OthersMT - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(37.)Chloro di-flouro pyridine10OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(38.)propargyl Chloride10OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(39.)Acetonitrile10OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
(40.)Ethyl Amine10OtherskL - Bulk StorageIndigenousRoad30 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube10.45.510.380
(2.)PM2.5Micro Gram per Meter Cube51184860
(3.)PM10Micro Gram per Meter Cube954093100
(4.)NOxMicro Gram per Meter Cube2710.426.480
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l3701822501000
(2.)pHNA7.707.128.58.5
(3.)TDSmg/l13796175002000
(4.)Total Hardnessmg/l422196200600
(5.)TSSmg/l2222
(6.)Fluoridemg/l4.661.1011.5
(7.)Heavy MetalsZincmg/l0.010.01515
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l00A
(2.)CODmg/l00A
(3.)pHNA00A
(4.)DOmg/l00A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))54.240.845-70
(2.)Leq(Day)A-weighted decibels(dB(A))62.248.355-75
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare288.4275.8
(2.)K(Potassium)Kilogram per hectare185.2155.8
(3.)Electric ConductivityMillisiemens per Centimetre195175
(4.)pHOthers1:2 Suspension7.627.42
(5.)P(Phosphorus)Kilogram per hectare26.418.8
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 40
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 45
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersRIICO Supply water/Ground water282Copy of Permission LettermodeOtherstanker water supply/borewellOthersTubewell/RIICO water supply91; S-21-4/12414/RJ/IND/2017-40710 Apr 201720
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process34Multi-effect EvaporatorReuse within the Plant & Recycling3
(2.)Cooling/Boiler/Washing2.8100Effluent Treatment PlantReuse within the Plant & Recycling2.8
(3.)Domestic2.252.5Septic Tank/Soak pitsOthersSeptic tanks/soak pits2.250
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 8.05
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 8.05
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Discarded Containers/Barrels (Category-33.3)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)20Tons60RoadAuthorized Recyclers
(2.)Spent Solvent (Category-20.2)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.80Tons8.62RoadOthersIncineration
(3.)Residual pesticide sludge (Category-29.2)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)5Tons440RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Hazardous Sludge (Category-34.2)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.4Tons440RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Waste Oil (Category-5.1)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.28Tons8.62RoadOthersIncineration
(6.)Oil and Grease skimming (Category-35.4)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.30Tons8.62RoadOthersIncinerator
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube790.200.3179.32100
(2.)PM2.5Microgram per Meter Cube370.200.1937.260
(3.)SO2Microgram per Meter Cube9.30.203.1012.580
(4.)NOxMicrogram per Meter Cube22.40.200.122.68
(5.)Others(Specify)HBrMicrogram per Meter Cube0.10.200.020.13-
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler (2x2 TPH)Coal300.5OthersPM10, SO2, NO2PM10- 0.7 g/s ; SO2-0.18 g/s ; NO2-0.39 g/s
(2.)MPB Reactor for HBrNA150.1OthersHBr0.005 kg/hr
(3.)Hot Air GeneratorDiesel150.25PM100.019 g/s
(4.)Lambda Cyhalothrin Reactor for SO2NA150.1SO20.009
(5.)Deltamethrin Reactor for HBrNA150.1OthersHBr0.0045 kg/hr
(6.)2,4 DSodium Salt ReactorNA150.1OthersHCl ClHCl 0.0006 g/s; Cl 0.0003 g/s
(7.)Lambda Cyhalothrin Reactor for HClNA150.1OthersHCl0.018 kg/hr
(8.)Cypermethrin Reactor for HClNA150.1OthersHCl0.018
(9.)Cypermethrin Reactor for SO2NA150.1SO20.009 Kg/hr
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1000
(b)Source Jaipur Vidyut Nigam Ltd. (JVVNL)
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1X500 kVA , 1x200 kVA
(e)Stack Height (in m) 8
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 2.013
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 2.013
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 25059
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 4
(e)Settlements (ha.) 1181
(f)Industrial (ha.) 2.013
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Vegetation/shrubs 5224
    Total (ha.) 31470.0130
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Othersutilities and open areas0.87143.27%
(2.)Green belt0.76537.97%
(3.)Main Plant0.37718.76%
Total (ha.) 2.013
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNone15None
(2.)CorridorsNone15None
(3.)NPANone15None
(4.)ESAsNone15None
(5.)Critically Polluted AreaNone15None
(6.)ESZsNone15None
(7.)Wildlife CorridorsNone15None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone15None
(2.)ForestNone15None
(3.)Defence InstallationsNone15None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 2.01
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired not applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sahibi river
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 4.1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt6645.0710007645.07
(2.)Percentage of Total Project Area33538
(3.)No. of Plants12001501350
(4.)Funds Allocated152.4317.43
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThrough CER activity company management will be committed to improve infrastructural facilities for the local people in field of Environmental, Medical, and Transportation etc. The local people will be benefited by way of indirect employment opportunities which will improve the socioeconomic environment of the area.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA 070
(ii)Name of the EIA Consultant EQMS India Pvt. Ltd.
(iii)Address 304-305, 3rd Floor, Plot No. 16, Rishabh Corporate Tower, Community Centre, Karkardooma, Delhi – 110092
(iv)Mobile No. 9810297612
(v)Landline No. 0114227008
(vi)Email Id eqms@eqmsindia.org
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 30 Oct 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterReply to the below mentioned query has been attached. We hope that the reply for above-mentioned queries is satisfactory and the process of grant of Environmental Clearance is re-commenced at the earliest. 29 Oct 2020
2. ADS Reply LetterReply to the below mentioned query has been attached. We hope that the reply for above-mentioned queries is satisfactory and the process of grant of Environmental Clearance is re-commenced at the earliest. 29 Oct 2020
3.NA

 

The Committee after detailed deliberations, desired for additional inputs/information as under:

 

(i)              Details of fresh water requirement and source.

 

(ii)             Details of pollution load due to the project.

 

(iii)           Detailed management and action plan for controlling the emissions at 99.99%

 

(iv)           Details of mitigations measures brought out during advanced modelling

 

(v)            Details of community awareness along with detailed medical and safety plan.

 

(vi)           Details of toxic raw materials/solvents, quantity and its inventory.

 

The proposal was accordingly DEFERRED for the needful.

29 Sep 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantGhulam Rabbani
DesignationVice President
Name of Company (Applicant Name should not be given here)M/s AMBAY LABORATORIES PVT LTD.
AddressSP 1-5, Riicco industrial area, Rajasthan
Print