1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s. Ajay Labs Private Limited | (b)Name of the Company / Organisation | AJAY LABS PRIVATE LIMITED | (c)Registered Address | Plot No: 90, Vivekananda Nagar Colony, Kukatpally, Hyderabad,,Rangareddi,Telangana-500072 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Ravi AjayChand | (b)Designation (Owner/ Partner/ CEO) | ManagingDirector | (c)Address | Sy.No. 11/2B, Pochampally Villagae, Jaggaiahpet Mandal, Krishna District, Andhra Pradesh,,Jaggayyapeta,Krishna,Andhra Pradesh-521178 | (d)Pin code | 521178 | (e)E-mail | ajaylabs19@gmail.com | (f)STD Code. | 40(f)Telephone No. | 23060702 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/AP/IND2/144171/2019 | (d)Master Proposal Number(Single Window) | SW/144159/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 11/2B | (b)Pincode | 521178 | (c)Bounded Latitudes (North) | | From | | Degree | 16 | Minutes | | Second | | From | | Degree | 16 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 80 | Minutes | | Second | | From | | Degree | 80 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 65 D/1 & 65 D/5 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 96 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 7.2 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Andhra Pradesh | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J-11011/48/2019-IA II (I) | (b)Date of Apply of TOR | 05 Feb 2019 | (c)Date of Issue of TOR / Standard ToR | 15 Mar 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 09 Jan 2020 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Proposed Project site is located at Survey No. 11/2B, Pochampally Village, Jaggayyapet Mandal, Krishna District, Andhra Pradesh | State : | Andhra Pradesh | District : | Krishna | Tehsil : | Jaggayyapeta | Village : | Pochampally |
| 89 | Suggested for Pollution control measures, greenbelt development and fund allocation for the nearest villagers | Others | District Revenue Officer & Addl. District Magistrate, Krishna District | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Coal Fired Boiler | 1 x 4.0 TPH | | (2.) | DG Sets | 2 x 320 KVA | | (3.) | Cooling Towers | 3 x 300 TR | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Tri Ethyl Ortho Formate | 20 | Others | MT/ Month | Road | | (2.) | Di Cyclohexyl Carbo Di Imide | 20 | Others | MT/ Month | Road | | (3.) | Levetiracetam | 10 | Others | MT/ Month | Road | | (4.) | Atorvastatin Calcium Trihydrate | 5 | Others | MT/ Month | Road | | (5.) | Darunavir | 5 | Others | MT/ Month | Road | | (6.) | Montelukast Sodium | 10 | Others | MT/ Month | Road | | (7.) | Curcumin | 5 | Others | MT/ Month | Road | | (8.) | Isobutene (By-product) | 20.12 | Others | Kg/ Day | Road | | (9.) | 1-Hydroxy-pyrrodiline-2,5-dione (By-product) | 35.86 | Others | Kg/ Day | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 6.4 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.74 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.16 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.18 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 80 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Ethanol | 207 | Tons per Annum | | Within the country | Road | | 10 | Linkage | | Copy of Linkage | (2.) | Aceto Nitrile | 30 | Tons per Annum | | Within the country | Road | | 10 | Linkage | | Copy of Linkage | (3.) | Methanol | 46 | Tons per Annum | | Within the country | Road | | 10 | Linkage | | Copy of Linkage | (4.) | N-hexane | 80 | Tons per Annum | | Within the country | Road | | 10 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2019 To 31 May 2019 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 62.15 | 53.23 | 62.13 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 25.18 | 14.52 | 25.18 | 60 | (3.) | NOx | | Micro Gram per Meter Cube | 22.96 | 13.82 | 22.92 | 80 | (4.) | SO2 | | Micro Gram per Meter Cube | 16.30 | 9.58 | 15.86 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 566 | 257.7 | 200 | 600 | (2.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (3.) | TDS | | | mg/l | | 1245 | 605 | 500 | 2000 | (4.) | Chlorides | | | mg/l | | 320.4 | 114.2 | 250 | 1000 | (5.) | Fluoride | | | mg/l | | 0.5 | 0.5 | 1 | 1.5 | (6.) | Heavy Metals | | Manganese as Mn | mg/l | | 0.02 | 0.02 | 0.1 | 0.3 | (7.) | pH | | | NA | | 8.27 | 7.54 | 6.5 | 8.5 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 19 | 9.0 | E | (2.) | pH | | NA | | 8.22 | 7.50 | E | (3.) | DO | | mg/l | | 5.8 | 3.9 | E | (4.) | COD | | mg/l | | 64 | 32 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 52.5 | 48.6 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 43.5 | 38.1 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Milligram per Kilogram | | 1.69 | 1.28 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 0.39 | 0.15 | (3.) | K(Potassium) | Milligram per Kilogram | | 18.25 | 15 | (4.) | pH | | | 8.05 | 7.29 | (5.) | P(Phosphorus) | Milligram per Kilogram | | 13.4 | 10.9 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.52 To 11.2 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.21 To 9.06 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 119 | 0 | Copy of Permission Letter | Pipeline | | Others | Existing borewell | 1588/Hg-II/2018 | 07 Aug 2019 | 119 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Process & Domestic | 39.26 | 40 | ZLD System | Reuse within the Plant & Recycling | | 39.26 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 39.26 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 39.26 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Spent carbon | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 3.6 | Tons | 10 | Road | | Others | Sent to Cement Industries | (2.) | Inorganic Solid waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 691.5 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 30 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (4.) | MEE Salts | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 203.1 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (5.) | Ash from boiler | Fly Ash | | 1680 | Tons | 10 | Road | | Others | Sent to Brick Manufacturers | (6.) | Organic distillate from stripper | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 48 | Tons | 10 | Road | | Others | Sent to Cement Industries | (7.) | Organic Solid waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 325.8 | Tons | 10 | Road | | Others | Sent to Cement Industries | (8.) | Used Oils | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.15 | Kilolitre | 10 | Road | | Authorized Recyclers | | (9.) | Solvent Distillation Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 44.4 | Tons | 10 | Road | | Others | Sent to Cement Industries | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 62.13 | 0.5 | 0.49 | 62.63 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 15.86 | 0.5 | 1.43 | 17.30 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 25.18 | 0.5 | 0.33 | 25.51 | 60 | (4.) | NOx | | Microgram per Meter Cube | 22.92 | 0.5 | 2.72 | 25.65 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Coal Fired Boiler | Coal | 32 | 0.5 | SO2 | | 1.19 | (2.) | Coal Fired Boiler | Coal | 32 | 0.5 | NOx | | 2.43 | (3.) | Coal Fired Boiler | Coal | 32 | 0.5 | PM10 | | 0.259 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 900 | (b)Source | Andhra Pradesh Southern Power Distribution Corpora | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 2 Nos. x 320 KVA | (e)Stack Height (in m) | 10 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 1.06 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 1.06 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 17301.4 | (b)Waste/Barren Land (ha.) | 5463.6 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 2449.2 | (e)Settlements (ha.) | 1130.4 | (f)Industrial (ha.) | 408.2 | (g)Forest (ha.) | 4647.2 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 31400.000000000004 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 1.06 | NA | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 0 | NA | (2.) | WLS | NA | 0 | NA | (3.) | NPA | NA | 0 | NA | (4.) | ESZs | NA | 0 | NA | (5.) | Wildlife Corridors | NA | 0 | NA | (6.) | ESAs | NA | 0 | NA | (7.) | Corridors | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 0 | NA | (2.) | Forest | | NA | 0 | NA | (3.) | Defence Installations | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 1.06 | (b)Land yet to be acquired(Ha) | 1.06 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Krishna River | (ii)Direction of Water Bodies in Buffer Area | South West | (iii)Distance of Water Bodies in Buffer Area | 7.2 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 50 | (c)Temporary Employment- During Construction | 10 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 300 | (f)Total Manpower | 60 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.44 | (b)Percentage of Total Project Area | 41.51 | (c)No. of Plants to be Planted | 670 | (d)Funds Allocated for Plantation | 400000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Increase in green belt area. | (2.) | Social | Direct employment to eligible persons preferable local persons besides creating indirect employment opportunities. Various CSR, CER activities in adjoining villages will help in improving social status. | (3.) | Financial | The project will contribute to the Government through various taxes. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1821/RA 0100 | (ii)Name of the EIA Consultant | Rightsource Industrial Solutions Pvt. Ltd. | (iii)Address | Plot No: 203, H.No:5-36/203, Prashanthi Nagar, IDA, Kukatpally, Hyderabad | (iv)Mobile No. | 9885560011 | (v)Landline No. | 0402307569 | (vi)Email Id | info@rightsource.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 25 Feb 2021 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (Sno. 7.1)
(ii) EIA report to be revised as per the terms of reference granted for the project, and shall conform to Appendix III of the EIA Notification, 2006. EIA report contains 11 chapters in place of 12 chapters.
(iii) Status of Conservation Plan approval from CWLW.
(iv) Status of Water approval.
(v) Details of membership for TSDF.
(vi) Details of Raw material linkage (S. no. 13.1 of form 2) and its mitigation measure during transportation needs to be submitted.
(vii) In view of the above, PP/Consultant are requested to revise the application for grant of EC and accordingly revise the Form 2 alongwith EIA/EMP Report. The EIA/EMP Report shall match with the information as filled in Form 2. On examination it is observed that the Consultant has not adequately submitted the application as per the provisions of the EIA Notification, 2006. Consultant has to read the documents before uploading the information in Form 2 /EIA/EMP report. | 05 Mar 2020 | 2. | NA | The correction have been made as per the instruction received | 23 Apr 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Ravi AjayChand | Designation | ManagingDirector | Name of Company (Applicant Name should not be given here) | AJAY LABS PRIVATE LIMITED | Address | Plot No: 90, Vivekananda Nagar Colony, Kukatpally, Hyderabad |
|