Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Capacity enhancement of manufacturing unit by replacing existing induction furnace (4 T & 6 T to 2x10 T each), Rolling Mill and enhance production capacity 45,000 MTPA to 1, 40,000 MTPA at Village- Ba
(b)Name of the Company / Organisation VARDHMAN ISPAT UDYOG
(c)Registered Address Bela Bathri, Haroli , Una, Himachal Pradesh,,Una,Himachal Pradesh-174301
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant pradeep Garg
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Bela Bathri, Haroli Una, Himachal Pradesh,,Una/Haroli,Una,Himachal Pradesh-174301
(d)Pin code 174301
(e)E-mail vardhmansswml@gmail.com
(f)STD Code. 1765(f)Telephone No. 506960
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/HP/IND/104614/2019
(d)Master Proposal Number(Single Window) SW/140946/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Kh. No.3705/3533,3762/3508,3763/3508,3885/3507,387
(b)Pincode 174301
(c)Bounded Latitudes (North)
From
Degree 31.31838
Minutes
Second
From
Degree 31.31945
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.2904
Minutes
Second
From
Degree 76.2936
Minutes
Second
(e)Survey of India Topo Sheet No. 53A3,53A4,53A7,53A8
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1041
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Himachal Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Himachal PradeshUnaHaroli(S.T)
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/187/2019-IA-II(I)
(b)Date of Apply of TOR 07 May 2019
(c)Date of Issue of TOR / Standard ToR 17 Sep 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :06 Nov 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :11 Dec 2019
Distance of Public Hearing Venue from the Proposed Project :1
Rajiv Gandhi Common Facility Center (HPSIDC))
State :Himachal Pradesh
District :Una
Tehsil :Una/Haroli
Village :Bathu
50How local workers will be benefited by proposed project and how many people will get employment?District Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Induction Furnace2X10Proposed Capacity:1,40,000 MTPA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Rolled Products27000Tons per AnnumRoad
(2.)Billet140000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 23 Jun 2018
(iv)Valid Upto 31 Mar 2023
(v)File No. HPSPCB/PCB-lD10264
(vi)Application No. HPSPCB/PCB-lD102604
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 30.38
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.695
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.25
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.115
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 147000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 147000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)MS Scrap154000Tons per AnnumIndiaRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube13.57.413.280
(2.)NOxMicro Gram per Meter Cube30.114.729.580
(3.)PM10Micro Gram per Meter Cube9963.398.2100
(4.)PM2.5Micro Gram per Meter Cube62.833.35560
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.666.968.58.5
(2.)TDSmg/l4862975002000
(3.)TSSmg/l0000
(4.)Fluoridemg/l0.910.5311.5
(5.)Total Hardnessmg/l440242200600
(6.)Chloridesmg/l3382501000
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.208.10B
(2.)BODmg/l5.73.8B
(3.)DOmg/l5.23.8B
(4.)CODmg/l2012B
    14.4.     No. of Ambient Noise monitoring locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))635075
(2.)Leq(Night)A-weighted decibels(dB(A))584070
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.257.2
(2.)N(Nitrogen)Percent0.450.31
(3.)Electric ConductivityOthersmmhos/cm0.500.10
(4.)P(Phosphorus)Kilogram per hectare8.665.69
(5.)K(Potassium)Kilogram per hectare238167
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 45
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.50 To 42
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersBore well310Copy of Permission LettermodeOthersBore wellOthersBore wellIUID-5618387518 Sep 201931
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic810STPReuse within the Plant & Recycling8
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 8
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 8
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Trimming & Cutting LossIndustrial Waste3150Tons0Otherswithin plantOthersreused as raw material
(2.)slagIndustrial Waste5880Tons20RoadCo-Processing
(3.)APCD DustHazardous Waste (as per Hazardous and Other Waste Management rules 2016)350Tons50RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Mill ScaleIndustrial Waste4200Tons20RoadCo-Processing
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube9900.0399.04100
(2.)NOxMicrogram per Meter Cube30.0150.0130.1280
(3.)PM2.5Microgram per Meter Cube62.860.0162.8160
(4.)SO2Microgram per Meter Cube13.550.0113.5280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetHSD80.6PM100.1
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 9925
(b)Source Himachal Pradesh State Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 3 DG Set (125,125 & 250 KVA)
(e)Stack Height (in m) 8
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 2.70
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 2.70
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 16475
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 828
(e)Settlements (ha.) 3786
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Scrub Land 10326
    Total (ha.) 31415
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.894
Total (ha.) 0.894
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Area000
(2.)NPA000
(3.)ESZs000
(4.)WLS000
(5.)ESAs000
(6.)Corridors000
(7.)Wildlife Corridors000
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest000
(2.)Archaeological Sites000
(3.)Defence Installations000
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Swan River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 53
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 131
(e)No. of working days 350
(f)Total Manpower 184
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.89
(b)Percentage of Total Project Area 32.96
(c)No. of Plants to be Planted 875
(d)Funds Allocated for Plantation 3.5
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialImprovement in infrastructure and economic status of the people living in the area
(2.)Financialextra opportunities of direct and indirect employment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0128
(ii)Name of the EIA Consultant Shivalik Solid Waste Management Limited
(iii)Address SCO 20-21,Ist floor,Near Dolphin Hotel, Zirakpur, Punjab-140604
(iv)Mobile No. 8288079363
(v)Landline No. 0176250949
(vi)Email Id drranjnasswm@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 16 Feb 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAProposal is returned due to the following: FORM 2: • In s.no. 7.1, authenticated English translation of the PH proceedings has not been furnished. • In s.no. 9.1, certified compliance report of CTO conditions from HPPCB has not been submitted. • In s.no.14.1, the limit for PM10 is already reached the threshold limit of 100 µg/m3. Reasons for the same shall be furnished. • In s.no.15.1, permission for 31 KLD of groundwater withdrawal is yet to be obtained. EIA report: • Lay out of the plant site is not legible. • In AAQ monitoring, presence of ammonia, ozone and lead has been reported. Source for the same has not been mentioned. • EMP is not specific to the project. 27 Mar 2020
2.NAThe correction have been made as per the instruction received 29 Apr 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicantpradeep Garg
DesignationPartner
Name of Company (Applicant Name should not be given here)VARDHMAN ISPAT UDYOG
AddressBela Bathri, Haroli , Una, Himachal Pradesh
Print