Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) ‘Lakhpat Cement Works Project’ (Cement Plant, Clinkerization Plant each of 10 MTPA production capacity with Captive Power Plant of 99MW, Limestone Mine for 12MTPA with lease area 251.9ha and Berthing Jetty - Material Handling Capacity: 19 MTPA)
(b)Name of the Company / Organisation ADANI CEMENTATION LIMITED
(c)Registered Address Adani House, 56 Srimali Society, Navrangpura,Ahmedabad,Ahmedabad,Gujarat-380009
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sanjay Prasad
(b)Designation (Owner/ Partner/ CEO) AGM
(c)Address Adani Cementation Limited, Ground Floor, South Wing, Adani Coporate House,Shantigram, S.G. Highway, Ahmedabad,,Ahmedabad,Gujarat-382421
(d)Pin code 382421
(e)E-mail sanjay.prasad@adani.com
(f)STD Code. 79(f)Telephone No. 25558623
(g)Fax No. 07925557401
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(b) Cement plants
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND/69706/2017
(d)Master Proposal Number(Single Window) SW/140523/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plant : 143, 144, 145, 146, 147, 148, 149, 150, 15
(b)Pincode 370627
(c)Bounded Latitudes (North)
From
Degree 2622387.98
Minutes
Second
From
Degree 2626835.09
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 457000.00
Minutes
Second
From
Degree 470552.26
Minutes
Second
(e)Survey of India Topo Sheet No. 41A/10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 27
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratkutchLakhpat
(2.)GujaratkutchLakhpatMudhvay, Maldo, Koriyani, Kapurashi
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/494/2017-IA-II(I)
(b)Date of Apply of TOR 26 Sep 2017
(c)Date of Issue of TOR / Standard ToR 25 Jun 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :22 Apr 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :28 May 2019
Distance of Public Hearing Venue from the Proposed Project :2
koriyani
State :Gujarat
District :kutch
Tehsil :Lakhpat
Village :koriyani
553Related to employment, Cattle grazing/ Fodder, Health/Medical, Educational/Skill development, Infrastructure/Hospital/School/Road, Marine/Fisherman, Greenbelt/Plantation, Godhatad Dam, Disposal of wasDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Captive Power plant99 MWTPP - 75 MW & WHRS - 24 MW
(2.)Clinker10 MTPA
(3.)Captive Jetty19 MTPA
(4.)Limestone Mine12MTPA
(5.)Cement10 MTPA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Cement Plant production capacity10OthersMTPAConveyor Belt
(2.)Clinker10OthersMTPAConveyor Belt
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. Not Applicable
(vi)Application No. Not Applicable
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 7525
(b) Funds Allocated for Environment Management (Capital) (in Crores) 107
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 45.6
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 12
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 20.37
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 20.37
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Silica Sand0.31OthersMTPAMundra, District KutchRoad210 Open MarketCopy of Linkage
(2.)Limestone2.7OthersMTPAFrom GMDCRoad20 MoUCopy of Linkage
(3.)Fly ash2.44OthersMTPACPP and Mundra TPPRoad,Conveyor Belt,OthersShipping210 OthersCaptive and From local MarketsCopy of Linkage
(4.)Coal0.86OthersMTPAImported CoalConveyor Belt9 Open MarketCopy of Linkage
(5.)Lignite1.56OthersMTPAGMDC Mine, Taluka Lakhpat, District - KutchRoad20 MoUCopy of Linkage
(6.)Limestone12OthersMTPACaptive MineConveyor Belt2 CaptiveCopy of Linkage
(7.)GYPSUM0.5OthersMTPADomestic/ImportedRoad160 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2017 To 28 Feb 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube19.97.119.980
(2.)PM10Micro Gram per Meter Cube75.257.475.1100
(3.)PM2.5Micro Gram per Meter Cube32.920.232.960
(4.)OthersCOMili Gram per Meter Cube0.850.480.852
(5.)SO2Micro Gram per Meter Cube18.85.318.780
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.47.16.58.5
(2.)TSSmg/l0000
(3.)TDSmg/l15708305002000
(4.)Chloridesmg/l5482532501000
(5.)Fluoridemg/l0.480.2911.5
(6.)Total Hardnessmg/l600.6309.7300600
(7.)OthersIronmg/l0.380.110.30.3
(8.)OthersTurbidityOthersNTU1115
(9.)OthersMagnesiummg/l66.73330100
(10.)OthersCoppermg/l0.050.050.051.5
(11.)OthersAlkalinitymg/l290150200600
(12.)OthersSulphatemg/l235.2153.5200400
(13.)OthersColorOthersHazen55515
(14.)OthersCalciummg/l130.769.775200
(15.)OthersManganesemg/l0.10.10.10.3
(16.)OthersArsenicmg/l0.010.010.010.05
(17.)Heavy MetalsChromiummg/l0.050.050.050.05
(18.)Heavy MetalsLeadmg/l0.010.010.010.01
(19.)OthersNitratemg/l0.370.164545
(20.)Heavy MetalsZincmg/l0.490.17515
(21.)OthersOil and Greesemg/l0.030.030.030.2
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)OthersConductivityOthersMicrosiemens per Centimeter647.2576.1C
(2.)OthersSodiummg/l8463C
(3.)OthersOil and Greesemg/l55C
(4.)OthersMagnesiummg/l24.815.4C
(5.)OthersSulphatemg/l65.238.5C
(6.)OthersIronmg/l1.281.13C
(7.)pHNA8.17.5C
(8.)OthersTDSmg/l414.2362.9C
(9.)OthersAlakalinitymg/l171.5147.2C
(10.)OthersPotassiummg/l3026C
(11.)OthersNitratemg/l8.65.4C
(12.)OthersFluoridemg/l0.980.82C
(13.)BODmg/l2.40.80C
(14.)CODmg/l38.420.3C
(15.)DOmg/l6.44.3C
(16.)OthersTotal Hardnessmg/l270.5182.1C
(17.)OthersCalciummg/l67.547.6C
(18.)OthersChloridemg/l195.6134.3C
(19.)OthersTotal ColiformOthersMPN/100 ml700500C
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))50.441.465
(2.)Leq(Night)A-weighted decibels(dB(A))42.932.755
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityOthersMicrosiemens per Cm985732
(2.)K(Potassium)Kilogram per hectare79.548.2
(3.)P(Phosphorus)Kilogram per hectare42.321.8
(4.)pH7.847.34
(5.)N(Nitrogen)Kilogram per hectare14587
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Sea300008.5Copy of Permission LetterPipelineIntake WellGMB/N/PVT-1/1798/559/41917 Jan 202030000
15.1.
(a)Whether Desalination is proposed Yes
(b)Desalination Capacity (KLD) 9000
(c)Quantity of Brine (KLD) 21000
(d)Mode of Disposal of Brine Brine shall be disposed to designated outfall loca
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)CPP Condenser Fin cleaning and effluent treatment11281128Settling TankOthersFor Dust suppression in Mine ML area11280
(2.)Domestic Use96120MBBR technologyReuse within the Plant & Recycling,OthersSludge from STP will be dried and used as Manure960
(3.)Brine discharge from Desalination210000Not applicableDischarge into Seawater Body21000
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 22224
(b)Total Discharged Water (Kilolitre per Day) 21000
(c)Total Reused Water (Kilolitre per Day) 1224
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used Containers (Drums)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)2Tons200RoadOthersTSDF
(2.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5Kilolitre0RoadAuthorized Recyclers
(3.)Bottom AshBottom Ash35000Tons0OthersBy Road within Plant premisesOthersShall be used as Additive
(4.)Fly AshFly Ash52500Tons0OthersBy Road within Plant PremisesOthersShall be used as Raw Material
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube19.9101.1421.0580
(2.)PM10Microgram per Meter Cube64.705.8170.52100
(3.)PM2.5Microgram per Meter Cube32.904.6537.5660
(4.)Others(Specify)COMicrogram per Meter Cube850107.13857.142000
(5.)SO2Microgram per Meter Cube18.7101.1519.8580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)RM/Kiln Bag House Line 1Coal1505.2PM105.9
(2.)RM/Kiln bag House Line - 1Coal1505.2SO223.32
(3.)RM/Kiln Bag House Line - 3Coal1505.2OthersCO631.3
(4.)Cooler ESP lie 3Coal604.8PM104.4
(5.)Coal Mill Bag House Line -2COal602.6PM101.9
(6.)Cement Mill 1 BH line 1NA454PM104.6
(7.)CPP 1Coal901.8SO23.12
(8.)CPP 3Coal901.8SO23.12
(9.)CPP 1Coal901.8NOx3.1
(10.)CPP 2Coal901.8NOx3.1
(11.)Cement Mill 2 BH line 2NA454PM104.6
(12.)CPP 3Coal901.8PM100.8
(13.)RM/Kiln Bag House Line - 3Coal1505.2PM105.9
(14.)RM/Kiln Bag House Line - 2Coal1505.2SO223.32
(15.)RM/Kiln Bag House Line - 1Coal1505.2OthersCO631.3
(16.)Packing Plant line 2NA350.8PM100.2
(17.)Coal Mill Bag House Line - 3Coal602.6PM101.9
(18.)Cement Mill 2 BH line 1NA454PM104.6
(19.)CPP 2Coal901.8PM100.8
(20.)RM/Kiln Bag House Line -2Coal1505.2PM105.9
(21.)RM/Kiln Bag House Line - 1Coal1505.2NOx36.8
(22.)RM/Kiln Bag House Line - 2Coal1505.2NOx36.8
(23.)RM/Kiln Bag House Line - 3Coal1505.2NOx36.8
(24.)RM/Kiln Bag House Line - 2Coal1505.2OthersCO631.3
(25.)Cooler ESP line 1Coal604.8PM104.4
(26.)RM/Kiln Bag House Line - 3Coal1505.2SO223.32
(27.)Cooler ESP line 2Coal604.8PM104.4
(28.)Coal Mill Bag house line - 1Coal602.6PM101.9
(29.)Cement Mill 1 BH line 2NA454PM104.6
(30.)Packing plant line 1NA350.8PM100.2
(31.)CPP 1Coal901.8PM100.8
(32.)CPP 2Coal901.8SO23.12
(33.)CPP 3Coal901.8NOx3.1
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 125000
(b)Source CPP, WHRS and Substation at Dayapar or Chher Moti
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1x600 KVA for CPP and 3x600 KVA for Cement Plant
(e)Stack Height (in m) 90
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 2.66
(b)Private Land (ha.) 142.08
(c)Government Land (ha.) 307.81
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 1.72
    Total Land (ha.) 454.27
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 8794.58
(b)Waste/Barren Land (ha.) 5400.67
(c)Grazing/ Community Land (ha.) 18835.90
(d)Surface Water Bodies (ha.) 11401.96
(e)Settlements (ha.) 434.39
(f)Industrial (ha.) 95.25
(g)Forest (ha.) 3332.33
(h)Mangroves (ha.) 1493.24
(i)Marine Area (ha.) 769.30
(j)Others (ha.) : Mining Activities, Sandy area and Mud land 12873.78
    Total (ha.) 63431.4
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant126.33Plant and Machine, Storage, Road etc
(2.)Green belt147.463.9 Ha in Plant and 83.5 Ha in ML area
(3.)Quarry Area168.4ML area excluding green Belt
(4.)Desalination Plant4.05Desalination Plant and Backup area
(5.)OthersConveyor Corridor and Jetty Approach8.09
Total (ha.) 454.27
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNA0NA
(2.)Wildlife CorridorsNA0NA
(3.)NPANA0NA
(4.)ESZsESZ of Narayan Sarovar Wild life sanctury4South from plant Boundary
(5.)WLSNarayan Sarovar Wild life sanctury5South from plant Boundary
(6.)ESAsNA0NA
(7.)Critically Polluted AreaNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestMudhvay Reserved Forest0.05Direction - S
(2.)Otherswater BodyKapurashi Nadi2Direction - W
(3.)Archaeological SitesLakhpat Fort12.2Direction - NE
(4.)Defence InstallationsBSF Camp7west of Plant Boundary
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status In-Principle(Stage-I) Approval Obtained
(i)MoEFCC file number FP/GJ/Others/28992/2017
(ii)Date of In-Principle (Stage-I) approval 28 Jun 2019
(iii)Area diverted 2.6564
(iv)Uploaded FC Letter Copy of FC Letter
(b)Legal Status of Forest Land Reserved
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 512
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 23
(b)Land yet to be acquired(Ha) 431.27
(c)Status of Land acquisition if not acquired Govt. Land : 307.8163ha. (Acquisition under proces
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 3
(b)No. of Households 131
(c)No. of PDFs (Project Displaced Families) 17
(d)No. of PAFs (Project Affected Families) 154
(e)Funds Allocated for R&R(in INR) (in Lacs) 992.86
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Black shoulder kite, Indian Peafowl, Montagu's Harrier, Pallid Harrier and Shikra
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 4.54 Crores
(iii)Period of Implementation 10
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. WLP/T.32/C/988/2019-20
(iii)Date of issue 29 Jan 2020
(iv)Recommendation Approved
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kapurashi Nadi
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 30
(b)Permanent Employment-During Operation 150
(c)Temporary Employment- During Construction 600
(d)Temporary Employment- During Operation 450
(e)No. of working days 300
(f)Total Manpower 1230
32.
Green Belt in Ha:
(a)Total Area of Green Belt 147.4
(b)Percentage of Total Project Area 32.45
(c)No. of Plants to be Planted 142400
(d)Funds Allocated for Plantation 300000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalOut of total integrated project area, ~148Ha will be developed into green cover which will be beneficial to the environment & provide an aesthetic look. The void area of mine shall be helpful for recharge of ground water. Environmental friendly mining operation through surface miner will have less negative impact w.r.t. noise and dust generation.
(2.)SocialThe company has undertaken and will continue undertake activities for the upliftment of the social community through community development. ACL has chosen following areas for social upliftment and prosperity in the communities; A) Infrastructure development, B) Healthcare development, C) School infrastructure, facilities and support (e.g., library, science lab etc.), D) Marine Infrastructure, E) Skill development, F) Water supply, G) Contribution to various Govt. Schemes (Swachh Bharat, Skill de
(3.)FinancialThe project has positive employment and income effects, both direct as well as indirect. Manpower is required for integrated project viz. plant operations, mining operations, and Jetty operations & manning of ships as well as other related activities such as transportation for day to day operations etc. The impact of the project on the economic aspects can be clearly observed.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0058
(ii)Name of the EIA Consultant Greencindia Consulting Private Limited
(iii)Address 608 - 611, Shopprix mall, Sector 5, Vaishali, National capital region Ghaziabad 201010 (UP)
(iv)Mobile No. 9891906015
(v)Landline No. 0120429653
(vi)Email Id information@greencindia.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 29 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSanjay Prasad
DesignationAGM
Name of Company (Applicant Name should not be given here)ADANI CEMENTATION LIMITED
AddressAdani House, 56 Srimali Society, Navrangpura
Print