Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Graddy Pharmachem
(b)Name of the Company / Organisation GRADDY PHARMACHEM
(c)Registered Address Plot No. 205,206,207/18, GIDC Industrial Estate - Panoli, Tal: Ankleshwar, Dist: Bharuch,,Bharuch,Gujarat-394115
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Chetan Popatbhai Ghinaiya
(b)Designation (Owner/ Partner/ CEO) Patrner
(c)Address A/22, Maninagar Society, A K Road, Surat-394115,,Surat City,Surat,Gujarat-395008
(d)Pin code 395008
(e)E-mail graddypharmachem@gmail.com
(f)STD Code. 261(f)Telephone No. 287778
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/123966/2019
(d)Master Proposal Number(Single Window) SW/140262/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot no. 205,206,207/18, GIDC Panoli, Ta-Ankleshwa
(b)Pincode 394116
(c)Bounded Latitudes (North)
From
Degree 21335197
Minutes
Second
From
Degree 21335318
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72595983
Minutes
Second
From
Degree 730158
Minutes
Second
(e)Survey of India Topo Sheet No. F43N2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 27
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 25
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratBharuchAnklesvar
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/327/2019-IA-II(I)
(b)Date of Apply of TOR 04 Nov 2019
(c)Date of Issue of TOR / Standard ToR 12 Dec 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Located In Panoli Industrial Estate, GIDC
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)S.S. Reactor with Column Condenser and Receiver3.0 KLFor Reaction
(2.)S.S. Reactor with Column Condenser and Receiver3.0 KLFor Reaction
(3.)Filter System1 ton/hrFiltration
(4.)Centrifuge300 kgFor Filtration
(5.)Vacuum Pump1-5 Torr VacuumFor Vacuum
(6.)S.S. Reactor with Column Condenser and Receiver2.0 KLFor Reaction
(7.)S.S. Reactor with Column Condenser and Receiver3.0 KLFor Reaction
(8.)Glass line Reactor Column Condenser2.0 KLFor Reaction
(9.)MSRL/HDPE with Stirrer0.5 KLFor Reaction
(10.)Tray Dryer24 Traysfor drying
(11.)S.S. Reactor with Column Condenser and Receiver1.0 KLFor Reaction
(12.)MSRL/HDPE with Stirrer5.0 KLFor Washing
(13.)Pulverizer300 kg/hrfor miling
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Group-150OthersMT/MonthRoad
(2.)Group-250OthersMT/MonthRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 4.5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.65
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.09
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.8
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 250
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 250
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Toluene900Tons per AnnumDomesticRoad25 Open MarketCopy of Linkage
(2.)Hydrochloric Acid250Tons per AnnumDomesticRoad25 Open MarketCopy of Linkage
(3.)Chloroform900Tons per AnnumDomesticRoad25 Open MarketCopy of Linkage
(4.)Pyridine180Tons per AnnumDomesticRoad25 Open MarketCopy of Linkage
(5.)Caustic Soda900Tons per AnnumDomesticRoad25 Open MarketCopy of Linkage
(6.)Hydrogen108Tons per AnnumDomesticRoad25 Open MarketCopy of Linkage
(7.)Acetone360Tons per AnnumDomesticRoad25 Open MarketCopy of Linkage
(8.)Methanol900Tons per AnnumDomesticRoad20 Open MarketCopy of Linkage
(9.)Mono Methyl Amine Solution 40%720Tons per AnnumImportOthersSea & Airway25 Open MarketCopy of Linkage
(10.)THF -360Tons per AnnumDomesticRoad25 Open MarketCopy of Linkage
(11.)Ethylacetate360Tons per AnnumDomesticRoad25 Open MarketCopy of Linkage
(12.)Ammonia gas540Tons per AnnumDomesticRoad20 Open MarketCopy of Linkage
(13.)IPA900Tons per AnnumDomesticRoad25 Open MarketCopy of Linkage
(14.)Sulphuric acid288Tons per AnnumDomesticRoad20 Open MarketCopy of Linkage
(15.)Acetic acid900Tons per AnnumDomesticRoad25 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube26.7217.522680
(2.)Otherso3Micro Gram per Meter Cube11.089.9711180
(3.)PM10Micro Gram per Meter Cube95.9476.6395100
(4.)PM2.5Micro Gram per Meter Cube58.144.395860
(5.)NOxMicro Gram per Meter Cube28.5319.982880
    14.2.     No. of Ground Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOthersPh Scale8.067.386.58.5
(2.)TSSmg/l52250100
(3.)Total Hardnessmg/l887.53166.66300600
(4.)Fluoridemg/l0011.5
(5.)TDSmg/l24514595002000
(6.)Chloridesmg/l749.7123.12501000
(7.)OthersSulphatesmg/l192.933.63200400
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHOthersPh Scale7.487.48A
(2.)DOmg/l6.66.6A
(3.)BODmg/l00A
(4.)Otherssulphatesmg/l19.4719.47A
(5.)CODmg/l24.6624.66A
    14.4.     No. of Ambient Noise monitoring locations : 09
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.54555
(2.)Leq(Night)A-weighted decibels(dB(A))45.136.745
    14.5.     No. of Soil Sample Monitored locations : 09
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOtherspH Scale8.027.16
(2.)N(Nitrogen)Milligram per Kilogram225.498.5
(3.)P(Phosphorus)Milligram per Kilogram20815.9
(4.)K(Potassium)Milligram per Kilogram869207
(5.)Electric ConductivityMillisiemens per Centimetre2.481.37
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 30
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Water Supply58.510Copy of Permission LettermodeOthersPipelineOthersPipe lineGIDC/PANOLI01 Aug 201961.0
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial31.535primary treatment & send to Common MEEOthersSend to Common MEE0031.5
(2.)Scrubbing Media0.71.0Reuse or sell to end userOthersReuse or sell to end user000.7
(3.)Utility3.03.0ROOthersRO And RO permeatereuse2.50.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 35.2
(b)Total Discharged Water (Kilolitre per Day) 32.7
(c)Total Reused Water (Kilolitre per Day) 2.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)48Tons11RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Distillation ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)144Tons11RoadOthersCo processing or Incineration
(3.)Spent SolventHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2800Tons11RoadOthersdistil and reuse in plant premises.
(4.)Spent hyfloHazardous Waste (as per Hazardous and Other Waste Management rules 2016)24Tons11RoadCo-Processing
(5.)Dil. HCLHazardous Waste (as per Hazardous and Other Waste Management rules 2016)168Tons15RoadOtherssell to end user
(6.)Discarded Drums/Bags /LinersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)24Tons11RoadAuthorized Recyclers
(7.)Spent OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.09Tons10RoadOthersAuthorized registered re-processor.
(8.)Sodium AcetateHazardous Waste (as per Hazardous and Other Waste Management rules 2016)300Tons15RoadOtherssell to end user
(9.)Sodium SulfiteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)60Tons15RoadOtherssell to end user
(10.)Spent CarbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)84Tons11RoadOthersCo processing or Incineration
(11.)Dil HbrHazardous Waste (as per Hazardous and Other Waste Management rules 2016)168Tons15RoadOtherssell to end user
(12.)Liq. AmmoniaHazardous Waste (as per Hazardous and Other Waste Management rules 2016)63Tons15RoadOtherssell to end user
(13.)Off Specification productsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons11RoadOthersCo processing or Incineration
(14.)Organic WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)120Tons11RoadOthersCo processing or Incineration
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube46.281.370.2246.660
(2.)NOxMicrogram per Meter Cube23.311.370.1323.4580
(3.)PM10Microgram per Meter Cube95.81.370.2296.05100
(4.)SO2Microgram per Meter Cube20.891.370.3821.2880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)TFH 2 Lac KcalNatural Gas180.5OthersPM SO2 NOX150 262 94
(2.)DG SetHSD110.1OthersPM SO2 NOX150 262 94
(3.)Boiler 1 TPHNatural gas180.5OthersPM SO2 NOX150 262 94
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 250
(b)Source DGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 125 *2
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.2592
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.2592
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 22938.39
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1167.40
(e)Settlements (ha.) 1378.23
(f)Industrial (ha.) 3592.74
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Scrubland & Mud Flats 2340.3
    Total (ha.) 31417.06
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.02
(2.)Green belt0.10
(3.)OthersOther0.13
Total (ha.) 0.25
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaAnkleshwar5.0Located within 10 km of critically polluted area
(2.)NPANA0.0NA
(3.)ESAsNA0.0NA
(4.)CorridorsNA0.0NA
(5.)WLSNA00NA
(6.)ESZsNA0.0NA
(7.)Wildlife CorridorsNA0.0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0.0NA
(2.)Defence InstallationsNA0.0NA
(3.)OthersNANA0.0NA
(4.)ForestNA0.0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.25
(b)Land yet to be acquired(Ha) 0.0
(c)Status of Land acquisition if not acquired Land is already acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Presence of 10 schedule-1 species
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 202500
(iii)Period of Implementation 1 year
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 15
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 15
(e)No. of working days 330
(f)Total Manpower 30
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.10
(b)Percentage of Total Project Area 38.58
(c)No. of Plants to be Planted 200
(d)Funds Allocated for Plantation 0.03
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalCER Activities
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. High Court Stay order against QCI NABET
(ii)Name of the EIA Consultant Aqua Air Environmental Engineers Pvt. Ltd.
(iii)Address 403, Center point, civil Char rasta, nr. Kadiwala school, ring roag, surat
(iv)Mobile No. 9909069611
(v)Landline No. 0261246124
(vi)Email Id aqua_eia@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 07 Apr 2016
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantChetan Popatbhai Ghinaiya
DesignationPatrner
Name of Company (Applicant Name should not be given here)GRADDY PHARMACHEM
AddressPlot No. 205,206,207/18, GIDC Industrial Estate - Panoli, Tal: Ankleshwar, Dist: Bharuch
Print