|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s. Oscar Pharma | (b)Name of the Company / Organisation | M/S. OSCAR PHARMA | (c)Registered Address | Plot No.A1-7304,7305,7313/4,GIDC,Industrial Estate,Ankleshwar,Dist.Bharuch,Gujarat.,,Bharuch,Gujarat-393002 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sunil Dholariya | (b)Designation (Owner/ Partner/ CEO) | Partner | (c)Address | Plot No. A1-7304,7305,7313/4, GIDC,Industrial Estate,Ankleshwar,Dist.Bharuch,Gujarat,,Anklesvar,Bharuch,Gujarat-393002 | (d)Pin code | 393002 | (e)E-mail | oscarpharma2018@gmail.com | (f)STD Code. | 2646(f)Telephone No. | 225335 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/123813/2019 | (d)Master Proposal Number(Single Window) | SW/230574/2021 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | PLOT NO: A1-7304, 7305, 7313/4, GIDC ESTATE, ANKLE | (b)Pincode | 393001 | (c)Bounded Latitudes (North) | | From | | Degree | 21.615604 | Minutes | | Second | | From | | Degree | 21.616452 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.042815 | Minutes | | Second | | From | | Degree | 73.043539 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43M14 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 75 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 7 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Bharuch | Anklesvar | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/325/2019-IA-II(I) | (b)Date of Apply of TOR | 11 Nov 2019 | (c)Date of Issue of TOR / Standard ToR | 20 Dec 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | The unit is located in Notified Industrial Estate | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Glass Lined Reactor | 5 KL * 5 Nos. | Existing | (2.) | S S Reactor | 4 KL * 2 Nos. | Existing | (3.) | S S Reactor | 3 KL * 1Nos. | Existing | (4.) | ANFD | 5 KL * 1 Nos. | Existing | (5.) | Boiler steam | 900 Kgs * 1 Nos. | Existing | (6.) | water + Steam Ejector | 1 Tor * 2 Nos. | Existing | (7.) | Hot Water System | 4.5 KL | Existing | (8.) | Storage Tank | 15 KL * 2 Nos. | Existing | (9.) | Scrubbing System | 10 KL * 2 Nos. | Existing | (10.) | MS Glass Lined Reactor | 5 KL * 3 Nos. | Proposed | (11.) | SS Reactor | 3 KL * 4 Nos. | Proposed | (12.) | Hydrogenator | 3 KL * 2 Nos. | Proposed | (13.) | ANFD | 5 Kl * 4 Nos. | Proposed | (14.) | D.G set | 200 KVA * 1 Nos. | Proposed | (15.) | Chilling Plant | 40 TR * 1 Nos. | Proposed | (16.) | Vacuum Tray Dryer | 24 Tray * 2 Nos. | Proposed | (17.) | Multi Mill | 50 Kg/Hr * 2 Nos. | Proposed | (18.) | Sifter | 36" * 2 Nos. | Proposed | (19.) | Solvent Storage Tank | 15 to 20 KL CAP * 10 Nos. | Proposed | (20.) | Vacuum 3 Stage Ejector | 10 Tor * 1 Nos. | Existing | (21.) | Lift | 2000 Kgs | Existing | (22.) | MS Glass Lined Reactor | 3 KL * 2 Nos. | Proposed | (23.) | SS Reactor | 5 KL * 10 Nos. | Proposed | (24.) | Glass Lined Reactor | 3 KL * 1 Nos. | Existing | (25.) | S S Reactor | 6.5 KL * 1 Nos. | Existing | (26.) | Centrifuge | 48" * 4 Nos. | Existing | (27.) | FBD | 125 KG * 2 Nos. | Existing | (28.) | Sparkler Filter | 50 Kgs | Existing | (29.) | Shifter | 36" Dia | Existing | (30.) | Centrifuge | 48 inch diameter * 3 Nos. | Proposed | (31.) | Centrifuge | 48 inch diameter * 3 Nos. | Proposed | (32.) | Thermic Fluid Heater | 6 lakh Kcal/Hr. * 1 Nos. | Proposed | (33.) | Tray Dryer | 48 Tray * 2 Nos. | Proposed | (34.) | Double Cone Vaccum Dryer | 1.5 KL * 2 Nos. | Proposed | (35.) | Vacuum Tray Dryer | 48 Tray * 1 Nos. | Proposed | (36.) | Sparkler Filter | 50 Kg carbon cap * 2 Nos. | Proposed | (37.) | Water System | 24 KL * 1 Nos. | Proposed | (38.) | S S Reactor | 5 Kl * 4 Nos. | Existing | (39.) | Chilling Plant | 40 TR * 2 Nos. | Existing | (40.) | Multi Mill | 50 Kgs | Existing | (41.) | Boiler steam | 3000 Kgs * 1 Nos. | Proposed | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Magnesium Turnings | 25 | Others | MT/ Month | Road | | (2.) | 2, 4-Dichloroacetophenone | 25 | Others | MT/ Month | Road | | (3.) | Flecainide acetate, Tigecycline, Nitrofurantoin Anhydrous, Montelukast Sodium, Levo Cetirizine Hydrochloride, Alendronic Acid, Levetiracetam, Mesalamine, Gabapentin, Ambroxol Hydrochloride, Bisacodyl, Sodium Picosulphate, Lornoxicam, PiroxicamBetacyclo Dextrin, Ethyl 4-Aminobenzoate[Benzocaine], Prilocaine, Prilocaine HCl, Alendronate sodium, Piroxicam, Aspirin, Phenyramidol HCl | 50 | Others | MT/Month | Road | | (4.) | 1-[2,4-d-Difluorophenyl]-2,3-epoxypropyl-1H-1,2,4-triazole methanesulfonate | 25 | Others | MT/ Month | Road | | (5.) | Azacyclonol | 25 | Others | MT/ Month | Road | | (6.) | 3-[Dimethylamino] Propiophenone | 25 | Others | MT/Month | Road | | (7.) | N-Methyl-4Chloro Piperidine | 25 | Others | MT/ Month | Road | | (8.) | 2-Amino 5-Methyl Thiazole; 5-Methoxy-2-Mercapto Benzimidazole; 5-(Difluoromethoxy)-2-Mercapto Benzimidazole; 2-Mercaptobenzimidazole; 6 chloro-4- hydroxy- 2- methyl- 2H thieno [2,3-e] [1,2] thiazine- 3- carboxylate- 1,1- dioxide; 2,2'-(cyclohexane-1,1-diyl)diacetic acid; 2-[2-3(S)-3-[2-(7-chloro-2-quinolinyl) -ethyl]phenyl]-3-hydroxypropyl] phenyl-2-propanol; 2-[1-(Mercaptomethyl) cyclopropyl] acetic acid; Denatonium Benzoate; Trans 4-Amino Cyclohexanol; 1-(4-Chlorobenzhydryl) piperazine; (Z)-Et | 150 | Others | MT/Month | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 08 Jun 2016 | (iv)Valid Upto | 07 May 2021 | (v)File No. | AWH-79438 | (vi)Application No. | GPCB/ANK/CCA-975/ID-15595/ | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 4.8 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.96 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.13 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 5.57 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 30000 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 30000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Thionyl chloride | 660 | Tons per Annum | | Shree Sulphuric,Ankleshwar | Road | | 10 | Open Market | | Copy of Linkage | (2.) | Toluene | 8160 | Tons per Annum | | AS Chemicals/Om Sai Ram:-Ankleshwar | Road | | 6 | Open Market | | Copy of Linkage | (3.) | I P A | 1920 | Tons per Annum | | NASIT PHARMACHEM:-Ankleshwar | Road | | 20 | Open Market | | Copy of Linkage | (4.) | Formaldehyde | 60 | Tons per Annum | | Local/Imported | Road | | 500 | Open Market | | Copy of Linkage | (5.) | Acetyl chloride | 1050 | Tons per Annum | | GHPC, Khambhat | Road | | 220 | Open Market | | Copy of Linkage | (6.) | Methanol | 5280 | Tons per Annum | | Local/Imported | Road | | 500 | Open Market | | Copy of Linkage | (7.) | NaOH | 8994 | Tons per Annum | | DCM, Jhagadia | Road | | 15 | Open Market | | Copy of Linkage | (8.) | Hydrogen | 180 | Tons per Annum | | Local | Road | | 250 | Open Market | | Copy of Linkage | (9.) | Chloro Benzene | 270 | Tons per Annum | | PIPL, Jhagadia | Road | | 15 | Open Market | | Copy of Linkage | (10.) | 2 – 4 dichlorobenzenes | 240 | Tons per Annum | | Aarti Industries, Vapi | Road | | 180 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2019 To 31 May 2019 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 25.68 | 17.52 | 25 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 94.22 | 75.84 | 94 | 100 | (3.) | SO2 | | Micro Gram per Meter Cube | 24.68 | 16.54 | 24 | 80 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 58.10 | 41.28 | 58 | 60 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 887.53 | 97.2 | 200 | 600 | (2.) | Heavy Metals | | Zn | mg/l | | 0 | 0 | 5 | 15 | (3.) | pH | | | NA | | 8.06 | 7.10 | 7.0 | 8.5 | (4.) | TSS | | | mg/l | | 52 | 8 | 80 | 120 | (5.) | TDS | | | mg/l | | 2451 | 258 | 500 | 2000 | (6.) | Chlorides | | | mg/l | | 773.76 | 49.98 | 250 | 1000 | (7.) | Fluoride | | | mg/l | | 0 | 0 | 1 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.48 | 7.48 | A | (2.) | BOD | | mg/l | | 0.8 | 0.8 | A | (3.) | COD | | mg/l | | 2.46 | 2.46 | A | (4.) | DO | | mg/l | | 6.4 | 6.4 | A | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 44 | 37 | 45 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 54 | 46 | 55 | |
14.5. No. of Soil Sample Monitored locations : 9 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.09 | 7.21 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 5.08 | 1.38 | (3.) | N(Nitrogen) | Milligram per Kilogram | | 225.4 | 92.62 | (4.) | P(Phosphorus) | Milligram per Kilogram | | 89.27 | 15.77 | (5.) | K(Potassium) | Milligram per Kilogram | | 1082 | 352 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 30 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 20 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | GIDC water supply | 30.0 | 10 | Copy of Permission Letter | Pipeline | | Weir | | NTA/ANK/DEE(WS)/244 | 17 Feb 2020 | 30.0 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 53.0 | 53.0 | ETP(Primary, Secondary & Tertiary) followed by RO & MEE | Reuse within the Plant & Recycling,Others | 2 MT of salt disposed to TSDF | 51.0 | 2.0 | (2.) | Domestic | 1.0 | 1.0 | Septic/Soak pit | Others | Septic/Soak pit | 0 | 1.0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 54 | (b)Total Discharged Water (Kilolitre per Day) | 3 | (c)Total Reused Water (Kilolitre per Day) | 51 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Sodium Hydrosulfide soln. [NaSH] (30-36%) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1683 | Tons | 60 | Road | | Others | Sell to end users having permission under rule 9 | (2.) | MEE salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 80 | Tons | 15 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Spent carbon | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 55 | Tons | 15 | Road | | Others | Co-processing or CHWIF-BEIL-Ankleshwar | (4.) | Sodium Hydrosulfide soln. [NaSH] (30-36%) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1683 | Tons | 60 | Road | | Others | Sell to end users having permission under rule 9 | (5.) | Used oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.5 | Tons | 25 | Road | | Authorized Recyclers | | (6.) | Distillation residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 88 | Tons | 30 | Road | | Others | Co-processing or sent to CHWIF-BEIL-Ankleshwar | (7.) | HCl solution (28-33%) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2554 | Tons | 60 | Road | | Others | Sell to end users having permission under rule 9 | (8.) | Sodium bromide [NaBr] (15-20%) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2577 | Tons | 60 | Road | | Others | Sell to end users having permission under rule 9 | (9.) | Sulfuric acid soln. [H2SO4] (60-70%) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 334 | Tons | 60 | Road | | Others | Sell to end users having permission under rule 9 | (10.) | Acetic acid [30-40%] | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2669 | Tons | 60 | Road | | Others | Sell to end users having permission under rule 9 | (11.) | Empty Barrels/ Containers/ liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 200 | Tons | 25 | Road | | Authorized Recyclers | | (12.) | Spent catalyst | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 90 | Tons | 15 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (13.) | ETP sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 230 | Tons | 15 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (14.) | Sodium Bisulfite [NaHSo3] (60-70%) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 356 | Tons | 60 | Road | | Others | Sell to end users having permission under rule 9 | (15.) | Spent solvent | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4080 | Tons | 25 | Road | | Others | reuse for production or sell to regd. users | (16.) | Off- Specification products | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 24 | Tons | 25 | Road | | Others | Co-processing or sent to CHWIF-BEIL-Ankleshwar | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 88.45 | 3.85 | 0.00 | 89 | 100 | (2.) | NOx | | Microgram per Meter Cube | 25.68 | 3.20 | 0.00 | 26 | 80 | (3.) | SO2 | | Microgram per Meter Cube | 24.68 | 3.20 | 0.00 | 25 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 58.10 | 8.16 | 0.00 | 59 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Reaction vessel-3 (Proposed) | -- | 11 | 0.3 | Others | H2S | 45 mg/Nm3 | (2.) | Thermic fluid heater (Proposed) | Natural gas | 11 | 0.35 | Others | SPM, SO2, NOx | 150 mg/Nm3; 50 ppm; 100 ppm | (3.) | DG set (Proposed) | Diesel | 11 | 0.25 | Others | SPM, SO2, NOx | 150mg/Nm3; 50 ppm; 100 ppm | (4.) | Boiler (existing) | Natural gas | 12 | 0.32 | Others | SPM, SO2, NOx | 150mg/Nm3; 50 ppm; 100 ppm | (5.) | Reaction vessel-1 (Existing) | -- | 11 | 0.3 | Others | HCl | 20 mg/Nm3 | (6.) | Boiler (Proposed) | Briquettes/Agro waste AND/OR Natural gas | 11 | 0.35 | Others | SPM, SO2, NOx | 150 mg/Nm3; 50 ppm; 100 ppm | (7.) | Reaction vessel-2 (Proposed) | -- | 11 | 0.3 | Others | HBr; SO2 | 20mg/Nm3; 40 mg/Nm3 | (8.) | Reaction vessel-1 (Proposed) | -- | 11 | 0.3 | Others | HCl | 20 mg/Nm3 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 350 | (b)Source | DGVCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 200 KVA * 1 Nos. | (e)Stack Height (in m) | 11 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0.75189 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 0.75189 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 2.293839 | (b)Waste/Barren Land (ha.) | 0.229555 | (c)Grazing/ Community Land (ha.) | 0.0 | (d)Surface Water Bodies (ha.) | 0.11674 | (e)Settlements (ha.) | 0.137823 | (f)Industrial (ha.) | 0.359274 | (g)Forest (ha.) | 0.0 | (h)Mangroves (ha.) | 0.0 | (i)Marine Area (ha.) | 0.0 | (j)Others (ha.) : Mud flats | 0.004475 | Total (ha.) | 3.141706 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 0.3 | | (2.) | Main Plant | | 0.1669 | | (3.) | Built Up Area | | 0.18 | R.M Storage; F.G. Storage; Utility area etc. | (4.) | Others | Open area | 0.10499 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Ankleshwar | 0 | -- | (2.) | WLS | NA | 0 | -- | (3.) | ESZs | NA | 0 | -- | (4.) | Corridors | NA | 0 | -- | (5.) | Wildlife Corridors | NA | 0 | -- | (6.) | NPA | NA | 0 | -- | (7.) | ESAs | NA | 0 | -- | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 0 | -- | (2.) | Defence Installations | | NA | 0 | -- | (3.) | Forest | | NA | 0 | -- | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.75 | (b)Land yet to be acquired(Ha) | 0.0 | (c)Status of Land acquisition if not acquired | Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | 10 Schedule-I species | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 10,22,500/- | (iii)Period of Implementation | 3 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Umarwada pond | (ii)Direction of Water Bodies in Buffer Area | South West | (iii)Distance of Water Bodies in Buffer Area | 8.04 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 00 | (b)Permanent Employment-During Operation | 50 | (c)Temporary Employment- During Construction | 15 | (d)Temporary Employment- During Operation | 20 | (e)No. of working days | 330 | (f)Total Manpower | 85 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.3 | (b)Percentage of Total Project Area | 39.90 | (c)No. of Plants to be Planted | 550 | (d)Funds Allocated for Plantation | 150000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Stay order against QCI/NABET | (ii)Name of the EIA Consultant | M/s. Aqua Air Environmental Engineers Pvt. Ltd. | (iii)Address | M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD. 403, CENTER POINT, NR. KADIWALA SCHOOL, RING ROAD, SURAT – 395002 (GUJARAT) | (iv)Mobile No. | 9904433995 | (v)Landline No. | 0261246124 | (vi)Email Id | aqua_eia@yahoo.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 07 Apr 2026 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Reply of ADS is attached here. | 09 Jun 2020 | 2. | NA | The matter has been examined in the Ministry and accordingly it is requested to kindly submit the following requisite information for further necessary action by the Ministry:
(i) Transfer of existing Consent to Operate from M/s Saheb Health Care to M/s Oscar Pharma.
(ii) Pl confirm whether any unit is working presently in the name of M/s Oscar Pharma with valid proof or not
(iii) The project proponent also needs to submit proof to establish that existing unit is operating with proper prior permission and to confirm that unit is not violating the provision contained in EIA Notification, 1994 and 2006. In this regard PP needs to submit all the old CTE/CTO and all the production details to verify the violation, if any.
(iv) Please confirm whether any Schedule I species is observed within the study area , if yes the proof of submission of conservation plan to the CWLW.
This issues is with approval of the competent authority. | 14 May 2020 | 3. | NA | The matter has been examined in the Ministry and accordingly it is requested to kindly submit the following requisite information for further necessary action by the Ministry:
(i) Transfer of existing Consent to Operate from M/s Saheb Health Care to M/s Oscar Pharma.
(ii) Pl confirm whether any unit is working presently in the name of M/s Oscar Pharma with valid proof or not
(iii) The project proponent also needs to submit proof to establish that existing unit is operating with proper prior permission and to confirm that unit is not violating the provision contained in EIA Notification, 1994 and 2006. In this regard PP needs to submit all the old CTE/CTO and all the production details to verify the violation, if any.
(iv) Please confirm whether any Schedule I species is observed within the study area , if yes the proof of submission of conservation plan to the CWLW.
This issues is with approval of the competent authority. | 14 May 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Sunil Dholariya | Designation | Partner | Name of Company (Applicant Name should not be given here) | M/S. OSCAR PHARMA | Address | Plot No.A1-7304,7305,7313/4,GIDC,Industrial Estate,Ankleshwar,Dist.Bharuch,Gujarat. |
|