1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Development of Industrial Park over 4194.32 acre (1697.38 Ha) at Guttapadu Village, Orvakal Mandal, Kurnool District, Andhra Pradesh by M/s. Andhra Pradesh Industrial Infrastructure Corporation (APIIC | (b)Name of the Company / Organisation | ANDRA PRADESH INDUSTRIAL INFRASTRUCTURE CORPORATION LIMITED | (c)Registered Address | APIIC Towers, 9, 10, 11 Floors, CFC-1, IT Park, Auto Nagar Mangalagiri,,Guntur,Andhra Pradesh-522503 | (d)Legal Status of the Company | State Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Chenchaiah R | (b)Designation (Owner/ Partner/ CEO) | CE | (c)Address | APIIC Towers, 9,10,11 Floors, CFC-1, IT Park, Auto Nagar, Mangalagiri,,Mangalagiri,Guntur,Andhra Pradesh-522503 | (d)Pin code | 522503 | (e)E-mail | bvsivareddy.apiic@nic.in | (f)STD Code. | 40(f)Telephone No. | 23237622 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
| Minor Activity | 7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
| (b)Category | A | (c)Proposal Number | IA/AP/NCP/143252/2019 | (d)Master Proposal Number(Single Window) | SW/143238/2020 | (e)EAC concerned (for category A Projects only) | INFRA-1 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Land documents attached for Survey Nos. | (b)Pincode | 518010 | (c)Bounded Latitudes (North) | | From | | Degree | 15.616954 | Minutes | | Second | | From | | Degree | 15.673398 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 78.103357 | Minutes | | Second | | From | | Degree | 78.163336 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | D44A01, D44A02, D44A06 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 405 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 10.5 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Andhra Pradesh | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | 27-74/2018-IA.III | (c)Date of Apply of TOR | 14 Mar 2019 | (d)Date of Issue of TOR / Standard ToR | 16 May 2019 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 31 Oct 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| At proposed project site | State : | Andhra Pradesh | District : | Kurnool | Tehsil : | Orvakal | Village : | Guttapadu |
| 200 | Some of the major issues raised during Public hearing include - employment related, compensation for land, grazing land for livestock, expected pollution from industries, objection for chemical indus | Others | District Revenue Officer | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Project area | 1697.38 ha | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Development of Industrial Park | 1697.38 | Hectares | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 495 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 160 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 7.5 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 16 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 1 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 1 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | NA | 0 | Others | na | nil | Road | | 0 | Others | NA | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2018 To 28 Feb 2019 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 16.6 | 7.2 | 16.6 | 80 | (2.) | Others | O3 | Micro Gram per Meter Cube | 22.1 | 13.2 | 22.1 | 100 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 36.6 | 23.3 | 36.6 | 60 | (4.) | PM10 | | Micro Gram per Meter Cube | 56.5 | 42.3 | 56.5 | 100 | (5.) | NOx | | Micro Gram per Meter Cube | 24.5 | 16.1 | 24.5 | 80 | |
14.2. No. of Ground Water monitoring locations : 11 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | mg/l | | 8.2 | 7.1 | 6.5 | 8.5 | (2.) | TSS | | | mg/l | | 58 | 14 | 0 | 0 | (3.) | Fluoride | | | mg/l | | 2 | 0.5 | 1 | 1.5 | (4.) | Total Hardness | | | mg/l | | 910 | 72 | 200 | 600 | (5.) | Heavy Metals | | Iron | mg/l | | 0.28 | 0.2 | 0.3 | 0.3 | (6.) | Chlorides | | | mg/l | | 664 | 24 | 250 | 1000 | (7.) | TDS | | | mg/l | | 2346 | 107 | 500 | 2000 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | mg/l | | 7.9 | 7.2 | D | (2.) | BOD | | mg/l | | 32 | 26 | D | (3.) | COD | | mg/l | | 120 | 98 | D | (4.) | DO | | mg/l | | 5.4 | 4.8 | D | |
14.4. No. of Ambient Noise monitoring locations : 10 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 54.3 | 50.8 | 55/65 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 43.6 | 40.8 | 45/55 | |
14.5. No. of Soil Sample Monitored locations : 11 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Kilogram per hectare | | 36.3 | 15.9 | (2.) | pH | Milligram per Litre | | 8.5 | 7.4 | (3.) | N(Nitrogen) | Kilogram per hectare | | 273 | 188 | (4.) | K(Potassium) | Kilogram per hectare | | 674 | 289 | (5.) | Electric Conductivity | Others | Microsiemens per centimeter | 320 | 84 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 03 To 13 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.5 To 10 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 19000 | 36 | Copy of Permission Letter | Pipeline | | Intake Well | | CE(P)/KNL/DEE.1/AEE.3/IWS/154 Govt | 01 Jun 2016 | 42475270 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial wastewater | 6892 | 7000 | Common Effluent Treatment Plant | Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 6892 | | (2.) | Domestic wastewater | 1048 | 1100 | Common Sewage Treatment Plant | Green Belt Renewal Plant | | 1048 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 7940 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 7940 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Solid waste | Bottom Ash | | 49.5 | Tons | 300 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Liquid waste | Others | Waste Oil | 51 | Tons | 300 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Solid waste | Fly Ash | | 12.5 | Tons | 100 | Road | | Others | Cement industries | (4.) | Solid wste | Municipal Solid Waste | | 2326 | Tons | 30 | Road | | Others | Disposed to local municipalities | (5.) | Solid waste | Industrial Waste | | 1542 | Tons | 300 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 16.6 | 0 | 20 | 36.61 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 56.5 | 0 | 3.9 | 60.41 | 100 | (3.) | NOx | | Microgram per Meter Cube | 24.5 | 0 | 25.1 | 49.61 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 36.5 | 0 | 3.9 | 40.41 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler | Coal | 30 | 0.3 | PM10 | | 0.507 | (2.) | DG set | HSD | 10 | 0.2 | NOx | | 1.32 | (3.) | Bolier | Coal | 30 | 0.3 | SO2 | | 3.19 | (4.) | Boiler | Coal | 30 | 0.3 | NOx | | 2.09 | (5.) | DG set | HSD | 10 | 0.2 | PM10 | | 0.066 | (6.) | DG set | HSD | 10 | 0.2 | SO2 | | 0.054 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 115000 | (b)Source | Nearest substations of Orvakal/Nannur/Kalvabugga | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 27250 kVA (250 kVA *8 = 2000 kVA, 500 kVA*25 = 125 | (e)Stack Height (in m) | 10 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 264.16 | (c)Government Land (ha.) | 1433.22 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 1697.38 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 251.43 | (b)Waste/Barren Land (ha.) | 1445.24 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0.71 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Other | 0 | Total (ha.) | 1697.38 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Water Reservoir | | 28.85 | water bodies | (2.) | Main Plant | | 1080.72 | Industrial plot area | (3.) | Others | Roads, common facilities & logistic hub | 310.41 | Roads, common facilities & logistic hub area | (4.) | Green belt | | 277.4 | Green buffer | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | GIB Rollapadu WLS | 19.7 | Great Indian Bustard (GIB) | (2.) | NPA | Not Available | 0 | Not Applicable | (3.) | ESAs | Not Available | 0 | Not Applicable | (4.) | ESZs | Not Available | 0 | Not Applicable | (5.) | Wildlife Corridors | Not Available | 0 | Not Applicable | (6.) | Corridors | Not Available | 0 | Not Applicable | (7.) | Critically Polluted Area | Not Available | 0 | Not Applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Gani Reserve Forest | 6 | Southeast direction | (2.) | Defence Installations | | Not Available | 0 | Not Applicable | (3.) | Archaeological Sites | | Not Available | 0 | Not Applicable | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 1433.22 | (b)Land yet to be acquired(Ha) | 264.16 | (c)Status of Land acquisition if not acquired | Initial stage | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Seasonal natural streams are passing through the site which will not be diverted. Sufficient greenbelt and development zone will be provided all along the natural streams. | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Rock Garden Lake | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 1.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 20000 | (c)Temporary Employment- During Construction | 2500 | (d)Temporary Employment- During Operation | 3000 | (e)No. of working days | 365 | (f)Total Manpower | 25500 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 560 | (b)Percentage of Total Project Area | 32.99 | (c)No. of Plants to be Planted | 840000 | (d)Funds Allocated for Plantation | 550000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Inventory of 2710 trees will be generated | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-1 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 10 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 1 | (d)Total plot area (sqm) | 169738 | (e)Total built up area (sqm) | 0 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 5 | (b)Capacity | 170 | (c)No. of Recharge Pits | 5 | (d)Capacity | 350 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 49760 | |
|
5. | Energy Saving Measures: | (a)Source/Mode | Solar street lighting, LED bulbs etc. | (b)Percentage | 3 | (c)Quantity | 3450 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
(1.) | White Category | 20 | B | (2.) | Green Category | 03 | B | (3.) | Red Category | 02 | A | (4.) | Orange Category | 23 | B | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | Yes | (b)Name of the Court | High Courts | (c)Name of the Sub Court | Andhra Pradesh | (d)Case No. | WP. No. 659 of 2019, WP No. 663 of 2019 | (e)Orders/Directions of the court ,if any and its relevance with the proposed project | The Wirt Petitions not filed against the project | (f)Case Details | Orders to pay the compensation towards DKT lands | (g)Uploaded Court Order | Copy of Court Order | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1922/RA 0140 | (ii)Name of the EIA Consultant | Ramky Enviro Services Private Limited | (iii)Address | Ramky Grandiose, Ramky Towers Complex, Gachibowli, Hyderabad – 500 032 | (iv)Mobile No. | 9949991029 | (v)Landline No. | 0402301536 | (vi)Email Id | vvijaykumar@ramky.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-1 | (ix)Validity of Accreditation | 21 May 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | 1.Please match with earlier ToR Proposal number
2.Instead of covering letter upload the copy of in support of competency authority
3.Please clarrify whether PH was conducted by District Magistate /Distict collector /Deputy commissioner or his representative not below the rank of Additional District Magistrate as per the EIA notification, 2006.Submit the clarriffication form APSPCB
4.Submit EIA/EMP report as per the generaic structure mentioned in EIA, notification,2006. In 7 chapter Sicial impact asessment and R&R action plan missed. Please check all the chapter and submit the EIA/EMP report again. | 20 Mar 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Chenchaiah R | Designation | CE | Name of Company (Applicant Name should not be given here) | ANDRA PRADESH INDUSTRIAL INFRASTRUCTURE CORPORATION LIMITED | Address | APIIC Towers, 9, 10, 11 Floors, CFC-1, IT Park, Auto Nagar Mangalagiri |
|