Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) “Proposed Expansion of Pesticide Technicals & Pesticide Specific Intermediates Products” By M/s. Tagros Chemicals India Private Limited (unit-I)
(b)Name of the Company / Organisation TAGROS CHEMICALS INDIA PRIVATE LIMITED [UNIT-I]
(c)Registered Address Plot No. A4/1-2 & 4-5, SIPCOT Industrial Complex, Vill: Pachayankuppam, Tehsil: Cuddalore, Dist. Cuddalore,,Cuddalore,Lakshadweep-607005
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant M Nagarajan
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Plot No. A4/1-2 and 4-5, SIPCOT Industrial Complex, Village Pachayankuppam, Tehsil Cuddalore District Cuddalore 607 005,,Cuddalore,Cuddalore,Tamil Nadu-607005
(d)Pin code 607005
(e)E-mail nagaraj@tagros.com
(f)STD Code. 4142(f)Telephone No. 239373
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Minor Activity
(b)Category A
(c)Proposal Number IA/TN/IND2/143725/2019
(d)Master Proposal Number(Single Window) SW/143714/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. A4/1,2, 4 and 5
(b)Pincode 607005
(c)Bounded Latitudes (North)
From
Degree 11.693970
Minutes
Second
From
Degree 11.696581
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 79.756798
Minutes
Second
From
Degree 79.758590
Minutes
Second
(e)Survey of India Topo Sheet No. 58M/9, 10 and 13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 7
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.84
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Tamil Nadu
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/453/2008-IA II(I)
(c)Date of Issue of TOR 26 Aug 2019
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 05 Mar 2020
(c)Date of Issue of EC 28 May 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Since it is located in Cuddalore SIPCOT
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chennai
(iii)Letter No. EP/12.1/774/TN/1853
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Oct 10 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Oxyclozanide202OthersTPMRoad
(2.)DV Acid Chloride15265280OthersTPMRoad
(3.)Fipronil05555OthersTPMRoad
(4.)Sodium Sulphite solution135011232473OthersTPMRoad
(5.)2 2 2 trichloroethyl08787OthersTPMRoad
(6.)Cupric chloride solution0141141OthersTPMRoad
(7.)Tefluthrin and Dimefluthrin and Transfluthrin01515OthersTPMRoad
(8.)Mixture of Ortho and para bromobenzene0189189OthersTPMRoad
(9.)Overall 22 Main product capacity273.75710983.75OthersTPMRoad
(10.)Ammonium Chloride330286616OthersTPMRoad
(11.)Spent isoprophy alcohol and EDC302252OthersTPMRoad
(12.)Potassium chloride0144144OthersTPMRoad
(13.)Alpha cypermethrin and Permethrin and betacyper175225400OthersTPMRoad
(14.)Piperonylbutoxide03535OthersTPMRoad
(15.)Sodium Sulphite Powder200-2000OthersTPMRoad
(16.)Metaphenoxy benzyl alcohol40040OthersTPMRoad
(17.)30% HCL Solution475152627OthersTPMRoad
(18.)AICI3 Solution12594219OthersTPMRoad
(19.)Mixture of ortho and para bromo Toluene95-950OthersTPMRoad
(20.)Spent Solvent01010OthersTPMRoad
(21.)Sodium Sulphate Solution0622622OthersTPMRoad
(22.)Deltamethrin second crop02626OthersTPMRoad
(23.)Deltamethrin201535OthersTPMRoad
(24.)Spent Sulphuric acid0824824OthersTPMRoad
(25.)Overall 15 Byproduct capacity264533856030OthersTPMRoad
(26.)Quinapyramine Sulfate1.7501.75OthersTPMRoad
(27.)Pyriproxyfen02020OthersTPMRoad
(28.)Hexa and difeno and Propiconazole and Dicamba2080100OthersTPMRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Boiler (TPH)81010Existing 8 TPH boiler is replaced by 10 TPH boiler and kept as standby only
(2.)DG SET (kVA)1x725* 1x1500 1x20001x1500 1x30002x1500 1x2000 1x3000After expansion 725 KVA will be replaced by 1500 kVA
(3.)Boiler (TPH)62525Existing 6 TPH boiler is replaced by 25 TPH boiler
(4.)Boiler (TPH)12-12Same after expansion
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 15 Jun 2018
(iv)Valid Upto 31 Mar 2021
(v)File No. T5/TNPCB/F.0148CUD/RL/CUB/W/2018
(vi)Application No. 180719950001
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 319.82
(b) Funds Allocated for Environment Management (Capital) (in Crores) 37.47
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.599
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 13.03
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? Yes
8.(a) If any Industrial Estate/Complex / Export processing Zones /Special Economic Zones/Biotech Parks / Leather Complex with homogeneous type of industries such as Items 4(d), 4(f), 5(e), 5(f), or those Industrial estates with pre –defined set of activities (not necessarily homogeneous, obtains prior environmental clearance, individual industries including proposed industrial housing within such estates /complexes will not be required to take prior environmental clearance, so long as the Terms and Conditions for the industrial estate/complex are complied with (Such estates/complexes must have a clearly identified management with the legal responsibility of ensuring adherence to the Terms and Conditions of prior environmental clearance, who may be held responsible for violation of the same throughout the life of the complex/estate
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 215.19
(b)Existing quantity of raw material/fuel 163.74
(c)Total quantity of raw material/fuel 378.93
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Coal8043OthersTPDAgarwal Coal companyRoad183 OthersPOCopy of Linkage
(2.)HSD for D.G set3.9OthersTPDLocalRoad5 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Aug 2019 To 31 Oct 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube75.1842.0674.75100
(2.)PM2.5Micro Gram per Meter Cube39.9422.6539.7060
(3.)NOxMicro Gram per Meter Cube32.8815.6532.6980
(4.)SO2Micro Gram per Meter Cube15.276.9915.1880
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0.520.2311.5
(2.)Heavy MetalsCoppermg/l0.010.010.051.5
(3.)pHNA8.026.926.58.5
(4.)Chloridesmg/l386.2661.362501000
(5.)TSSmg/l11100100
(6.)Total Hardnessmg/l710156200600
(7.)TDSmg/l13073055002000
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l7.996.86A
(2.)BODmg/l292E
(3.)CODmg/l19212E
(4.)DOmg/l6.35.51B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))72.152.675
(2.)Leq(Night)A-weighted decibels(dB(A))67.942.770
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH9.467.12
(2.)N(Nitrogen)Milligram per Kilogram680.6220.3
(3.)K(Potassium)Milligram per Kilogram30.116.74
(4.)P(Phosphorus)Milligram per Kilogram180.0731.04
(5.)Electric ConductivityOthersµmho/cm69485.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersSIPCOT7940.5Copy of Permission LetterPipelineOthersPipelineBW59382031 Dec 2019970
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sewage6475STPGreen Belt Renewal Plant64
(2.)Effluent612850ETP, FO RO and HPROReuse within the Plant & Recycling,OthersLoss432180
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 676
(b)Total Discharged Water (Kilolitre per Day) 180
(c)Total Reused Water (Kilolitre per Day) 496
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Spent SolventHazardous Waste (as per Hazardous and Other Waste Management rules 2016)200Kilolitre10RoadAuthorized Recyclers
(2.)chemical sludge/ MEE saltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)20440Tons194RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Empty barrelsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)200Tons10RoadAuthorized Recyclers
(4.)OrganicMunicipal Solid Waste59.95Tons0RoadOthersOWC
(5.)InorganicMunicipal Solid Waste89.97Tons10RoadCo-Processing
(6.)Process wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)745Tons153RoadOthersGEPIL, rainpet
(7.)Chemical containing residue from decontaminationHazardous Waste (as per Hazardous and Other Waste Management rules 2016)133.66Kilolitre0RoadOthersEvaporator
(8.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3.38Kilolitre10RoadAuthorized Recyclers
(9.)Distillation residuesHazardous Waste (as per Hazardous and Other Waste Management rules 2016)179Tons194RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube15.271.433.9719.2580
(2.)NOxMicrogram per Meter Cube32.881.431.7734.6680
(3.)PM10Microgram per Meter Cube75.181.430.4775.7100
(4.)PM2.5Microgram per Meter Cube39.941.430.2840.360
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)10 TPH boilerCoal301PM100.560
(2.)25 TPH BoilerCoal421.6PM100.022
(3.)10 TPH Boilercoal301SO20.212
(4.)25 TPH BoilerCoal421.6SO21.806
(5.)DG set 3000 kVAHSD130.36PM100.0339
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 6725
(b)Source TANGEDCO
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2x1500 1x2000 1x3000
(e)Stack Height (in m) 35
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 3.3676
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 00
    Total Land (ha.) 3.3676
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 13627.29
(b)Waste/Barren Land (ha.) 972
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1342
(e)Settlements (ha.) 2887
(f)Industrial (ha.) 259.71
(g)Forest (ha.) 86
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 12068
(j)Others (ha.) : Inland 1134
    Total (ha.) 32376
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant3.3676Ha
Total (ha.) 3.3676
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaCuddalore SIPCOT0Site within SIPCOT
(2.)NPANil0Nil
(3.)ESAsNil0Nil
(4.)Wildlife CorridorsNil0Nil
(5.)CorridorsNil0Nil
(6.)ESZsNil0Nil
(7.)WLSNil0Nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNil0Nil
(2.)Archaeological SitesNil0Nil
(3.)OthersTourismSt David Fort (Ruins)5.26NNE
(4.)ForestNil0Nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Uppanar River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 0.84
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 543
(c)Temporary Employment- During Construction 75
(d)Temporary Employment- During Operation 370
(e)No. of working days 365
(f)Total Manpower 988
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt7987.703138.311126
(2.)Percentage of Total Project Area23.719.3133.02
(3.)Funds Allocated100000020000003000000
(4.)No. of Plants8310341117
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalIncrease in green belt area.
(2.)SocialDirect employment to eligible persons preferable local persons besides creating indirect employment opportunities. Various CSR, CER activities in adjoining villages will help in improving social status.
(3.)FinancialThe project will contribute to the Government through various taxes.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/SA085(Rev.01)
(ii)Name of the EIA Consultant ECO Chem Sales & Services
(iii)Address Office Floor, Ashoka Pavillion-A, Opp.Kapadia Health Club, New Civil Road, Surat-395001
(iv)Mobile No. 9824476624
(v)Landline No. 0261223622
(vi)Email Id eco@ecoshripad.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 13 May 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantM Nagarajan
DesignationDirector
Name of Company (Applicant Name should not be given here)TAGROS CHEMICALS INDIA PRIVATE LIMITED [UNIT-I]
AddressPlot No. A4/1-2 & 4-5, SIPCOT Industrial Complex, Vill: Pachayankuppam, Tehsil: Cuddalore, Dist. Cuddalore
Print