Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Sumilon Polyester Limited
(b)Name of the Company / Organisation SUMILON POLYESTER LIMITED
(c)Registered Address Survey No. 43 & 46/2, Vill. Varsana, Tal:Anjar, Dist:Kutch & Survey No. 346, Vill:Nani Chirai, Tal:Bhachav, Dist:Kutch, State:Gujarat,,kutch,Gujarat-370201
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Jitendrabhai Sumanlal Jariwala
(b)Designation (Owner/ Partner/ CEO) director
(c)Address 6/121, A-1 ,Paiki, Plot No.8, First floor, Vairagini wadi, Delhi gate, Surat,,Surat City,Surat,Gujarat-395003
(d)Pin code 395003
(e)E-mail cp.project@sumilon.com
(f)STD Code. 261(f)Telephone No. 2631349
(g)Fax No. 2442952
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(d) Manmade fibres manufacturing
5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/GJ/IND2/99226/2019
(d)Master Proposal Number(Single Window) SW/140024/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 43 & 46/2, 346
(b)Pincode 370201
(c)Bounded Latitudes (North)
From
Degree 23.18630000
Minutes
Second
From
Degree 23.18921111
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 70.21070278
Minutes
Second
From
Degree 70.21650000
Minutes
Second
(e)Survey of India Topo Sheet No. 41I/3, 41I/4, 41I/7, 41I/8
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 16
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 5.11
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratkutchBhachau
(2.)GujaratkutchAnjar
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/90/2019-IA-II(I)
(b)Date of Apply of TOR 19 Mar 2019
(c)Date of Issue of TOR / Standard ToR 20 Apr 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :19 Sep 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :22 Oct 2019
Distance of Public Hearing Venue from the Proposed Project :0
(At Site) S. No. 346, National Highway 8/A, Vill. Nani Chirai, Tal. Bhachav, Dist. Kutch, Gujarat.
State :Gujarat
District :kutch
Tehsil :Bhachau
Village :Nani Chirai
56regarding CSR Activities & EmploymentDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Boiler4 T/hrExisting will be removed after expansion
(2.)THERMOPACK-14000 UExisting will be removed after expansion
(3.)Thermopack-21500 UExisting will be removed after expansion
(4.)Boiler-140 T/HrProposed
(5.)Boiler-240 T/hrProposed
(6.)THERMOPACK-114000 UProposed
(7.)THERMOPACK-214000 UProposed
(8.)D.G Set750 kvaExisting will be removed after expansion
(9.)D.G set750 kvaExisting will be removed after expansion
(10.)THERMOPACK-32500 UExisting will be removed after expansion
(11.)D.G Set3300 KVAExisting will be removed after expansion
(12.)THERMOPACK-314000 UProposed
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Polyester Chips (Different grades)31000OthersMT/MonthRoad,Rail
(2.)Metalized Polyester Film2050OthersMT/MonthRoad,Rail
(3.)Power Plant20Mega Watt(MW)Othersinternal use
(4.)Metallic Yarn0OthersMT/MonthRoad,Rail
(5.)Epoxy Resin0OthersMT/MonthRoad,Rail
(6.)Plastic Bobbins (Reels)0OthersMT/MonthRoad,Rail
(7.)Metalized & Lacquered Laminated Polyester Film0OthersMT/MonthRoad,Rail
(8.)Tetra Hydro furan250OthersMT/Month (Byproduct)Road,Rail
(9.)Bi Axial Orient Polyester Film8000OthersMT/MonthRoad,Rail
(10.)Metalized & Lacquered Polyester Film3000OthersMT/MonthRoad,Rail
(11.)M.F Resin0OthersMT/MonthRoad,Rail
(12.)Lacquers0OthersMT/MonthRoad,Rail
(13.)Metalized Laminated polyester film0OthersMT/MonthRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 09 Jan 2020
(iv)Valid Upto 07 Apr 2023
(v)File No. AWH-94666
(vi)Application No. 550833
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 501
(b) Funds Allocated for Environment Management (Capital) (in Crores) 9
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.56
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 145704
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 145704
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Isopropyl Alcohol900Tons per AnnumLocal MarketRoad,Rail500 Open MarketCopy of Linkage
(2.)Iso Phthalic Acid6000Tons per AnnumLocal MarketRoad,Rail500 Open MarketCopy of Linkage
(3.)Dyes900Tons per AnnumLocal MarketRoad,Rail500 Open MarketCopy of Linkage
(4.)Polyester Bright Chips126276Tons per AnnumLocal MarketRoad,Rail500 Open MarketCopy of Linkage
(5.)Pet Film23976Tons per AnnumLocal MarketRoad,Rail500 Open MarketCopy of Linkage
(6.)Coal216000Tons per AnnumLocal MarketRoad,Rail500 Open MarketCopy of Linkage
(7.)Purified Terephthalic Acid319920Tons per AnnumLocal marketRoad,Rail500 Open MarketCopy of Linkage
(8.)Polyester Resin5940Tons per AnnumLocal MarketRoad,Rail500 Open MarketCopy of Linkage
(9.)Metalized Poly Film27000Tons per AnnumLocal MarketRoad,Rail500 Open MarketCopy of Linkage
(10.)Polyester Mb Chips13164Tons per AnnumLocal MarketRoad,Rail500 Open MarketCopy of Linkage
(11.)Acrlyc Resin5940Tons per AnnumLocal MarketRoad,Rail500 Open MarketCopy of Linkage
(12.)Butane Diol16800Tons per AnnumLocal MarketRoad,Rail500 Open MarketCopy of Linkage
(13.)Mono Ethylene Glycol126480Tons per AnnumLocal MarketRoad,Rail500 Open MarketCopy of Linkage
(14.)Di Ethylene Glycol1800Tons per AnnumLocal MarketRoad,Rail500 Open MarketCopy of Linkage
(15.)Aluminum624Tons per AnnumLocal MarketRoad,Rail500 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube96.8471.2896.61100
(2.)NOxMicro Gram per Meter Cube41.8022.7341.1980
(3.)OthersCOMili Gram per Meter Cube0.650.400.652
(4.)PM2.5Micro Gram per Meter Cube49.9627.7549.7560
(5.)SO2Micro Gram per Meter Cube39.5620.2939.0680
    14.2.     No. of Ground Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l408231985002000
(2.)Total Hardnessmg/l389334300600
(3.)Fluoridemg/l0.320.2711.5
(4.)Heavy MetalsArsenicmg/l000.20
(5.)pHOthers-7.77.46.58.5
(6.)Chloridesmg/l165412142501000
(7.)TSSmg/l0000
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHOthers--8.27.9C
(2.)CODmg/l5228C
(3.)OthersTDSmg/l946498C
(4.)BODmg/l14.17.8C
(5.)DOmg/l6.35.2C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))66.24170
(2.)Leq(Day)A-weighted decibels(dB(A))6851.275
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityOthersmicromohsper centimeter856740
(2.)pHOthers--7.97.1
(3.)N(Nitrogen)Percent00
(4.)K(Potassium)Milligram per Kilogram5643
(5.)P(Phosphorus)Milligram per Kilogram5.024.04
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 6.0
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 4.0 To 8.0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGujarat water infrastructure limited1024.900Copy of Permission LetterPipelineOthersPipeline---02 Jul 20191024.9
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial & Domestic579.90600ZLD systemReuse within the Plant & Recycling579.90
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 579.9
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 579.9
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilIndustrial Waste24Tons100RoadAuthorized Recyclers
(2.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1800Tons500RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Fly ashFly Ash10800Tons500RoadOtherssell to brick manufacturing
(4.)Discarded ContainerHazardous Waste (as per Hazardous and Other Waste Management rules 2016)180Tons200RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Evaporated SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1320Tons500RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Waste Contaminated OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)36Tons200RoadCo-Processing
(7.)Polymer LumpsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1200Tons500RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube96.8400096.85100
(2.)SO2Microgram per Meter Cube39.561.210.1139.6880
(3.)NOxMicrogram per Meter Cube41.804.490.0141.8280
(4.)PM2.5Microgram per Meter Cube49.963.970.0149.9860
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler-1(40 t/hr)Coal672PM101.2683 g/s
(2.)Thermopack-2 (14000 U))Coal672PM101.1029 g/s
(3.)Thermopack-1 (14000 U)Coal672PM101.1029 G/S
(4.)Thermopack-3 (14000 U)Coal672PM101.1029 g/s
(5.)Boiler-2 (40 t/hr)coal672PM101.2683 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 20000
(b)Source own coal based power plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 10.259
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 10.259
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 17046
(b)Waste/Barren Land (ha.) 1965
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1968
(e)Settlements (ha.) 343
(f)Industrial (ha.) 1802
(g)Forest (ha.) 0
(h)Mangroves (ha.) 6574
(i)Marine Area (ha.) 0
(j)Others (ha.) : saltpans 1717
    Total (ha.) 31415
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt3.38
(2.)Main Plant1.37
(3.)Area for Solid Waste Management0.42
(4.)Built Up Area0.09office, sc
(5.)Othersutilities, road, ect4.99
Total (ha.) 10.25
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Wildlife Corridorsnon within 10 km0-
(2.)WLSKutch Desert Wildlife Sanctury121.73out side of the study area
(3.)NPAnon within 10 km0-
(4.)ESAsnon within 10 km0-
(5.)Corridorsnon within 10 km0-
(6.)Critically Polluted Areanon within 10 km0-
(7.)ESZsnon within 10 km0-
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNone within 10 km0-
(2.)ForestNone within 10 km0-
(3.)Archaeological SitesNone within 10 km0-
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 10.26
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Already acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 200
(c)Temporary Employment- During Construction 25
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 225
32.
Green Belt in Ha:
(a)Total Area of Green Belt 3.39
(b)Percentage of Total Project Area 33.04
(c)No. of Plants to be Planted 7350
(d)Funds Allocated for Plantation 250000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Financialthis project will be benefited to Social and financial both.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. stay order against NABET/QCI
(ii)Name of the EIA Consultant Earthcare Enviro Solutions Pvt. Ltd.
(iii)Address Moradia House, Plot no. 31-32, Shiv Ashish Industrial Estate Co op. Society – II, Udhna Magdalla Road, Surat-394210, Gujarat
(iv)Mobile No. 9033293327
(v)Landline No. 0261263134
(vi)Email Id office@earthcare.org.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 07 Apr 2016
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterPoint wise ADS reply is attached. Please Grant us EC. 29 Aug 2020
2.NA


The EAC, after detailed deliberations decided to defer the proposal for want of requisite information as under and have asked the PP to revise the Report alongwith following clarification/information:-


24 Apr 2020

Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantJitendrabhai Sumanlal Jariwala
Designationdirector
Name of Company (Applicant Name should not be given here)SUMILON POLYESTER LIMITED
AddressSurvey No. 43 & 46/2, Vill. Varsana, Tal:Anjar, Dist:Kutch & Survey No. 346, Vill:Nani Chirai, Tal:Bhachav, Dist:Kutch, State:Gujarat
Print