Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Suliyari Coal Mine
(b)Name of the Company / Organisation AP MINERAL DEVELOPMENT CORPORATION
(c)Registered Address The Andhra Pradesh Mineral Development Corporation Ltd,(A State Govt. of A.P. Undertaking), Door No. 294/1D,100 Feet Road (Tadigadapa to Enikepadu Road) Kanuru,Vijayawada,Krishna,Andhra Pradesh-521137
(d)Legal Status of the Company State PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant KEDARANATH REDDY
(b)Designation (Owner/ Partner/ CEO) GM MINING
(c)Address The Andhra Pradesh Mineral Development Corporation Limited,A State Govt of AP undertaking , Door no.294/1D, 100 Feet Road,Tadigadapa to Enikepadu Road Kanuru, Vijayawada,Vijayawada (Urban),Krishna,Andhra Pradesh-521137
(d)Pin code 521137
(e)E-mail coalsuliyari@gmail.com
(f)STD Code. 866(f)Telephone No. 2429999
(g)Fax No. 08662429977
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/MP/CMIN/73904/2018
(d)Master Proposal Number(Single Window) SW/137891/2020
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Toposheet No. 64I/5 Forest division: Singrauli, R
(b)Pincode 486881
(c)Bounded Latitudes (North)
From
Degree 23.92138
Minutes
Second
From
Degree 23.92498
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 82.31254
Minutes
Second
From
Degree 83.3142
Minutes
Second
(e)Survey of India Topo Sheet No. 64 I/5 (OSM NO F44E5)
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 438
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshSingrouliNo Data
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11015/35/2018-IA-II(M)
(b)Date of Apply of TOR 04 Apr 2018
(c)Date of Issue of TOR / Standard ToR 03 Jul 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :30 Jul 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :30 Aug 2019
Distance of Public Hearing Venue from the Proposed Project :0
Playground of Govt. High School, Majhaulipath
State :Madhya Pradesh
District :Singrouli
Tehsil :Singrauli
Village :Jhalari
1400(1) Land Acquisition and R&R (2) Employment to locals (3) Plantation, Green belt development. (4)Compensatory Afforestation (5) Cons. of biodiversity (6) Wildlife cons.(7) Air PollutionOthersA.D.M
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Open Cast Coal Mine5.0 Million TPAUse of Surface Miner for coal removal
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)coal5000000Tons per AnnumRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1200
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.70
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 11.54
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.11
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Lubes/ Greases10.5Kilo Litre per DaySupplierRoad60 Fuel Supply AgreementCopy of Linkage
(2.)HSD105Kilo Litre per DaySupplierRoad60 Fuel Supply AgreementCopy of Linkage
(3.)Power9Mega Watt(MW)MPPTCLOthersHT Line3 LOACopy of Linkage
(4.)Explosives5590Tons per AnnumApproved supplierRoad60 OthersContractCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Apr 2018 To 30 Jun 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube392038.160
(2.)NOxMicro Gram per Meter Cube34143180
(3.)PM10Micro Gram per Meter Cube876283.7100
(4.)OthersCOMili Gram per Meter Cube0.80.10.74
(5.)SO2Micro Gram per Meter Cube22122180
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.47.18.58.5
(2.)TDSmg/l3902805002000
(3.)Total Hardnessmg/l185165200600
(4.)TSSNA0000
(5.)Chloridesmg/l26152501000
(6.)Fluoridemg/l0.830.511.01.5
(7.)Heavy MetalsLeadOthersMicro Gram per Meter Cube111010
(8.)OthersArsenicOthersMicro Gram per Meter Cube111050
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l7.24.8A
(2.)OthersTotal dissolved solidsOthersMPN/ 100ml130110B
(3.)BODmg/l4.21D
(4.)pHmg/l7.97.1A
(5.)CODmg/l00B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))45.735.270
(2.)Leq(Night)A-weighted decibels(dB(A))60.736.775
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare49899.9
(2.)Electric ConductivityMillisiemens per Centimetre21443.2
(3.)pH6.44.5
(4.)K(Potassium)Kilogram per hectare2210.02
(5.)N(Nitrogen)Kilogram per hectare1450228
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 13.60 To 9.76
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 6.51 To 9.41
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. Appliaction letter No. 21-4/843/MP/MIN/2019
(f)Date of Issue 13 Mar 2020
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater13300Copy of Permission LetterPipelineOthersBorewell21-4/843/MP/MIN/2019 [NOC APPROVED]13 Mar 20201560
(2.)OthersMine water (Reused)23100 Not Appliacble PipelineOthersMine water dischargeApplication has already been made26 Apr 20193015
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Potable water for township14502000STPDischarge into Surface Water Body,OthersAfforestation/Green belt development1201330
(2.)Equipment and vehicle washing40100ETPOthersDust suppression at mines400
(3.)Pit head bath20100ETPOthersDust suppression at mines200
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1510
(b)Total Discharged Water (Kilolitre per Day) 1330
(c)Total Reused Water (Kilolitre per Day) 180
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Top SoilOthersMining Waste288000Tons0RoadOthersMaking Embankment & avenue plantation/reclamation
(2.)Overburden/InterburdenOthersMining Waste80108182Tons0RoadOthersWill be used for backfilling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube69.30.5877.4100
(2.)SO2Microgram per Meter Cube190.51029.180
(3.)NOxMicrogram per Meter Cube30.50.5636.680
(4.)PM2.5Microgram per Meter Cube31.60.5334.760
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NoneNone00PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 9000
(b)Source MPPTCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) none
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 259.239
(b)Private Land (ha.) 344.121
(c)Government Land (ha.) 396.720
(d)Revenue Land (ha.) 251.860
(e)Other Land (ha.) 46.060
    Total Land (ha.) 1298
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 251.860
(b)Waste/Barren Land (ha.) 396.720
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 46.060
(e)Settlements (ha.) 51.990
(f)Industrial (ha.) 0
(g)Forest (ha.) 259.239
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Barren Tenancy land 292.131
    Total (ha.) 1298
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Township5.0Outside Lease Area
(2.)Built Up Area0.69
(3.)Water Reservoir23.47Diverted nala
(4.)OthersRoad23.07
(5.)Quarry Area1171.90Including backfilled area and void
(6.)Safety Zone78.87includes 10.654 ha of greenbelt along ML boundary
Total (ha.) 1303
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNone0None
(2.)NPANone0None
(3.)ESAsNone0None
(4.)ESZsNone0None
(5.)CorridorsNone0None
(6.)Critically Polluted AreaNone0None
(7.)Wildlife CorridorsNone0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestMohanban R.F. & Langhadol P.F.7.3Mohanban is in core zone
(2.)Defence InstallationsNone0None
(3.)Archaeological SitesNone0None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Application for Forest Clearance yet to be submitted
(b)Legal Status of Forest Land Reserve, protected and revenue
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 1038.76
(c)Status of Land acquisition if not acquired R&R scheme has already been formulated by district
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 10
(b)No. of Households 1386
(c)No. of PDFs (Project Displaced Families) 1386
(d)No. of PAFs (Project Affected Families) 1944
(e)Funds Allocated for R&R(in INR) (in Lacs) 14924
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Mammals Indian Porcupine, Spotted Deer, Bandicoot Rat, jackal, Indian Wolf, Striped Hyena, Indian Porcupine Reptiles Indian Python, Monitor Lizard, Green Vine Snake, Russel’s Viper, Indian Cobra, Yell
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 35.45 crore
(iii)Period of Implementation 10 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. 6348
(iii)Date of issue 16 Sep 2019
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Hurdul Nala
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required 5.3 km inside ML area during 6th year of operation, approval for the same obtained from WRD, however, as per MoC directions route of diversion has been changed, study for new route under progress.
(ii)Details of Study Conducted Annexure 7.3.2 of EIA report
(c)Whether permission has been obtained from competent authority ? Yes
(i)Uploaded copy of permission Copy of permission
(ii)Letter No. 3827
(iii)Date of issue 16 Dec 2019
(iv)Recommendation Recommended
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Hurdul Nala Amta nala Chhtraha nala Bibiao nala Jhana nala Sulkhia Nala
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 3.1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 25
(b)Permanent Employment-During Operation 175
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 200
32.
Green Belt in Ha:
(a)Total Area of Green Belt 52.64
(b)Percentage of Total Project Area 4.06
(c)No. of Plants to be Planted 84500
(d)Funds Allocated for Plantation 5000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental(1)Revenue generation to the Govt. (2)To meet the rising demand of coal for power generation
(2.)Financial(1)Provision of about 8.54 crores towards CER (2)More than 5.45 lakhs plantation till the end of the project
(3.)Social(1) Peripheral development and CSR activities (2)Employment generation and improvement in social infrastructures
(4.)Social(1) Peripheral development and CSR activities (2)Employment generation and improvement in social infrastructures
(5.)Financial(1)Provision of about 8.54 crores towards CER (2)More than 5.45 lakhs plantation till the end of the project
(6.)Environmental(1)Revenue generation to the Govt. (2)To meet the rising demand of coal for power generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)CoalMajor
2.
Mine Capacity in ROM (Run of Mine) 5 MTPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. F.No. 34011-14-2017-CPAM
(b)Date of Approval 08 Jul 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Coal
(e)Approved Mining Lease Area 1298
(f)Approved Capacity 5.0
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 142.36
(b)Mineable Reserves (Million Ton) 113.08
(c)Extractable Reserves(Million Ton) 107.43
(d)Percent(%) of Extraction 75.46
(e)Grade of Coal /Ore /Mineral COAL
(f)Stripping Ratio 7.29 : 1
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) OPENCAST MINING
(h)Average Gradient(Degree) 5
(i)Mining Method Opencast
(j)Life of Mine (Years) 23
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable Yes
(b)No. of seams 15
(c)Thickness of seams to be worked on 0.5
(d)Maximum Thickness of Seams (metres) 5.82
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 1298
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 31 Oct 2019
(iii)Validity of LOI 0
(iv)Reference No. of LOI FNo CBA2-13016/32018-CBA2
(c)Whether Lease Deed Executed ? No
(i)Reason thereof FC Clearance required for Lease deed
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof NEW MINE
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 1
(ii)Total Area (in Hectare) 59.56
(iii)Height (in meter) 74
(iv)Quantity (in Million Cubic meter) 146.59
(v)No. of year back fill up 6
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 1
(ii)Total Area (in Hectare) 998.015
(iii)Height (in meter) 90
(iv)Quantity (in Million Cubic meter) 783.28
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 3.52
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 3.41
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0.11
11.
Details of Final Mine Void:
(a)Area (in Hectare) 173.881
(b)Depth (in meter) 170
(c)Volume (in Million Cubic meter) 470
12.
Details of Quarry:
(a)Final Void of 173.881 (hectare) at a Depth of 270 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 1171.896
13.
Details of Transportation:
(a)In Pit/Underground to Surface Dumper or trucks
(b)Surface to Siding/Loading Dumpers or trucks
(c)Transportation / Conveyor Details Through road or rail
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)FOREST LAND259.2390259.239
(2.)OTHERS(Specify)Barren Tenancy Land292.1310292.131
(3.)WASTE LAND396.7200396.72
(4.)GRAZING LAND000
(5.)SURFACE WATER BODIES46.060046.06
(6.)AGRICULTURE LAND251.8600251.86
(7.)SETTLEMENTS51.990051.99
TOTAL129801298
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY651.987268.049251.8601171.896
(2.)BUILT UP AREA (COLONY/OFFICE)000.6970.697
(3.)TOP SOIL STORAGE0000
(4.)OtherDiversion below nala023.474023.474
(5.)EXTERNAL OB DUMPS0000
(6.)INTERNAL OB DUMPS0000
(7.)GREEN BELT0000
(8.)VIRGIN AREA52.643026.22178.864
(9.)ROADS0023.06923.069
TOTAL704.63291.523301.84701298
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 638.209
(d)Safety Zone(in hectare) 52.643
(e)Final Void of 13.778 (hectare) at a Depth of 250 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1600
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 704.630
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/ACO/19/1073
(ii)Name of the EIA Consultant MECON Limited
(iii)Address MECON Limited Vivekananda Path PO. Doranda, Dist – Ranchi, Jharkhand – 834002
(iv)Mobile No. 9431101160
(v)Landline No. 6512483645
(vi)Email Id mining@mecon.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 29 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe Proposal submitted by PP online has been examined and following are the clarification is required:- PP has not uploaded the Public Hearing Proceeding to be forwarded by the Member Secretary, SPCB, however uploaded the Regional office SPCB letter. In S. No. 18.1 of Form # 2, i.e. impact prediction – SO2, NOx and PM2.5, baseline concentration, distance GLC, incremental concentration is zero whereas Total GLC is 0.01 for the same. Pls Justify. Stage – I Forest Clearance as per ToR is still pending and at S. No. 24 of Form # 2, it is mentioned that application for Forest Clearance yet to be submitted. Pls provide the actual correct status of Stage-1 FC. In S. No. 32 Proposed Green belt development program along-with time line and budgetary allocation needs to be provided Please upload full document of Mine Plan including Mine Closure Plan as approved by MoC along with MoC approval letter. 16 Mar 2020
2.NAThe correction have been made as per the instruction received 06 Apr 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterDear Sir, Reply to ADS is being uploaded. Please issue EC. 16 Mar 2021
2.NAIt has been decided that proposal needs re-consideration in EAC on account of site visit as well as on the recommendation of EAC for one year. You are requested to make presentation on 26 February , 2021. Kindly track the agenda item of EAC. 19 Feb 2021
3. ADS Reply LetterDear Sir Stage-I FC as well as information regarding distance from protected area is uploaded. Please issue EC. 16 Dec 2020
4. ADS Raise LetterPlease find the enclose document 22 Sep 2020
5. ADS Reply LetterReply of ADS dated 06.05.2020 by PP (APMDC) 03 Jun 2020
6.NA

This proposal is considered by EAC after due approval of the Ministry as an additional item for the consideration of EAC. The EAC members had very limited time to go through the detailed proposal. The presentation was made by PP. During deliberation, it was found that the compliance of earlier observations has not been completed yet, therefore, the EAC sought clarity on previous obser

06 May 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKEDARANATH REDDY
DesignationGM MINING
Name of Company (Applicant Name should not be given here)AP MINERAL DEVELOPMENT CORPORATION
AddressThe Andhra Pradesh Mineral Development Corporation Ltd