Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Real Power Private Limited
(b)Name of the Company / Organisation REAL POWER PRIVATE LIMITED
(c)Registered Address Vrindavan, Near IDBI Bank, Civil Lines, Raipur,,Mungeli,Chhattisgarh-492001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rajesh Biswas
(b)Designation (Owner/ Partner/ CEO) GM
(c)Address Vrindavan, Near IDBI Bank, Civil Lines, Raipur - 492001,,No Data,Mungeli,Chhattisgarh-495334
(d)Pin code 495334
(e)E-mail realpowerraipur@gmail.com
(f)STD Code. 771(f)Telephone No. 4224000
(g)Fax No. 4224010
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/CG/IND/142231/2017
(d)Master Proposal Number(Single Window) SW/142230/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 1, 4/1, 5, 6/4, 7/4, 8/3, 12, 13/2, 14, 16/2, 16/3
(b)Pincode 495335
(c)Bounded Latitudes (North)
From
Degree 21.939981
Minutes
Second
From
Degree 21.944225
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 81.989834
Minutes
Second
From
Degree 81.990824
Minutes
Second
(e)Survey of India Topo Sheet No. 64 G/13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 245
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Chhattisgarh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/347/2017-IA-II(I)
(c)Date of Issue of TOR 20 Jul 2017
(f)Previous TOR Letter NA
(b)Date of Apply of EC 02 Sep 2020
(c)Date of Issue of EC 07 Nov 2023
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :06 Oct 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :08 Nov 2019
Distance of Public Hearing Venue from the Proposed Project :1.3
Government Primary School, Khamhardih
State :Chhattisgarh
District :Mungeli
Tehsil :No Data
Village :Khamhardih
200Construction of entrance gate and renovation of Mahamaya Temple at Village Rambod,RO plant for drinking water, Road widening & repairing, Employment & Pollution, Support will be given to sports activiOthersAdditional Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. 5367/HO/Tech/CECB/2019
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 7 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Pig Iron02520025200Tons per Annum(TPA)Road
(2.)Silico Managanese01440014400Tons per Annum(TPA)Road
(3.)Ferro Silicon070007000Tons per Annum(TPA)Road
(4.)Ferro Manganese02520025200Tons per Annum(TPA)Road
(5.)Ferro Chrome01500015000Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Submerged Electric Arc FurnaceNil1 x 9 MVA1 x 9 MVAProposed Ferro Alloys will be taken up in the existing Biomass plant premises
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 02 Jul 2018
(iv)Valid Upto 30 Nov 2021
(v)File No. 2724/TS/CECB/2018
(vi)Application No. 1064869
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 13.0
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.13
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.376
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 46260
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 46260
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Manganese Ore46260Tons per AnnumBalaghat (M.P.)Road,Rail500 e-auctionCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube28.39.528.380
(2.)OthersCOMicro Gram per Meter Cube115052511502000
(3.)PM10Micro Gram per Meter Cube63.232.963.2100
(4.)PM2.5Micro Gram per Meter Cube37.419.737.460
(5.)SO2Micro Gram per Meter Cube19.68.319.680
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l4712645002000
(2.)Total Hardnessmg/l356187300600
(3.)TSSmg/l2.51.11.53.0
(4.)pHNA7.97.16.58.5
(5.)Chloridesmg/l2101182502000
(6.)Fluoridemg/l0.420.251.01.5
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.97.3A
(2.)BODmg/l2.91.5A
(3.)DOmg/l5.54.2A
(4.)CODmg/l19.010.0A
(5.)OthersTDSmg/l207131A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))604575
(2.)Leq(Night)A-weighted decibels(dB(A))493670
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare290110
(2.)Electric ConductivityMillisiemens per Centimetre150110
(3.)pH7.87.1
(4.)P(Phosphorus)Kilogram per hectare7537
(5.)K(Potassium)Kilogram per hectare354156
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 12.09 To 7.4
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 5.14 To 8.83
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface5201.0Copy of Permission LetterPipelineIntake Well7070/354/ WR/TS/05/IWS/D-413 Sep 2011551
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sanitary Waste water44STPGreen Belt Renewal Plant4
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 4
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 4
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Pig Iron slagIndustrial Waste15600Tons100RoadOthersgiven to cement plant
(2.)FeMn SlagIndustrial Waste30Tons0RoadOthersreused
(3.)FeCr slagIndustrial Waste15000Tons200RoadOthersused to road construction or brick manf.
(4.)FeSi SlagIndustrial Waste7000Tons50RoadOthersgiven to cast iron foundaries
(5.)SiMn SlagIndustrial Waste14400Tons75RoadOthersused in Road construction or given to cement plant
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)Others(Specify)COMicrogram per Meter Cube11500.452.171152.182000
(2.)PM10Microgram per Meter Cube63.20.450.8464.05100
(3.)PM2.5Microgram per Meter Cube37.40.450.2237.6360
(4.)SO2Microgram per Meter Cube19.60.45019.780
(5.)NOxMicrogram per Meter Cube28.30.456.735.180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)SEAFElectricity301.2PM100.6
(2.)SEAFElectricity301.2NOx6.0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 11750
(b)Source Captive & State Grid
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 250
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 10.85
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 10.85
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 26220
(b)Waste/Barren Land (ha.) 1151.5
(c)Grazing/ Community Land (ha.) 1447.6
(d)Surface Water Bodies (ha.) 2072.7
(e)Settlements (ha.) 1019.9
(f)Industrial (ha.) 361.9
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : quarry 625.1
    Total (ha.) 32898.7000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant1.53
(2.)Green belt3.83
(3.)Water Reservoir0.2
(4.)Built Up Area1.97Storage
(5.)OthersMisc. area3.32
Total (ha.) 10.85
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0Nil within 10 Kms. radius
(2.)ESZsNA0Nil within 10 Kms. radius
(3.)Wildlife CorridorsNA0Nil within 10 Kms. radius
(4.)NPANA0Nil within 10 Kms. radius
(5.)Critically Polluted AreaNA0Nil within 10 Kms. radius
(6.)ESAsNA0Nil within 10 Kms. radius
(7.)CorridorsNA0Nil within 10 Kms. radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0Nil within 10 Kms. radius
(2.)Archaeological SitesNA0Nil within 10 Kms. radius
(3.)Defence InstallationsNA0Nil within 10 Kms. radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 10.85
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired total land in possession
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Maniyari River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 0.05
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 20
(c)Temporary Employment- During Construction 95
(d)Temporary Employment- During Operation 20
(e)No. of working days 300
(f)Total Manpower 135
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Percentage of Total Project Area33.6033.6
(2.)Funds Allocated150000150000300000
(3.)No. of Plants849015009990
(4.)Total Area of Green Belt3.8303.83
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalIncrease in green belt area
(2.)SocialDirect employment to eligible persons preferable local persons besides creating indirect employment opportunities. Various CSR, CER activities in adjoining villages will help in improving social status
(3.)FinancialThe project will contribute to the Government through various taxes
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/ EIA/ 1922/ RA 0149
(ii)Name of the EIA Consultant PIONEER ENVIRO LABORATORIES & CONSULTANTS PVT. LTD
(iii)Address 2nd Floor, A-Z Elite, Plot No. 197, Kavuri Hills, Guttala Begumpet Village, Madhapur, Hyderabad, Telangana - 500081
(iv)Mobile No. 9440677333
(v)Landline No. 0402311427
(vi)Email Id pelcpl@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 22 Mar 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAProposal is returned due to the following shortcomings: Form 2: i. In s.no. 2, documents in support of the competence/authority of the person making this application i.e., Shri. Rajesh Biswas shall be submitted. ii. In s.No.4, not able to access the KML file. Appropriate KML file shall be uploaded. iii. In s.no. 7.1, entire PH proceedings inter-alia including SPCB cover letter, actual proceedings, authenticated English translation, attendance sheet, written representations and the response submitted shall be uploaded. iv. In s.no. 15.1, the water withdrawal permission dated Sep, 2011 has been submitted. May kindly clarify the source of water for the existing biomass-based power plant operation and the said permission is valid for current expansion proposal. Water balance for the entire unit including bio mass power plant shall be furnished. v. In s.no. 17, it is mentioned that solid waste will be sent to authorized recyclers whereas in the EIA report the mode of utilization is mentioned as road making, construction and supply to cement industries. Kindly clarify it. vi. As per the EIA report, Maniyari River is at 0.05 Kms., i.e., 50m from the site whereas in s.no. 30, the distance is mentioned as 0.5km. Kindly clarify the factual position in this regard. vii. In s.no. 32, kindly furnish the time bound action plan for green belt development covering 33% of the 10.85 ha with appropriate layout. EIA report i. Capacity of the Briquetting plant shall be mentioned in the EIA report. ii. In chapter 4, input data used for the AAQ modeling shall be furnished. iii. Time bound action for green belt development shall be furnished. iv. Action plan for recharge of water equal to (or) more than annual water consumption within the plant premises (or) outside the plant premises shall be submitted. v. Protection measures for Maniyari River shall be incorporated in the EMP as it is located 50m from the boundary of the plant site. 16 Jun 2020
2.NAThe correction have been made as per the instruction received 02 Sep 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterSir, plz find the attachment for reply to ADS sought on 09/08/2023 18 Aug 2023
2.NADear Sir, Please refer the ADS reply and it is noted that PP has not revised the EIA/EMP Report with new baseline data. The title of EIA/EMP report still mentioned Year 2020. Please submit the complete updated EIA/EMP Report as sought by the EAC. 09 Aug 2023
3. ADS Reply LetterDear Sir, We are herewith submitting Reply to ADS issued by Ministry vide 14th EAC (Industry-I) meeting held on 29th September 2022 (Agenda Item No. 14.4). Kindly grant us the EC at the earliest. 03 Aug 2023
4.NA

Deliberations by the Committee

 

14.1.1             The Committee noted the following:

1.           M/s. Real Power Private Limited obtained ToR on 20.07.2017 and baseline data was collected during 1st October 2017 to 31st December 2017. The EAC noted that PP applied for EC on 02.09.2020. The proposal was initially considered in the EAC meeting held during 28-30th September, 2020 wherein the Committee deferred the proposal on account of technical shortcomings. However, PP has submitted the ADS reply after almost two years i.e. on 8th September 2022. As per the Ministry’s O.M. vide F. No. IA3-22/10/2022-IA.III [E 177258] dated 08.06.2022, para 6 (iii) states that the baseline data shall not be more than three years old at the time of submission of application for consideration of EC. Since, in this case though at the time of submission of EC application, the baseline data was valid, however, PP has consciously delayed the proposal by delayed submission of ADS reply by Two Years. The EAC opined that baseline data is almost 5 years old at present, and during this period the baseline scenario at the project site might have changed. Thus, EAC is of the view that for validation of the old baseline data, fresh baseline data of 3 months shall be collected and compared with the old data and accordingly revise the Report.  

2.           The project proponent informed during the meeting that due to change in management of the company there was a delay in submission of ADS reply. However, the project proponent did not report the same to the Ministry at the time when change in management of the company took place. In this context, PP shall upload/submit the documents in this regard.

3.           The nearest habitation to plant is Atarra Village which is at distance of 0.65 km in East direction. Project Proponent shall submit environmental safeguard measures that will be undertaken to minimise the impact on the habitation on the inhabitants.

4.           Maniyari River is very close to the project site at distance of 50 m. Also, Agar River – 5.5 km and Shivnath river – 8.0 km also exists within 10 km radius of the plant site. A robust and full proof Drainage Conservation scheme to protect the natural drainage and its flow parameters; along with Soil conservation scheme and multiple Erosion control measures shall be prepared and submitted. PP is advised to plant locally grown tress along the banks of Maniyari river for 1-2 kms which is just 50 meters away from the plant side.  This may be helpful to prevent soil erosion and increase soil fertility and also helps in flood control.

5.           PP shall undertake village adoption and formulate Village Adoption program consisting of need-based community development activities, shall be prepared to develop them into model villages. PP shall submit commitment alongwith name of the villages to be adopted. Action plan submitted to address the PH issues and socio-economic development of the nearby villages shall also be revised and submitted. 

 

Recommendations of the Committee:

 

14.1.2             In view of the foregoing and after detailed deliberations, the committee recommended to defer the proposal due to certain deficiencies in the proposal and sought requisite information on the points referred at para no. 14.4.24 above. The proposal shall be considered after submission of requisite information.

07 Oct 2022
5. ADS Reply LetterRespected Sir, we are here with submitting the reply to ADS sought 08 Sep 2022
6.NA

Proposal deferred for want of additional information. 

15 Oct 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRajesh Biswas
DesignationGM
Name of Company (Applicant Name should not be given here)REAL POWER PRIVATE LIMITED
AddressVrindavan, Near IDBI Bank, Civil Lines, Raipur
Print