1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Sumilon Polyester Limited | (b)Name of the Company / Organisation | SUMILON POLYESTER LIMITED | (c)Registered Address | Survey No. 43 & 46/2, Vill. Varsana, Tal:Anjar, Dist:Kutch & Survey No. 346, Vill:Nani Chirai, Tal:Bhachav, Dist:Kutch, State:Gujarat,,kutch,Gujarat-370201 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Jitendrabhai Sumanlal Jariwala | (b)Designation (Owner/ Partner/ CEO) | director | (c)Address | 6/121, A-1 ,Paiki, Plot No.8, First floor, Vairagini wadi, Delhi gate, Surat,,Surat City,Surat,Gujarat-395003 | (d)Pin code | 395003 | (e)E-mail | cp.project@sumilon.com | (f)STD Code. | 261(f)Telephone No. | 2631349 | (g)Fax No. | 2442952 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(d) Manmade fibres manufacturing 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | 1(d) Thermal Power Plants
| (b)Category | A | (c)Proposal Number | IA/GJ/IND2/99226/2019 | (d)Master Proposal Number(Single Window) | SW/140024/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 43 & 46/2, 346 | (b)Pincode | 370201 | (c)Bounded Latitudes (North) | | From | | Degree | 23.18630000 | Minutes | | Second | | From | | Degree | 23.18921111 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 70.21070278 | Minutes | | Second | | From | | Degree | 70.21650000 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 41I/3, 41I/4, 41I/7, 41I/8 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 16 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 5.11 | (j)Seismic Zone | 5 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | kutch | Bhachau | | (2.) | Gujarat | kutch | Anjar | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/90/2019-IA-II(I) | (b)Date of Apply of TOR | 19 Mar 2019 | (c)Date of Issue of TOR / Standard ToR | 20 Apr 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 22 Oct 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| (At Site) S. No. 346, National Highway 8/A, Vill. Nani Chirai, Tal. Bhachav, Dist. Kutch, Gujarat. | State : | Gujarat | District : | kutch | Tehsil : | Bhachau | Village : | Nani Chirai |
| 56 | regarding CSR Activities & Employment | District Collector | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Boiler | 4 T/hr | Existing will be removed after expansion | (2.) | THERMOPACK-1 | 4000 U | Existing will be removed after expansion | (3.) | Thermopack-2 | 1500 U | Existing will be removed after expansion | (4.) | Boiler-1 | 40 T/Hr | Proposed | (5.) | Boiler-2 | 40 T/hr | Proposed | (6.) | THERMOPACK-1 | 14000 U | Proposed | (7.) | THERMOPACK-2 | 14000 U | Proposed | (8.) | D.G Set | 750 kva | Existing will be removed after expansion | (9.) | D.G set | 750 kva | Existing will be removed after expansion | (10.) | THERMOPACK-3 | 2500 U | Existing will be removed after expansion | (11.) | D.G Set | 3300 KVA | Existing will be removed after expansion | (12.) | THERMOPACK-3 | 14000 U | Proposed | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Polyester Chips (Different grades) | 31000 | Others | MT/Month | Road,Rail | | (2.) | Metalized Polyester Film | 2050 | Others | MT/Month | Road,Rail | | (3.) | Power Plant | 20 | Mega Watt(MW) | | Others | internal use | (4.) | Metallic Yarn | 0 | Others | MT/Month | Road,Rail | | (5.) | Epoxy Resin | 0 | Others | MT/Month | Road,Rail | | (6.) | Plastic Bobbins (Reels) | 0 | Others | MT/Month | Road,Rail | | (7.) | Metalized & Lacquered Laminated Polyester Film | 0 | Others | MT/Month | Road,Rail | | (8.) | Tetra Hydro furan | 250 | Others | MT/Month (Byproduct) | Road,Rail | | (9.) | Bi Axial Orient Polyester Film | 8000 | Others | MT/Month | Road,Rail | | (10.) | Metalized & Lacquered Polyester Film | 3000 | Others | MT/Month | Road,Rail | | (11.) | M.F Resin | 0 | Others | MT/Month | Road,Rail | | (12.) | Lacquers | 0 | Others | MT/Month | Road,Rail | | (13.) | Metalized Laminated polyester film | 0 | Others | MT/Month | Road,Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 09 Jan 2020 | (iv)Valid Upto | 07 Apr 2023 | (v)File No. | AWH-94666 | (vi)Application No. | 550833 | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 501 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 9 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 2.5 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.56 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 145704 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 145704 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Isopropyl Alcohol | 900 | Tons per Annum | | Local Market | Road,Rail | | 500 | Open Market | | Copy of Linkage | (2.) | Iso Phthalic Acid | 6000 | Tons per Annum | | Local Market | Road,Rail | | 500 | Open Market | | Copy of Linkage | (3.) | Dyes | 900 | Tons per Annum | | Local Market | Road,Rail | | 500 | Open Market | | Copy of Linkage | (4.) | Polyester Bright Chips | 126276 | Tons per Annum | | Local Market | Road,Rail | | 500 | Open Market | | Copy of Linkage | (5.) | Pet Film | 23976 | Tons per Annum | | Local Market | Road,Rail | | 500 | Open Market | | Copy of Linkage | (6.) | Coal | 216000 | Tons per Annum | | Local Market | Road,Rail | | 500 | Open Market | | Copy of Linkage | (7.) | Purified Terephthalic Acid | 319920 | Tons per Annum | | Local market | Road,Rail | | 500 | Open Market | | Copy of Linkage | (8.) | Polyester Resin | 5940 | Tons per Annum | | Local Market | Road,Rail | | 500 | Open Market | | Copy of Linkage | (9.) | Metalized Poly Film | 27000 | Tons per Annum | | Local Market | Road,Rail | | 500 | Open Market | | Copy of Linkage | (10.) | Polyester Mb Chips | 13164 | Tons per Annum | | Local Market | Road,Rail | | 500 | Open Market | | Copy of Linkage | (11.) | Acrlyc Resin | 5940 | Tons per Annum | | Local Market | Road,Rail | | 500 | Open Market | | Copy of Linkage | (12.) | Butane Diol | 16800 | Tons per Annum | | Local Market | Road,Rail | | 500 | Open Market | | Copy of Linkage | (13.) | Mono Ethylene Glycol | 126480 | Tons per Annum | | Local Market | Road,Rail | | 500 | Open Market | | Copy of Linkage | (14.) | Di Ethylene Glycol | 1800 | Tons per Annum | | Local Market | Road,Rail | | 500 | Open Market | | Copy of Linkage | (15.) | Aluminum | 624 | Tons per Annum | | Local Market | Road,Rail | | 500 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2019 To 31 May 2019 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 96.84 | 71.28 | 96.61 | 100 | (2.) | NOx | | Micro Gram per Meter Cube | 41.80 | 22.73 | 41.19 | 80 | (3.) | Others | CO | Mili Gram per Meter Cube | 0.65 | 0.40 | 0.65 | 2 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 49.96 | 27.75 | 49.75 | 60 | (5.) | SO2 | | Micro Gram per Meter Cube | 39.56 | 20.29 | 39.06 | 80 | |
14.2. No. of Ground Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 4082 | 3198 | 500 | 2000 | (2.) | Total Hardness | | | mg/l | | 389 | 334 | 300 | 600 | (3.) | Fluoride | | | mg/l | | 0.32 | 0.27 | 1 | 1.5 | (4.) | Heavy Metals | | Arsenic | mg/l | | 0 | 0 | 0.2 | 0 | (5.) | pH | | | Others | - | 7.7 | 7.4 | 6.5 | 8.5 | (6.) | Chlorides | | | mg/l | | 1654 | 1214 | 250 | 1000 | (7.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | Others | -- | 8.2 | 7.9 | C | (2.) | COD | | mg/l | | 52 | 28 | C | (3.) | Others | TDS | mg/l | | 946 | 498 | C | (4.) | BOD | | mg/l | | 14.1 | 7.8 | C | (5.) | DO | | mg/l | | 6.3 | 5.2 | C | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 66.2 | 41 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 68 | 51.2 | 75 | |
14.5. No. of Soil Sample Monitored locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | Electric Conductivity | Others | micromohsper centimeter | 856 | 740 | (2.) | pH | Others | -- | 7.9 | 7.1 | (3.) | N(Nitrogen) | Percent | | 0 | 0 | (4.) | K(Potassium) | Milligram per Kilogram | | 56 | 43 | (5.) | P(Phosphorus) | Milligram per Kilogram | | 5.02 | 4.04 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 6.0 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 4.0 To 8.0 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Gujarat water infrastructure limited | 1024.9 | 00 | Copy of Permission Letter | Pipeline | | Others | Pipeline | --- | 02 Jul 2019 | 1024.9 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial & Domestic | 579.90 | 600 | ZLD system | Reuse within the Plant & Recycling | | 579.90 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 579.9 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 579.9 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Used Oil | Industrial Waste | | 24 | Tons | 100 | Road | | Authorized Recyclers | | (2.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1800 | Tons | 500 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Fly ash | Fly Ash | | 10800 | Tons | 500 | Road | | Others | sell to brick manufacturing | (4.) | Discarded Container | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 180 | Tons | 200 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (5.) | Evaporated Salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1320 | Tons | 500 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (6.) | Waste Contaminated Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 36 | Tons | 200 | Road | | Co-Processing | | (7.) | Polymer Lumps | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1200 | Tons | 500 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 96.84 | 00 | 0 | 96.85 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 39.56 | 1.21 | 0.11 | 39.68 | 80 | (3.) | NOx | | Microgram per Meter Cube | 41.80 | 4.49 | 0.01 | 41.82 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 49.96 | 3.97 | 0.01 | 49.98 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler-1(40 t/hr) | Coal | 67 | 2 | PM10 | | 1.2683 g/s | (2.) | Thermopack-2 (14000 U)) | Coal | 67 | 2 | PM10 | | 1.1029 g/s | (3.) | Thermopack-1 (14000 U) | Coal | 67 | 2 | PM10 | | 1.1029 G/S | (4.) | Thermopack-3 (14000 U) | Coal | 67 | 2 | PM10 | | 1.1029 g/s | (5.) | Boiler-2 (40 t/hr) | coal | 67 | 2 | PM10 | | 1.2683 g/s | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 20000 | (b)Source | own coal based power plant | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 10.259 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 10.259 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 17046 | (b)Waste/Barren Land (ha.) | 1965 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 1968 | (e)Settlements (ha.) | 343 | (f)Industrial (ha.) | 1802 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 6574 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : saltpans | 1717 | Total (ha.) | 31415 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 3.38 | | (2.) | Main Plant | | 1.37 | | (3.) | Area for Solid Waste Management | | 0.42 | | (4.) | Built Up Area | | 0.09 | office, sc | (5.) | Others | utilities, road, ect | 4.99 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Wildlife Corridors | non within 10 km | 0 | - | (2.) | WLS | Kutch Desert Wildlife Sanctury | 121.73 | out side of the study area | (3.) | NPA | non within 10 km | 0 | - | (4.) | ESAs | non within 10 km | 0 | - | (5.) | Corridors | non within 10 km | 0 | - | (6.) | Critically Polluted Area | non within 10 km | 0 | - | (7.) | ESZs | non within 10 km | 0 | - | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | None within 10 km | 0 | - | (2.) | Forest | | None within 10 km | 0 | - | (3.) | Archaeological Sites | | None within 10 km | 0 | - | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 10.26 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Already acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 200 | (c)Temporary Employment- During Construction | 25 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 365 | (f)Total Manpower | 225 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 3.39 | (b)Percentage of Total Project Area | 33.04 | (c)No. of Plants to be Planted | 7350 | (d)Funds Allocated for Plantation | 250000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | this project will be benefited to Social and financial both. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | stay order against NABET/QCI | (ii)Name of the EIA Consultant | Earthcare Enviro Solutions Pvt. Ltd. | (iii)Address | Moradia House, Plot no. 31-32, Shiv Ashish Industrial Estate Co op. Society – II, Udhna Magdalla Road, Surat-394210, Gujarat | (iv)Mobile No. | 9033293327 | (v)Landline No. | 0261263134 | (vi)Email Id | office@earthcare.org.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 07 Apr 2016 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Point wise ADS reply is attached.
Please Grant us EC. | 29 Aug 2020 | 2. | NA |
The
EAC, after detailed deliberations decided to defer the proposal for want of requisite information as under and
have asked the PP to revise the Report alongwith following clarification/information:-
24 Apr 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Jitendrabhai Sumanlal Jariwala | Designation | director | Name of Company (Applicant Name should not be given here) | SUMILON POLYESTER LIMITED | Address | Survey No. 43 & 46/2, Vill. Varsana, Tal:Anjar, Dist:Kutch & Survey No. 346, Vill:Nani Chirai, Tal:Bhachav, Dist:Kutch, State:Gujarat |
|