Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Bhengari coal washery of 5.0 MTPA in an area of 17.48 ha of M/s Mahavir coal washery Private Limited in District Raigarh, Chhattisgarh
(b)Name of the Company / Organisation VK JAIN
(c)Registered Address village bhengari, tehsil gharghora, distt. raigarh ,,Raigarh,Chhattisgarh-496111
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant YP Ohri
(b)Designation (Owner/ Partner/ CEO) Vice President
(c)Address 198, Vasant Enclave, Rao Tula Ram Marg,New Delhi,Vasant Vihar,South West,Delhi-110057
(d)Pin code 110057
(e)E-mail mahavirglobalcoal@yahoo.co.in
(f)STD Code. 7752(f)Telephone No. 26141901
(g)Fax No. 404523
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity2(a) Coal washeries
Minor Activity
(b)Category A
(c)Proposal Number IA/CG/CMIN/27185/2015
(d)Master Proposal Number(Single Window) SW/139381/2020
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 6/1, 7, 8/1, 8/2, 9/1, 9/2, 9/4, 9/5, 2/1, 5/2, 5/
(b)Pincode 496111
(c)Bounded Latitudes (North)
From
Degree 220819.40
Minutes
Second
From
Degree 22085.7
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 831421.2
Minutes
Second
From
Degree 831449.4
Minutes
Second
(e)Survey of India Topo Sheet No. 64N/4,64N/8
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 300
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3.6
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Chhattisgarh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)ChhattisgarhRaigarhGharghoda
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11015/161/2015-IA.II(M)
(b)Date of Apply of TOR 23 Sep 2015
(c)Date of Issue of TOR / Standard ToR 03 Feb 2016
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :07 Nov 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :08 Dec 2019
Distance of Public Hearing Venue from the Proposed Project :0.5
Govt Higher secondary school ground premises
State :Chhattisgarh
District :Raigarh
Tehsil :Gharghoda
Village :Nawapara (Tenda)
625Public hearing not conducted in 45 days, March – May 2015 baseline data, Adivasi land, employment to outsiders, pollution from proposed washery & existing industries (TRN Energy-600 MW TPP, Phil CoalOthersAdditional District Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)heavy media cyclones2 X 2.5 MTPA5.0 MTPA coal washery
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Washed Coal including fines3.60OthersMillion TPARoad,Rail
(2.)Middling0.95OthersMillion TPARoad,Rail
(3.)Rejects0.45OthersMillion TPARoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 56.78
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.55
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.15
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.12
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 5.0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 5
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Raw coal5.0OthersMillion TPASECL MinesRoad29 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube74.540.274.1100
(2.)PM2.5Micro Gram per Meter Cube29.120.328.660
(3.)SO2Micro Gram per Meter Cube26.514.225.680
(4.)NOxMicro Gram per Meter Cube29.216.528.480
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l423119200600
(2.)Chloridesmg/l166.246.82501000
(3.)pHNA7.86.96.58.5
(4.)TDSmg/l7332595002000
(5.)Fluoridemg/l0.70.21.01.5
(6.)TSSmg/l0000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l1.51.0D
(2.)pHmg/l7.67.2D
(3.)DOmg/l5.85.4D
(4.)BODmg/l2.51.3D
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))48.144.775
(2.)Leq(Night)A-weighted decibels(dB(A))44.941.570
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.97.4
(2.)P(Phosphorus)Kilogram per hectare98.362.8
(3.)K(Potassium)Kilogram per hectare326.474.6
(4.)Electric ConductivityMillisiemens per Centimetre386128.6
(5.)N(Nitrogen)Kilogram per hectare106.461.4
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.7 To 3.5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1 To 6.1
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater8000Copy of Permission LetterPipelineTube Well35-1/NCCR/CGWA/Vol-VIII-89511 Jul 2019800
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)process312312rOthersZLD3120
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 312
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 312
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Coal RejectsIndustrial WasteCoal Rejects0.45Tons0OthersBy dumpersAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube741.47.782100
(2.)NOxMicrogram per Meter Cube290.70.13080
(3.)PM2.5Microgram per Meter Cube291.41.83160
(4.)SO2Microgram per Meter Cube2600.02780
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)CrusherCoal300.5PM100.4
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 5000
(b)Source Chhattisgarh State Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 125 KVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 17.48
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 17.48
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 17.48
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Nil 0
    Total (ha.) 17.4800
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersPlant and its facilities17.48
Total (ha.) 17.48
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Wildlife CorridorsNil0Nil within the study area
(2.)Critically Polluted AreaNil0Nil within the study area
(3.)WLSNil0Nil within the study area
(4.)ESAsNil0Nil within the study area
(5.)ESZsNil0Nil within the study area
(6.)CorridorsNil0Nil within the study area
(7.)NPANil0Nil within the study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNil0Nil within the study area
(2.)Defence InstallationsNil0Nil within the study area
(3.)ForestBhengari PF1.3S
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 20
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 17.48
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land under possession
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pavo cristatus (Common peafowl), Gazelle gazella (Chinkara), Elephas maximas (Indian elephant) Melursus ursinus (Sloth bear) Panthera pardus (Panther) Python molurus (Python), Crimson rose
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 15 Lakhs
(iii)Period of Implementation 5 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kurket river
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 3.6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 70
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 70
32.
Green Belt in Ha:
(a)Total Area of Green Belt 5.76
(b)Percentage of Total Project Area 32.95
(c)No. of Plants to be Planted 4600
(d)Funds Allocated for Plantation 2049000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe project will improve the socio-economic status of the society in the region by generating direct and indirect employment opportunities. The project will contribute additional revenue to the State & Central exchequers in the form of taxes, cess, etc.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)NAMajor
2.
Mine Capacity in ROM (Run of Mine) NA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. NA
(b)Date of Approval 01 Jan 2020
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department NA
(e)Approved Mining Lease Area 0
(f)Approved Capacity 0
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) NA
(b)Mineable Reserves (Million Ton) NA
(c)Extractable Reserves(Million Ton) NA
(d)Percent(%) of Extraction NA
(e)Grade of Coal /Ore /Mineral NA
(f)Stripping Ratio NA : NA
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) NA
(i)Mining Method Opencast
(j)Life of Mine (Years) NA
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 0
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Not applicable. The proposal is for coal washery.
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Not applicable. The proposal is for coal washery.
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Not applicable. The proposal is for coal washery.
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
(v)No. of year back fill up
(b) Details of Internal Dumps:
(i)No. of Internal Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare)
(b)Depth (in meter)
(c)Volume (in Million Cubic meter)
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 0
13.
Details of Transportation:
(a)In Pit/Underground to Surface NA
(b)Surface to Siding/Loading NA
(c)Transportation / Conveyor Details NA
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND000
(2.)FOREST LAND000
(3.)GRAZING LAND000
(4.)SETTLEMENTS000
(5.)WASTE LAND000
(6.)SURFACE WATER BODIES000
TOTAL000
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY0000
(2.)TOP SOIL STORAGE0000
(3.)EXTERNAL OB DUMPS0000
(4.)ROADS0000
(5.)BUILT UP AREA (COLONY/OFFICE)0000
(6.)VIRGIN AREA0000
(7.)GREEN BELT0000
(8.)INTERNAL OB DUMPS0000
TOTAL00000
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 0
(d)Safety Zone(in hectare) 0
(e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 0
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 0
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 164
(ii)Name of the EIA Consultant Vimta Labs Limited
(iii)Address 142, IDA, Phase-II, Cherlapally, Hyderabad-500051, Telangana state
(iv)Mobile No. 9000711309
(v)Landline No. 0402726414
(vi)Email Id env@vimta.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 19 Nov 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPls provide or clarify following details Wild life conservation plan for presence of schedule- I species (all species) with fund allocated as approved by PCCF Greenbelt development along with fund and timeframe for achieving 33% greenery In case of Diesel generator – fuel linkage document and details of generator and likely emission Agreement for power connection Public hearing proceeding is chaired by Regional Officer (CECB) and Additional District Officer. However as per Chhattisgarh High court, Member Secretary (CECB) should chair the Public Hearing proceedings. Pls justify Copy of raw coal linkage in Form # 2. The attached document is offer of washed coal usage. Extension of validity of usage of ground water by Central Ground Water Board Washed coal consumption agreement is dated 2011 and 2013 wherin even ToR was given. Fresh agreement shall be uploaded Attendence sheet of Public Hearing shall be provided. In S. No. 32 Proposed Green belt development program along-with time line and budgetary allocation needs to be provided. Details submitted in 32 (4) unit of details not mentioned List of consultants involved in the preparation of EIA/EMP report shall be enclosed in EIA Report with their signature. Quantity of hazardous waste to be generated and its management shall be provided Proposed linkage of power plants for utilization of washery rejects. 07 Feb 2020
2.NAThe correction have been made as per the instruction received 23 May 2020
3.NAYou are requested to provide following details/clarification. a. Attendance of people present during Public Hearing and shall be included in EIA Report b. Letter with details of PH from Member Secretar, CECB to this Ministry c. Report on Wild life conservation plan for presence of schedule- I species (all species) with fund allocated as approved by PCCF d. Greenbelt implementation plan with time line and fund allocation e. Point wise compliance of ToR is not included in EIA Report. f. Overall plan of utilization of washery rejects with quantity shall be provided along with MoUs (if any) g. Provide NABL certificate of sub consultant engaged by main Consultant 14 Jul 2020
4.NAThe correction have been made as per the instruction received 12 Oct 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterADS Reply (M/S Mahavir Coal Washery) New Consultant: M/s Grass Roots Research & Creations India Pvt Ltd 28 Jun 2022
2.NA

The EAC after detailed deliberations observed that compliance submitted by PP on earlier observation are inadequate and there is no technical justification. PP needs to provide justification based on technical study/data and facts in view of certain restriction imposed by NGT. Values shown for impact (modelling result) of road transportation in terms of pollutants are very negligible and inaccurate. The committee also noted that there is no concrete plan for development of railway siding and PP has to first prepare DPR for railway siding. Therefore, EAC was of view that Ministry shall take necessary action on consultant i.e. M/s Vimta Labs for inconsistencies in collection and analysis of air quality data. In view of the incomplete and inadequate submission of information by PP, the EAC desired further deliberation would be required for compliance on below mentioned observations.

(i)            As per the NGT’s Committee recommendation, carrying capacity of the site area shall be carried out for suitability of the proposed project.

(ii)         PP shall submit Traffic impact assessment based on fresh data considering transportation activity of other companies.

(iii)       PP shall carry out feasibility study vis-à-vis with right of way w.r.t. Forest and technical justification for not using water from Kurket River.

(iv)        PP shall explore the usage of wastewater from nearby power plants for washery operations.

(v)          Impact of washery on nearby agricultural land and flora-fauna. Proper flora management plan needs to be prepared.

(vi)        Proper Air pollution mitigation measures at site with installation of Continuous Ambient Air Quality Station during operation of project.

(vii)      Adherence to the compliance to Issues raised during Public Consultation with the timeline and budgetary provision.

(viii)    Fund allotment for greenbelt is too less and more fund should be allotted for developing peripheral plantation.

(ix)        PP shall submit the action plan with timeline for development of railway siding.

 

The proposal was deferred on above lines.

05 Apr 2021
3. ADS Reply LetterADS Reply Submitted 25 Feb 2021
4. ADS Reply LetterADS Reply Submitted 25 Feb 2021
5. ADS Reply LetterADS Reply Submitted 25 Feb 2021
6. ADS Reply LetterADS Reply Submitted 25 Feb 2021
7.NA

 

The EAC after deliberations and observed certain deficiencies in the submission of PP and deferred the proposal on the following points:

  1. Response from project proponent on the Hon’ble NGT order dated 27th February, 2020 and in reference to extra mitigation measures adopted for the proposed activity.
  2. Confirmation of Wildlife Santuary/National Park within 10 km of project site.
  3. Plan for 100 % Rejects utilisation shall be submitted to be utilised in FBC boilers and accordingly MoU with power plants shall be submitted.
  4. PP shall explore use of surface water from kurket river which is at a distance of 3.6 km instead of using groundwater for proposed washery during operations/construction activity.
  5. The percentage of system loss in washery operation seems to be on higher side and shall be further optimized/reduced.
  6. Clarity on the ownership of Land for the project and whether there is no court case as raised in Public Hearing.
  7. Feasibility of proposed transportation route for raw coal and washed coal through road considering the presence of other industries. Plan for further reduction in fleet size of trucks for transportation of raw coal and product.
  8. Status of implementation of proposed railway siding shall be submitted.
  9. Tree transplantation in the area of washery shall be explored instead of cutting the trees and accordingly number of trees for transplantation and plan of action shall be submitted. Development of greenbelt along the periphery of plan premises shall be submitted with fixed timeline.
  10. Plan/layout of washery shall be proposed as such that storage yard of raw coal and washed coal shall be not in pre-dominant wind direction and near any villages. Accordingly, layout may be revised.
  11. Ambient Air quality modelling for So2 and Nox shall also be carried out and impact of these shall be provided.
  12. Letter from PCCF stating the project area does not come under elephant corridor
  13. Fund allocated for Wildlife conservation plan shall be submitted
  14. Clarification may be provided about applicability of Chhattisgarh Minerals (Mining, Transportation & Storage) Rules, 2009 not allowing coal storage within 25 km radius from any coal mine wherein site is 13 km from SECL coal mine area

13 Nov 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantYP Ohri
DesignationVice President
Name of Company (Applicant Name should not be given here)VK JAIN
Addressvillage bhengari, tehsil gharghora, distt. raigarh