Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Establishing 1x800 MW Coal Based Supercritical Thermal Power Plant and Decommissioning of 2x120 MW Units at Ukai Thermal Power Plant at Vill. Vagda, Tehsil –Fort Songadh, Dist-Tapi, Gujarat
(b)Name of the Company / Organisation Gujarat State Electricity Corporation Limited (GSECL)
(c)Registered Address Race Course,Vadodara,Vadodara,Gujarat-390007
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Chief Engineer Project and Planning
(b)Designation (Owner/ Partner/ CEO) Chief Engineer
(c)Address GUJARAT STATE ELECTRICITY CORPORATION LIMITED Vidyut Bhawan, Race, Course, Vadodara,Vadodara,,Vadodara,Gujarat-390007
(d)Pin code 390007
(e)E-mail gsecltp@gmail.com
(f)STD Code. 265(f)Telephone No. 6612154
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(d) Thermal Power Plants
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/THE/18733/2007
(d)Master Proposal Number(Single Window) SW/137792/2020
(e)EAC concerned (for category A Projects only) Thermal Projects
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Within the premises of Ukai Thermal Power Plant of
(b)Pincode 394680
(c)Bounded Latitudes (North)
From
Degree 21.12.21.68
Minutes
Second
From
Degree 21.12.49.525
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.33.26.186
Minutes
Second
From
Degree 73.50.616
Minutes
Second
(e)Survey of India Topo Sheet No. 46 G7/8/11/12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 83
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 50
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-13011/38/2008. IA-II (T)
(c)Date of Issue of TOR 20 Nov 2007
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 06 May 2008
(c)Date of Issue of EC 13 Jun 2008
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :18 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :19 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :2
Urja Nagar Colony Ukai
State :Gujarat
District :Tapi
Tehsil :Songadh
Village :Ukai
200Related to CRS employment fly ash generation health checkup campsDistrict Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. F. No. 4-21/2008(ENV)/034 dated 07.01.2018
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 29 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Caol based supercritical Thermal Power stattion11108001910Mega Watt(MW)Otherstransmission line
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)unit 3&42 x 200 MW2 x 200 MW2 x 200 MWNo change
(2.)Unit 5210 MW210 MW210 MWNo change
(3.)Unit 6500 MW500 MW500 MWNo change
(4.)Unit 70800 MW800 MWUnits1,2 decommissioned and proposed supercritical unit of 800 MW capacity shall be set up
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 28 Aug 2015
(iv)Valid Upto 06 Jul 2020
(v)File No. GPCB/CCA-NAV-392(2)/ID-20753/326255
(vi)Application No. order no.AWH-72779
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 5113
(b) Funds Allocated for Environment Management (Capital) (in Crores) 8.466
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 12.78
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 47.4
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3340000
(b)Existing quantity of raw material/fuel 000
(c)Total quantity of raw material/fuel 3340000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Coal3340000Tons per AnnumGare Palma Sector-I coal blockRail1200 CaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 11
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube885087.24100
(2.)OthersCOMili Gram per Meter Cube0.970.560.942 (8 hr)
(3.)NOxMicro Gram per Meter Cube281527.6480
(4.)PM2.5Micro Gram per Meter Cube482647.0560
(5.)SO2Micro Gram per Meter Cube18617.7680
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.947.367.58.5
(2.)TDSmg/l3242405002000
(3.)Total Hardnessmg/l170142200600
(4.)Chloridesmg/l68292501000
(5.)Heavy Metalspbmg/l0.010.010.010.0
(6.)TSSmg/l0000
(7.)Fluoridemg/l0.880.561.01.5
    14.3.     No. of Surface Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.227.25C
(2.)DOmg/l6.85.8C
(3.)BODmg/l266C
(4.)CODmg/l6618C
    14.4.     No. of Ambient Noise monitoring locations : 11
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))60.242.455 75
(2.)Leq(Night)A-weighted decibels(dB(A))52.236.245, 70
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.147.52
(2.)N(Nitrogen)Othersmg/100 gm16.412.6
(3.)P(Phosphorus)Othersmg/100gm0.940.58
(4.)K(Potassium)Othersmg/100gm1.20.6
(5.)Electric ConductivityOthersmicro mhos/cm456.2326.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface456000.5Copy of Permission LetterCanalOthersOpen channelWTR/2007/475/5/P23 Aug 20071531200
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)service water96300ETPReuse within the Plant & Recycling96
(2.)Domestic480STP / septic tankGreen Belt Renewal Plant48
(3.)Boiler blow down & other DM water240300ETPReuse within the Plant & Recycling240
(4.)CW system blow down8640300ETPReuse within the Plant & Recycling8640
(5.)FGD System600300ETPReuse within the Plant & Recycling600
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 9624
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 9624
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)AshBottom Ash227120Tons0.4OthersHigh Conc. slurryOthersExisting ash dyke, other users
(2.)AshFly Ash908480Tons12RoadOthersAbandoned mines, other users
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube880.00.3588.36100
(2.)PM2.5Microgram per Meter Cube000010
(3.)SO2Microgram per Meter Cube180.01.1919.2080
(4.)NOxMicrogram per Meter Cube260.01.1927.2080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)chimneycoal1507.2PM1027.2
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 400
(b)Source Gujarat Electricity Transmission Company Limited
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 36
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 36
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 36
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 36
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Township0area does not invloved plant area
(2.)Ash Pond0Nil (existing to be used)
(3.)Quarry Area00
(4.)OB Dump Area0NA
(5.)Safety Zone0NA
(6.)Tailing Pond0Nil
(7.)LandFill0NA
(8.)Water Reservoir0NA
(9.)Desalination Plant0NA
(10.)Area for Solid Waste Management1.62Ash Handling Plant
(11.)Built Up Area6.07
(12.)OthersBalance of Plant + FGD8.09Balance of plant 6.07, FGD- 2.02
(13.)Main Plant20.23Main Plant 12.14, Coal handling 8.094
Total (ha.) 36.01
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNA000not present with 10 km study area
(2.)ESZsNA000not present with 10 km study area
(3.)WLSNA0NA
(4.)Critically Polluted AreaNA0not present with 10 km study area
(5.)Wildlife CorridorsNA00not present with 10 km study area
(6.)CorridorsNA000not present with 10 km study area
(7.)NPANA0not present with 10 km study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNIL0not present within 10 km study area
(2.)Defence InstallationsNA00not present within 10 km study area
(3.)OthersNILNA00not present within 10 km study area
(4.)Archaeological SitesNA000not present within 10 km study area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Ukai Left Bank Main Canal
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 0.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 200
(b)Permanent Employment-During Operation 200
(c)Temporary Employment- During Construction 600
(d)Temporary Employment- During Operation 100
(e)No. of working days 365
(f)Total Manpower 1100
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt8.913.5012.41
(2.)Percentage of Total Project Area24.728.2833
(3.)No. of Plants23435700030435
(4.)Funds Allocated83976821000000018397682
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialThe project will improve the power supply position in western region particularly, which is vital for economic growth as well as improving the quality of life.
(2.)SocialThe proposed project will keep certain matching amount for development of physical infrastructure of nearby villages, especially adjacent villages under corporate social responsibility.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Thermal Projects
S. No.Item Details
1.
Specifications of Plant:
(b) Technology Proposed Supercritical
(b) Plant Load Factor(%) 85
(c) Station Heat Rate (Kcal/Kwh) 2150
(d) Steam Rate/Flow Rate 2277.4
(e) Boiler Temperature 602
(f) Boiler Pressure 274
(g) Type of Stack Single flue
(h) No. of Stacks 1
S. No. Stack ID Stack Height (m) Stack Diameter at exit (m) Exit Velocity of Stack Gas (m/s) Exit Temperature of Stack Gas (Degree Celsius)
(1.)Unit -71507.225.665
      2.        Details of Fuel Linkage
S. No.Type of Fuel Type of Linkage Other Type of Linkage DetailsCharacteristics
(1.)CoalCaptive
Source of Linkage :Gare Palma Sector-I coal block
Quantity of Linkage Granted :3340000
Date of Linkage :10 Feb 2020
Duration of Linkage :34
Gross Calorific Value (Kcal/Kg) :4706
Ash Content (%) :31.97
Sulphur Content (%) :0.54
Moisture (%) :5.38
Mercury (mg/kg) :0.12
Fixed Carbon (%) :35.66
Volatile Matter (%) :26.99
     3.       Details of Transportation of Fuel
S. No.Fuel Rail RoadPipe ConveyorConveyor BeltArial RopewayOther Mode of TransportationTotal DistanceTotal Quantity
(1.)Coal
Distance :1200
Quantity :3340000
Distance :
Quantity :
Distance :
Quantity :
Distance :
Quantity :
Distance :
Quantity :
Distance :
Quantity :
12003340000
TOTAL Distance : 1200
Quantity : 3340000
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
4.
Details of Cooling System:
(a) Type of Cooling System Water Cooled
(b) Type of Draft Natural Draft
(c) Type of Air Circulation Counter Flow
(d) Cycle of Cooling (COC) 5
(e) Water Req. For Cooling (m3/day) 43728
(f) Boiler Blow Down Temperature 0
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA 083 (Rev.01 )
(ii)Name of the EIA Consultant Mantec Consultants Pvt. Ltd
(iii)Address D-36, sector 6 Noida
(iv)Mobile No. 9911994264
(v)Landline No. 0120421580
(vi)Email Id envmantec@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Thermal Projects
(ix)Validity of Accreditation 18 Apr 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAduplicate proposal. Already a proposal was submitted on the no.144074. 15 Jun 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantChief Engineer Project and Planning
DesignationChief Engineer
Name of Company (Applicant Name should not be given here)Gujarat State Electricity Corporation Limited (GSECL)
AddressRace Course
Print