1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s. Shree Mahakali Dyes and Chemicals | (b)Name of the Company / Organisation | SHREE MAHAKALI DYES AND CHEMICALS | (c)Registered Address | Plot No. C1 413, 412, GIDC, Ankleshwar, Tal:Ankleshwar, Dist: Bharuch - 393 002, Gujarat,,Bharuch,Gujarat-393002 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Milan Patel | (b)Designation (Owner/ Partner/ CEO) | Partner | (c)Address | Plot No. C1, 413, 412, GIDC, Ankleshwar, Tal Ankleshwar, Dist Bharuch - 393 002, Gujarat,,Anklesvar,Bharuch,Gujarat-393002 | (d)Pin code | 393002 | (e)E-mail | shreemahakalidyes@gmail.com | (f)STD Code. | 261(f)Telephone No. | 2461241 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/139258/2018 | (d)Master Proposal Number(Single Window) | SW/139256/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | PLOT NO. C1/413, 412 | (b)Pincode | 393002 | (c)Bounded Latitudes (North) | | From | | Degree | 21.620594 | Minutes | | Second | | From | | Degree | 21.620953 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.019672 | Minutes | | Second | | From | | Degree | 73.020036 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43N2 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 25 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 23 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | IA-J-11011/38/2020-IA-II(I) | (c)Date of Issue of TOR | 31 May 2018 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 23 May 2020 | (c)Date of Issue of EC | 15 Oct 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | The project is located within Notified Industrial | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | SPCB | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | | (iii)Letter No. | Not Applicable | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | May 31 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Ammonium Sulphate | 1000 | 0 | 1000 | Others | MT/Month | Road | | (2.) | Potassium Sulphate | 1000 | 0 | 1000 | Others | MT/Month | Road | | (3.) | Potassium Chloride | 1000 | 0 | 1000 | Others | MT/Month | Road | | (4.) | Salicylic Acid | 0 | 5 | 5 | Others | MT/Month | Road | | (5.) | M-2 (N,N-Di[2-hydroxyethyl] M-Toludine) | 0 | 50 | 50 | Others | MT/Month | Road | | (6.) | M-3 A(N,N Di 2-AcetoxyEthylMetaAminoAcetanilide) | 0 | 50 | 50 | Others | MT/Month | Road | | (7.) | M-7A (N-Cyano-Ethyl N-Hydroxy Ethyl Aniline) | 0 | 50 | 50 | Others | MT/Month | Road | | (8.) | M-8 (N-Ethyl N-Cyanoethyl Aniline) | 0 | 50 | 50 | Others | MT/Month | Road | | (9.) | M-15 (N-Ethyl-N-[2-Hydroxyethyl] Aniline) | 0 | 50 | 50 | Others | MT/Month | Road | | (10.) | M-22 (N,N- BIS Cyanoethyl Aniline) | 0 | 50 | 50 | Others | MT/Month | Road | | (11.) | M-23 (N-Ethyl-N-Cyanoethyl Meta Toluidine) | 0 | 50 | 50 | Others | MT/Month | Road | | (12.) | M-24 (3,N,N-Diallyl Amino-4-Methoxy-Acetanilide) | 0 | 50 | 50 | Others | MT/Month | Road | | (13.) | CEEMA | 0 | 50 | 50 | Others | MT/Month | Road | | (14.) | Diluting Agent 007 (AMCOL 100) | 0 | 100 | 100 | Others | MT/Month | Road | | (15.) | Sodium Nitrate | 1000 | 0 | 1000 | Others | MT/Month | Road | | (16.) | M-6 (3,N[2-Cyanoethyl]-N-[2-Acetoxyethyl] | 0 | 50 | 50 | Others | MT/Month | Road | | (17.) | 2,4 Dinitro Aniline | 0 | 50 | 50 | Others | MT/Month | Road | | (18.) | Methyl Pyridone | 0 | 15 | 15 | Others | MT/Month | Road | | (19.) | M-14 (N-[2 Acetoxyethyl]-N-[2-Cyanoethyl]-M-Amino | 0 | 50 | 50 | Others | MT/Month | Road | | (20.) | M-38 (N-Cyano Ethyl N-Benzyl Aniline) | 0 | 50 | 50 | Others | MT/Month | Road | | (21.) | M-2A (N,N Di Acetoxyethyl Meta Toludine) | 0 | 50 | 50 | Others | MT/Month | Road | | (22.) | N-Cyanoethyl Aniline | 0 | 50 | 50 | Others | MT/Month | Road | | (23.) | M-3 (N,N-Di hydroxy ethyl meta amino acetanilide) | 0 | 50 | 50 | Others | MT/Month | Road | | (24.) | M-4 (N,N-Di Hydroxy Ethyl Aniline) | 0 | 50 | 50 | Others | MT/Month | Road | | (25.) | Total Area | 0.14079 | 0 | 0.14079 | Hectares(ha) | | Road | | (26.) | Rubber Product | 125 | -125 | 0 | Others | MT/Month | Others | NA | (27.) | 2-Ethyl Pyridone | 0 | 15 | 15 | Others | MT/Month | Road | | (28.) | Butyl Pyridone | 0 | 15 | 15 | Others | MT/Month | Road | | (29.) | M-1 (N,N-Di[2-hydroxyethyl]-M-Chloro Aniline) | 0 | 50 | 50 | Others | MT/Month | Road | | (30.) | M-5(3,N,N-DiAcetoxyEthylAmono4-MethoxyAcetanilid) | 0 | 50 | 50 | Others | MT/Month | Road | | (31.) | M-5A (3 N,N-Dihydroxyethylamino 4-Methoxy | 0 | 50 | 50 | Others | MT/Month | Road | | (32.) | M-10 (3,N,N- Diethyl Amino 4-Methoxy Acetanilide) | 0 | 50 | 50 | Others | MT/Month | Road | | (33.) | M-23A (N,N-Di-[2-Cyanoethyl]-M-Toluidine) | 0 | 50 | 50 | Others | MT/Month | Road | | (34.) | M-38A (N-Cyano Ethyl M-Toluidine) | 0 | 50 | 50 | Others | MT/Month | Road | | (35.) | Total Production Capacity | 1125 | 145 | 1270 | Others | MT/Month | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Centrifuge SS | 0 | 1 | 1 | 36" | (2.) | SS Reactor | 1 | 0 | 1 | 5 KL | (3.) | SS Reactor | 1 | 0 | 1 | 2.5 KL | (4.) | ANFD | 0 | 1 | 1 | 5 KL | (5.) | Storage Tank SS | 1 | 0 | 1 | 20 KL | (6.) | SS Reactor | 0 | 1 | 1 | 3 KL | (7.) | PP Reactor | 0 | 1 | 1 | 10 KL | (8.) | PP Reactor | 1 | 0 | 1 | 5 KL | (9.) | Storage Tank HDPE | 2 | 0 | 2 | 7 KL | (10.) | SS Reactor | 0 | 1 | 1 | 8 KL | (11.) | Centrifuge MSRL | 1 | 0 | 1 | 36" | (12.) | Steam Boiler | 1 | 0 | 1 | 500 Kgs | (13.) | Steam Boiler | 0 | 1 | 1 | 1500 Kgs | (14.) | Storage Tank MS | 2 | 0 | 2 | 10 KL | (15.) | Chilling Plant | 0 | 1 | 1 | 30 TR | (16.) | Cooling Tower | 1 | 1 | 2 | 15 TR | (17.) | Storage Tank SS | 0 | 1 | 1 | 15 KL | (18.) | Storage Tank HDPE | 1 | 0 | 1 | 20 KL | (19.) | Dryer Hot Air Generator | 2 | 0 | 2 | 200 Tray | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 15 Mar 2019 | (iv)Valid Upto | 17 Jul 2023 | (v)File No. | AWH-100090 | (vi)Application No. | GPCB/ANK/CCA-1358/ID-33022/504068 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 2.98 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.48 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.08 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.4 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 5814 | (b)Existing quantity of raw material/fuel | 16458.84 | (c)Total quantity of raw material/fuel | 22272.84 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Hydrochloric Acid | 5973.48 | Tons per Annum | | Local | Road | | 25 | Open Market | | Copy of Linkage | (2.) | Aniline Oil | 606.36 | Tons per Annum | | Local | Road | | 70 | Open Market | | Copy of Linkage | (3.) | Aniline | 294.12 | Tons per Annum | | Local | Road | | 70 | Open Market | | Copy of Linkage | (4.) | Acrylonitrile | 394.32 | Tons per Annum | | Local | Road | | 100 | Open Market | | Copy of Linkage | (5.) | diesel | 12 | Others | Lit/Hr | Local | Road | | 7 | Fuel Supply Agreement | | Copy of Linkage | (6.) | Natural Gas | 1000 | Others | Sm3/day | Local | Others | Pipeline | 10 | Fuel Supply Agreement | | Copy of Linkage | (7.) | Benzyl chloride | 240 | Tons per Annum | | Local | Road | | 125 | Open Market | | Copy of Linkage | (8.) | MONO CHLROACETIC ACID | 204 | Tons per Annum | | 204 | Road | | 10 | Open Market | | Copy of Linkage | (9.) | Monoethyl Amine | 63.12 | Tons per Annum | | Local | Road | | 30 | Open Market | | Copy of Linkage | (10.) | ammonia | 3810.96 | Tons per Annum | | Local | Road | | 15 | Open Market | | Copy of Linkage | (11.) | Meta Chloro Aniline | 326.16 | Tons per Annum | | Local | Road | | 10 | Open Market | | Copy of Linkage | (12.) | Mono methyl amine | 71.88 | Tons per Annum | | Local | Road | | 10 | Open Market | | Copy of Linkage | (13.) | Acetic anhydride | 229.68 | Tons per Annum | | Local | Road | | 15 | Open Market | | Copy of Linkage | (14.) | Allyl Chloride | 328.92 | Tons per Annum | | Local | Road | | 10 | Open Market | | Copy of Linkage | (15.) | Sulphuric acid | 9370.2 | Tons per Annum | | Local | Road | | 15 | Open Market | | Copy of Linkage | (16.) | Acetic acid | 229.68 | Tons per Annum | | Local | Road | | 70 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2019 To 31 May 2019 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 22.90 | 17.52 | 21.19 | 80 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 58.10 | 44.29 | 52.84 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 20.84 | 16.92 | 19.41 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 96.12 | 79.12 | 91.14 | 100 | |
14.2. No. of Ground Water monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.81 | 6.78 | 6.5 | 8.5 | (2.) | Total Hardness | | | mg/l | | 1166.64 | 97.2 | 300 | 600 | (3.) | Fluoride | | | mg/l | | 0 | 0 | 1 | 1.5 | (4.) | TDS | | | mg/l | | 2860 | 195 | 500 | 2000 | (5.) | Chlorides | | | mg/l | | 823.34 | 49.98 | 250 | 1000 | (6.) | Heavy Metals | | Iron | mg/l | | 0.27 | 0.1 | 0.3 | 1 | (7.) | TSS | | | mg/l | | 38 | 6 | 50 | 100 | |
14.3. No. of Surface Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.48 | 7.48 | A | (2.) | BOD | | mg/l | | 8.13 | 8.13 | A | (3.) | DO | | mg/l | | 5.8 | 5.8 | A | (4.) | COD | | mg/l | | 24.66 | 24.66 | A | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 70 | 62 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 73 | 65 | 75 | |
14.5. No. of Soil Sample Monitored locations : 9 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.9 | 7.21 | (2.) | N(Nitrogen) | Milligram per Kilogram | | 164.5 | 92.62 | (3.) | P(Phosphorus) | Milligram per Kilogram | | 25.8 | 15.77 | (4.) | K(Potassium) | Milligram per Kilogram | | 898 | 326.9 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 4.12 | 2.08 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 20 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 30 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | GIDC Water | 41 | 10 | Copy of Permission Letter | Pipeline | | Others | Pipeline | NTA/ANK/DEE(WS)/2053 | 20 Dec 2017 | 41 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 17 | 17 | ETP | Others | CMEE of M/s. ACPTCL, Ankleshwar | 0 | 17 | (2.) | Domestic | 2 | 2 | Soak Pit & Septic Tank | Others | Soak Pit & Septic Tank | 0 | 2 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 19 | (b)Total Discharged Water (Kilolitre per Day) | 19 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Used Oil/ Spent Oil | Industrial Waste | | 0.6 | Tons | 11 | Road | | Authorized Recyclers | | (2.) | Inorganic Process Waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 600 | Tons | 12 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Spent Solvent | Industrial Waste | | 49.2 | Tons | 0 | Others | Reuse | Others | Reuse within premises | (4.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 120 | Tons | 12 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (5.) | Discarded Containers/ Bags/ Liners | Industrial Waste | | 290.4 | Tons | 10 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 50.88 | 7.62 | 0.01 | 50.90 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 19.82 | 7.62 | 0.01 | 19.84 | 80 | (3.) | NOx | | Microgram per Meter Cube | 22.90 | 7.62 | 0.01 | 22.92 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 88.45 | 7.62 | 0.01 | 88.47 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler-1 (100 kg/hour) | Natural Gas | 9 | 0.1 | PM10 | | SPM 150, SO2 262, NOx 94 | (2.) | Boiler-2 (600 kg/hour) | Natural Gas | 11 | 0.2 | PM10 | | SPM 150, SO2 262, NOx 94 | (3.) | DG Set (125 KVA) | Diesel | 9 | 0.1 | PM10 | | SPM 150, SO2 262, NOx 94 | (4.) | Boiler-3 (1500 kg/hour) | Natural Gas | 11 | 0.2 | PM10 | | SPM 150, SO2 262, NOx 94 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 120 | (b)Source | DGVCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | DG Set * 1 No. | (e)Stack Height (in m) | 9 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0.1408 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 0.14079 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 22938.39 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 1167.40 | (e)Settlements (ha.) | 1378.23 | (f)Industrial (ha.) | 3592.74 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Scrubland & Mud flats | 2340.3 | Total (ha.) | 31417.0600 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Built Up Area | | 0.06 | | (2.) | Green belt | | 0.06 | | (3.) | Others | Parking and Open Area | 0.02 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | NA | 0 | NA | (2.) | Corridors | NA | 0 | NA | (3.) | ESZs | NA | 0 | NA | (4.) | WLS | NA | 0 | NA | (5.) | Critically Polluted Area | Ankleshwar | 0.75 | Located within Critically polluted area | (6.) | ESAs | NA | 0 | NA | (7.) | Wildlife Corridors | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | NA | 0 | NA | (2.) | Others | NA | NA | 0 | NA | (3.) | Forest | | NA | 0 | NA | (4.) | Archaeological Sites | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.14 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Land already acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Presence of 10 Schedule-I species. Funds for 1 species | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 202500 | (iii)Period of Implementation | 1 year | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 20 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 10 | (e)No. of working days | 330 | (f)Total Manpower | 30 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 0.02 | 0.03 | 0.05 | (2.) | Percentage of Total Project Area | 16.4 | 23.6 | 40 | (3.) | No. of Plants | 35 | 50 | 85 | (4.) | Funds Allocated | 105000 | 150000 | 255000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | CSR & CER | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Stay Order Against QCI NABET | (ii)Name of the EIA Consultant | Aqua-Air Environmental Engineers Pvt. Ltd. | (iii)Address | 403, Centre Point, Nr. Kadiwala School, Ring Road, Surat- 395002 | (iv)Mobile No. | 9904433995 | (v)Landline No. | 0261246124 | (vi)Email Id | aqua_eia@yahoo.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 07 Apr 2016 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) TOR granted by SEEIA however, now application submitted at Central level please clarify
(ii) All old CTOs not uploaded to verify the violation, if any done by PP.
(iii) TOR compliance is not adequate in EIA/EMP report and need to revise as per the terms of reference granted for the project, and shall conform to Appendix III of the EIA Notification, 2006.
(iv) Submit action plan as per the Ministry’s office memorandum 31st October, 2019 regarding projects located in Critically Polluted Area.
(v) Effluent treatment mechanism with plan for Zero Liquid Discharge needs to be submitted.
(vi) Proposed Green belt development programe along-with time line and budgetary allocation needs to be provided(green belt has not mentioned as per OM Dated 31.10.2019-CPA)
(vii) Details of Court case if any.
(viii) Updated status of water approval.
(ix) In view of the above, PP/Consultant are requested to revise the application for grant of EC and accordingly revise the Form 2 alongwith EIA/EMP Report. The EIA/EMP Report shall match with the information as filled in Form 2. On examination it is observed that the Consultant has not adequately submitted the application as per the provisions of the EIA Notification, 2006. Consultant has to read the documents before uploading the information in Form 2 /EIA/EMP report. | 05 Mar 2020 | 2. | NA | The correction have been made as per the instruction received | 23 May 2020 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Additional details sought as per the minutes in 21st EAC meeting for the action plan to control the particulate matter has been attached herewith | 26 Aug 2020 | 2. | NA | The EAC during deliberations noted that the project proponent proposed to lift fresh water from the Dudhganga river and treated effluent/cane condensate are proposed to send to nearby farm/share holders farm land. The Committee was of the view that such discharge shall lead to contamination of the farm land and the PP shall reuse the treated water and accordingly fresh water requirement shall be reduced. The Minutes of 21st EAC Meeting held during July 14-16, 2020 Page 8 of 145 Committee after detailed deliberations insisted for following requisite information/inputs in respect of the following: (i). Revised Water balance with complete Zero Liquid Discharge Plan. PP can drop the fresh water requirement by utilizing water from harvested rain water, cane condensate and reuse of treated water. (ii). Current status of court case. Details of action taken by SPCB along with copies/CTO etc.. (iii). Commitment that no treated/untreated waste water shall be discharged outside the plant premises. (iv). Plan for rain water harvesting. (v). Committee sought the plan for green energy viz. solar power generation (at least 2.5 MW for use in the unit). (vi). Commitment for employment to the local people along with details. (vii). Issues raised during public hearing, action plan, and as committed for utilization of Rs 5.0 crore for CER, revised action plan. (viii). Earlier EC was granted in 2016. The Committee noted that there is Schedule-I species in the study area and PP has still not taken the approval of conservation plan. (ix). Consultant needs to upload all the required details in Form 2 (Parivesh Portal), [for eg. Letter of SPCB forwarding the Public Hearing to MoEFCC at S No. 7.1 has not uploaded; In S No. 6, in place of TOR, minutes uploaded etc.] The proposal was accordingly DEFERRED for the needful. | 27 Jul 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Milan Patel | Designation | Partner | Name of Company (Applicant Name should not be given here) | SHREE MAHAKALI DYES AND CHEMICALS | Address | Plot No. C1 413, 412, GIDC, Ankleshwar, Tal:Ankleshwar, Dist: Bharuch - 393 002, Gujarat |
|