Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Multistoried Parking cum Commercial Complex
(b)Name of the Company / Organisation NEHRU PLACE HOTELS AND REAL ESTATES PVT. LTD.
(c)Registered Address 8th Floor, Eros Corporate Tower, Nehru Place, New Delhi,,South,Delhi-110019
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Deepak Gupta
(b)Designation (Owner/ Partner/ CEO) GeneralManager
(c)Address 8th Floor, Etos Corporate Tower, Nehru Place, New Delhi,,Kalkaji,South,Delhi-110019
(d)Pin code 110019
(e)E-mail deepakhome@gmail.com
(f)STD Code. 11(f)Telephone No. 46208282
(g)Fax No. 46208200
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity8(a) Building and Construction projects
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/MIS/140924/2020
(d)Master Proposal Number(Single Window) SW/140918/2020
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. -
(b)Pincode 110019
(c)Bounded Latitudes (North)
From
Degree 3160099.68
Minutes
Second
From
Degree 3160274.04
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 720321.01
Minutes
Second
From
Degree 720344.02
Minutes
Second
(e)Survey of India Topo Sheet No. 53 H/06
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 232
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.89
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application No
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Since, it is building construction project hence p
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)No. of FloorsG+15Unit-NA
(2.)Height of Building69.9Unit - Meters
(3.)No. of Blocks2Unit - Number
(4.)No. of Basement1Unit - Number
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Total Plot Area12985OthersSquare MetersOthersNA
(2.)Total Built-up Area65491.99OthersSquare MetersOthersNA
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Jan 2004
(iv)Valid Upto 01 Feb 2020
(v)File No. -
(vi)Application No. -
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 10
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.78
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.1
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.327
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)000OthersNA-OthersNA0 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 21 Jan 2020 To 28 Jan 2020
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube242.6235.1241.6100
(2.)PM2.5Micro Gram per Meter Cube184.3175.6183.360
(3.)SO2Micro Gram per Meter Cube9.58.49.280
(4.)NOxMicro Gram per Meter Cube41.339.540.380
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.37.38.58.5
(2.)TSSmg/l0011
(3.)Heavy MetalsLeadmg/l0.010.010.010.01
(4.)Fluoridemg/l0.20.211
(5.)Chloridesmg/l4444250250
(6.)TDSmg/l457457500500
(7.)Total Hardnessmg/l156156200200
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA77E
(2.)DOmg/l4.14.1E
(3.)BODmg/l1212E
(4.)CODmg/l41.641.6E
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))60.260.265
(2.)Leq(Night)A-weighted decibels(dB(A))47.847.855
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.747.74
(2.)N(Nitrogen)Milligram per Kilogram65.265.2
(3.)Electric ConductivityOthersMicrosiemens per centimeter187.8187.8
(4.)P(Phosphorus)Milligram per Kilogram15.615.6
(5.)K(Potassium)Milligram per Kilogram31.331.3
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 24.05 To 6.44
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 25.05 To 6.11
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersDelhi Jal Board2160Copy of Permission LetterPipelineOthersPipelines-28 Dec 2019216
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic,flushing, gardening, cooling104125STPDischarge into Seawater Body,Othersosses of 7 KLD from STP and 1 KLD from ETP1040
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 104
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 104
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Plastic WastePlastic Waste30Tons10RoadAuthorized Recyclers
(2.)Biaodegradable WasteMunicipal Solid Waste40Tons0RoadOthersOrganic Waste Converter
(3.)Non Biodegradable WasteMunicipal Solid Waste30Tons10RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube184.30.90.5184.960
(2.)SO2Microgram per Meter Cube10.20.90.1510.3680
(3.)NOxMicrogram per Meter Cube41.30.91.3742.6880
(4.)PM10Microgram per Meter Cube242.60.91243.7100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)2 x 1500 kVALSD75.90.3NOx0.70
(2.)1 x 500 kVALSD74.40.3NOx0.175
(3.)2 x 1500 kVALSD75.90.3OthersPM 2.50.175
(4.)2 x 1500 kVALSD75.90.3PM100.370
(5.)2 x 1500 kVALSD75.90.3SO20.075
(6.)1 x 500 kVALSD74.40.3PM100.025
(7.)1 x 500 kVALSD74.40.3SO20.09
(8.)1 x 500 kVALSD74.40.3OthersPM 2.50.010
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2327
(b)Source BSES Rajdhani Power Limited
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2x1500 kVA & 1x500 kVA
(e)Stack Height (in m) 75.9
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 1.2985
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1.2985
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Plot area 1.2985
    Total (ha.) 1.2985
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area6.26
Total (ha.) 6.26
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNone0NA
(2.)NPANone0NA
(3.)Critically Polluted AreaOkhla Critically polluted Area4.05NEE
(4.)ESAsNone0NA
(5.)ESZsAsola Wild Life Sanctuary4.06SSE
(6.)CorridorsNone0NA
(7.)Wildlife CorridorsNone0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesAshokan Rock Edict at Bahapur0.94NNE
(2.)Forestjahapanah City protected Forest2.32SW
(3.)Defence InstallationsNaval head Quater7.18NWW
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.29
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 1.29
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Pond near Bharat Nagar
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 3.13
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 60
(d)Temporary Employment- During Operation 2482
(e)No. of working days 300
(f)Total Manpower 2542
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.12
(b)Percentage of Total Project Area 9.24
(c)No. of Plants to be Planted 20
(d)Funds Allocated for Plantation 1400000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment will be generated.
(2.)Environmental1298.5 sqm of the area will be developed as green area which will reduce the pollution load of the areas.
(3.)FinancialRevenue will be generated.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 69.9
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 2
(d)Total plot area (sqm) 12985
(e)Total built up area (sqm) 62689.83
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 3
(d)Capacity 107
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 1063
5.
Energy Saving Measures:
(a)Source/Mode Solar, LED, DG
(b)Percentage 6.9
(c)Quantity 160
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area There will be no impact on Water Bodies and Draina
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Rev 83/20 January, 2020 at S. No. 120
(ii)Name of the EIA Consultant Perfact Enviro Solutions Pvt. Ltd.
(iii)Address 5th Floor, NN Mall, Mangalam Palace, Sector 3, Rohini, New Delhi
(iv)Mobile No. 9818362330
(v)Landline No. 0114928136
(vi)Email Id info@perfactgroup.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 08 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAKindly upload legible copy of Form-1. 14 Feb 2020
2.NAThe correction have been made as per the instruction received 14 Feb 2020
3.NAThis is an expansion project. However, Project type is mentioned as FRESH in the application. Kindly correct the same. Besides following are also required to be submitted/uploaded: (i) Submit a copy of the valid consent to establish and consent to operate under the Water and Air acts for the existing project. (ii) Submit/upload source of fresh water for the existing project and proposed one. (iii) Submit/upload fire NOC for the existing project with its validity. (iv) Submit Plan for Corporate Environment Responsibility (CER) as specified under Ministry’s Office Memorandum vide F.No. 22-65/2017-IA.III dated 1st May 2018 for the proposed project. 14 Feb 2020
4.NAThe correction have been made as per the instruction received 05 Mar 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NA

Kindly see minutes of 50th meeting of EAC (Infra-2)

01 May 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDeepak Gupta
DesignationGeneralManager
Name of Company (Applicant Name should not be given here)NEHRU PLACE HOTELS AND REAL ESTATES PVT. LTD.
Address8th Floor, Eros Corporate Tower, Nehru Place, New Delhi
Print