1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | ‘Lakhpat Cement Works Project’ (Cement Plant, Clinkerization Plant each of 10 MTPA production capacity with Captive Power Plant of 99MW, Limestone Mine for 12MTPA with lease area 251.9ha and Berthing Jetty - Material Handling Capacity: 19 MTPA) | (b)Name of the Company / Organisation | ADANI CEMENTATION LIMITED | (c)Registered Address | Adani House,
56 Srimali Society, Navrangpura,Ahmedabad,Ahmedabad,Gujarat-380009 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sanjay Prasad | (b)Designation (Owner/ Partner/ CEO) | AGM | (c)Address | Adani Cementation Limited, Ground Floor, South Wing, Adani Coporate House,Shantigram, S.G. Highway,
Ahmedabad,,Ahmedabad,Gujarat-382421 | (d)Pin code | 382421 | (e)E-mail | sanjay.prasad@adani.com | (f)STD Code. | 79(f)Telephone No. | 25558623 | (g)Fax No. | 07925557401 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(b) Cement plants
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND/69706/2017 | (d)Master Proposal Number(Single Window) | SW/140523/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plant : 143, 144, 145, 146, 147, 148, 149, 150, 15 | (b)Pincode | 370627 | (c)Bounded Latitudes (North) | | From | | Degree | 2622387.98 | Minutes | | Second | | From | | Degree | 2626835.09 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 457000.00 | Minutes | | Second | | From | | Degree | 470552.26 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 41A/10 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 27 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 3 | (j)Seismic Zone | 5 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | kutch | Lakhpat | | (2.) | Gujarat | kutch | Lakhpat | Mudhvay, Maldo, Koriyani, Kapurashi | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/494/2017-IA-II(I) | (b)Date of Apply of TOR | 26 Sep 2017 | (c)Date of Issue of TOR / Standard ToR | 25 Jun 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 28 May 2019 | Distance of Public Hearing Venue from the Proposed Project : | 2 |
| koriyani | State : | Gujarat | District : | kutch | Tehsil : | Lakhpat | Village : | koriyani |
| 553 | Related to employment, Cattle grazing/ Fodder, Health/Medical, Educational/Skill development, Infrastructure/Hospital/School/Road, Marine/Fisherman, Greenbelt/Plantation, Godhatad Dam, Disposal of was | District Collector | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Captive Power plant | 99 MW | TPP - 75 MW & WHRS - 24 MW | (2.) | Clinker | 10 MTPA | | (3.) | Captive Jetty | 19 MTPA | | (4.) | Limestone Mine | 12MTPA | | (5.) | Cement | 10 MTPA | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Cement Plant production capacity | 10 | Others | MTPA | Conveyor Belt | | (2.) | Clinker | 10 | Others | MTPA | Conveyor Belt | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | Not Applicable | (vi)Application No. | Not Applicable | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 7525 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 107 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 45.6 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 12 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 20.37 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 20.37 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Silica Sand | 0.31 | Others | MTPA | Mundra, District Kutch | Road | | 210 | Open Market | | Copy of Linkage | (2.) | Limestone | 2.7 | Others | MTPA | From GMDC | Road | | 20 | MoU | | Copy of Linkage | (3.) | Fly ash | 2.44 | Others | MTPA | CPP and Mundra TPP | Road,Conveyor Belt,Others | Shipping | 210 | Others | Captive and From local Markets | Copy of Linkage | (4.) | Coal | 0.86 | Others | MTPA | Imported Coal | Conveyor Belt | | 9 | Open Market | | Copy of Linkage | (5.) | Lignite | 1.56 | Others | MTPA | GMDC Mine, Taluka Lakhpat, District - Kutch | Road | | 20 | MoU | | Copy of Linkage | (6.) | Limestone | 12 | Others | MTPA | Captive Mine | Conveyor Belt | | 2 | Captive | | Copy of Linkage | (7.) | GYPSUM | 0.5 | Others | MTPA | Domestic/Imported | Road | | 160 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2017 To 28 Feb 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 19.9 | 7.1 | 19.9 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 75.2 | 57.4 | 75.1 | 100 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 32.9 | 20.2 | 32.9 | 60 | (4.) | Others | CO | Mili Gram per Meter Cube | 0.85 | 0.48 | 0.85 | 2 | (5.) | SO2 | | Micro Gram per Meter Cube | 18.8 | 5.3 | 18.7 | 80 | |
14.2. No. of Ground Water monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.4 | 7.1 | 6.5 | 8.5 | (2.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (3.) | TDS | | | mg/l | | 1570 | 830 | 500 | 2000 | (4.) | Chlorides | | | mg/l | | 548 | 253 | 250 | 1000 | (5.) | Fluoride | | | mg/l | | 0.48 | 0.29 | 1 | 1.5 | (6.) | Total Hardness | | | mg/l | | 600.6 | 309.7 | 300 | 600 | (7.) | Others | Iron | | mg/l | | 0.38 | 0.11 | 0.3 | 0.3 | (8.) | Others | Turbidity | | Others | NTU | 1 | 1 | 1 | 5 | (9.) | Others | Magnesium | | mg/l | | 66.7 | 33 | 30 | 100 | (10.) | Others | Copper | | mg/l | | 0.05 | 0.05 | 0.05 | 1.5 | (11.) | Others | Alkalinity | | mg/l | | 290 | 150 | 200 | 600 | (12.) | Others | Sulphate | | mg/l | | 235.2 | 153.5 | 200 | 400 | (13.) | Others | Color | | Others | Hazen | 5 | 5 | 5 | 15 | (14.) | Others | Calcium | | mg/l | | 130.7 | 69.7 | 75 | 200 | (15.) | Others | Manganese | | mg/l | | 0.1 | 0.1 | 0.1 | 0.3 | (16.) | Others | Arsenic | | mg/l | | 0.01 | 0.01 | 0.01 | 0.05 | (17.) | Heavy Metals | | Chromium | mg/l | | 0.05 | 0.05 | 0.05 | 0.05 | (18.) | Heavy Metals | | Lead | mg/l | | 0.01 | 0.01 | 0.01 | 0.01 | (19.) | Others | Nitrate | | mg/l | | 0.37 | 0.16 | 45 | 45 | (20.) | Heavy Metals | | Zinc | mg/l | | 0.49 | 0.17 | 5 | 15 | (21.) | Others | Oil and Greese | | mg/l | | 0.03 | 0.03 | 0.03 | 0.2 | |
14.3. No. of Surface Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | Others | Conductivity | Others | Microsiemens per Centimeter | 647.2 | 576.1 | C | (2.) | Others | Sodium | mg/l | | 84 | 63 | C | (3.) | Others | Oil and Greese | mg/l | | 5 | 5 | C | (4.) | Others | Magnesium | mg/l | | 24.8 | 15.4 | C | (5.) | Others | Sulphate | mg/l | | 65.2 | 38.5 | C | (6.) | Others | Iron | mg/l | | 1.28 | 1.13 | C | (7.) | pH | | NA | | 8.1 | 7.5 | C | (8.) | Others | TDS | mg/l | | 414.2 | 362.9 | C | (9.) | Others | Alakalinity | mg/l | | 171.5 | 147.2 | C | (10.) | Others | Potassium | mg/l | | 30 | 26 | C | (11.) | Others | Nitrate | mg/l | | 8.6 | 5.4 | C | (12.) | Others | Fluoride | mg/l | | 0.98 | 0.82 | C | (13.) | BOD | | mg/l | | 2.4 | 0.80 | C | (14.) | COD | | mg/l | | 38.4 | 20.3 | C | (15.) | DO | | mg/l | | 6.4 | 4.3 | C | (16.) | Others | Total Hardness | mg/l | | 270.5 | 182.1 | C | (17.) | Others | Calcium | mg/l | | 67.5 | 47.6 | C | (18.) | Others | Chloride | mg/l | | 195.6 | 134.3 | C | (19.) | Others | Total Coliform | Others | MPN/100 ml | 700 | 500 | C | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 50.4 | 41.4 | 65 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 42.9 | 32.7 | 55 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | Electric Conductivity | Others | Microsiemens per Cm | 985 | 732 | (2.) | K(Potassium) | Kilogram per hectare | | 79.5 | 48.2 | (3.) | P(Phosphorus) | Kilogram per hectare | | 42.3 | 21.8 | (4.) | pH | | | 7.84 | 7.34 | (5.) | N(Nitrogen) | Kilogram per hectare | | 145 | 87 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Sea | | 30000 | 8.5 | Copy of Permission Letter | Pipeline | | Intake Well | | GMB/N/PVT-1/1798/559/419 | 17 Jan 2020 | 30000 | |
|
15.1. | (a)Whether Desalination is proposed | Yes | (b)Desalination Capacity (KLD) | 9000 | (c)Quantity of Brine (KLD) | 21000 | (d)Mode of Disposal of Brine | Brine shall be disposed to designated outfall loca | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | CPP Condenser Fin cleaning and effluent treatment | 1128 | 1128 | Settling Tank | Others | For Dust suppression in Mine ML area | 1128 | 0 | (2.) | Domestic Use | 96 | 120 | MBBR technology | Reuse within the Plant & Recycling,Others | Sludge from STP will be dried and used as Manure | 96 | 0 | (3.) | Brine discharge from Desalination | 21000 | 0 | Not applicable | Discharge into Seawater Body | | | 21000 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 22224 | (b)Total Discharged Water (Kilolitre per Day) | 21000 | (c)Total Reused Water (Kilolitre per Day) | 1224 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Used Containers (Drums) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2 | Tons | 200 | Road | | Others | TSDF | (2.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 5 | Kilolitre | 0 | Road | | Authorized Recyclers | | (3.) | Bottom Ash | Bottom Ash | | 35000 | Tons | 0 | Others | By Road within Plant premises | Others | Shall be used as Additive | (4.) | Fly Ash | Fly Ash | | 52500 | Tons | 0 | Others | By Road within Plant Premises | Others | Shall be used as Raw Material | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 19.9 | 10 | 1.14 | 21.05 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 64.7 | 0 | 5.81 | 70.52 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 32.9 | 0 | 4.65 | 37.56 | 60 | (4.) | Others(Specify) | CO | Microgram per Meter Cube | 850 | 10 | 7.13 | 857.14 | 2000 | (5.) | SO2 | | Microgram per Meter Cube | 18.7 | 10 | 1.15 | 19.85 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | RM/Kiln Bag House Line 1 | Coal | 150 | 5.2 | PM10 | | 5.9 | (2.) | RM/Kiln bag House Line - 1 | Coal | 150 | 5.2 | SO2 | | 23.32 | (3.) | RM/Kiln Bag House Line - 3 | Coal | 150 | 5.2 | Others | CO | 631.3 | (4.) | Cooler ESP lie 3 | Coal | 60 | 4.8 | PM10 | | 4.4 | (5.) | Coal Mill Bag House Line -2 | COal | 60 | 2.6 | PM10 | | 1.9 | (6.) | Cement Mill 1 BH line 1 | NA | 45 | 4 | PM10 | | 4.6 | (7.) | CPP 1 | Coal | 90 | 1.8 | SO2 | | 3.12 | (8.) | CPP 3 | Coal | 90 | 1.8 | SO2 | | 3.12 | (9.) | CPP 1 | Coal | 90 | 1.8 | NOx | | 3.1 | (10.) | CPP 2 | Coal | 90 | 1.8 | NOx | | 3.1 | (11.) | Cement Mill 2 BH line 2 | NA | 45 | 4 | PM10 | | 4.6 | (12.) | CPP 3 | Coal | 90 | 1.8 | PM10 | | 0.8 | (13.) | RM/Kiln Bag House Line - 3 | Coal | 150 | 5.2 | PM10 | | 5.9 | (14.) | RM/Kiln Bag House Line - 2 | Coal | 150 | 5.2 | SO2 | | 23.32 | (15.) | RM/Kiln Bag House Line - 1 | Coal | 150 | 5.2 | Others | CO | 631.3 | (16.) | Packing Plant line 2 | NA | 35 | 0.8 | PM10 | | 0.2 | (17.) | Coal Mill Bag House Line - 3 | Coal | 60 | 2.6 | PM10 | | 1.9 | (18.) | Cement Mill 2 BH line 1 | NA | 45 | 4 | PM10 | | 4.6 | (19.) | CPP 2 | Coal | 90 | 1.8 | PM10 | | 0.8 | (20.) | RM/Kiln Bag House Line -2 | Coal | 150 | 5.2 | PM10 | | 5.9 | (21.) | RM/Kiln Bag House Line - 1 | Coal | 150 | 5.2 | NOx | | 36.8 | (22.) | RM/Kiln Bag House Line - 2 | Coal | 150 | 5.2 | NOx | | 36.8 | (23.) | RM/Kiln Bag House Line - 3 | Coal | 150 | 5.2 | NOx | | 36.8 | (24.) | RM/Kiln Bag House Line - 2 | Coal | 150 | 5.2 | Others | CO | 631.3 | (25.) | Cooler ESP line 1 | Coal | 60 | 4.8 | PM10 | | 4.4 | (26.) | RM/Kiln Bag House Line - 3 | Coal | 150 | 5.2 | SO2 | | 23.32 | (27.) | Cooler ESP line 2 | Coal | 60 | 4.8 | PM10 | | 4.4 | (28.) | Coal Mill Bag house line - 1 | Coal | 60 | 2.6 | PM10 | | 1.9 | (29.) | Cement Mill 1 BH line 2 | NA | 45 | 4 | PM10 | | 4.6 | (30.) | Packing plant line 1 | NA | 35 | 0.8 | PM10 | | 0.2 | (31.) | CPP 1 | Coal | 90 | 1.8 | PM10 | | 0.8 | (32.) | CPP 2 | Coal | 90 | 1.8 | SO2 | | 3.12 | (33.) | CPP 3 | Coal | 90 | 1.8 | NOx | | 3.1 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 125000 | (b)Source | CPP, WHRS and Substation at Dayapar or Chher Moti | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1x600 KVA for CPP and 3x600 KVA for Cement Plant | (e)Stack Height (in m) | 90 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 2.66 | (b)Private Land (ha.) | 142.08 | (c)Government Land (ha.) | 307.81 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 1.72 | Total Land (ha.) | 454.27 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 8794.58 | (b)Waste/Barren Land (ha.) | 5400.67 | (c)Grazing/ Community Land (ha.) | 18835.90 | (d)Surface Water Bodies (ha.) | 11401.96 | (e)Settlements (ha.) | 434.39 | (f)Industrial (ha.) | 95.25 | (g)Forest (ha.) | 3332.33 | (h)Mangroves (ha.) | 1493.24 | (i)Marine Area (ha.) | 769.30 | (j)Others (ha.) : Mining Activities, Sandy area and Mud land | 12873.78 | Total (ha.) | 63431.4 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 126.33 | Plant and Machine, Storage, Road etc | (2.) | Green belt | | 147.4 | 63.9 Ha in Plant and 83.5 Ha in ML area | (3.) | Quarry Area | | 168.4 | ML area excluding green Belt | (4.) | Desalination Plant | | 4.05 | Desalination Plant and Backup area | (5.) | Others | Conveyor Corridor and Jetty Approach | 8.09 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | NA | 0 | NA | (2.) | Wildlife Corridors | NA | 0 | NA | (3.) | NPA | NA | 0 | NA | (4.) | ESZs | ESZ of Narayan Sarovar Wild life sanctury | 4 | South from plant Boundary | (5.) | WLS | Narayan Sarovar Wild life sanctury | 5 | South from plant Boundary | (6.) | ESAs | NA | 0 | NA | (7.) | Critically Polluted Area | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Mudhvay Reserved Forest | 0.05 | Direction - S | (2.) | Others | water Body | Kapurashi Nadi | 2 | Direction - W | (3.) | Archaeological Sites | | Lakhpat Fort | 12.2 | Direction - NE | (4.) | Defence Installations | | BSF Camp | 7 | west of Plant Boundary | |
|
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | In-Principle(Stage-I) Approval Obtained | (i)MoEFCC file number | FP/GJ/Others/28992/2017 | (ii)Date of In-Principle (Stage-I) approval | 28 Jun 2019 | (iii)Area diverted | 2.6564 | (iv)Uploaded FC Letter | Copy of FC Letter | (b)Legal Status of Forest Land | Reserved | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 23 | (b)Land yet to be acquired(Ha) | 431.27 | (c)Status of Land acquisition if not acquired | Govt. Land : 307.8163ha. (Acquisition under proces | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 3 | (b)No. of Households | 131 | (c)No. of PDFs (Project Displaced Families) | 17 | (d)No. of PAFs (Project Affected Families) | 154 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 992.86 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Black shoulder kite, Indian Peafowl, Montagu's Harrier, Pallid Harrier and Shikra | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 4.54 Crores | (iii)Period of Implementation | 10 | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | WLP/T.32/C/988/2019-20 | (iii)Date of issue | 29 Jan 2020 | (iv)Recommendation | Approved | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kapurashi Nadi | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 2 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 30 | (b)Permanent Employment-During Operation | 150 | (c)Temporary Employment- During Construction | 600 | (d)Temporary Employment- During Operation | 450 | (e)No. of working days | 300 | (f)Total Manpower | 1230 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 147.4 | (b)Percentage of Total Project Area | 32.45 | (c)No. of Plants to be Planted | 142400 | (d)Funds Allocated for Plantation | 300000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Out of total integrated project area, ~148Ha will be developed into green cover which will be beneficial to the environment & provide an aesthetic look. The void area of mine shall be helpful for recharge of ground water.
Environmental friendly mining operation through surface miner will have less negative impact w.r.t. noise and dust generation. | (2.) | Social | The company has undertaken and will continue undertake activities for the upliftment of the social community through community development. ACL has chosen following areas for social upliftment and prosperity in the communities;
A) Infrastructure development,
B) Healthcare development,
C) School infrastructure, facilities and support (e.g., library, science lab etc.),
D) Marine Infrastructure,
E) Skill development,
F) Water supply,
G) Contribution to various Govt. Schemes (Swachh Bharat, Skill de | (3.) | Financial | The project has positive employment and income effects, both direct as well as indirect. Manpower is required for integrated project viz. plant operations, mining operations, and Jetty operations & manning of ships as well as other related activities such as transportation for day to day operations etc. The impact of the project on the economic aspects can be clearly observed. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0058 | (ii)Name of the EIA Consultant | Greencindia Consulting Private Limited | (iii)Address | 608 - 611, Shopprix mall, Sector 5, Vaishali, National capital region Ghaziabad 201010 (UP) | (iv)Mobile No. | 9891906015 | (v)Landline No. | 0120429653 | (vi)Email Id | information@greencindia.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 29 Mar 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Sanjay Prasad | Designation | AGM | Name of Company (Applicant Name should not be given here) | ADANI CEMENTATION LIMITED | Address | Adani House,
56 Srimali Society, Navrangpura |
|