1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Amendment in EC of Amalgamated lease ( 2897.499 ha) of Kiriburu-Meghahatuburu Iron Ore Mines of SAIL for Change in product mix by including excavation and despatch of tailings from tailing ponds abo | (b)Name of the Company / Organisation | Raw Materials Division (RMD), Steel Authority of India Limited (SAIL) | (c)Registered Address | KIRIBURU MEGHAHTUBURU IRON ORE MINES,KIRIBURU,West Singhbhum,Jharkhand-833222 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | CHANCHAL MUKHOPADHYAY | (b)Designation (Owner/ Partner/ CEO) | CHIEF GENERAL MANAGER | (c)Address | KIRIBURU MEGHAHTUBURU IRON ORE MINES,KIRIBURU,Noamundi,West Singhbhum,Jharkhand-833222 | (d)Pin code | 833222 | (e)E-mail | rmdmiom@gmail.com | (f)STD Code. | 6596(f)Telephone No. | 244203 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/JH/MIN/139875/2020 | (d)Master Proposal Number(Single Window) | SW/139873/2020 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Change of Product Mix under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Karampada RF | (b)Pincode | 833222 | (c)Bounded Latitudes (North) | | From | | Degree | 22.036310 | Minutes | | Second | | From | | Degree | 22.130899 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 85.230888 | Minutes | | Second | | From | | Degree | 85.303078 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F45H8, F45H4 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 900 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.5 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Jharkhand | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Ranchi | (iii)Letter No. | 103/232/09/EPE/3698 | (iv)Status of Compliance | Partially Complied | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Nov 26 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Kiriburu Mine - ROM & tailings excavation | 7.5 | 0 | 7.5 | Others | MTPA | Road,Rail | | (2.) | Meghahatuburu Mine - ROM & tailings excavation | 8.5 | 0 | 8.5 | Others | MTPA | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Tailings excavation from Kiriburu mine | Slime beneficiation | 1MTPA excavation for selling/pellet conversion | 1MTPA excavation for selling/pellet conversion | Total ROM+tailings within EC capacity of 7.5MTPA | (2.) | Transportation of tailings from Kiriburu Mine | Limited excavation for blending | Transportation by road over 3.3km to SAIL's siding | Transportation by road over 3.3km to SAIL's siding | No involvement of public roads | (3.) | Transportation of tailings from Meghahatuburu Mine | Limited excavation for blending | Transportation by road over 6.5km to SAIL's siding | Transportation by road over 6.5km to SAIL's siding | No involvement of public roads | (4.) | Tailings excavation from Meghahatuburu mine | Slime beneficiation | 1MTPA excavation for selling/pellet conversion | 1MTPA excavation for selling/pellet conversion | Total ROM+tailings within EC capacity of 8.5MTPA | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | Copy of Consent to Operate | (iii)Date of Issue | 24 Dec 2019 | (iv)Valid Upto | 31 Dec 2024 | (v)File No. | JSPCB/HO/RNC/CTO-5913229/2019/2540 | (vi)Application No. | 5913229 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 2.55 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 2 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.5 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.5 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | d)Inter-State boundaries and international boundaries | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 2.5 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 2.5 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | HSD | 2.5 | Kilo Litre per Day | | Kiriburu | Road | | 10 | Open Market | | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 4.9 To 7.6 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3.2 To 5.1 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 360 | 6 | Copy of Permission Letter | Pipeline | | Others | Pumping | 2/PMC/WS-549/2017-448 | 20 Sep 2017 | 9100 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic & drinking | 40 | 50 | Primary Septic tank and secondary Soak Pit | Others | Soak pit | 0 | 40 | (2.) | Equipment and vehicle washing | 40 | 50 | Oil Catch Pit | Green Belt Renewal Plant | | 40 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 80 | (b)Total Discharged Water (Kilolitre per Day) | 40 | (c)Total Reused Water (Kilolitre per Day) | 40 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Over burden | Others | BHJ & BHQ | 9800000 | Tons | 2 | Road | | Others | Backfilling & stacking | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 96.9 | 2.1 | 0.01 | 97.01 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 57.29 | 2.1 | 0.00 | 57.3 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 13.89 | 1.9 | 0.0 | 13.9 | 80 | (4.) | NOx | | Microgram per Meter Cube | 16.79 | 2.1 | 0.02 | 16.82 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | None | None | 0 | 0 | Others | No stack | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 20 | (b)Source | JBVNL & NESCO | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | None | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 2816.569 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 80.93 | Total Land (ha.) | 2897.499 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 2816.569 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : De-notified area for township | 80.93 | Total (ha.) | 2897.499 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 243.55 | | (2.) | OB Dump Area | | 58 | | (3.) | Tailing Pond | | 40.93 | | (4.) | Township | | 131 | | (5.) | Main Plant | | 40 | Mineral Processing plant | (6.) | Area for Solid Waste Management | | 9.5 | Top soil & Sub-grade storage | (7.) | Built Up Area | | 282.96 | Road,Railway,loading,infrastructure,Mag.& Pumping | (8.) | Others | Mineral Storage | 27 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | None | 0 | None | (2.) | Critically Polluted Area | None | 0 | None | (3.) | ESAs | None | 0 | None | (4.) | ESZs | None | 0 | None | (5.) | Corridors | None | 0 | None | (6.) | WLS | None | 0 | None | (7.) | Wildlife Corridors | Karo-Karampada elephant corridor | 0.1 | Adjacent to Southern lease boundary | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Others | Reserved Forest | Karo RF | 0.1 | Adjoining to Eastern lease boundary | (2.) | Archaeological Sites | | None | 0 | Not Applicable | (3.) | Defence Installations | | None | 0 | None | (4.) | Forest | | Karampada RF | 0 | Within ML area | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Application for Forest Clearance yet to be submitted | (b)Legal Status of Forest Land | Reserved | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | 1. Core Zone: Peafowl Buffer Zone: Mouse deer, Indian Pangolin, Indian elephant, Sloth Bear, Gaur, Indian Wolf, Four Horned antelope, Indian Python, Peafowl | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | Rs. 4983.698 Lakhs | (iii)Period of Implementation | 10 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Seasonal nallah: Sankoja, Gagirathi, Meghahatu, Sasangdah, Pardih & Rang-Ring | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Koina river | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 0.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 190 | (e)No. of working days | 225 | (f)Total Manpower | 190 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 1842.98 | 456.70 | 2299.68 | (2.) | Percentage of Total Project Area | 63.61 | 15.76 | 79.37 | (3.) | No. of Plants | 922000 | 893400 | 1815400 | (4.) | Funds Allocated | 20000000 | 80000000 | 100000000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Liquidation of tailings will eliminate
environmental hazards. The land can be eco-restored. | (2.) | Social | Generate employment mostly locals. | (3.) | Financial | Meet the rising demand of Iron ore in the country during the scarcity period.Low-grade Iron ore /tailings which cannot be used by SAIL's plants will become available for others’ use. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Iron ore | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 14MTPA ROM + 2MTPA Tailings | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | RAN/WSB/Fe/MP--09/2019-20 | (b)Date of Approval | 27 Jan 2020 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 2897.499 | (f)Approved Capacity | 16000000 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 173.92 | (b)Mineable Reserves (Million Ton) | 87.88 | (c)Extractable Reserves(Million Ton) | 87.88 | (d)Percent(%) of Extraction | 99.5 | (e)Grade of Coal /Ore /Mineral | Avg. 62% Fe content | (f)Stripping Ratio | 1 : 0.6 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 45 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 12 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 2897.499 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 30 Jul 2019 | (iii)Validity of LOI | 0.25 | (iv)Reference No. of LOI | Kha.Ni(Chai)-31/2005/1255M, Ranchi | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 2897.499 | (iii)Validity of the lease deed | From : 28 Mar 1990 To : 27 Mar 2030 | (iv)Date of Execution of Mining Lese | 25 Oct 2019 | (v)Reference Number | 2019/CHAI/069/BK1/574 | (d)Whether Lease Deed Renewed ? | Yes | |
|
8.1. Earlier Renewals: |
---|
S. No. | Lease Details | Date of Renewal | Period | Copy of Earlier Lease | Letter No. | Area | Remarks |
---|
(1.) | Initial | 01 Jan 1900 | From : 28 Mar 1960 To : 27 Mar 1990 | Copy of Earlier Lease | Lease-I Deed | 1936.06 | Later amalgamated with Lease-II & III of KIOM-MIOM | (2.) | Initial | 01 Jan 1900 | From : 01 Oct 1973 To : 30 Sep 2003 | Copy of Earlier Lease | Lease-III deed | 82 | Later amalgamated with Lease-I & II of KIOM-MIOM | (3.) | Initial | 01 Jan 1900 | From : 06 Feb 1973 To : 05 Feb 2003 | Copy of Earlier Lease | Lease-II deed | 879.439 | Later amalgamated with Lease-I & III of KIOM-MIOM | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 10 | (ii)Total Area (in Hectare) | 41 | (iii)Height (in meter) | 30 | (iv)Quantity (in Million Cubic meter) | 25 | (v)No. of year back fill up | 24 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 2 | (ii)Total Area (in Hectare) | 11.32 | (iii)Height (in meter) | 30 | (iv)Quantity (in Million Cubic meter) | 10 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0.3 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0.3 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 382.2 | (b)Depth (in meter) | 110 | (c)Volume (in Million Cubic meter) | 126 | |
|
12. | Details of Quarry: | (a)Final Void of 330.6 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 382.2 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | Dumper trucks | (b)Surface to Siding/Loading | Covered conveyors | (c)Transportation / Conveyor Details | Fresh prod. by rail & tailings by road & rail | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | WASTE LAND | | 0 | 0 | 0 | (2.) | OTHERS(Specify) | De-notified area for township | 80.93 | 0 | 80.93 | (3.) | AGRICULTURE LAND | | 0 | 0 | 0 | (4.) | FOREST LAND | | 2816.569 | 0 | 2816.569 | (5.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (6.) | GRAZING LAND | | 0 | 0 | 0 | (7.) | SETTLEMENTS | | 0 | 0 | 0 | |
TOTAL | 2897.499 | 0 | 2897.499 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | INTERNAL OB DUMPS | | 51.6 | 0 | 0 | | 51.6 | (2.) | TOP SOIL STORAGE | | 6.5 | 0 | 0 | | 6.5 | (3.) | ROADS | | 0 | 0 | 110 | | 110 | (4.) | VIRGIN AREA | | 1818.073 | 0 | 0 | | 1818.073 | (5.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 265 | | 265 | (6.) | GREEN BELT | | 24.906 | 0 | 0 | | 24.906 | (7.) | Other | Tailing pond, Denotified area & others | 0 | 40.93 | 191.89 | | 232.82 | (8.) | EXCAVATION/QUARRY | | 330.6 | 0 | 0 | | 330.6 | (9.) | EXTERNAL OB DUMPS | | 58 | 0 | 0 | | 58 | |
TOTAL | 2289.679 | 40.93 | 566.89 | 0 | 2897.499 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 58 | (b)Internal Dump(in hectare) | 51.6 | (c)Quarry(in hectare) | 330.6 | (d)Safety Zone(in hectare) | 24.906 | (e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2000 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 6.5 | (h)Total afforestation plant (in hectare) | 471.606 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 2014 | 10 | 10 | 16 | 7.233324 | 0 | (2.) | 2007 | 10 | 10 | 10 | 7.917963 | 0 | (3.) | 2008 | 10 | 10 | 10 | 8.332528 | 0 | (4.) | 2015 | 16 | 10 | 16 | 7.335653 | 0 | (5.) | 2012 | 10 | 10 | 16 | 7.511008 | 0 | (6.) | 2016 | 16 | 10 | 16 | 7.134280 | 0 | (7.) | 2017 | 16 | 16 | 16 | 7.946082 | 0 | (8.) | 2018 | 16 | 16 | 16 | 7.841320 | 0 | (9.) | 2009 | 10 | 10 | 10 | 7.632884 | 0 | (10.) | 2001 | 10 | 10 | 10 | 5.622864 | 0 | (11.) | 2002 | 10 | 10 | 10 | 6.351038 | 0 | (12.) | 2003 | 10 | 10 | 10 | 6.787938 | 0 | (13.) | 2004 | 10 | 10 | 10 | 7.174897 | 0 | (14.) | 2005 | 10 | 10 | 10 | 7.192188 | 0 | (15.) | 2006 | 10 | 10 | 10 | 7.552503 | 0 | (16.) | 2011 | 10 | 10 | 16 | 7.591521 | 0 | (17.) | 2013 | 10 | 10 | 16 | 7.724195 | 0 | (18.) | 2019 | 16 | 16 | 16 | 7.548140 | 0 | (19.) | 2010 | 10 | 10 | 10 | 7.430900 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | Yes | (b)Name of the Court | High Courts | (c)Name of the Sub Court | Jharkhand | (d)Case No. | WP (C) No- 7016/2017 | (e)Orders/Directions of the court ,if any and its relevance with the proposed project | Nil | (f)Case Details | Matter pending before High Court of Jharkhand | (g)Uploaded Court Order | Copy of Court Order | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0068 | (ii)Name of the EIA Consultant | MECON Limited | (iii)Address | MECON Limited, Vivekananda Path, Doranda, Ranchi, JH - 834002 | (iv)Mobile No. | 9470193793 | (v)Landline No. | 0651248324 | (vi)Email Id | envenggranchi@meconlimited.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 29 Mar 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | In compliance to the Additional detailed sought by Ministry vide Minutes of Meeting dated 26.03.2020 populated in Parivesh portal, we are hereby uploading the reply for kind consideration of the EC amendment proposal of Kiriburu-Meghahatuburu Iron Mines of SAIL. | 15 May 2020 | 2. | NA | Deferred | 26 Mar 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | CHANCHAL MUKHOPADHYAY | Designation | CHIEF GENERAL MANAGER | Name of Company (Applicant Name should not be given here) | Raw Materials Division (RMD), Steel Authority of India Limited (SAIL) | Address | KIRIBURU MEGHAHTUBURU IRON ORE MINES |
|