Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Chemical Manufacturing unit of M/s Flowtech Chemicals Pvt. Ltd.
(b)Name of the Company / Organisation M/S FLOW TECH CHEMICALS PVT. LTD.
(c)Registered Address PACL Campus, Industrial Area, Naya Nangal, District- Ropar, Punjab,,Ropar,Punjab-140126
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant S S Dahiya
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address PACL Campus, Industrial Area, Naya Nangal, District- Ropar, Punjab,,Ropar,Ropar,Punjab-140126
(d)Pin code 140126
(e)E-mail flowtechchemicals1@gmail.com
(f)STD Code. 172(f)Telephone No. 4669295
(g)Fax No. 4669295
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/PB/IND2/145121/2018
(d)Master Proposal Number(Single Window) SW/145103/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 512/979, 1218/578, 590-592
(b)Pincode 140126
(c)Bounded Latitudes (North)
From
Degree 312206.78
Minutes
Second
From
Degree 312207.02
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 762042.04
Minutes
Second
From
Degree 762042.04
Minutes
Second
(e)Survey of India Topo Sheet No. H43E3 H43E7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 351
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Punjab
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaKendujharHarichandanpurTalpada & Rebana R.F.
(2.)OrissaJajpurSukindaDaitari
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/335/2012-IA II (I)
(c)Date of Issue of TOR 13 May 2018
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 29 Jul 2020
(c)Date of Issue of EC 28 Dec 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :04 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :19 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :0
Project Premises
State :Punjab
District :Rupnagar
Tehsil :Anandpur Sahib
Village :PACL Campus, Naya Nangal
160Safety MeasuresOthersADC
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chandigarh
(iii)Letter No. 5-731/2014/RO (NZ)/308
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Mar 4 2020 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Hydrochloric Acid384003840076800Tons per Annum(TPA)Road
(2.)Chlorinated Paraffin192001920038400Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Chemical Manufacturing PlantChlorinated Paraffin wax, Hydrochloric acidsChlorinated Paraffin wax, Hydrochloric acidsChlorinated Paraffin wax, Hydrochloric acids
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Jan 2019
(iv)Valid Upto 31 Dec 2021
(v)File No. CTOA/Renewal/RPN/2018/7572177
(vi)Application No. 7572177
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 7.60
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.54
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.08
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.20
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
c)Notified Eco-sensitive areas Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 33415
(b)Existing quantity of raw material/fuel 33415
(c)Total quantity of raw material/fuel 66830
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Liquid chlorine51902Tons per AnnumLocalRoad0 MoUCopy of Linkage
(2.)Heavy Normal Paraffin14792Tons per AnnumLocalRoad0 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)OthersCl2Micro Gram per Meter Cube15.12.112.6NS
(2.)NOxMicro Gram per Meter Cube25.719.223.780
(3.)PM10Micro Gram per Meter Cube82.264.580.9100
(4.)SO2Micro Gram per Meter Cube9.56.3980
(5.)PM2.5Micro Gram per Meter Cube45.227.144.160
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l3803085002000
(2.)Chloridesmg/l48.238.92501000
(3.)Total Hardnessmg/l250200200600
(4.)pHNA7.617.196.58.5
(5.)Heavy MetalsFemg/l0.120.101.01.0
(6.)Heavy MetalsCamg/l564075200
(7.)TSSmg/l0000
(8.)Fluoridemg/l001.01.5
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.817.72E
(2.)CODmg/l8.68.4E
(3.)BODmg/l21.9E
(4.)DOmg/l7.26.6E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))61.334.470
(2.)Leq(Day)A-weighted decibels(dB(A))73.147.375
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare3.01.22
(2.)pH8.767.80
(3.)N(Nitrogen)Percent2.41.1
(4.)K(Potassium)Kilogram per hectare88.350.2
(5.)Electric ConductivityMillisiemens per Centimetre504194.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.3 To 2.7
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 11.6 To 2.1
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater1800Copy of Permission LetterPipelineTube WellPACL 201425 Mar 2014180
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Waste Water5.66Septic TankReuse within the Plant & Recycling5.6
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 5.6
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 5.6
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid wasteMunicipal Solid Waste1.75Tons3RoadOthersAs per norms by Municipal Council
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube7200.2472.3100
(2.)PM2.5Microgram per Meter Cube38.9003960
(3.)SO2Microgram per Meter Cube7.2007.380
(4.)NOxMicrogram per Meter Cube21.103.42580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 350
(b)Source PSPCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2
(e)Stack Height (in m) 13.4
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1.2
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1.2
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 1.2
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 1.2000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant1.2in Ha
Total (ha.) 1.2
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNangal Wildlife Sanctuary2.6Ecologically sensitive area - WLS present in study area
(2.)Critically Polluted AreaNA00
(3.)ESAsNA00
(4.)CorridorsNA00
(5.)Wildlife CorridorsNA00
(6.)NPANangal Wildlife Sanctuary2.6Ecologically sensitive area - NPA present in study area
(7.)ESZsEco sensitive zone of Nangal WLS2.6Ecologically sensitive area - ESZ present in study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA00
(2.)OthersWetlandNangal Wetland/Reservoir2.6Present in study area
(3.)ForestNA00
(4.)Defence InstallationsNA00
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.24
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species (IWPA,1972) Faunal species i.e. Peacock or Indian Peafowl (Pavo cristatus), Python (Pythin molurus), Pangolin (Manis crassicaudata) and Leopard (Panthera pardus)
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Rs. 40 Lakh
(iii)Period of Implementation 5 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Satluj River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 3.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 350
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt1593.312389.963983.27
(2.)Percentage of Total Project Area13.2719.9133.18
(3.)Funds Allocated50000012000001700000
(4.)No. of Plants200397597
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalLandscaping
(2.)SocialEmployment
(3.)FinancialRevenue generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/SA095
(ii)Name of the EIA Consultant M/S ECO LABORATORIES & CONSULTANTS PVT. LTD.
(iii)Address Eco Bhawan, E-207, 204 & 205, Industrial Area, Phase VIII-B, (Sector- 74), Mohali (Punjab) - 160071
(iv)Mobile No. 9501514169
(v)Landline No. 0172461622
(vi)Email Id consulteco@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 13 Dec 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i) Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (Sno. 7.1) (ii) TOR compliance is not adequate in EIA/EMP report and need to revise as per the terms of reference granted for the project, and shall conform to Appendix III of the EIA Notification, 2006. (iii) Air Quality Impact Prediction (18.1 of form 2) mentioned wrong. Please correct the same (iv) Details of R&R (v) This is an expansion case. Details of action plan on non compliances reported by MoEFCC RO needs to be submitted (vi) Status of Conservation Plan approval from CWLW. (vii) Status of Water approval. (viii) Details of membership for TSDF. (ix) Details of Raw material linkage (S. no. 13.1 of form 2) and its mitigation measure during transportation needs to be submitted. (x) PP mentioned green belt @20%. PP Shall submit plan of about at least 30% Green belt development program along-with time line and budgetary allocation needs to be provided (xi) In view of the above, PP/Consultant are requested to revise the application for grant of EC and accordingly revise the Form 2 alongwith EIA/EMP Report. The EIA/EMP Report shall match with the information as filled in Form 2. On examination it is observed that the Consultant has not adequately submitted the application as per the provisions of the EIA Notification, 2006. Consultant has to read the documents before uploading the information in Form 2 /EIA/EMP report. 05 Mar 2020
2.NAThe correction have been made as per the instruction received 17 Jul 2020
3.NAYour application vide dated 17.07.2020 has been examined and on perusal it is noted that the Nangal Wildlife Sanctuary is located at 2.6 Km. PP has mentioned that unit is in operation with earlier EC, However NBWL clearance has not obtained yet. Please clarify and provide justification why PP has operated without NBWL Clearance. It is noncompliance of EC. 28 Jul 2020
4.NAThe correction have been made as per the instruction received 29 Jul 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterADS Reply dated 17.09.2020 07 Nov 2020
2.NA

 

The Committee after detailed deliberations has desired for additional information/inputs in respect of the following:

 

(i)              Detailed action plan for management of emissions from the unit.

 

(ii)             Incremental GLC due to the proposed project needs to be justified.

(iii)           Details of protected/ESZ area within 10 km of the project site.

 

(iv)           Copy of notification of ESZ details of the sanctuary and distance of the project from the sanctuary and the ESZ.

 

(v)            CER plan based on the public hearing issues.

 

(vi)           Details of fresh water requirement along with source.

 

(vii)          Detailed effluent management plan along with quantity.

 

(viii)        Details of conservation plan submitted to the Chief Wildlife Warden

 

(ix)           Details regarding the operation of Unit without NBWL clearance.

 

The proposal was accordingly DEFERRED for the needful.

29 Sep 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantS S Dahiya
DesignationDirector
Name of Company (Applicant Name should not be given here)M/S FLOW TECH CHEMICALS PVT. LTD.
AddressPACL Campus, Industrial Area, Naya Nangal, District- Ropar, Punjab
Print