1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Suliyari Coal Mine | (b)Name of the Company / Organisation | AP MINERAL DEVELOPMENT CORPORATION | (c)Registered Address | The Andhra Pradesh Mineral Development Corporation Ltd,(A State Govt. of A.P. Undertaking), Door No. 294/1D,100 Feet Road (Tadigadapa to Enikepadu Road) Kanuru,Vijayawada,Krishna,Andhra Pradesh-521137 | (d)Legal Status of the Company | State PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | KEDARANATH REDDY | (b)Designation (Owner/ Partner/ CEO) | GM MINING | (c)Address | The Andhra Pradesh Mineral Development Corporation Limited,A State Govt of AP undertaking , Door no.294/1D, 100 Feet Road,Tadigadapa to Enikepadu Road Kanuru, Vijayawada,Vijayawada (Urban),Krishna,Andhra Pradesh-521137 | (d)Pin code | 521137 | (e)E-mail | coalsuliyari@gmail.com | (f)STD Code. | 866(f)Telephone No. | 2429999 | (g)Fax No. | 08662429977 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MP/CMIN/73904/2018 | (d)Master Proposal Number(Single Window) | SW/137891/2020 | (e)EAC concerned (for category A Projects only) | Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Toposheet No. 64I/5 Forest division: Singrauli, R | (b)Pincode | 486881 | (c)Bounded Latitudes (North) | | From | | Degree | 23.92138 | Minutes | | Second | | From | | Degree | 23.92498 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 82.31254 | Minutes | | Second | | From | | Degree | 83.3142 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 64 I/5 (OSM NO F44E5) | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 438 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 3.5 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Madhya Pradesh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Madhya Pradesh | Singrouli | No Data | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11015/35/2018-IA-II(M) | (b)Date of Apply of TOR | 04 Apr 2018 | (c)Date of Issue of TOR / Standard ToR | 03 Jul 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 30 Aug 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Playground of Govt. High School, Majhaulipath | State : | Madhya Pradesh | District : | Singrouli | Tehsil : | Singrauli | Village : | Jhalari |
| 1400 | (1) Land
Acquisition and
R&R (2)
Employment to
locals (3)
Plantation, Green
belt
development.
(4)Compensatory
Afforestation (5)
Cons. of biodiversity
(6)
Wildlife cons.(7)
Air Pollution | Others | A.D.M | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Open Cast Coal Mine | 5.0 Million TPA | Use of Surface Miner for coal removal | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | coal | 5000000 | Tons per Annum | | Road,Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 1200 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.70 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 11.54 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.11 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Lubes/ Greases | 10.5 | Kilo Litre per Day | | Supplier | Road | | 60 | Fuel Supply Agreement | | Copy of Linkage | (2.) | HSD | 105 | Kilo Litre per Day | | Supplier | Road | | 60 | Fuel Supply Agreement | | Copy of Linkage | (3.) | Power | 9 | Mega Watt(MW) | | MPPTCL | Others | HT Line | 3 | LOA | | Copy of Linkage | (4.) | Explosives | 5590 | Tons per Annum | | Approved supplier | Road | | 60 | Others | Contract | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Apr 2018 To 30 Jun 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 39 | 20 | 38.1 | 60 | (2.) | NOx | | Micro Gram per Meter Cube | 34 | 14 | 31 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 87 | 62 | 83.7 | 100 | (4.) | Others | CO | Mili Gram per Meter Cube | 0.8 | 0.1 | 0.7 | 4 | (5.) | SO2 | | Micro Gram per Meter Cube | 22 | 12 | 21 | 80 | |
14.2. No. of Ground Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.4 | 7.1 | 8.5 | 8.5 | (2.) | TDS | | | mg/l | | 390 | 280 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 185 | 165 | 200 | 600 | (4.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (5.) | Chlorides | | | mg/l | | 26 | 15 | 250 | 1000 | (6.) | Fluoride | | | mg/l | | 0.83 | 0.51 | 1.0 | 1.5 | (7.) | Heavy Metals | | Lead | Others | Micro Gram per Meter Cube | 1 | 1 | 10 | 10 | (8.) | Others | Arsenic | | Others | Micro Gram per Meter Cube | 1 | 1 | 10 | 50 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 7.2 | 4.8 | A | (2.) | Others | Total dissolved solids | Others | MPN/ 100ml | 130 | 110 | B | (3.) | BOD | | mg/l | | 4.2 | 1 | D | (4.) | pH | | mg/l | | 7.9 | 7.1 | A | (5.) | COD | | mg/l | | 0 | 0 | B | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 45.7 | 35.2 | 70 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 60.7 | 36.7 | 75 | |
14.5. No. of Soil Sample Monitored locations : 5 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Kilogram per hectare | | 498 | 99.9 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 214 | 43.2 | (3.) | pH | | | 6.4 | 4.5 | (4.) | K(Potassium) | Kilogram per hectare | | 221 | 0.02 | (5.) | N(Nitrogen) | Kilogram per hectare | | 1450 | 228 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 13.60 To 9.76 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 6.51 To 9.41 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | Appliaction letter No. 21-4/843/MP/MIN/2019 | (f)Date of Issue | 13 Mar 2020 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 1330 | 0 | Copy of Permission Letter | Pipeline | | Others | Borewell | 21-4/843/MP/MIN/2019 [NOC APPROVED] | 13 Mar 2020 | 1560 | (2.) | Others | Mine water (Reused) | 2310 | 0 | Not Appliacble | Pipeline | | Others | Mine water discharge | Application has already been made | 26 Apr 2019 | 3015 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Potable water for township | 1450 | 2000 | STP | Discharge into Surface Water Body,Others | Afforestation/Green belt development | 120 | 1330 | (2.) | Equipment and vehicle washing | 40 | 100 | ETP | Others | Dust suppression at mines | 40 | 0 | (3.) | Pit head bath | 20 | 100 | ETP | Others | Dust suppression at mines | 20 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1510 | (b)Total Discharged Water (Kilolitre per Day) | 1330 | (c)Total Reused Water (Kilolitre per Day) | 180 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Top Soil | Others | Mining Waste | 288000 | Tons | 0 | Road | | Others | Making Embankment & avenue plantation/reclamation | (2.) | Overburden/Interburden | Others | Mining Waste | 80108182 | Tons | 0 | Road | | Others | Will be used for backfilling | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 69.3 | 0.5 | 8 | 77.4 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 19 | 0.5 | 10 | 29.1 | 80 | (3.) | NOx | | Microgram per Meter Cube | 30.5 | 0.5 | 6 | 36.6 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 31.6 | 0.5 | 3 | 34.7 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | None | None | 0 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 9000 | (b)Source | MPPTCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | none | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 259.239 | (b)Private Land (ha.) | 344.121 | (c)Government Land (ha.) | 396.720 | (d)Revenue Land (ha.) | 251.860 | (e)Other Land (ha.) | 46.060 | Total Land (ha.) | 1298 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 251.860 | (b)Waste/Barren Land (ha.) | 396.720 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 46.060 | (e)Settlements (ha.) | 51.990 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 259.239 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Barren Tenancy land | 292.131 | Total (ha.) | 1298 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Township | | 5.0 | Outside Lease Area | (2.) | Built Up Area | | 0.69 | | (3.) | Water Reservoir | | 23.47 | Diverted nala | (4.) | Others | Road | 23.07 | | (5.) | Quarry Area | | 1171.90 | Including backfilled area and void | (6.) | Safety Zone | | 78.87 | includes 10.654 ha of greenbelt along ML boundary | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | None | 0 | None | (2.) | NPA | None | 0 | None | (3.) | ESAs | None | 0 | None | (4.) | ESZs | None | 0 | None | (5.) | Corridors | None | 0 | None | (6.) | Critically Polluted Area | None | 0 | None | (7.) | Wildlife Corridors | None | 0 | None | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Mohanban R.F. & Langhadol P.F. | 7.3 | Mohanban is in core zone | (2.) | Defence Installations | | None | 0 | None | (3.) | Archaeological Sites | | None | 0 | None | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Application for Forest Clearance yet to be submitted | (b)Legal Status of Forest Land | Reserve, protected and revenue | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 1038.76 | (c)Status of Land acquisition if not acquired | R&R scheme has already been formulated by district | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 10 | (b)No. of Households | 1386 | (c)No. of PDFs (Project Displaced Families) | 1386 | (d)No. of PAFs (Project Affected Families) | 1944 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 14924 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Mammals Indian Porcupine, Spotted Deer, Bandicoot Rat, jackal, Indian Wolf, Striped Hyena, Indian Porcupine Reptiles Indian Python, Monitor Lizard, Green Vine Snake, Russel’s Viper, Indian Cobra, Yell | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 35.45 crore | (iii)Period of Implementation | 10 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | 6348 | (iii)Date of issue | 16 Sep 2019 | (iv)Recommendation | NA | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Hurdul Nala | (b)Whether there is Diversion Required ? | Yes | (i)Details of Diversion Required | 5.3 km inside ML area during 6th year of operation, approval for the same obtained from WRD, however, as per MoC directions route of diversion has been changed, study for new route under progress. | (ii)Details of Study Conducted | Annexure 7.3.2 of EIA report | (c)Whether permission has been obtained from competent authority ? | Yes | (i)Uploaded copy of permission | Copy of permission | (ii)Letter No. | 3827 | (iii)Date of issue | 16 Dec 2019 | (iv)Recommendation | Recommended | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Hurdul Nala Amta nala Chhtraha nala Bibiao nala Jhana nala Sulkhia Nala | (ii)Direction of Water Bodies in Buffer Area | South West | (iii)Distance of Water Bodies in Buffer Area | 3.1 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 25 | (b)Permanent Employment-During Operation | 175 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 330 | (f)Total Manpower | 200 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 52.64 | (b)Percentage of Total Project Area | 4.06 | (c)No. of Plants to be Planted | 84500 | (d)Funds Allocated for Plantation | 5000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | (1)Revenue generation to the Govt. (2)To meet the rising demand of coal for power generation | (2.) | Financial | (1)Provision of about 8.54 crores towards CER (2)More than 5.45 lakhs plantation till the end of the project | (3.) | Social | (1) Peripheral development and CSR activities (2)Employment generation and improvement in social infrastructures | (4.) | Social | (1) Peripheral development and CSR activities (2)Employment generation and
improvement in social infrastructures | (5.) | Financial | (1)Provision of about 8.54 crores towards CER (2)More than 5.45 lakhs plantation till the
end of the project | (6.) | Environmental | (1)Revenue generation to the Govt. (2)To meet the rising demand of coal for power
generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Coal | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 5 MTPA | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | F.No. 34011-14-2017-CPAM | (b)Date of Approval | 08 Jul 2019 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | Coal | (e)Approved Mining Lease Area | 1298 | (f)Approved Capacity | 5.0 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 142.36 | (b)Mineable Reserves (Million Ton) | 113.08 | (c)Extractable Reserves(Million Ton) | 107.43 | (d)Percent(%) of Extraction | 75.46 | (e)Grade of Coal /Ore /Mineral | COAL | (f)Stripping Ratio | 7.29 : 1 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | OPENCAST MINING | (h)Average Gradient(Degree) | 5 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 23 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | Yes | (b)No. of seams | 15 | (c)Thickness of seams to be worked on | 0.5 | (d)Maximum Thickness of Seams (metres) | 5.82 | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 1298 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 31 Oct 2019 | (iii)Validity of LOI | 0 | (iv)Reference No. of LOI | FNo CBA2-13016/32018-CBA2 | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | FC Clearance required for Lease deed | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | NEW MINE | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 1 | (ii)Total Area (in Hectare) | 59.56 | (iii)Height (in meter) | 74 | (iv)Quantity (in Million Cubic meter) | 146.59 | (v)No. of year back fill up | 6 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 1 | (ii)Total Area (in Hectare) | 998.015 | (iii)Height (in meter) | 90 | (iv)Quantity (in Million Cubic meter) | 783.28 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 3.52 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 3.41 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0.11 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 173.881 | (b)Depth (in meter) | 170 | (c)Volume (in Million Cubic meter) | 470 | |
|
12. | Details of Quarry: | (a)Final Void of 173.881 (hectare) at a Depth of 270 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 1171.896 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | Dumper or trucks | (b)Surface to Siding/Loading | Dumpers or trucks | (c)Transportation / Conveyor Details | Through road or rail | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | FOREST LAND | | 259.239 | 0 | 259.239 | (2.) | OTHERS(Specify) | Barren Tenancy Land | 292.131 | 0 | 292.131 | (3.) | WASTE LAND | | 396.720 | 0 | 396.72 | (4.) | GRAZING LAND | | 0 | 0 | 0 | (5.) | SURFACE WATER BODIES | | 46.060 | 0 | 46.06 | (6.) | AGRICULTURE LAND | | 251.860 | 0 | 251.86 | (7.) | SETTLEMENTS | | 51.990 | 0 | 51.99 | |
TOTAL | 1298 | 0 | 1298 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXCAVATION/QUARRY | | 651.987 | 268.049 | 251.860 | | 1171.896 | (2.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0.697 | | 0.697 | (3.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (4.) | Other | Diversion below nala | 0 | 23.474 | 0 | | 23.474 | (5.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (6.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (7.) | GREEN BELT | | 0 | 0 | 0 | | 0 | (8.) | VIRGIN AREA | | 52.643 | 0 | 26.221 | | 78.864 | (9.) | ROADS | | 0 | 0 | 23.069 | | 23.069 | |
TOTAL | 704.63 | 291.523 | 301.847 | 0 | 1298 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 638.209 | (d)Safety Zone(in hectare) | 52.643 | (e)Final Void of 13.778 (hectare) at a Depth of 250 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 1600 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 704.630 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 0 | 0 | 0 | 0 | 0 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/ACO/19/1073 | (ii)Name of the EIA Consultant | MECON Limited | (iii)Address | MECON Limited Vivekananda Path PO. Doranda, Dist – Ranchi, Jharkhand – 834002 | (iv)Mobile No. | 9431101160 | (v)Landline No. | 6512483645 | (vi)Email Id | mining@mecon.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 29 Mar 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The Proposal submitted by PP online has been examined and following are the clarification is required:-
PP has not uploaded the Public Hearing Proceeding to be forwarded by the Member Secretary, SPCB, however uploaded the Regional office SPCB letter.
In S. No. 18.1 of Form # 2, i.e. impact prediction – SO2, NOx and PM2.5, baseline concentration, distance GLC, incremental concentration is zero whereas Total GLC is 0.01 for the same. Pls Justify.
Stage – I Forest Clearance as per ToR is still pending and at S. No. 24 of Form # 2, it is mentioned that application for Forest Clearance yet to be submitted. Pls provide the actual correct status of Stage-1 FC.
In S. No. 32 Proposed Green belt development program along-with time line and budgetary allocation needs to be provided
Please upload full document of Mine Plan including Mine Closure Plan as approved by MoC along with MoC approval letter. | 16 Mar 2020 | 2. | NA | The correction have been made as per the instruction received | 06 Apr 2020 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Dear Sir,
Reply to ADS is being uploaded. Please issue EC. | 16 Mar 2021 | 2. | NA | It has been decided that proposal needs re-consideration in EAC on account of site visit as well as on the recommendation of EAC for one year. You are requested to make presentation on 26 February , 2021. Kindly track the agenda item of EAC. | 19 Feb 2021 | 3. | ADS Reply Letter | Dear Sir Stage-I FC as well as information regarding distance from protected area is uploaded. Please issue EC. | 16 Dec 2020 | 4. | ADS Raise Letter | Please find the enclose document | 22 Sep 2020 | 5. | ADS Reply Letter | Reply of ADS dated 06.05.2020 by PP (APMDC) | 03 Jun 2020 | 6. | NA | This proposal is considered by
EAC after due approval of the Ministry as an additional item for the
consideration of EAC. The EAC members had very limited time to go through the
detailed proposal. The presentation was made by PP. During deliberation, it was found that the compliance of earlier
observations has not been completed yet, therefore, the EAC sought clarity on
previous obser | 06 May 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | KEDARANATH REDDY | Designation | GM MINING | Name of Company (Applicant Name should not be given here) | AP MINERAL DEVELOPMENT CORPORATION | Address | The Andhra Pradesh Mineral Development Corporation Ltd |
|