Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Cadila Healthcare Limited
(b)Name of the Company / Organisation CADILA HEALTHCARE LIMITED
(c)Registered Address Plot No. 26 to 29, 31, Dabhasa-Umraya Road, Vill: Dabhasa, Tal: Padra, Dist. Vadodara,,Vadodara,Gujarat-391440
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Gautam Jain
(b)Designation (Owner/ Partner/ CEO) VicePresident
(c)Address Zydus Tower, Satellite Cross Road, Ahmedabad,,Ahmedabad City,Ahmedabad,Gujarat-380015
(d)Pin code 380015
(e)E-mail ashoksinh.rana@zyduscadila.com
(f)STD Code. 2662(f)Telephone No. 679118
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/72445/2018
(d)Master Proposal Number(Single Window) SW/140250/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Masar Block No. 1162-1164,1171-1174,1181-1183 and
(b)Pincode 391421
(c)Bounded Latitudes (North)
From
Degree 22.120500
Minutes
Second
From
Degree 22.124244
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.890039
Minutes
Second
From
Degree 72.895681
Minutes
Second
(e)Survey of India Topo Sheet No. F43G16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 17
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 13.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)ChhattisgarhKorbaPaliKartali
(2.)GujaratVadodaraPadra
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/39/2018-IA-II(I)
(b)Date of Apply of TOR 24 Jan 2018
(c)Date of Issue of TOR / Standard ToR 24 Mar 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :29 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :01 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :00
Project Site, Block No. 1181, Vill: Masar, Padra-Jambusar Road, Ta. Padra, Dist. Vadodara
State :Gujarat
District :Vadodara
Tehsil :Padra
Village :Masar
39Local employment, training programs for locals, APCM and wastewater managementOthersResident Additional Collector and Additional District Magistrate, Vadodara
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)SSR (Reactor)4000 Lit x6Nos., 5000Litx8Nos., 6000Litx5Nos.
(2.)SSR (Reactor)50 Lit x3 Nos., 100 Lit x3 Nos., 200 Lit x1 Nos.
(3.)SSR (Reactor)1200 Lit x4 Nos., 1500Litx3Nos., 2000Litx12Nos.
(4.)SSR (Reactor)2500Litx4Nos., 3000Litx9Nos., 3500Lit x2 Nos.
(5.)SSR (Reactor)6500 Lit x1 No., 7500Litx6Nos., 9000Lit x2Nos.
(6.)SSR (Reactor)7000 Lit x4 Nos., 1000 Lit x6 Nos.
(7.)GLR (Reactor)63 Lit x2 Nos., 100 Lit x2 Nos., 250 Lit x10 Nos.
(8.)GLR (Reactor)1600Litx4Nos., 2000Litx7Nos., 3000Lit x6 Nos.
(9.)GR (Reactor)10 Lit x1 No., 20 Lit x2 Nos.
(10.)HER (Reactor)250 Lit x1 No.
(11.)CF (centrifuge)48" x26 Nos., 60" x3 Nos.
(12.)VTD (Vacuum Tray Dryer)48 Trays x5 Nos., 72 Trays x3 Nos.
(13.)NF (Nutsche filter)50 Lit x2 Nos., 100 Lit x1 No., 200 Lit x2 Nos.
(14.)NF (Nutsche filter)250 Lit x1 No., 1200 Lit x2 Nos.
(15.)CF (centrifuge)18" x1 No., 24" x7 Nos., 36" x4 Nos.
(16.)GLR (Reactor)500 Lit x3 Nos., 630 Lit x4 Nos., 1000 Lit x2 Nos.
(17.)GLR (Reactor)4000 Lit x4 Nos., 5000 Lit x2 Nos.
(18.)VTD (Vacuum Tray Dryer)96 Trays x2 Nos.
(19.)SSR (Reactor)250 Lit x5 Nos., 500Litx6 Nos., 750Litx4 Nos.
(20.)GLR (Reactor)6300 Lit x6 Nos., 8000 Lit x1 No.
(21.)SF (Sparkler Filter)7" x1 No., 8" x10 Nos., 14" x8 Nos.
(22.)SF (Sparkler Filter)18" x23 Nos., 24" x10 No.
(23.)VTD (Vacuum Tray Dryer)12 Trays x1 No., 24 Trays x2 Nos.
(24.)GR (Reactor)50 Lit x 5 Nos., 100 Lit x2 Nos.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)R&D Products /Pilot Plant batches/Development Batches24Tons per AnnumRoad
(2.)Bupropion HCl /BuspironeHCl/Brivaracetam/Canagliflozin/ Candesartan Cilexetil/Carvedilol/Clindamycin/Clonidine OR240Tons per AnnumRoad
(3.)Hydroxychloroquine sulfate /Lamotrigine/LansoprazoleSulphide/Ledipasvir/Letrozole/Levofloxacin Hemihydrate/Linagliptine/Loratidine/LorcaserinHCl/Losartan Potassium/Lurasidone hydrochloride/Macitentan/Meloxicam240Tons per AnnumRoad
(4.)Amlodipine Beyslate/Etodolac/TirofibanHCl/Tofacitinib Citrate/Tolvaptan/Topiramate/Tramadol Hydrochloride UDCA (India Market)/Valdecoxib/Valsartan/Venlafaxine Hydrochloride/Vilazodone hydrochloride/Vildagliptin/ Vortioxetine Hydrobromide/Warfarin sodium clathrate/ Ziprasidone HCl300Tons per AnnumRoad
(5.)Azathioprine, Febuxosate, Lacosamide, Refaximin, Tolperison, Udenafil120Tons per AnnumRoad
(6.)Clopidogrel Bisulphate/ besylate /Colestipol Hydrochloride/CinacalcetHCl/Dapagliflozin/ Darunavir/Desloratadine/Desvenlafaxine succinate/Dimethyl Fumarate OR240Tons per AnnumRoad
(7.)Donepezil HCl /Duloxetine Hydrochloride/Edoxaban Tosylate Monohydrate/ Eltrombopagolamine/Empagliflozin/Entecavir/ Escitalopram Oxalate/Esomeprazole Magnesium OR240Tons per AnnumRoad
(8.)Atorvastatin Calcium /Atovaquone/Avanafil/ Azelastine HCl/Azilsartan Medoxomil/ Bisacodyl/Bosentan/Brexpiprazole OR240Tons per AnnumRoad
(9.)Pregabalin/Propefenone/Polmacoxib/QuetiapineHemifumarate/Ranolazine/Rasagilinebesylate/Risperidone/ Rivastigmine/Roflumilast/Rosuvastatin calcium/Rosuvastatin ethanol amine/Sacubitril Valsartan Trisodium OR240Tons per AnnumRoad
(10.)Saroglitazar/Saxagliptin/SetralineHydrochloride/Sildenafil citrate/Silidosin/Sitagliptin phosphate Anhydroous/Besylate/Sparfloxacin/Tamsulosin HCl/ Tebipenempivoxil/Telapvir/Telmisartan/Tenegliptin240Tons per AnnumRoad
(11.)Mesalamine/Metoprolol succinate/MidodrineHCl/ Mirabegron/Nicronadil/Olmesartane/Omeprazole/OmeprazoleMagnesium/Pantoprazole Sodium/Paroxetine Hydrochloride/Phenteramin/Pramipexole Dihydro Mono Hydrate240Tons per AnnumRoad
(12.)Acotiamide hydrochloride /Agomelatine/ Anagrelide Mono hydrochloride Monohydrate/Anastrozole/Apixaban/ ApomorphineHCl/Apremilast/Aripiprazole/Atenolol/Atomoxetine HCl/Trazodone240Tons per AnnumRoad
(13.)Ethacrynic acid /Etoricoxib/Famotidine/Fingolimod/Flibanserin/ Fluconazole/Fosphenytoin Sodium/Gabapentine /Glimepiride/Hydrochlorothiazide/ Hyoscyamine Sulfate/Ivabradine Hydrochloride/ Levomilnacipran240Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 200
(b) Funds Allocated for Environment Management (Capital) (in Crores) 10
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 4.35
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 2124
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 2124
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)File Attached2124Tons per AnnumOpen MarketRoad425 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube48.825.644.860
(2.)SO2Micro Gram per Meter Cube18.39.715.780
(3.)NOxMicro Gram per Meter Cube21.912.318.980
(4.)PM10Micro Gram per Meter Cube86.545.375.7100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l564378300600
(2.)Chloridesmg/l12404932501000
(3.)pHOtherspH Unit7.97.378
(4.)TSSmg/l13.16.200
(5.)TDSmg/l252812025002000
(6.)Fluoridemg/l0.780.5911.5
(7.)Heavy MetalsIronmg/l0.290.190.31.0
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l17.810.2D
(2.)pHOtherspH Unit7.87.5A
(3.)CODmg/l38.222.5D
(4.)DOmg/l6.84.5B
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))43.340.170
(2.)Leq(Day)A-weighted decibels(dB(A))54.551.575
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram42661
(2.)Electric ConductivityOthersdS/m3.81.7
(3.)N(Nitrogen)Milligram per Kilogram35361
(4.)pHOtherspH Unit7.57.1
(5.)P(Phosphorus)Milligram per Kilogram23545
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 60 To 80
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 55 To 70
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater6450Copy of Permission LetterPipelineOthersBorewell21-4/4750/GJ/IND/201911 Jan 2019645
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic90125STPGreen Belt Renewal Plant90
(2.)Industrial690700ETP-ROMEE/ ATFDReuse within the Plant & Recycling,OthersReuse66030
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 780
(b)Total Discharged Water (Kilolitre per Day) 30
(c)Total Reused Water (Kilolitre per Day) 750
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2400Tons50RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)MEE saltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3000Tons50RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Spent CarbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)900Tons50RoadOthersIncineration at CHWIF or co-processing
(4.)Spent CatalystHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6.0Tons55RoadOthersBy back to supplier for reactivation or reprocess.
(5.)Spent SolventHazardous Waste (as per Hazardous and Other Waste Management rules 2016)30000Tons55RoadOthersDistillation in-house or at SPCB approved facility
(6.)Distillation ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)7680Tons55RoadOthersIncineration at CHWIF or co-processing
(7.)Discarded Liners/bagsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)180Tons25RoadAuthorized Recyclers
(8.)Fly AshHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1470Tons25RoadOthersBrick Manufacturer
(9.)Off Specification ProductHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.01Tons55RoadOthersIncineration at CHWIF or co-processing
(10.)Date Expired productHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.01Tons55RoadOthersIncineration at CHWIF or co-processing
(11.)Discarded ContainersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)40Tons25RoadAuthorized Recyclers
(12.)Process Residue / SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)900Tons50RoadOthersIncineration at CHWIF or co-processing
(13.)Used Lubricating OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)30Kilolitre25RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube67.81.414.672.4100
(2.)PM2.5Microgram per Meter Cube38.31.414.643.060
(3.)SO2Microgram per Meter Cube13.71.413.617.480
(4.)NOxMicrogram per Meter Cube16.01.412.618.780
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler-3 (12 TPH)Coal/White Coal/Imported Coal300.6OthersSPM, SO2, NOX0.254 g/s, 0.136 g/s, 0.119 g/s
(2.)D G Set (500 kVA)HSD110.3OthersSPM, SO2, NOX0.030 g/s, 0.018 g/s, 0.024 g/s
(3.)D G Set (750 kVA)HSD110.3OthersSPM, SO2, NOX0.030 g/s, 0.018 g/s, 0.024 g/s
(4.)D G Set (2 nos.) 1000 kVAHSD210.45OthersSPM, SO2, NOX0.068 g/s, 0.041 g/s, 0.054 g/s
(5.)Process Vent-1None210.3OthersSO2, Cl20.010 g/s, 0.003 g/s
(6.)Process Vent-7NOne210.3OthersSO2, HCl0.010 g/s, 0.006 g/s
(7.)Process Vent-6None210.3OthersSO2, HCl0.010 g/s, 0.006 g/s
(8.)Boiler-2 (6 TPH)Coal/White Coal/Imported Coal300.6OthersSPM, SO2, NOX0.172 g/s, 0.092 g/s, 0.080 g/s
(9.)Vent of ATFDsNone110.3OthersPM0.012 g/s
(10.)Boiler-1 (5 TPH)Coal/White Coal/Imported Coal300.6OthersSPM, SO2, NOX0.159 g/s, 0.085 g/s, 0.074 g/s
(11.)Process Vent - 2None210.3OthersSO2, HCl0.010 g/s, 0.006 g/s
(12.)Process Vent -4None210.3OthersSO2, HCl0.010 g/s, 0.006 g/s
(13.)Process Vent-5None210.3OthersSO2, HCl0.010 g/s, 0.006 g/s
(14.)Process Vent-8None210.3OthersSO2, HCl0.010 g/s, 0.006 g/s
(15.)Process Vent-3None210.3OthersSO2, HCl0.010 g/s, 0.006 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2800
(b)Source Gujarat Electricity Board (GEB)
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 500 KVA (1 No.), 750 KVA(1 No.), 1000 KVA(1 No.)
(e)Stack Height (in m) 21
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 26.0789
(c)Government Land (ha.) 00
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 00
    Total Land (ha.) 26.0789
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 23287
(b)Waste/Barren Land (ha.) 5706
(c)Grazing/ Community Land (ha.) 00
(d)Surface Water Bodies (ha.) 541
(e)Settlements (ha.) 1095
(f)Industrial (ha.) 593
(g)Forest (ha.) 00
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : Roads 226
    Total (ha.) 31448
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant3.45
(2.)Green belt8.7
(3.)Built Up Area0.14admin & Lab
(4.)OthersParking, roads and open area13.79Parking, roads and open area
Total (ha.) 26.08
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone within 10 km00None within 10 km
(2.)NPANone within 10 km00None within 10 km
(3.)CorridorsNone within 10 km00None within 10 km
(4.)Wildlife CorridorsNone within 10 km00None within 10 km
(5.)WLSNone within 10 km00None within 10 km
(6.)ESZsNone within 10 km00None within 10 km
(7.)ESAsNone within 10 km00None within 10 km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone within 10 km00None within 10 km
(2.)Archaeological SitesNone within 10 km00None within 10 km
(3.)Defence InstallationsNone within 10 km00None within 10 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 26.08
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired 26.08
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area ponds of Masar, Abhol, Gajera, Kanzat village
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area ponds of Kahanva, Gavasad, Dabha, Piludra village
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 5.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 00
(b)Permanent Employment-During Operation 800
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 00
(e)No. of working days 26
(f)Total Manpower 850
32.
Green Belt in Ha:
(a)Total Area of Green Belt 8.7
(b)Percentage of Total Project Area 33.36
(c)No. of Plants to be Planted 5000
(d)Funds Allocated for Plantation 3000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialCSR, Employment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0084
(ii)Name of the EIA Consultant San Envirotech Pvt. Ltd., Ahmedabad
(iii)Address 401/402/423/424/324, Medicine Market, Opp. Shefali Centre, Paldi Cross Road, Ahmedabad
(iv)Mobile No. 9825007201
(v)Landline No. 0792658307
(vi)Email Id mahendra.sepl@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 16 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantGautam Jain
DesignationVicePresident
Name of Company (Applicant Name should not be given here)CADILA HEALTHCARE LIMITED
AddressPlot No. 26 to 29, 31, Dabhasa-Umraya Road, Vill: Dabhasa, Tal: Padra, Dist. Vadodara
Print