1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Existing Jetty for Additional Cargo Handling and Isolated Storage Facilities including the Conveying Pipelines at Existing GSFC Sikka Unit | (b)Name of the Company / Organisation | GUJARAT STATE FERTILIZERS AND CHEMICALS LIMITED | (c)Registered Address | Post-Fertilizernagar, District: Vadodara, State: Gujarat,,Jamnagar,Gujarat-391750 | (d)Legal Status of the Company | State PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Kanyo S Badlani | (b)Designation (Owner/ Partner/ CEO) | VP | (c)Address | Survey No. 57,427 & 429 (Older Plot No. 167/2, & 167/1) , Sikka, Port Sikka, Jamnagar, Gujarat,,Jamnagar,Jamnagar,Gujarat-361140 | (d)Pin code | 361140 | (e)E-mail | sunita@gsfcltd.com | (f)STD Code. | 265(f)Telephone No. | 3092586 | (g)Fax No. | 02652240966 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(e) Ports, Harbours
| Minor Activity | 6(a) Oil & gas transportation pipe line (crude and refinery/ petrochemical 6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
| (b)Category | A | (c)Proposal Number | IA/GJ/MIS/647/2012 | (d)Master Proposal Number(Single Window) | SW/139716/2020 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | S. No.57,427 & 429 (Older Plot No. 167/2, & 167/1) | (b)Pincode | 361140 | (c)Bounded Latitudes (North) | | From | | Degree | 22.44156 | Minutes | | Second | | From | | Degree | 22.48232 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 69.78937 | Minutes | | Second | | From | | Degree | 69.84149 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F42J10, F42J11, F42J14, F42J15 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 7 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | 11-90/2012-IA-III | (c)Date of Issue of TOR | 07 Feb 2013 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 06 Mar 2014 | (c)Date of Issue of EC | 16 Sep 2014 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | The site is located in Notified Industrial Area | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 5-53/2014(ENV)/628 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 16 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Sulphuric Acid | 0.0 | 1.400 | 1.4 | Others | MMTPA | Pipe Conveyor | | (2.) | Benzene | 0.0 | 0.100 | 0.1 | Others | MMTPA | Road | | (3.) | Rock Phosphate- Phase 2 (Either/Or) | 0.0 | 2.450 | 2.45 | Others | MMTPA | Pipe Conveyor | | (4.) | Methanol | 0.0 | 0.100 | 0.1 | Others | MMTPA | Road | | (5.) | Fertilizer (Urea/DAP/NPK/APS)- Phase 2 (Either/Or) | 0.0 | 0.775 | 0.775 | Others | MMTPA | Road,Rail | | (6.) | Ethylene Dichloride (EDC) | 0.0 | 0.200 | 0.2 | Others | MMTPA | Road | | (7.) | Rock Phosphate- Phase 1 (Either/OR) | 0.0 | 1.225 | 1.225 | Others | MMTPA | Pipe Conveyor | | (8.) | Phosphoric Acid | 1.050 | 0.1 | 1.1500000000000001 | Others | MMTPA | Road | | (9.) | Ammonia | 0.265 | 0.185 | 0.45 | Others | MMTPA | Pipe Conveyor | | (10.) | Cyclohexanone | 0.0 | 0.100 | 0.1 | Others | MMTPA | Road | | (11.) | Fertilizer (Urea/DAP/NPK/APS)-Phase 1 (Either/Or) | 0.0 | 2.000 | 2 | Others | MMTPA | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Navigation Channel | W: 120 m, L: Depth: -11.5 m | W: 168 m, L:2000 m, Depth: -14.5 m | W: 168 m, L:2000 m, Depth: -14.5 m | -- | (2.) | Turning Circle | Dia: 400 m, Depth: -10 m | Dia: 440 m, Depth: -14.8 m | Dia: 440 m, Depth: -14.8 m | -- | (3.) | Vessel Handling capacity (Liquid Cargo) | 33000 DWT | 60000 DWT | 60000 DWT | Bulk Liquid Cargo | (4.) | Ammonia pipeline (18") (1 Nos.) | 4.5 km | 0.0 | 4.5 km | From Jetty to Sikka Shore Terminal (SST) | (5.) | Ammonia pipeline (4") (2 Nos.) | 9.5 Km | 0.0 | 9.5 Km | From Sikka Shore Terminal to Motikhavdi GSFC Plant | (6.) | Liquid Cargo Handling Jetty | 48.8 m × 18.5 m | 70 m × 27.25 m | 70 m × 27.25 m | Existing jetty will be extended | (7.) | Concrete Approach for Liquid Cargo Handling Jetty | 0.92 Ha | 0 | 0.92 Ha | Existing structure will be utilized | (8.) | Sulphuric Acid pipeline (22”) (1 Nos) | 0.0 | 4.5 km | 4.5 km | From Jetty to Sikka Shore Terminal (SST) | (9.) | Methanol/EDC/Benzene (Piggable Line) (12”) (1 No.) | 0.0 | 4.5 Km | 4.5 Km | From Jetty to Chemical Storage Terminal (CST) | (10.) | Phosphoric Acid Pipeline (20”) (1 Nos.) | 4.5 Km | 0.0 | 4.5 Km | From Jetty to Sikka Shore Terminal (SST) | (11.) | Nitrogen (line for pigging Operation)(4") (1 Nos.) | 0.0 | 4.5 km | 4.5 km | From Chemical Storage Terminal (CST) to Jetty | (12.) | Concrete Approach for Solid Cargo Handling Jetty | 0 | 8 m x 200 m | 8 m x 200 m | New | (13.) | Solid Cargo Handling Jetty | 0 | 270 m × 30 m | 270 m × 30 m | New Jetty will be developed adjacent to existing liquid cargo handling jetty | (14.) | Ammonia pipeline (6") (1 Nos.) | 9.5 Km | 0.0 | 9.5 Km | From Sikka Shore Terminal to Motikhavdi GSFC Plant | (15.) | Rock Phosphate Slurry pipeline (8") (2 Nos.) | 0.0 | 9.5 Km | 9.5 Km | From Chemical Storage Terminal (CST) to Motikhavdi GSFC Plant | (16.) | Sulphuric Acid (8") (2 Nos.) | 0.0 | 9.5 Km | 9.5 Km | From Sikka Shore Terminal to Motikhavdi GSFC Plant | (17.) | Vessel Handling capacity (Solid Cargo) | 0 | 60000 DWT | 60000 DWT | Bulk Solid Cargo | (18.) | Night Navigation Facility | No | Yes | Yes | -- | (19.) | Ammonia Pre-Cooling Line (4") (1 Nos.) | 4.5 Km | 0.0 | 4.5 Km | From Jetty to Sikka Shore Terminal (SST) | (20.) | Cyclohexanone pipeline (12") (1 Nos.) | 0.0 | 4.5 km | 4.5 km | From Jetty to Chemical Storage Terminal (CST) | (21.) | Phosphoric Acid Pipeline (8”) (1 Nos.) | 9.5 Km | 0.0 | 9.5 Km | From Sikka Shore Terminal to Motikhavdi GSFC Plant | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 18 Apr 2019 | (iv)Valid Upto | 13 Feb 2022 | (v)File No. | GPCB/CCA-2(6)/ID-16971/502821 | (vi)Application No. | 145696 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 775 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 14.2 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 3.8 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.1004 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 00 | (b)Existing quantity of raw material/fuel | 00 | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | 00 | 00 | Tons per Annum | | None (Proposed is not manufacturing facility) | Others | None | 00 | Others | None | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2017 To 28 Feb 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 18.8 | 11 | 18.5 | 80 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 49 | 31.2 | 47.4 | 60 | (3.) | NOx | | Micro Gram per Meter Cube | 23.1 | 14.6 | 22.8 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 88.2 | 59.8 | 87.1 | 100 | (5.) | Others | CO | Micro Gram per Meter Cube | 1032 | 459 | 1020.5 | 2000 | |
14.2. No. of Ground Water monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 2 | 2 | 0 | 0 | (2.) | TDS | | | mg/l | | 1454 | 845 | 500 | 2000 | (3.) | Fluoride | | | mg/l | | 2 | 0.9 | 1 | 1.5 | (4.) | pH | | | NA | | 7.68 | 7.08 | 7 | 7 | (5.) | Total Hardness | | | mg/l | | 740 | 30 | 200 | 600 | (6.) | Chlorides | | | mg/l | | 573 | 23 | 250 | 1000 | (7.) | Heavy Metals | | Iron | mg/l | | 0.52 | 0.08 | 0.3 | 0 | (8.) | Others | Total Alkalinity | | mg/l | | 414 | 234 | 200 | 600 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.89 | 7.26 | C | (2.) | DO | | mg/l | | 5.6 | 5.3 | C | (3.) | COD | | mg/l | | 12 | 8 | C | (4.) | BOD | | mg/l | | 5 | 4 | C | (5.) | Others | TDS | mg/l | | 1524 | 168 | C | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 79.2 | 39.6 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 84.1 | 45.8 | 75 | |
14.5. No. of Soil Sample Monitored locations : 4 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Milliequivalents per 100 Gram | | 1.2 | 0.6 | (2.) | N(Nitrogen) | Kilogram per hectare | | 1004.1 | 617.9 | (3.) | Electric Conductivity | Others | dS/m | 1.4 | 0.5 | (4.) | P(Phosphorus) | Kilogram per hectare | | 73.5 | 47.9 | (5.) | pH | | | 7.96 | 7.22 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 5 To 7 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 12 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Jamnagar Municipal Corporation | 2694 | 3 | Copy of Permission Letter | Pipeline | | Others | Pipeline by JMC | MD/2016/232 | 13 Sep 2016 | 20000 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 42.4 | 50 | STP | Green Belt Renewal Plant | | 42.4 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 42.4 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 42.4 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Discarded Bags/Containers (Ex.+Pro.) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2 | Tons | 10 | Road | | Authorized Recyclers | | (2.) | Oil Containing Cargo Residue (Ex.+Pro.) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.4 | Tons | 10 | Road | | Others | CHWIF | (3.) | Oil Contaminated Cotton Waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1 | Tons | 10 | Road | | Others | CHWIF | (4.) | Used Oil (Ex.+Pro.) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1 | Tons | 10 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 18.8 | 00 | 0.0 | 18.81 | 80 | (2.) | NOx | | Microgram per Meter Cube | 23.1 | 0.0 | 0.0 | 23.11 | 80 | (3.) | Others(Specify) | CO | Microgram per Meter Cube | 1032 | 0.0 | 0.0 | 1032.1 | 2000 | (4.) | PM10 | | Microgram per Meter Cube | 88.2 | 00 | 0.0 | 88.21 | 100 | (5.) | PM2.5 | | Microgram per Meter Cube | 49.00 | 00 | 00 | 49.01 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | D.G Set | Diesel | 11 | 0.3 | Others | PM, SO2 & NOx | 0.0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 11040 | (b)Source | Paschim Gujarat Vij Company Ltd. (PGVCL) | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | Proposed: DG Set 2 × 500 kVA Existing: 1× 515 kVA | (e)Stack Height (in m) | 11 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 56.01 | Total Land (ha.) | 56.01 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 3042.7 | (b)Waste/Barren Land (ha.) | 6736.9 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 408.3 | (e)Settlements (ha.) | 1537.6 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 221.5 | (h)Mangroves (ha.) | 3266.1 | (i)Marine Area (ha.) | 12955.7 | (j)Others (ha.) : Range Land | 11200.1 | Total (ha.) | 39368.9000 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 18.5 | | (2.) | Others | SST,CST,Open Land ,Connecting terminals | 37.51 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Wildlife Corridors | None Identified | 0.0 | -- | (2.) | ESZs | Eco Sensitive Zone for MNP | 0.21 | Jetty Expansion will be outside the ESZ | (3.) | Corridors | None Identified | 0.0 | -- | (4.) | ESAs | Marine Forest | 3.0 | Expansion will be within existing area, no new land will be acquired | (5.) | Critically Polluted Area | None Identified | 0.0 | -- | (6.) | WLS | Marine Sanctuary | 1.3 | Expansion will be within existing area, no new land will be acquired | (7.) | NPA | Marine National park | 0.4 | Expansion will be within existing area, no new land will be acquired | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | None Identified | 0.0 | -- | (2.) | Defence Installations | | None Identified | 0.0 | -- | (3.) | Forest | | Marine Forest | 3.0 | Expansion will be within existing area, no new land will be acquired | |
|
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 56.01 | (b)Land yet to be acquired(Ha) | 0.0 | (c)Status of Land acquisition if not acquired | Expansion within existing land no new land require | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Corals, Mangroves & Sea Grass (Protected Species) | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 46606700 | (iii)Period of Implementation | 1990, 2000 & 2009 to till date | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Motikhavdi | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 8.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 500 | (c)Temporary Employment- During Construction | 100 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 365 | (f)Total Manpower | 600 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 8.95 | 9.55 | 18.5 | (2.) | Percentage of Total Project Area | 16 | 17 | 33 | (3.) | No. of Plants | 538 | 10611 | 11149 | (4.) | Funds Allocated | 0 | 1000000 | 1000000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
|
1. | Project Details: | (a)CRZ Classification | IA | (b)Location Type | Non-Eroding Coast | (c)Details of Mangroves Land Involved, if Any | Mangrove (3266.1 Ha.)are present in study area but | (d)Area of Mangroves Land (hectare) | 0.0 | (e)EIA (Terrestrial) Studies | Carried Out | (i)Summary Details of EIA (Terrestrial) Studies | The project falls under 7 (e), 6 (a) and 6 (b) Cat | (ii)Uploaded Recommendation made in EIAs | Copy of Recommendation made in EIAs | (iii)Period of Study from (EIA Terrestrial) | 01 Dec 2017 | (iv)Period of Study To (EIA Terrestrial) | 28 Feb 2018 | (f)EIA (Marine) Studies | Carried Out | (i)Summary Details of EIA (Marine) Studies | Modelling studies concludes that there will be no | (ii)Uploaded Recommendation made in EIAs | Copy of Recommendation made in EIAs | (iii)Period of Study from (EIA Marine) | 01 Dec 2017 | (iv)Period of Study to (EIA Marine) | 28 Feb 2018 | (g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan | The proposed project does not envisaged handling o | |
|
2. | Description of the Project Under Consideration: | (a)Type of Project | Others | (i)Agency Name for Preparing CRZ Maps | Anna University, Chennai | (ii)Please Specify with salient features | Proposed Project is for Expansion of Existing Jett | (iii)Uploaded relevent Document | Copy of relevent Document | |
|
3. | Distance of Project (in meters) from ltl/htl to be stated : | (a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity | IA | (b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? | Yes | (i)Distance of Project (in meters) from HTL to be Stated | 4000 | (ii)Uploaded Maps(Shape File) | Copy of Maps | (iii)Distance of Project(in meters) from LTL to be Stated | 260 | (iv)Uploaded Maps(Shape File) | Copy of Maps | (c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? | Yes | (i)Uploaded Maps (Shape File) | Copy of Maps | (d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? | Yes | (i)Uploaded Maps (Shape File) | Copy of Maps | (e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared | Yes | (i)Uploaded Maps (kml File) | Copy of Maps | (f)NOC from State Pollution Control Boards Obtained | Yes | (i)Copy of NOC | Copy of NOC | (g)Details of Rain Water Harvesting System | | |
|
4. | Recommendation of State Coastal Zone Management Authority: | (a)Copy of CZMA | Copy of CZMA | (b)State the Conditions Imposed | To carry out those activities mentioned in CRZ Not | (c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) | Social: R&R not applicable, issues identified duri | |
|
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 0.0 | (b)Total No. of Flats to be Build | 0.0 | (c)No. of Buildings | 0.0 | (d)Total plot area (sqm) | 0.0 | (e)Total built up area (sqm) | 0.0 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | Yes | (b)Upload Shoreline Study | Copy of Shoreline stuudy | (c)Type of Cargo | Solid & Liquid Cargo | (d)Quantity of Cargo | 6.725 | (e)Control Measures of Cargo | Safe Handling | (f)Dust Control Measures | Not Applicable | (g)Quantum | 60000 | (h)Quantity of Dredging (Cubic meter per day) | 13333 | (i)Type of Dredging | Capital | (j)Disposal of Dredge Material | Existing designated dredged disposal area into dee | (k)Details of Outfall Diffusers | Not Applicable to this project | (l)No. of Dilution Expected | 0.0 | (m)Distance at which the Outlet will Reach Ambient Parameters | 0.0 | (n)Details of Monitoring at Outfall | 0.0 | (o)Copy of NoC from PCB in case of Marine Disposal | Copy of NoC | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0.0 | (b)Capacity | 0.0 | (c)No. of Recharge Pits | 0.0 | (d)Capacity | 0.0 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | Yes | |
|
5. | Energy Saving Measures: | (a)Source/Mode | PGVCL | (b)Percentage | 0.0 | (c)Quantity | 11.04 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | Yes | (b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | SCN have been received till 2017 under Air/Water Act. All are closed and complied. | (c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | Copy of Direction Issued | (d)Compliance status of the directions | Complied | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/ SA085(Rev.01) | (ii)Name of the EIA Consultant | Eco Chem Sales and Services | (iii)Address | Office floor, Ashoka Pavilion ’A’ New Civil Road, Surat, 395001 | (iv)Mobile No. | 9924476624 | (v)Landline No. | 0261223163 | (vi)Email Id | eco@ecoshripad.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 31 Jul 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Kindly submit the following:
(i) Recommendation of SCZMA. (ToR condition no. v)
(ii) Action taken report submitted to Regional Office of MoEFCC for the Non-Compliances/partial compliances of the Environmental Clearance Conditions reported in Certified Compliance Report. (ToR condition no. vi)
(iii) Plan for Corporate Environment Responsibility (CER) as specified under Ministry’s Office Memorandum vide F.No. 22-65/2017-IA.III dated 1st May 2018. (ToR condition no. xxviii) | 08 May 2020 | 2. | NA | The correction have been made as per the instruction received | 30 Jun 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Kanyo S Badlani | Designation | VP | Name of Company (Applicant Name should not be given here) | GUJARAT STATE FERTILIZERS AND CHEMICALS LIMITED | Address | Post-Fertilizernagar, District: Vadodara, State: Gujarat |
|