1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Real Power Private Limited | (b)Name of the Company / Organisation | REAL POWER PRIVATE LIMITED | (c)Registered Address | Vrindavan, Near IDBI Bank, Civil Lines, Raipur,,Mungeli,Chhattisgarh-492001 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Rajesh Biswas | (b)Designation (Owner/ Partner/ CEO) | GM | (c)Address | Vrindavan, Near IDBI Bank, Civil Lines, Raipur - 492001,,No Data,Mungeli,Chhattisgarh-495334 | (d)Pin code | 495334 | (e)E-mail | realpowerraipur@gmail.com | (f)STD Code. | 771(f)Telephone No. | 4224000 | (g)Fax No. | 4224010 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/CG/IND/142231/2017 | (d)Master Proposal Number(Single Window) | SW/142230/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 1, 4/1, 5, 6/4, 7/4, 8/3, 12, 13/2, 14, 16/2, 16/3 | (b)Pincode | 495335 | (c)Bounded Latitudes (North) | | From | | Degree | 21.939981 | Minutes | | Second | | From | | Degree | 21.944225 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 81.989834 | Minutes | | Second | | From | | Degree | 81.990824 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 64 G/13 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 245 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.5 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Chhattisgarh | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/347/2017-IA-II(I) | (c)Date of Issue of TOR | 20 Jul 2017 | (f)Previous TOR Letter | NA | (b)Date of Apply of EC | 02 Sep 2020 | (c)Date of Issue of EC | 07 Nov 2023 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 08 Nov 2019 | Distance of Public Hearing Venue from the Proposed Project : | 1.3 |
| Government Primary School, Khamhardih | State : | Chhattisgarh | District : | Mungeli | Tehsil : | No Data | Village : | Khamhardih |
| 200 | Construction of entrance gate and renovation of Mahamaya Temple at Village Rambod,RO plant for drinking water, Road widening & repairing, Employment & Pollution, Support will be given to sports activi | Others | Additional Collector | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | SPCB | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | | (iii)Letter No. | 5367/HO/Tech/CECB/2019 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Sep 7 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Pig Iron | 0 | 25200 | 25200 | Tons per Annum(TPA) | | Road | | (2.) | Silico Managanese | 0 | 14400 | 14400 | Tons per Annum(TPA) | | Road | | (3.) | Ferro Silicon | 0 | 7000 | 7000 | Tons per Annum(TPA) | | Road | | (4.) | Ferro Manganese | 0 | 25200 | 25200 | Tons per Annum(TPA) | | Road | | (5.) | Ferro Chrome | 0 | 15000 | 15000 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Submerged Electric Arc Furnace | Nil | 1 x 9 MVA | 1 x 9 MVA | Proposed Ferro Alloys will be taken up in the existing Biomass plant premises | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 02 Jul 2018 | (iv)Valid Upto | 30 Nov 2021 | (v)File No. | 2724/TS/CECB/2018 | (vi)Application No. | 1064869 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 13.0 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 2.0 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.13 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.376 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 46260 | (b)Existing quantity of raw material/fuel | 0 | (c)Total quantity of raw material/fuel | 46260 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Manganese Ore | 46260 | Tons per Annum | | Balaghat (M.P.) | Road,Rail | | 500 | e-auction | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2017 To 31 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 28.3 | 9.5 | 28.3 | 80 | (2.) | Others | CO | Micro Gram per Meter Cube | 1150 | 525 | 1150 | 2000 | (3.) | PM10 | | Micro Gram per Meter Cube | 63.2 | 32.9 | 63.2 | 100 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 37.4 | 19.7 | 37.4 | 60 | (5.) | SO2 | | Micro Gram per Meter Cube | 19.6 | 8.3 | 19.6 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 471 | 264 | 500 | 2000 | (2.) | Total Hardness | | | mg/l | | 356 | 187 | 300 | 600 | (3.) | TSS | | | mg/l | | 2.5 | 1.1 | 1.5 | 3.0 | (4.) | pH | | | NA | | 7.9 | 7.1 | 6.5 | 8.5 | (5.) | Chlorides | | | mg/l | | 210 | 118 | 250 | 2000 | (6.) | Fluoride | | | mg/l | | 0.42 | 0.25 | 1.0 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.9 | 7.3 | A | (2.) | BOD | | mg/l | | 2.9 | 1.5 | A | (3.) | DO | | mg/l | | 5.5 | 4.2 | A | (4.) | COD | | mg/l | | 19.0 | 10.0 | A | (5.) | Others | TDS | mg/l | | 207 | 131 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 60 | 45 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 49 | 36 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 290 | 110 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 150 | 110 | (3.) | pH | | | 7.8 | 7.1 | (4.) | P(Phosphorus) | Kilogram per hectare | | 75 | 37 | (5.) | K(Potassium) | Kilogram per hectare | | 354 | 156 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 12.09 To 7.4 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 5.14 To 8.83 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 520 | 1.0 | Copy of Permission Letter | Pipeline | | Intake Well | | 7070/354/ WR/TS/05/IWS/D-4 | 13 Sep 2011 | 551 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Sanitary Waste water | 4 | 4 | STP | Green Belt Renewal Plant | | 4 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 4 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 4 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Pig Iron slag | Industrial Waste | | 15600 | Tons | 100 | Road | | Others | given to cement plant | (2.) | FeMn Slag | Industrial Waste | | 30 | Tons | 0 | Road | | Others | reused | (3.) | FeCr slag | Industrial Waste | | 15000 | Tons | 200 | Road | | Others | used to road construction or brick manf. | (4.) | FeSi Slag | Industrial Waste | | 7000 | Tons | 50 | Road | | Others | given to cast iron foundaries | (5.) | SiMn Slag | Industrial Waste | | 14400 | Tons | 75 | Road | | Others | used in Road construction or given to cement plant | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | Others(Specify) | CO | Microgram per Meter Cube | 1150 | 0.45 | 2.17 | 1152.18 | 2000 | (2.) | PM10 | | Microgram per Meter Cube | 63.2 | 0.45 | 0.84 | 64.05 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 37.4 | 0.45 | 0.22 | 37.63 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 19.6 | 0.45 | 0 | 19.7 | 80 | (5.) | NOx | | Microgram per Meter Cube | 28.3 | 0.45 | 6.7 | 35.1 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | SEAF | Electricity | 30 | 1.2 | PM10 | | 0.6 | (2.) | SEAF | Electricity | 30 | 1.2 | NOx | | 6.0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 11750 | (b)Source | Captive & State Grid | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 250 | (e)Stack Height (in m) | 7 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 10.85 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 10.85 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 26220 | (b)Waste/Barren Land (ha.) | 1151.5 | (c)Grazing/ Community Land (ha.) | 1447.6 | (d)Surface Water Bodies (ha.) | 2072.7 | (e)Settlements (ha.) | 1019.9 | (f)Industrial (ha.) | 361.9 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : quarry | 625.1 | Total (ha.) | 32898.7000 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 1.53 | | (2.) | Green belt | | 3.83 | | (3.) | Water Reservoir | | 0.2 | | (4.) | Built Up Area | | 1.97 | Storage | (5.) | Others | Misc. area | 3.32 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | NA | 0 | Nil within 10 Kms. radius | (2.) | ESZs | NA | 0 | Nil within 10 Kms. radius | (3.) | Wildlife Corridors | NA | 0 | Nil within 10 Kms. radius | (4.) | NPA | NA | 0 | Nil within 10 Kms. radius | (5.) | Critically Polluted Area | NA | 0 | Nil within 10 Kms. radius | (6.) | ESAs | NA | 0 | Nil within 10 Kms. radius | (7.) | Corridors | NA | 0 | Nil within 10 Kms. radius | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 0 | Nil within 10 Kms. radius | (2.) | Archaeological Sites | | NA | 0 | Nil within 10 Kms. radius | (3.) | Defence Installations | | NA | 0 | Nil within 10 Kms. radius | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 10.85 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | total land in possession | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Maniyari River | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 0.05 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 20 | (c)Temporary Employment- During Construction | 95 | (d)Temporary Employment- During Operation | 20 | (e)No. of working days | 300 | (f)Total Manpower | 135 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Percentage of Total Project Area | 33.6 | 0 | 33.6 | (2.) | Funds Allocated | 150000 | 150000 | 300000 | (3.) | No. of Plants | 8490 | 1500 | 9990 | (4.) | Total Area of Green Belt | 3.83 | 0 | 3.83 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Increase in green belt area | (2.) | Social | Direct employment to eligible persons preferable local persons besides creating indirect employment opportunities. Various CSR, CER activities in adjoining villages will help in improving social status | (3.) | Financial | The project will contribute to the Government through various taxes | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/ EIA/ 1922/ RA 0149 | (ii)Name of the EIA Consultant | PIONEER ENVIRO LABORATORIES & CONSULTANTS PVT. LTD | (iii)Address | 2nd Floor, A-Z Elite, Plot No. 197, Kavuri Hills, Guttala Begumpet Village, Madhapur, Hyderabad, Telangana - 500081 | (iv)Mobile No. | 9440677333 | (v)Landline No. | 0402311427 | (vi)Email Id | pelcpl@yahoo.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 22 Mar 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Proposal is returned due to the following shortcomings:
Form 2:
i. In s.no. 2, documents in support of the competence/authority of the person making this application i.e., Shri. Rajesh Biswas shall be submitted.
ii. In s.No.4, not able to access the KML file. Appropriate KML file shall be uploaded.
iii. In s.no. 7.1, entire PH proceedings inter-alia including SPCB cover letter, actual proceedings, authenticated English translation, attendance sheet, written representations and the response submitted shall be uploaded.
iv. In s.no. 15.1, the water withdrawal permission dated Sep, 2011 has been submitted. May kindly clarify the source of water for the existing biomass-based power plant operation and the said permission is valid for current expansion proposal. Water balance for the entire unit including bio mass power plant shall be furnished.
v. In s.no. 17, it is mentioned that solid waste will be sent to authorized recyclers whereas in the EIA report the mode of utilization is mentioned as road making, construction and supply to cement industries. Kindly clarify it.
vi. As per the EIA report, Maniyari River is at 0.05 Kms., i.e., 50m from the site whereas in s.no. 30, the distance is mentioned as 0.5km. Kindly clarify the factual position in this regard.
vii. In s.no. 32, kindly furnish the time bound action plan for green belt development covering 33% of the 10.85 ha with appropriate layout.
EIA report
i. Capacity of the Briquetting plant shall be mentioned in the EIA report.
ii. In chapter 4, input data used for the AAQ modeling shall be furnished.
iii. Time bound action for green belt development shall be furnished.
iv. Action plan for recharge of water equal to (or) more than annual water consumption within the plant premises (or) outside the plant premises shall be submitted.
v. Protection measures for Maniyari River shall be incorporated in the EMP as it is located 50m from the boundary of the plant site. | 16 Jun 2020 | 2. | NA | The correction have been made as per the instruction received | 02 Sep 2020 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Sir, plz find the attachment for reply to ADS sought on 09/08/2023 | 18 Aug 2023 | 2. | NA | Dear Sir,
Please refer the ADS reply and it is noted that PP has not revised the EIA/EMP Report with new baseline data. The title of EIA/EMP report still mentioned Year 2020. Please submit the complete updated EIA/EMP Report as sought by the EAC. | 09 Aug 2023 | 3. | ADS Reply Letter | Dear Sir, We are herewith submitting Reply to ADS issued by Ministry vide 14th EAC (Industry-I) meeting held on 29th September 2022 (Agenda Item No. 14.4). Kindly grant us the EC at the earliest. | 03 Aug 2023 | 4. | NA | Deliberations by the Committee
14.1.1 The Committee noted the following:
1. M/s. Real Power Private Limited obtained ToR on 20.07.2017 and baseline data was collected during 1st October 2017 to 31st December 2017. The EAC noted that PP applied for EC on 02.09.2020. The proposal was initially considered in the EAC meeting held during 28-30th September, 2020 wherein the Committee deferred the proposal on account of technical shortcomings. However, PP has submitted the ADS reply after almost two years i.e. on 8th September 2022. As per the Ministry’s O.M. vide F. No. IA3-22/10/2022-IA.III [E 177258] dated 08.06.2022, para 6 (iii) states that the baseline data shall not be more than three years old at the time of submission of application for consideration of EC. Since, in this case though at the time of submission of EC application, the baseline data was valid, however, PP has consciously delayed the proposal by delayed submission of ADS reply by Two Years. The EAC opined that baseline data is almost 5 years old at present, and during this period the baseline scenario at the project site might have changed. Thus, EAC is of the view that for validation of the old baseline data, fresh baseline data of 3 months shall be collected and compared with the old data and accordingly revise the Report.
2. The project proponent informed during the meeting that due to change in management of the company there was a delay in submission of ADS reply. However, the project proponent did not report the same to the Ministry at the time when change in management of the company took place. In this context, PP shall upload/submit the documents in this regard.
3. The nearest habitation to plant is Atarra Village which is at distance of 0.65 km in East direction. Project Proponent shall submit environmental safeguard measures that will be undertaken to minimise the impact on the habitation on the inhabitants.
4. Maniyari River is very close to the project site at distance of 50 m. Also, Agar River – 5.5 km and Shivnath river – 8.0 km also exists within 10 km radius of the plant site. A robust and full proof Drainage Conservation scheme to protect the natural drainage and its flow parameters; along with Soil conservation scheme and multiple Erosion control measures shall be prepared and submitted. PP is advised to plant locally grown tress along the banks of Maniyari river for 1-2 kms which is just 50 meters away from the plant side. This may be helpful to prevent soil erosion and increase soil fertility and also helps in flood control.
5. PP shall undertake village adoption and formulate Village Adoption program consisting of need-based community development activities, shall be prepared to develop them into model villages. PP shall submit commitment alongwith name of the villages to be adopted. Action plan submitted to address the PH issues and socio-economic development of the nearby villages shall also be revised and submitted.
Recommendations of the Committee:
14.1.2 In view of the foregoing and after detailed deliberations, the committee recommended to defer the proposal due to certain deficiencies in the proposal and sought requisite information on the points referred at para no. 14.4.24 above. The proposal shall be considered after submission of requisite information. | 07 Oct 2022 | 5. | ADS Reply Letter | Respected Sir, we are here with submitting the reply to ADS sought | 08 Sep 2022 | 6. | NA | Proposal deferred for want of additional information. | 15 Oct 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Rajesh Biswas | Designation | GM | Name of Company (Applicant Name should not be given here) | REAL POWER PRIVATE LIMITED | Address | Vrindavan, Near IDBI Bank, Civil Lines, Raipur |
|