1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Bhengari coal washery of 5.0 MTPA in an area of 17.48 ha of M/s Mahavir coal washery Private Limited in District Raigarh, Chhattisgarh | (b)Name of the Company / Organisation | VK JAIN | (c)Registered Address | village bhengari, tehsil gharghora, distt. raigarh ,,Raigarh,Chhattisgarh-496111 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | YP Ohri | (b)Designation (Owner/ Partner/ CEO) | Vice President | (c)Address | 198, Vasant Enclave, Rao Tula Ram Marg,New Delhi,Vasant Vihar,South West,Delhi-110057 | (d)Pin code | 110057 | (e)E-mail | mahavirglobalcoal@yahoo.co.in | (f)STD Code. | 7752(f)Telephone No. | 26141901 | (g)Fax No. | 404523 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 2(a) Coal washeries
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/CG/CMIN/27185/2015 | (d)Master Proposal Number(Single Window) | SW/139381/2020 | (e)EAC concerned (for category A Projects only) | Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 6/1, 7, 8/1, 8/2, 9/1, 9/2, 9/4, 9/5, 2/1, 5/2, 5/ | (b)Pincode | 496111 | (c)Bounded Latitudes (North) | | From | | Degree | 220819.40 | Minutes | | Second | | From | | Degree | 22085.7 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 831421.2 | Minutes | | Second | | From | | Degree | 831449.4 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 64N/4,64N/8 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 300 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 3.6 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Chhattisgarh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Chhattisgarh | Raigarh | Gharghoda | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J-11015/161/2015-IA.II(M) | (b)Date of Apply of TOR | 23 Sep 2015 | (c)Date of Issue of TOR / Standard ToR | 03 Feb 2016 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 08 Dec 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0.5 |
| Govt Higher secondary school ground premises | State : | Chhattisgarh | District : | Raigarh | Tehsil : | Gharghoda | Village : | Nawapara (Tenda) |
| 625 | Public hearing not conducted in 45 days, March – May 2015 baseline data, Adivasi land, employment to outsiders, pollution from proposed washery & existing industries (TRN Energy-600 MW TPP, Phil Coal | Others | Additional District Collector | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | heavy media cyclones | 2 X 2.5 MTPA | 5.0 MTPA coal washery | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Washed Coal including fines | 3.60 | Others | Million TPA | Road,Rail | | (2.) | Middling | 0.95 | Others | Million TPA | Road,Rail | | (3.) | Rejects | 0.45 | Others | Million TPA | Road,Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 56.78 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.55 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.15 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.12 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 5.0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 5 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Raw coal | 5.0 | Others | Million TPA | SECL Mines | Road | | 29 | MoU | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 May 2018 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 74.5 | 40.2 | 74.1 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 29.1 | 20.3 | 28.6 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 26.5 | 14.2 | 25.6 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 29.2 | 16.5 | 28.4 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 423 | 119 | 200 | 600 | (2.) | Chlorides | | | mg/l | | 166.2 | 46.8 | 250 | 1000 | (3.) | pH | | | NA | | 7.8 | 6.9 | 6.5 | 8.5 | (4.) | TDS | | | mg/l | | 733 | 259 | 500 | 2000 | (5.) | Fluoride | | | mg/l | | 0.7 | 0.2 | 1.0 | 1.5 | (6.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 1.5 | 1.0 | D | (2.) | pH | | mg/l | | 7.6 | 7.2 | D | (3.) | DO | | mg/l | | 5.8 | 5.4 | D | (4.) | BOD | | mg/l | | 2.5 | 1.3 | D | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 48.1 | 44.7 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 44.9 | 41.5 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.9 | 7.4 | (2.) | P(Phosphorus) | Kilogram per hectare | | 98.3 | 62.8 | (3.) | K(Potassium) | Kilogram per hectare | | 326.4 | 74.6 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 386 | 128.6 | (5.) | N(Nitrogen) | Kilogram per hectare | | 106.4 | 61.4 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10.7 To 3.5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1 To 6.1 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 800 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | 35-1/NCCR/CGWA/Vol-VIII-895 | 11 Jul 2019 | 800 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | process | 312 | 312 | r | Others | ZLD | 312 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 312 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 312 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Coal Rejects | Industrial Waste | Coal Rejects | 0.45 | Tons | 0 | Others | By dumpers | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 74 | 1.4 | 7.7 | 82 | 100 | (2.) | NOx | | Microgram per Meter Cube | 29 | 0.7 | 0.1 | 30 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 29 | 1.4 | 1.8 | 31 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 26 | 0 | 0.0 | 27 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Crusher | Coal | 30 | 0.5 | PM10 | | 0.4 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 5000 | (b)Source | Chhattisgarh State Electricity Board | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 125 KVA | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 17.48 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 17.48 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 17.48 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Nil | 0 | Total (ha.) | 17.4800 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Plant and its facilities | 17.48 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Wildlife Corridors | Nil | 0 | Nil within the study area | (2.) | Critically Polluted Area | Nil | 0 | Nil within the study area | (3.) | WLS | Nil | 0 | Nil within the study area | (4.) | ESAs | Nil | 0 | Nil within the study area | (5.) | ESZs | Nil | 0 | Nil within the study area | (6.) | Corridors | Nil | 0 | Nil within the study area | (7.) | NPA | Nil | 0 | Nil within the study area | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | Nil | 0 | Nil within the study area | (2.) | Defence Installations | | Nil | 0 | Nil within the study area | (3.) | Forest | | Bhengari PF | 1.3 | S | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 17.48 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Land under possession | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Pavo cristatus (Common peafowl), Gazelle gazella (Chinkara), Elephas maximas (Indian elephant) Melursus ursinus (Sloth bear) Panthera pardus (Panther) Python molurus (Python), Crimson rose | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 15 Lakhs | (iii)Period of Implementation | 5 Years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kurket river | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 3.6 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 70 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 330 | (f)Total Manpower | 70 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 5.76 | (b)Percentage of Total Project Area | 32.95 | (c)No. of Plants to be Planted | 4600 | (d)Funds Allocated for Plantation | 2049000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | The project will improve the socio-economic status of the society in the region by generating direct and indirect employment opportunities. The project will contribute additional revenue to the State & Central exchequers in the form of taxes, cess, etc. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | NA | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | NA | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | NA | (b)Date of Approval | 01 Jan 2020 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | NA | (e)Approved Mining Lease Area | 0 | (f)Approved Capacity | 0 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | NA | (b)Mineable Reserves (Million Ton) | NA | (c)Extractable Reserves(Million Ton) | NA | (d)Percent(%) of Extraction | NA | (e)Grade of Coal /Ore /Mineral | NA | (f)Stripping Ratio | NA : NA | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | NA | (i)Mining Method | Opencast | (j)Life of Mine (Years) | NA | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 0 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | Not applicable. The proposal is for coal washery. | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | Not applicable. The proposal is for coal washery. | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | Not applicable. The proposal is for coal washery. | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | (v)No. of year back fill up | | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | | (b)Depth (in meter) | | (c)Volume (in Million Cubic meter) | | |
|
12. | Details of Quarry: | (a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 0 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | NA | (b)Surface to Siding/Loading | NA | (c)Transportation / Conveyor Details | NA | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | AGRICULTURE LAND | | 0 | 0 | 0 | (2.) | FOREST LAND | | 0 | 0 | 0 | (3.) | GRAZING LAND | | 0 | 0 | 0 | (4.) | SETTLEMENTS | | 0 | 0 | 0 | (5.) | WASTE LAND | | 0 | 0 | 0 | (6.) | SURFACE WATER BODIES | | 0 | 0 | 0 | |
TOTAL | 0 | 0 | 0 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXCAVATION/QUARRY | | 0 | 0 | 0 | | 0 | (2.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (3.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (4.) | ROADS | | 0 | 0 | 0 | | 0 | (5.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0 | | 0 | (6.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | (7.) | GREEN BELT | | 0 | 0 | 0 | | 0 | (8.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | |
TOTAL | 0 | 0 | 0 | 0 | 0 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 0 | (d)Safety Zone(in hectare) | 0 | (e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 0 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 0 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 0 | 0 | 0 | 0 | 0 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 164 | (ii)Name of the EIA Consultant | Vimta Labs Limited | (iii)Address | 142, IDA, Phase-II, Cherlapally, Hyderabad-500051, Telangana state | (iv)Mobile No. | 9000711309 | (v)Landline No. | 0402726414 | (vi)Email Id | env@vimta.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 19 Nov 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Pls provide or clarify following details
Wild life conservation plan for presence of schedule- I species (all species) with fund allocated as approved by PCCF
Greenbelt development along with fund and timeframe for achieving 33% greenery
In case of Diesel generator – fuel linkage document and details of generator and likely emission
Agreement for power connection
Public hearing proceeding is chaired by Regional Officer (CECB) and Additional District Officer. However as per Chhattisgarh High court, Member Secretary (CECB) should chair the Public Hearing proceedings. Pls justify
Copy of raw coal linkage in Form # 2. The attached document is offer of washed coal usage.
Extension of validity of usage of ground water by Central Ground Water Board
Washed coal consumption agreement is dated 2011 and 2013 wherin even ToR was given. Fresh agreement shall be uploaded
Attendence sheet of Public Hearing shall be provided.
In S. No. 32 Proposed Green belt development program along-with time line and budgetary allocation needs to be provided. Details submitted in 32 (4) unit of details not mentioned
List of consultants involved in the preparation of EIA/EMP report shall be enclosed in EIA Report with their signature.
Quantity of hazardous waste to be generated and its management shall be provided
Proposed linkage of power plants for utilization of washery rejects. | 07 Feb 2020 | 2. | NA | The correction have been made as per the instruction received | 23 May 2020 | 3. | NA | You are requested to provide following details/clarification.
a. Attendance of people present during Public Hearing and shall be included in EIA Report
b. Letter with details of PH from Member Secretar, CECB to this Ministry
c. Report on Wild life conservation plan for presence of schedule- I species (all species) with fund allocated as approved by PCCF
d. Greenbelt implementation plan with time line and fund allocation
e. Point wise compliance of ToR is not included in EIA Report.
f. Overall plan of utilization of washery rejects with quantity shall be provided along with MoUs (if any)
g. Provide NABL certificate of sub consultant engaged by main Consultant | 14 Jul 2020 | 4. | NA | The correction have been made as per the instruction received | 12 Oct 2020 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | ADS Reply (M/S Mahavir Coal Washery)
New Consultant: M/s Grass Roots Research & Creations India Pvt Ltd | 28 Jun 2022 | 2. | NA | The EAC after detailed deliberations observed that compliance submitted by PP on earlier observation are inadequate and there is no technical justification. PP needs to provide justification based on technical study/data and facts in view of certain restriction imposed by NGT. Values shown for impact (modelling result) of road transportation in terms of pollutants are very negligible and inaccurate. The committee also noted that there is no concrete plan for development of railway siding and PP has to first prepare DPR for railway siding. Therefore, EAC was of view that Ministry shall take necessary action on consultant i.e. M/s Vimta Labs for inconsistencies in collection and analysis of air quality data. In view of the incomplete and inadequate submission of information by PP, the EAC desired further deliberation would be required for compliance on below mentioned observations.
(i) As per the NGT’s Committee recommendation, carrying capacity of the site area shall be carried out for suitability of the proposed project.
(ii) PP shall submit Traffic impact assessment based on fresh data considering transportation activity of other companies.
(iii) PP shall carry out feasibility study vis-à-vis with right of way w.r.t. Forest and technical justification for not using water from Kurket River.
(iv) PP shall explore the usage of wastewater from nearby power plants for washery operations.
(v) Impact of washery on nearby agricultural land and flora-fauna. Proper flora management plan needs to be prepared.
(vi) Proper Air pollution mitigation measures at site with installation of Continuous Ambient Air Quality Station during operation of project.
(vii) Adherence to the compliance to Issues raised during Public Consultation with the timeline and budgetary provision.
(viii) Fund allotment for greenbelt is too less and more fund should be allotted for developing peripheral plantation.
(ix) PP shall submit the action plan with timeline for development of railway siding.
The proposal was deferred on above lines. | 05 Apr 2021 | 3. | ADS Reply Letter | ADS Reply Submitted | 25 Feb 2021 | 4. | ADS Reply Letter | ADS Reply Submitted | 25 Feb 2021 | 5. | ADS Reply Letter | ADS Reply Submitted | 25 Feb 2021 | 6. | ADS Reply Letter | ADS Reply Submitted | 25 Feb 2021 | 7. | NA |
The EAC after deliberations and observed certain deficiencies in the submission of PP and deferred the proposal on the following points:
- Response from project proponent on the Hon’ble NGT order dated 27th February, 2020 and in reference to extra mitigation measures adopted for the proposed activity.
- Confirmation of Wildlife Santuary/National Park within 10 km of project site.
- Plan for 100 % Rejects utilisation shall be submitted to be utilised in FBC boilers and accordingly MoU with power plants shall be submitted.
- PP shall explore use of surface water from kurket river which is at a distance of 3.6 km instead of using groundwater for proposed washery during operations/construction activity.
- The percentage of system loss in washery operation seems to be on higher side and shall be further optimized/reduced.
- Clarity on the ownership of Land for the project and whether there is no court case as raised in Public Hearing.
- Feasibility of proposed transportation route for raw coal and washed coal through road considering the presence of other industries. Plan for further reduction in fleet size of trucks for transportation of raw coal and product.
- Status of implementation of proposed railway siding shall be submitted.
- Tree transplantation in the area of washery shall be explored instead of cutting the trees and accordingly number of trees for transplantation and plan of action shall be submitted. Development of greenbelt along the periphery of plan premises shall be submitted with fixed timeline.
- Plan/layout of washery shall be proposed as such that storage yard of raw coal and washed coal shall be not in pre-dominant wind direction and near any villages. Accordingly, layout may be revised.
- Ambient Air quality modelling for So2 and Nox shall also be carried out and impact of these shall be provided.
- Letter from PCCF stating the project area does not come under elephant corridor
- Fund allocated for Wildlife conservation plan shall be submitted
- Clarification may be provided about applicability of Chhattisgarh Minerals (Mining, Transportation & Storage) Rules, 2009 not allowing coal storage within 25 km radius from any coal mine wherein site is 13 km from SECL coal mine area
| 13 Nov 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |