Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Dyes & Intermediates Manufacturing Project of 150 MT/Month (Crude) [{Disperse Azo Dyes (All colours) - 100 MT/Month, Coumarin Dyes (All colours) - 25 MT/Month & Methine Dyes (All colours) - 2
(b)Name of the Company / Organisation M/S KRISHNUM DYES & INTERMEDIATE PVT LTD
(c)Registered Address Opposite Narbada Bhawan, Churu,,Churu,Rajasthan-331001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Mahesh Kumar Prajapat
(b)Designation (Owner/ Partner/ CEO) Authorizedsignatory
(c)Address Opposite Narbda Bhawan, Churu,,Churu,Churu,Rajasthan-331001
(d)Pin code 331001
(e)E-mail maheshprajapat.churu@gmail.com
(f)STD Code. 931(f)Telephone No. 4961278
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/RJ/IND2/137761/2018
(d)Master Proposal Number(Single Window) SW/137752/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasra No. 670/521
(b)Pincode 331001
(c)Bounded Latitudes (North)
From
Degree 281430.83
Minutes
Second
From
Degree 281436.09
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 7500008.89
Minutes
Second
From
Degree 750013.87
Minutes
Second
(e)Survey of India Topo Sheet No. 44P/3, 44P/4, 44L/15, 44L/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 299
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 89
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/134/2018-IA-II (I)
(b)Date of Apply of TOR 11 Apr 2018
(c)Date of Issue of TOR / Standard ToR 18 May 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :11 Aug 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 Sep 2019
Distance of Public Hearing Venue from the Proposed Project :0
Plant site - Khasara no. 670/521 of Revenue Village - Untwalia, Tehsil & District - Churu (Rajasthan)
State :Rajasthan
District :Churu
Tehsil :Churu
Village :Untwalia
130Employment opportunities, Development in the nearby area and health check-up of the workers.District Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Filter Press48"No. of Equipment - 10
(2.)Coupling Tank20 KlNo. of Equipment - 10
(3.)S S Tank6.5 KlNo. of Equipment - 4
(4.)Chilling PlantKC4No. of Equipment - 1
(5.)Cooling Tower5 KlNo. of Equipment - 1
(6.)Boiler5 TPH (10.54 kg/cm2)No. of Equipment - 1
(7.)Solvent Recovery Storage Plant20 KlNo. of Equipment - 2
(8.)Tertiary Treatment Plant100 KLDNo. of Equipment - 1
(9.)Three Stage R.O.50 KLDNo. of Equipment - 1
(10.)Storage Tank20 Kl (Oleum 23%)No. of Equipment - 2
(11.)Glass Lined Reactor6.3 KlNo. of Equipment - 4
(12.)Storage Tank10 Kl (HCl)No. of Equipment - 2
(13.)S S Tank10 KlNo. of Equipment - 4
(14.)MEE-No. of Equipment - 1
(15.)Filter Press36"No. of Equipment - 4
(16.)Glass Lined Reactor12.5 KlNo. of Equipment - 2
(17.)Glass Lined Reactor4 KlNo. of Equipment - 2
(18.)Casting Iron Tank4 KlNo. of Equipment - 6
(19.)Coupling Tank10 KlNo. of Equipment - 4
(20.)Casting Iron Tank2 KlNo. of Equipment - 6
(21.)Storage Tank20 Kl (H2SO4)No. of Equipment - 2
(22.)Storage Tank20 Kl (Acetic Acid)No. of Equipment - 1
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Methine Dyes – (Brilliant Blue SR - CI Disperse Blue 354)8250Tons per AnnumRoad,OthersTankers
(2.)Disperse Azo Dyes (including HCl Based Disperse Dyes, NSA Based Disperse Dyes & Solution based Disperse Dyes)1200Tons per AnnumRoad,OthersTankers
(3.)Coumarin Dyes - (Flourescent Yellow 8GF - CI Disperse 82, Flourescent Yellow 10GF - CI Disperse 184, Flourescent Yellow 10GN - CI Disperse 232/184.1)8250Tons per AnnumRoad,OthersTankers
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 20.21
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.405
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.35
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3444.6
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 3444.6
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Ferrous Sulphate12Tons per AnnumBarodaRoad850 Open MarketCopy of Linkage
(2.)Malononitrile60Tons per AnnumMumbaiRoad1300 Open MarketCopy of Linkage
(3.)Acetic acid120Tons per AnnumBharuchRoad950 Open MarketCopy of Linkage
(4.)Di Methyl Formamide300Tons per AnnumMumbaiRoad1300 Open MarketCopy of Linkage
(5.)Sodium Chloride60Tons per AnnumJaipurRoad200 Open MarketCopy of Linkage
(6.)Ethyl Cyano Acetate72Tons per AnnumMumbaiRoad1300 Open MarketCopy of Linkage
(7.)Sulphuric Acid480Tons per AnnumJaipurRoad200 Open MarketCopy of Linkage
(8.)Cuprous Cyanide60Tons per AnnumBarodaRoad850 Open MarketCopy of Linkage
(9.)Soda ash240Tons per AnnumJaipurRoad200 Open MarketCopy of Linkage
(10.)Zinc Cyanide72Tons per AnnumBarodaRoad850 Open MarketCopy of Linkage
(11.)Piperidine0.6Tons per AnnumMumbaiRoad1300 Open MarketCopy of Linkage
(12.)Caustic Flakes180Tons per AnnumJaipurRoad200 Open MarketCopy of Linkage
(13.)Sodium Cyanide36Tons per AnnumBarodaRoad850 Open MarketCopy of Linkage
(14.)Meta- Toluidine72Tons per AnnumVapiRoad1100 Open MarketCopy of Linkage
(15.)Para Toluidine72Tons per AnnumVapiRoad1100 Open MarketCopy of Linkage
(16.)Dimethyl Sulfate120Tons per AnnumAnkleshwarRoad950 Open MarketCopy of Linkage
(17.)Sodium Bicarbonate240Tons per AnnumMumbaiRoad1300 Open MarketCopy of Linkage
(18.)Benzoyl Chloride60Tons per AnnumKhambhatRoad900 Open MarketCopy of Linkage
(19.)Phosphorous Oxychloride90Tons per AnnumVapiRoad1100 Open MarketCopy of Linkage
(20.)Bromine60Tons per AnnumAnkleshwarRoad950 Open MarketCopy of Linkage
(21.)Para Nitro Aniline Derivatives420Tons per AnnumVapiRoad1100 Open MarketCopy of Linkage
(22.)Coal as a Fuel for Boiler330Tons per AnnumJaipurRoad200 Open MarketCopy of Linkage
(23.)Ammonium Chloride42Tons per AnnumMumbaiRoad1300 Open MarketCopy of Linkage
(24.)Methanol240Tons per AnnumBarodaRoad850 Open MarketCopy of Linkage
(25.)Sulfamic Acid36Tons per AnnumJaipurRoad200 Open MarketCopy of Linkage
(26.)Aniline Derivatives480Tons per AnnumVapiRoad1100 Open MarketCopy of Linkage
(27.)Lime60Tons per AnnumSardarsaharRoad50 Open MarketCopy of Linkage
(28.)Sodium Nitrite60Tons per AnnumBarodaRoad850 Open MarketCopy of Linkage
(29.)diesel1.92Kilo Litre per DayChuruRoad9 Open MarketCopy of Linkage
(30.)Hydrochloric Acid360Tons per AnnumJaipurRoad200 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube43.824.941.7360
(2.)NOxMicro Gram per Meter Cube25.210.223.480
(3.)PM10Micro Gram per Meter Cube87.456.883.27100
(4.)OthersCOMili Gram per Meter Cube1.0401.014
(5.)SO2Micro Gram per Meter Cube14.25.713.680
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Heavy MetalsIronmg/l0.270.161.01.0
(2.)pHNA7.827.566.58.5
(3.)Chloridesmg/l658.4368.62501000
(4.)TSSmg/l0000
(5.)Total Hardnessmg/l396.4164.6200600
(6.)Fluoridemg/l1.490.851.01.5
(7.)Heavy MetalsMagnesiummg/l82.7125.430.0100.0
(8.)TDSmg/l171610835002000
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA00B
(2.)DOmg/l00B
(3.)BODmg/l00B
(4.)CODmg/l00B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))63.448.975 (I);65 (C);55 (R)
(2.)Leq(Night)A-weighted decibels(dB(A))53.839.170 (I); 55(C); 45 (R)
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare10581
(2.)P(Phosphorus)Kilogram per hectare24.315.4
(3.)Electric ConductivityMillisiemens per Centimetre0.240.14
(4.)K(Potassium)Kilogram per hectare187.2168.3
(5.)pH87.7
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 19.99 To 43.41
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 18.92 To 42.65
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater34.80Copy of Permission LetterPipelineOthersBorewell21-4/12530/RJ/IND/201827 May 201949.5
(2.)OthersIce2210Copy of Permission LettermodeOthersBy roadOthersopen market023 Jan 202022
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Boiler2100ETP/RO/MEEReuse within the Plant & Recycling2
(2.)Sewage Water90Soak pits via septic tankOthersdisposed off09
(3.)Scrubber0.5100ETP/RO/MEEReuse within the Plant & Recycling0.5
(4.)Process Effluent80100ETP/RO/MEEReuse within the Plant & Recycling,Otherssalt generated from MEE will be sent to TSDF79.650.35
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 91.5
(b)Total Discharged Water (Kilolitre per Day) 9.35
(c)Total Reused Water (Kilolitre per Day) 82.15
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Fly AshFly Ash55Tons9RoadOthersSent to brick manufacturer
(2.)Evaporator ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.35Tons425RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Discarded Drums/Containers/Barrels/PP Liners/BagsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.5Tons425RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Used/Spent OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.02Kilolitre425RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)10Tons425RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube68.110.8468.95100
(2.)NOxMicrogram per Meter Cube17.111.9619.0780
(3.)SO2Microgram per Meter Cube9.711.7511.4680
(4.)PM2.5Microgram per Meter Cube0000.0160
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Steam BoilerImported Coal300.8NOx24.05 gm/sec
(2.)Steam Boiler (5 TPH)Imported Coal300.8PM101.20 gm/sec
(3.)Steam Boiler (5 TPH)Imported Coal300.8SO22.32 gm/sec
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source Jaipur Vidhyut Vitran Nigam Limited (JVVNL)
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 nos of DG Set of 125 kVA each
(e)Stack Height (in m) 6.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 1
    Total Land (ha.) 1
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 1
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : - 0
    Total (ha.) 1
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.33
(2.)OthersUndisturbed area0.12
(3.)Built Up Area0.55
Total (ha.) 1
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA0-
(2.)Wildlife CorridorsNA0-
(3.)WLSNA0-
(4.)ESAsNA0-
(5.)ESZsNA0-
(6.)CorridorsNA0-
(7.)Critically Polluted AreaNA0-
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestJod Bir PF5West direction
(2.)Archaeological SitesNA0-
(3.)Defence InstallationsNA0-
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Pithrana Johra (Seasonal Pond)
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 0.3
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 40
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 59
(e)No. of working days 330
(f)Total Manpower 154
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.33
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 750
(d)Funds Allocated for Plantation 150000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreenery of the area will be increased
(2.)SocialEmployment generation and upliftment of the nearby villagers through CER
(3.)FinancialRevenue generation for State and Centre in terms of taxes etc.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/SA 097
(ii)Name of the EIA Consultant J.M. Environet Pvt. Ltd.
(iii)Address 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector 25, Gurugram (Haryana) – 122001
(iv)Mobile No. 9829068775
(v)Landline No. 1244824156
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 07 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMahesh Kumar Prajapat
DesignationAuthorizedsignatory
Name of Company (Applicant Name should not be given here)M/S KRISHNUM DYES & INTERMEDIATE PVT LTD
AddressOpposite Narbada Bhawan, Churu
Print