Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed New National Highway NH 754K greenfield alignment Sanchore to Santalpur section starting from Vantdau in Banaskantha district to Ranmalpura in Patan district in the state of Gujarat
(b)Name of the Company / Organisation NATIONAL HIGHWAYS AUTHORITY OF INDIA (NHAI)
(c)Registered Address G-5 & G-6, Sector 10,Dwarka, New Delhi,New Delhi,Delhi-110075
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Prabhat Kumar Singh
(b)Designation (Owner/ Partner/ CEO) PD
(c)Address Gandhidham, Z-6, Ground Floor,Near Divine Life Society Hospital, Adhipur,Gandhidham,kutch,Gujarat-370205
(d)Pin code 370205
(e)E-mail pksinghnhai.2011@gmail.com
(f)STD Code. 283(f)Telephone No. 66260104
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(f) Highways
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/MIS/75732/2018
(d)Master Proposal Number(Single Window) SW/141529/2020
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Banaskantha and Patan
(b)Pincode 385001
(c)Bounded Latitudes (North)
From
Degree 234430.81
Minutes
Second
From
Degree 243919.45
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 710811.02
Minutes
Second
From
Degree 714429.27
Minutes
Second
(e)Survey of India Topo Sheet No. F42F1, F42F2, F42F5, F42F6, F42F9,G42X7, G42X8, G4
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 99
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 55
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratBanaskanthaVav
(2.)GujaratBanaskanthaTharad
(3.)GujaratBanaskanthaBhabhar
(4.)GujaratPatanSantalpur
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-60/2018-IA.III
(c)Date of Apply of TOR 11 Aug 2018
(d)Date of Issue of TOR / Standard ToR 13 Sep 2018
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :06 Jul 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :07 Aug 2019
Distance of Public Hearing Venue from the Proposed Project :1.20
Government Rest House, Near Industrial Training Center, Radhanpur- Santalpur Highway, Santalpur
State :Gujarat
District :Patan
Tehsil :Santalpur
Village :Santalpur
63Enclosed as Annexure-11 of Final EIA/EMP ReportOthersDirector-DRDA and Representative of District Magistrate
(2.)
Date of Advertisement :06 Jul 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :09 Aug 2019
Distance of Public Hearing Venue from the Proposed Project :1.55
Hotel Desert Inn, Banquet hall, Mumbai Market, Highway Char Rasta, Tharad
State :Gujarat
District :Banaskantha
Tehsil :Tharad
Village :Tharad
61Enclosed as Annexure-11 of Final EIA/EMP ReportOthersDirector-DRDA and Representative of District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)National Highway (NH-754K)125.185 KmProposed
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)National Highway (NH-754K) (Area - 843.54 ha)125.18KilometersRoad,OthersNational Highway
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 15 Feb 2020
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2959.31
(b) Funds Allocated for Environment Management (Capital) (in Crores) 14.3
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 14.796
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.49
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3087293
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 3087293
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Steel302OthersMT per KMapproved suppliers in Patan and BanaskanthaRoad00 Othersapproved suppliersCopy of Linkage
(2.)Bitumen38310OthersMT per KMapproved supplierRoad00 Othersapproved suppliersCopy of Linkage
(3.)cement1393OthersMT per KMapproved suppliersRoad00 Othersapproved suppliersCopy of Linkage
(4.)Aggregate21095Otherscubic meter per KMapproved mine quarryRoad00 Othersapproved mine quarryCopy of Linkage
(5.)Sand196130Otherscubic meterBanas RiverRoad55 Othersauthorized dealersCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube159.487.1157.6100
(2.)SO2Micro Gram per Meter Cube9.73.69.580
(3.)OthersCarbon Monoxide (CO)Micro Gram per Meter Cube1252.0348.51216.0677.7
(4.)PM2.5Micro Gram per Meter Cube84.546.881.060
(5.)NOxMicro Gram per Meter Cube26.29.425.680
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.267.416.58.5
(2.)TDSmg/l4624.2182.25002000
(3.)Heavy MetalsMercury (Hg)mg/l0.000.000.000.00
(4.)TSSmg/l00000000
(5.)Total Hardnessmg/l1080.0104.0200600
(6.)Chloridesmg/l2100.026.02501000
(7.)Fluoridemg/l1.080.481.01.5
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l16.25.1C
(2.)pHNA8.858.11C
(3.)DOmg/l8.37.1C
(4.)CODmg/l72.020.0C
(5.)OthersTDSmg/l205.0184.0C
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))51.442.455
(2.)Leq(Night)A-weighted decibels(dB(A))38.734.845
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare68.537.4
(2.)K(Potassium)Kilogram per hectare1512.552.2
(3.)Electric ConductivityOthersµmhos/cm495.0133.0
(4.)pH8.897.81
(5.)N(Nitrogen)Kilogram per hectare684.0575.5
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 17.38 To 199.15
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 40
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface25200000Copy of Permission LettermodeOthersWater TankerOthersWater Tanker0015 Feb 202000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)00000000OthersMobile Toilets0000
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Construction WasteConstruction & Demolition Waste0.15Tons00RoadOthersAs per Solid Waste Management Rules, 2016
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube219.40.133.83224.0100
(2.)PM2.5Microgram per Meter Cube84.50.132.387.060
(3.)SO2Microgram per Meter Cube0000000.100
(4.)NOxMicrogram per Meter Cube14.20.130.0315.080
(5.)Others(Specify)Carbon Monoxide (CO)Microgram per Meter Cube00.130.120.134.0
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)00000000NOx00
(2.)00000000SO200
(3.)00000000PM1000
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 00
(b)Source Solar Power and Grid Supply
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 00
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 153.99
(b)Private Land (ha.) 685.39
(c)Government Land (ha.) 00
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 4.16
    Total Land (ha.) 843.54
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 685.39
(b)Waste/Barren Land (ha.) 00
(c)Grazing/ Community Land (ha.) 00
(d)Surface Water Bodies (ha.) 00
(e)Settlements (ha.) 00
(f)Industrial (ha.) 00
(g)Forest (ha.) 153.99
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : Protected Area 4.16
    Total (ha.) 843.54
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersRoad (National Highway - 754K)843.54Proposed
Total (ha.) 843.54
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Area0000Nil
(2.)ESAsFlamingo Nest4.80Seasonal
(3.)Corridors000000
(4.)ESZsWild Ass Santuary1.87Applied (Wildlife Clearance Under Process)
(5.)WLSWild Ass Sanctuary1.87Applied (Wildlife Clearance Under Process)
(6.)Wildlife Corridors000000
(7.)NPA000000
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological Sites000000
(2.)ForestProtected and Reserve Forest00Applied (Forest Clearance Under Process)
(3.)Defence Installations000000
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? Yes
(i)Status of NBWL NIL
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Under Process(Stage-II)
(b)Legal Status of Forest Land Protected and Reserve Forest
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 6773
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 843.54
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired Nil
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 41
(b)No. of Households 280
(c)No. of PDFs (Project Displaced Families) 1528
(d)No. of PAFs (Project Affected Families) 7624
(e)Funds Allocated for R&R(in INR) (in Lacs) 232.67
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Wild Ass, Peafowl and Black Kite (Cheel)
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 2640000
(iii)Period of Implementation 00
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Narmada Main and Kutch Canal
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area 00
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 00
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 450
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 40
(d)Temporary Employment- During Operation 10
(e)No. of working days 365
(f)Total Manpower 550
32.
Green Belt in Ha:
(a)Total Area of Green Belt 00
(b)Percentage of Total Project Area 0.00
(c)No. of Plants to be Planted 62500
(d)Funds Allocated for Plantation 0.00
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalIncrease in green belt area
(2.)SocialDirect employment to eligible persons preferable local persons besides creating indirect employment opportunities. Various CSR, CER activities in adjoining villages will help in improving social status
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 00
(b)Total No. of Flats to be Build 00
(c)No. of Buildings 00
(d)Total plot area (sqm) 00
(e)Total built up area (sqm) 00
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 00
(b)Capacity 00
(c)No. of Recharge Pits 250
(d)Capacity 00
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 00
5.
Energy Saving Measures:
(a)Source/Mode Solar Panels, LED etc.
(b)Percentage 00
(c)Quantity 00
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area 00
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment 00
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
(a)Total No. of Bridges 28
(b)Total No. of ROB 00
(c)Total No. of Interchanges 04
(d)Total No. of Flyovers 00
(e)Total No. of Vehicle Underpass 70
(f)Total No. of Pedestrian Underpass 00
(g)Details of other utilities rail and road corridors 00
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA0141
(ii)Name of the EIA Consultant Amaltas Enviro Industrial Consultant LLP
(iii)Address 2925-Basement, Sector-46, Gurugram, Haryana
(iv)Mobile No. 9899531153
(v)Landline No. 0124418153
(vi)Email Id amaltascon@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 31 Dec 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease re-submit the application after incorporating compliance in respect of EDS points raised for similar proposal submitted earlier. Most of the points are not yet complied. 09 Mar 2020
2.NAThe correction have been made as per the instruction received 12 Mar 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterWe are herewith submitting the documents as per the requirement. Kindly consider it and grant the EC at the earliest. Thanking You. 06 Jul 2020
2.NAPlease submit the required information and documents as per the minutes of 235th EAC meeting held on 26.05.2020 06 Jul 2020
3. ADS Reply LetterWith reference of 234th EAC Meeting held on dated 27.04.2020, we are herewith submitting the reply of ADS raised on 12.05.2020. It is requested to kindly consider the reply for grant of Environmental Clearance. 14 May 2020
4.NAAs per ADS raised during 234th EAC meeting held on 27.04.2020, the proponent is required to reply for points no. (v) to (xix) only. It is also observed that two replies have been submitted on 09.05.2020. For examination purpose, the upper one has been considered. The point wise observations are as under: 1. RESPONSE AT S. NO. VI: it is mentioned that detailed study on ‘Salt pan, water bird and water draining pattern and changes that can occur especially during rains and floods’ has been carried out as per scope mentioned in ToR conditions and referred the annexures II and III. However, one perusal it is observed annexure II (page 239 of ADS reply document) is a map only that shows the distance of salt pan from the proposed alignment. Likewise, annexure III (pages 240-272) shows only certain hydraulic calculations for one major bridge and five minor bridges along with few maps (date and scale not mentioned) showing boundaries of catchment areas. The detailed of methodology for data collection, analysis and subsequent findings are not discussed and compiled in report form. 2. RESPONSE AT S. NO. VII: Same as above. Annexure III (pages 240-272) shows only certain hydraulic calculations for one major bridge and five minor bridges along with few maps (date and scale not mentioned) showing boundaries of catchment areas. The detailed of methodology for data collection, analysis and subsequent findings are not discussed and compiled in report form. 3. RESPONSE AT S. NO. VIII: Map showing ESZ has been provided (pages 273-275). This does not show the distribution and movement of Wild Ass along the proposed alignment and cross over sites on the basis of Wild Ass census data collected by the State Forest Department of Gujarat. 4. RESPONSE AT S. NO. XIX: Not complied ADS. Only provided the list of species to be planted along with the number of trees and allocated budget (pages 384-385). Comprehensive plan is not provided. Please provide the above mentioned information/documents at the earliest for further consideration of the proposal. 12 May 2020
5.NAAs per ADS raised during 234th EAC meeting held on 27.04.2020, the proponent is required to reply for points no. (v) to (xix) only. It is also observed that two replies have been submitted on 09.05.2020. For examination purpose, the upper one has been considered. The point wise observations are as under: 1. RESPONSE AT S. NO. VI: it is mentioned that detailed study on ‘Salt pan, water bird and water draining pattern and changes that can occur especially during rains and floods’ has been carried out as per scope mentioned in ToR conditions and referred the annexures II and III. However, one perusal it is observed annexure II (page 239 of ADS reply document) is a map only that shows the distance of salt pan from the proposed alignment. Likewise, annexure III (pages 240-272) shows only certain hydraulic calculations for one major bridge and five minor bridges along with few maps (date and scale not mentioned) showing boundaries of catchment areas. The detailed of methodology for data collection, analysis and subsequent findings are not discussed and compiled in report form. 2. RESPONSE AT S. NO. VII: Same as above. Annexure III (pages 240-272) shows only certain hydraulic calculations for one major bridge and five minor bridges along with few maps (date and scale not mentioned) showing boundaries of catchment areas. The detailed of methodology for data collection, analysis and subsequent findings are not discussed and compiled in report form. 3. RESPONSE AT S. NO. VIII: Map showing ESZ has been provided (pages 273-275). This does not show the distribution and movement of Wild Ass along the proposed alignment and cross over sites on the basis of Wild Ass census data collected by the State Forest Department of Gujarat. 4. RESPONSE AT S. NO. XIX: Not complied ADS. Only provided the list of species to be planted along with the number of trees and allocated budget (pages 384-385). Comprehensive plan is not provided. Please provide the above mentioned information/documents at the earliest for further consideration of the proposal. 12 May 2020
6.NAAs per ADS raised during 234th EAC meeting held on 27.04.2020, the proponent is required to reply for points no. (v) to (xix) only. It is also observed that two replies have been submitted on 09.05.2020. For examination purpose, the upper one has been considered. The point wise observations are as under: 1. RESPONSE AT S. NO. VI: it is mentioned that detailed study on ‘Salt pan, water bird and water draining pattern and changes that can occur especially during rains and floods’ has been carried out as per scope mentioned in ToR conditions and referred the annexures II and III. However, one perusal it is observed annexure II (page 239 of ADS reply document) is a map only that shows the distance of salt pan from the proposed alignment. Likewise, annexure III (pages 240-272) shows only certain hydraulic calculations for one major bridge and five minor bridges along with few maps (date and scale not mentioned) showing boundaries of catchment areas. The detailed of methodology for data collection, analysis and subsequent findings are not discussed and compiled in report form. 2. RESPONSE AT S. NO. VII: Same as above. Annexure III (pages 240-272) shows only certain hydraulic calculations for one major bridge and five minor bridges along with few maps (date and scale not mentioned) showing boundaries of catchment areas. The detailed of methodology for data collection, analysis and subsequent findings are not discussed and compiled in report form. 3. RESPONSE AT S. NO. VIII: Map showing ESZ has been provided (pages 273-275). This does not show the distribution and movement of Wild Ass along the proposed alignment and cross over sites on the basis of Wild Ass census data collected by the State Forest Department of Gujarat. 4. RESPONSE AT S. NO. XIX: Not complied ADS. Only provided the list of species to be planted along with the number of trees and allocated budget (pages 384-385). Comprehensive plan is not provided. Please provide the above mentioned information/documents at the earliest for further consideration of the proposal. 12 May 2020
7.NAAs per ADS raised during 234th EAC meeting held on 27.04.2020, the proponent is required to reply for points no. (v) to (xix) only. It is also observed that two replies have been submitted on 09.05.2020. For examination purpose, the upper one has been considered. The point wise observations are as under: 1. RESPONSE AT S. NO. VI: it is mentioned that detailed study on ‘Salt pan, water bird and water draining pattern and changes that can occur especially during rains and floods’ has been carried out as per scope mentioned in ToR conditions and referred the annexures II and III. However, one perusal it is observed annexure II (page 239 of ADS reply document) is a map only that shows the distance of salt pan from the proposed alignment. Likewise, annexure III (pages 240-272) shows only certain hydraulic calculations for one major bridge and five minor bridges along with few maps (date and scale not mentioned) showing boundaries of catchment areas. The detailed of methodology for data collection, analysis and subsequent findings are not discussed and compiled in report form. 2. RESPONSE AT S. NO. VII: Same as above. Annexure III (pages 240-272) shows only certain hydraulic calculations for one major bridge and five minor bridges along with few maps (date and scale not mentioned) showing boundaries of catchment areas. The detailed of methodology for data collection, analysis and subsequent findings are not discussed and compiled in report form. 3. RESPONSE AT S. NO. VIII: Map showing ESZ has been provided (pages 273-275). This does not show the distribution and movement of Wild Ass along the proposed alignment and cross over sites on the basis of Wild Ass census data collected by the State Forest Department of Gujarat. 4. RESPONSE AT S. NO. XIX: Not complied ADS. Only provided the list of species to be planted along with the number of trees and allocated budget (pages 384-385). Comprehensive plan is not provided. Please provide the above mentioned information/documents at the earliest for further consideration of the proposal. 12 May 2020
8.NAAs per ADS raised during 234th EAC meeting held on 27.04.2020, the proponent is required to reply for points no. (v) to (xix) only. It is also observed that two replies have been submitted on 09.05.2020. For examination purpose, the upper one has been considered. The point wise observations are as under: 1. RESPONSE AT S. NO. VI: it is mentioned that detailed study on ‘Salt pan, water bird and water draining pattern and changes that can occur especially during rains and floods’ has been carried out as per scope mentioned in ToR conditions and referred the annexures II and III. However, one perusal it is observed annexure II (page 239 of ADS reply document) is a map only that shows the distance of salt pan from the proposed alignment. Likewise, annexure III (pages 240-272) shows only certain hydraulic calculations for one major bridge and five minor bridges along with few maps (date and scale not mentioned) showing boundaries of catchment areas. The detailed of methodology for data collection, analysis and subsequent findings are not discussed and compiled in report form. 2. RESPONSE AT S. NO. VII: Same as above. Annexure III (pages 240-272) shows only certain hydraulic calculations for one major bridge and five minor bridges along with few maps (date and scale not mentioned) showing boundaries of catchment areas. The detailed of methodology for data collection, analysis and subsequent findings are not discussed and compiled in report form. 3. RESPONSE AT S. NO. VIII: Map showing ESZ has been provided (pages 273-275). This does not show the distribution and movement of Wild Ass along the proposed alignment and cross over sites on the basis of Wild Ass census data collected by the State Forest Department of Gujarat. 4. RESPONSE AT S. NO. XIX: Not complied ADS. Only provided the list of species to be planted along with the number of trees and allocated budget (pages 384-385). Comprehensive plan is not provided. Please provide the above mentioned information/documents at the earliest for further consideration of the proposal. 12 May 2020
9. ADS Reply LetterSubmitting the Compliance of observations raised in 234th EAC Meeting held on 27th April, 2020 for obtaining Environmental Clearance 09 May 2020
10. ADS Reply LetterSubmitting the Compliance of observations raised in 234th EAC Meeting held on 27th April, 2020 for obtaining Environmental Clearance 09 May 2020
11.NA