1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion in Existing Unit | (b)Name of the Company / Organisation | SHIMMER CHEMICALS PVT LTD | (c)Registered Address | Survey No. 313, Padra - Borsad state highway, village - Mujpur, Tal - Padra, Dist. Vadodara, Gujarat,,Vadodara,Gujarat-391440 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Ramanbhai Patel | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | E-14, Sardar Estate, Ajwa road, Vadodara 390019, Gujarat,,Vadodara,Vadodara,Gujarat-390019 | (d)Pin code | 390019 | (e)E-mail | info@shimmerchem.com | (f)STD Code. | 265(f)Telephone No. | 2561026 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| (b)Category | A | (c)Proposal Number | IA/GJ/IND2/140871/2007 | (d)Master Proposal Number(Single Window) | SW/140850/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Survey No. 313, Padra - Borsad state highway, Vill | (b)Pincode | 391440 | (c)Bounded Latitudes (North) | | From | | Degree | 22.150709 | Minutes | | Second | | From | | Degree | 22.151039 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.000749 | Minutes | | Second | | From | | Degree | 73.001177 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43G15, F43G16, F4H3, F4H4 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 30.60 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 13 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | kutch | Lakhpat | Mudhvay, Maldo, Koriyani, Kapurashi | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/763/2008-IAII(I) | (c)Date of Issue of TOR | 19 Feb 2008 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 12 Mar 2020 | (c)Date of Issue of EC | 25 Jan 2021 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 31 Dec 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Survey No. 313, Padra - Borsad state highway, Village-Mujpur, Taluka - Padra, Vadodara | State : | Gujarat | District : | Vadodara | Tehsil : | Padra | Village : | Mujpur |
| 126 | Issues raised were implementation of Padra Policy, Employment to local people, installation of Rainwater Harvesting System, CSR Activity, Air Emission and effective control measures, etc. | Others | Resident Addl. Collector and Additional District Magistrate, Vadodara | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 5-111/2009(ENV)/020 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Sep 5 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Benzyl Alcohol | 72 | 228 | 300 | Tons per Annum(TPA) | | Road | | (2.) | Ortho Chloro Benzyl Chloride | 480 | 2820 | 3300 | Tons per Annum(TPA) | | Road | | (3.) | Benzyl Chloride | 180 | 3120 | 3300 | Tons per Annum(TPA) | | Road | | (4.) | Para Chloro Benzyl Chloride | 0 | 3300 | 3300 | Tons per Annum(TPA) | | Road | | (5.) | 2-Methyl Benzyl Chloride | 0 | 3300 | 3300 | Tons per Annum(TPA) | | Road | | (6.) | N-Butyl Chloride | 444 | 3456 | 3900 | Tons per Annum(TPA) | | Road | | (7.) | Dichloro Ortho Xylene | 0 | 3300 | 3300 | Tons per Annum(TPA) | | Road | | (8.) | 2,4 Dichloro Benzyl Chloride | 0 | 3300 | 3300 | Tons per Annum(TPA) | | Road | | (9.) | Meta Chloro Benzyl Chloride | 0 | 3300 | 3300 | Tons per Annum(TPA) | | Road | | (10.) | Ortho Chloro Benzaldehyde | 48 | 3552 | 3600 | Tons per Annum(TPA) | | Road | | (11.) | Para Chloro Benzaldehyde | 0 | 3600 | 3600 | Tons per Annum(TPA) | | Road | | (12.) | Benzaldehyde | 1056 | 2544 | 3600 | Tons per Annum(TPA) | | Road | | (13.) | 2,4 Dichloro Benzaldehyde | 0 | 3600 | 3600 | Tons per Annum(TPA) | | Road | | (14.) | N-Hexyl Chloride | 0 | 3900 | 3900 | Tons per Annum(TPA) | | Road | | (15.) | 1,6 Dichloro Hexane | 444 | 3456 | 3900 | Tons per Annum(TPA) | | Road | | (16.) | Benzylidine Acetone | 240 | 360 | 600 | Tons per Annum(TPA) | | Road | | (17.) | N-Chloro Pentane | 444 | 3456 | 3900 | Tons per Annum(TPA) | | Road | | (18.) | Ortho or Para Chloro Benzyl Alcohol | 0 | 300 | 300 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Separation Units | 1 KL/day x 10 Nos. | 1 KL/day x 15 Nos. | 1 KL/day x 25 Nos. | | (2.) | S.S. Vessel | 3.5 KL x 2 Nos. | 3.5 KL x 3 Nos. | 3.5 KL x 5 Nos. | | (3.) | BDA Rectors | 2 KL/day x 2 Nos. | --- | 2 KL/day x 2 Nos. | | (4.) | BDA Distillation | 0.8 KL x 2 Nos. | 0.8 KL x 2 Nos. | 0.8 KL x 4 Nos. | | (5.) | BHY Distillation | 1.5 KL/day x 3 Nos. | 1.5 KL/day x 2 Nos. | 1.5 KL/day x 5 Nos. | | (6.) | Sepration Bcl2 | 1 KL/day x 8 Nos. | 1 KL/day x 12 Nos. | 1 KL/day x 20 Nos. | | (7.) | Ref. Unit/ (gas) F22 | 20 TR x 1 No. | 40 TR x 1 No. | 20 TR x 1 No., 40 TR x 1 No. | | (8.) | Vacuum System | 2 Nos. | 2 Nos. | 4 Nos. | | (9.) | N. Chloro Butane | 1.6 KL x 4 Nos. | 1.6 KL x 4 Nos. | 1.6 KL x 8 Nos. | | (10.) | P.C.B, O.C.B Distillation | 1 KL/day x 2 Nos. | 1 KL/day x 6 Nos. | 1 KL/day x 8 Nos. | | (11.) | Distillation Units | 1 KL/day x 8 Nos. | 1 KL/day x 15 Nos. | 1 KL/day x 23 Nos. | | (12.) | HCl Scrubber | 20 KL x 16 Nos. | 20 KL x 16 Nos. | 20 KL x 32 Nos. | | (13.) | Glass Line Reactors (BHY) | 1.6 KL x 4 Nos. | 1.6 KL x 4 Nos. | 1.6 KL x 8 Nos. | | (14.) | Boiler | 2 MT x 2 Nos. | 3 MT x 1 No. | 2 MT x 2 Nos., 3 MT x 1 No. | | (15.) | N. Chloro Pantane | 1.6 KL x 5 Nos. | 1.6 KL x 4 Nos. | 1.6 KL x 9 Nos. | | (16.) | Cooling Tower | 100 TR x 2 Nos. + 40 TR x 3 Nos. | 100 TR x 5 Nos. | 100 TR x 7 Nos. + 40 TR x 3 Nos. | | (17.) | R.O Plant | 1 KL/hr. x 1 No. | 1 KL/hr. x 1 No. | 1 KL/hr. x 2 Nos. | | (18.) | Caustic Scrubber | 1 KL/day x 2 Nos. | 1 KL/day x 3 Nos. | 1 KL/day x 5 Nos. | | (19.) | Reactors O.C Bcl + O Bcl + Bcl2 | 1 KL/day x 7 Nos. | 1 KL/day x 10 Nos. | 1 KL/day x 17 Nos. | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 14 May 2018 | (iv)Valid Upto | 31 Mar 2023 | (v)File No. | AWH-94789 | (vi)Application No. | 137302 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 7.3 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.42 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.18 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.084 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 74422.78 | (b)Existing quantity of raw material/fuel | 4793.72 | (c)Total quantity of raw material/fuel | 79216.5 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | refer attachment | 79216.5 | Tons per Annum | | Open Market | Road | | 80 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2018 To 28 Feb 2019 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 47.3 | 7.2 | 34.18 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 117.3 | 46.8 | 102.6 | 100 | (3.) | SO2 | | Micro Gram per Meter Cube | 38.6 | 5.3 | 28.7 | 80 | (4.) | Others | CO | Mili Gram per Meter Cube | 1.3 | 0.4 | 1.17 | 02 | (5.) | PM2.5 | | Micro Gram per Meter Cube | 66.7 | 15.1 | 56.19 | 60 | |
14.2. No. of Ground Water monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Fluoride | | | mg/l | | 0.68 | 0.36 | 1 | 1.5 | (2.) | Chlorides | | | mg/l | | 964 | 134 | 250 | 1000 | (3.) | Others | Sulphate | | mg/l | | 164 | 48 | 200 | 400 | (4.) | pH | | | NA | | 8.53 | 6.77 | 6.5 | 8.5 | (5.) | TDS | | | mg/l | | 3691 | 1224 | 500 | 2000 | (6.) | Total Hardness | | | mg/l | | 1405 | 403 | 200 | 600 | (7.) | TSS | | | mg/l | | 14 | 8 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 7.2 | 4.9 | C | (2.) | BOD | | mg/l | | 20 | 06 | D | (3.) | pH | | NA | | 8.93 | 7.69 | D | (4.) | COD | | mg/l | | 82 | 21 | C | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 65 | 52 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 52 | 44 | 45 | |
14.5. No. of Soil Sample Monitored locations : 9 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.69 | 7.64 | (2.) | K(Potassium) | Milliequivalents per 100 Gram | | 0.39 | 0.28 | (3.) | Electric Conductivity | Millisiemens per Centimetre | | 0.33 | 0.1 | (4.) | N(Nitrogen) | Milligram per Kilogram | | 144 | 126 | (5.) | P(Phosphorus) | Milligram per Kilogram | | 26 | 10 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 35 To 55 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 25 To 50 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 62.7 | 0 | Copy of Permission Letter | Pipeline | | Others | Borewell | 21-4/5699/GJ/IND/2020 | 06 Feb 2020 | 62.7 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 10 | 10 | STP | Green Belt Renewal Plant | | 10 | | (2.) | Industrial | 6.4 | 6.4 | Recycling & Reuse | Reuse within the Plant & Recycling | | 6.4 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 16.4 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 16.4 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Process Waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 144 | Tons | 00 | Road | | Others | Distillation and recovered martial is used as RM | (2.) | Calcium Chloride Solution | Industrial Waste | | 647.76 | Tons | 50 | Road | | Others | Sold to actual users under Rule-9 | (3.) | Sodium Hypochlorite (10% Sol.) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 5562 | Tons | 50 | Road | | Others | Sold to actual users under Rule-9 | (4.) | Fly Ash | Industrial Waste | | 120 | Tons | 45 | Road | | Others | Sale to brick manufacturers | (5.) | Distillation Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 74 | Tons | 30 | Road | | Others | Sent for Incineration at M/s. NECL, Nandesari | (6.) | Used or Spent Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1 | Kilolitre | 0 | Road | | Others | Selling to registered re-refiner / reuse. | (7.) | Sodium Benzoate (10% Sol.) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1800 | Tons | 50 | Road | | Others | Sold to actual users under Rule-9 | (8.) | Spent Catalyst | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1 | Tons | 30 | Road | | Others | Sent for Incineration at M/s. NECL, Nandesari | (9.) | Discarded Containers/Barrels/Liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 23 | Tons | 30 | Road | | Authorized Recyclers | | (10.) | Spent HCl (30% Sol.) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 16560 | Tons | 50 | Road | | Others | Sold to actual users under Rule-9 | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 19.7 | 1.01 | 0.48 | 20.2 | 80 | (2.) | NOx | | Microgram per Meter Cube | 23.8 | 1.18 | 0.16 | 24 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 90.60 | 3.57 | 0.18 | 90.8 | 100 | (4.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 0.1 | 0 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler | Briquette/Agro-waste | 30 | 0.5 | SO2 | | 0.60 | (2.) | Boiler | Briquette/Agro-wsate | 30 | 0.5 | NOx | | 0.25 | (3.) | Process vent of Benzyl chloride | None | 15 | 0.23 | Others | HCl | 0.0006 | (4.) | Process vent of Benzaldehyde | None | 17 | 0.23 | Others | HCl | 0.0007 | (5.) | Process vent of Benzaldehyde | None | 17 | 0.23 | Others | Cl2 | 0.0002 | (6.) | Boiler | Briquette/Agro-waste | 30 | 0.5 | PM10 | | 0.39 | (7.) | Process vent of Benzyl chloride | None | 15 | 0.23 | Others | Cl2 | 0.0001 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 500 | (b)Source | Madhya Gujarat Vij Company Limited | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 175 KVA x 1 No. + 75 KVA x 1 No. | (e)Stack Height (in m) | 3 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 1.6 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 1.6 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 21895 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 436 | (e)Settlements (ha.) | 983 | (f)Industrial (ha.) | 304 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 8462 | Total (ha.) | 32080 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Open and Road Area | 0.4 | | (2.) | Green belt | | 0.5 | | (3.) | Built Up Area | | 0.7 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESZs | Thol Bird Sanctuary | 115 | NNW | (2.) | ESAs | Jambughoda Wild Life Sanctuary | 74 | ENE | (3.) | Corridors | Gir National Park | 257 | SW | (4.) | NPA | Jambughoda Wild Life Sanctuary | 74 | ENE | (5.) | Critically Polluted Area | Nandesari & PCCI Estate | 20 | NNE | (6.) | WLS | Jambughoda Wild Life Sanctuary | 74 | ENE | (7.) | Wildlife Corridors | Gir National Park | 257 | SW | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | Fresco Rooms in Bhau Tambekar's Wada | 21 | ENE | (2.) | Forest | | Shoolpaneshwar Wildlife Sanctuary | 98 | SE | (3.) | Defence Installations | | Makarpura AFS | 20 | ESE | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 1.6 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Indian Peafowl | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 150000 | (iii)Period of Implementation | 5 Years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | 1. Narmada Canal 2. Mahi River | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Muval | (ii)Direction of Water Bodies in Buffer Area | South West | (iii)Distance of Water Bodies in Buffer Area | 9.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 5 | (b)Permanent Employment-During Operation | 15 | (c)Temporary Employment- During Construction | 10 | (d)Temporary Employment- During Operation | 20 | (e)No. of working days | 340 | (f)Total Manpower | 50 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | No. of Plants | 936 | 280 | 1216 | (2.) | Total Area of Green Belt | 5346 | 1.49 | 5347.49 | (3.) | Percentage of Total Project Area | 33 | 0.1 | 33.1 | (4.) | Funds Allocated | 100000 | 600000 | 700000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Due to proposed expansion activity, Social Infrastructure will improve by means of Civilization, Vocational Training and Basic Amenities. Sports activities and other similar programmes will be carried out in the surrounding area under CSR programme. This will indirectly contribute to significant positive changes in the socioeconomic scenario of the area.
Civilization:
Due to expansion; employment and other infrastructural facilities will boost up income of surrounding people and improve quality | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Stay Order against the NABET/QCI | (ii)Name of the EIA Consultant | Aryan Greens | (iii)Address | 401, Sakar Complex, Above Union Bank, Near Saradar Estate, New VIP Road, Vadodara | (iv)Mobile No. | 9712000535 | (v)Landline No. | 0265251615 | (vi)Email Id | info@aryangreens.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 29 Mar 2021 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (Sno. 7.1)
(ii) All old CTOs not uploaded to verify the violation, if any done by PP.
(iii) Copy of earlier EC is not uploaded in at S. No. 6 of Form 2.
(iv) TOR compliance is not adequate in EIA/EMP report and need to revise as per the terms of reference granted for the project, and shall conform to Appendix III of the EIA Notification, 2006.
(v) Status of Conservation Plan approval from CWLW.
(vi) In view of the above, PP/Consultant are requested to revise the application for grant of EC and accordingly revise the Form 2 alongwith EIA/EMP Report. The EIA/EMP Report shall match with the information as filled in Form 2. On examination it is observed that the Consultant has not adequately submitted the application as per the provisions of the EIA Notification, 2006. Consultant has to read the documents before uploading the information in Form 2 /EIA/EMP report. | 05 Mar 2020 | 2. | NA | The correction have been made as per the instruction received | 12 Mar 2020 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Revised query reply with all complete details are attached. | 08 Dec 2020 | 2. | NA | The information submitted by you was examined and as PP informed that still the information is incomplete. Please submit the complete reply so that the same can be placed before the EAC quickly. | 07 Dec 2020 | 3. | ADS Reply Letter | As per the query, all other replies were ready but we had applied to MOEF&CC, Bhopal for the closer report of partly complied points received in earlier compliance report. Hence, submission of query reply has taken long time. Considering above reasons, kindly re-list our proposal. Reply is attached. | 04 Dec 2020 | 4. | NA | The EAC, after detailed deliberations decided to defer the proposal for want of requisite information as under and have asked the PP to revise the Report along with following clarification/information: -
(i) Submit the permission for fresh water withdrawal and submit clarification for operating the existing unit without prior permission for fresh water withdrawal.
(ii) Action Taken Report on non-compliance points in the existing EC conditions which needs to be forwarded by the Regional Office of the Ministry.
(iii) Submit the copy of public hearing report forwarded by the Head office of Gujarat Pollution Control Board as the said report uploaded on the PARIVESH portal is not opening. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation and its time lines needs to be submitted.
(iv) The Committee observed that District Vadodara comes under Critically Polluted area, however PP mentioned that this is away from CPA. In this context, the Committee suggested that PP shall submit the copy of letter either from CPCB or SPCB about the location of project in Critically Polluted area or not as there are different provisions of appraisal of projects which comes under CPA.
(v) Detailed effluent analysis report needs to be submitted.
(vi) Status of TSDF membership needs to be submitted. | 26 May 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Ramanbhai Patel | Designation | Director | Name of Company (Applicant Name should not be given here) | SHIMMER CHEMICALS PVT LTD | Address | Survey No. 313, Padra - Borsad state highway, village - Mujpur, Tal - Padra, Dist. Vadodara, Gujarat |
|