Details of Project:
(a)Name of the project(s) Proposed Group Housing for Sarv Kalyan CGHS on Plot No.6, Vishwas Nagar, New Delhi
(b)Name of the Company / Organisation SARVA KALYAN CGHS LTD
(c)Registered Address 224, TRIVENI APARTMENT, JHILMIL INDUSTRIAL AREA, DELHI,,East,Delhi-110095
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant ATUL KUMAR AGARWAL
(b)Designation (Owner/ Partner/ CEO) P
(c)Address 224, TRIVENI APARTMENT, JHILMIL INDUSTRIAL AREA, DELHI,,Preet Vihar,East,Delhi-110095
(d)Pin code 110095
(e)E-mail sarva.kalyan@aol.com
(f)STD Code. 11(f)Telephone No. 43592522
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/MIS/140919/2020
(d)Master Proposal Number(Single Window) SW/140917/2020
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No.6, Vishwas Nagar, New Delhi
(b)Pincode 110032
(c)Bounded Latitudes (North)
From
Degree 2839.609
Minutes
Second
From
Degree 2839.651
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 7717.565
Minutes
Second
From
Degree 7717.712
Minutes
Second
(e)Survey of India Topo Sheet No. 53H/6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 204
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application No
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason It is a group housing project
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)******
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)**0Others*Road
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 56
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.44
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.12
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.13
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)**0Others****Road0 Others**Copy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 18 Jan 2020 To 19 Jan 2020
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)OthersCOMili Gram per Meter Cube1.081.081.084
(2.)PM10Micro Gram per Meter Cube204204204100
(3.)SO2Micro Gram per Meter Cube11.511.511.580
(4.)PM2.5Micro Gram per Meter Cube98989860
(5.)NOxMicro Gram per Meter Cube25252580
    14.2.     No. of Ground Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l0000
(2.)TSSmg/l0000
(3.)Fluoridemg/l0000
(4.)TDSmg/l0000
(5.)pHmg/l0000
(6.)Chloridesmg/l0000
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l00D
(2.)DOmg/l00D
(3.)BODmg/l00D
(4.)CODmg/l00D
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))40.240.245
(2.)Leq(Day)A-weighted decibels(dB(A))51.851.855
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Kilogram4.64.6
(2.)Electric ConductivityOthers*478478
(3.)K(Potassium)Milligram per Kilogram8282
(4.)pHOthers*8.118.11
(5.)N(Nitrogen)Milligram per Kilogram3939
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From To
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From To
(c)Whether Ground Water Intersection will be there ?
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersDJB965Copy of Permission LettermodeOthers*Others*.......08 Jan 202096
15.1.
(a)Whether Desalination is proposed
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Onsite80100MBR TechnologyDischarge into Surface Water Body,Reuse within the Plant & Recycling32.547.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 80
(b)Total Discharged Water (Kilolitre per Day) 47.5
(c)Total Reused Water (Kilolitre per Day) 32.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid WasteMunicipal Solid Waste240.9Tons0RoadOthersOnsite OWC and authorized Recycler
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube2040.20205100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.).....00PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA))
(b)Source
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets)
(e)Stack Height (in m)
20.
Land Ownership Pattern:
(a)Forest Land (ha.)
(b)Private Land (ha.)
(c)Government Land (ha.)
(d)Revenue Land (ha.)
(e)Other Land (ha.)
    Total Land (ha.)
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.)
(b)Waste/Barren Land (ha.)
(c)Grazing/ Community Land (ha.)
(d)Surface Water Bodies (ha.)
(e)Settlements (ha.)
(f)Industrial (ha.)
(g)Forest (ha.)
(h)Mangroves (ha.)
(i)Marine Area (ha.)
(j)Others (ha.) :
    Total (ha.)
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.20Proposed Green Area
Total (ha.) 0.2
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAs*0*
(2.)Corridors*0*
(3.)WLS..0**
(4.)NPA**0**
(5.)ESZs*0*
(6.)Wildlife Corridors*0*
(7.)Critically Polluted Area*0*
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestCentral Ridge Forest10.82**
(2.)Defence InstallationsHindon Airforce Station7.79**
(3.)Archaeological Sites*0*
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Yamuna river
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 3.19
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 74
(e)No. of working days 320
(f)Total Manpower 224
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.20
(b)Percentage of Total Project Area NaN
(c)No. of Plants to be Planted 0
(d)Funds Allocated for Plantation 0
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment will be generated during construction as well as in operation phase
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 79.5
(b)Total No. of Flats to be Build 142
(c)No. of Buildings 0
(d)Total plot area (sqm) 7666.66
(e)Total built up area (sqm) 28427.66
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 2
(b)Capacity 44
(c)No. of Recharge Pits 2
(d)Capacity 44
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 326
5.
Energy Saving Measures:
(a)Source/Mode **
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area **
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 89
(ii)Name of the EIA Consultant IND TECH HOUSE CONSULT
(iii)Address G-8/6, GROUND FLOOR, SECTOR-11, ROHINI, NEW DELHI
(iv)Mobile No. 8860080363
(v)Landline No. 0112757141
(vi)Email Id dubeyakw@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 31 Jan 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterDear Sir As per the minutes of 49th meeting of EAC (Infra-2), please find enclosed herewith reply. You are requested to kindly consider our reply. 07 Mar 2020
2.NA

Kindly see the minutes of 49th meeting of EAC (Infra-2)

05 Mar 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantATUL KUMAR AGARWAL
DesignationP
Name of Company (Applicant Name should not be given here)SARVA KALYAN CGHS LTD
Address224, TRIVENI APARTMENT, JHILMIL INDUSTRIAL AREA, DELHI
Print