|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s. Vijayanagar Sugar Pvt. Ltd., | (b)Name of the Company / Organisation | M/S. VIJAYANAGAR SUGAR PVT. LTD., | (c)Registered Address | M/s. Vijayanagar Sugar Pvt. Ltd., Plot No.359, Road No. 80, Jubilee Hills, Hyderabad,,Gadag,Karnataka-582118 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | SivaramiReddy B | (b)Designation (Owner/ Partner/ CEO) | Directoroperations | (c)Address | M/s. Vijayanagar Sugar Pvt. Ltd., Gangapur Village, Mundargi Taluk, Gadag District,,Mundargi,Gadag,Karnataka-582118 | (d)Pin code | 582118 | (e)E-mail | em@vspl.in | (f)STD Code. | 8371(f)Telephone No. | 265100 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(g) Distilleries
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/KA/IND2/137096/2020 | (d)Master Proposal Number(Single Window) | SW/137091/2020 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Expansion under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Survey No. 32, 33, 34 of Gangapur and Survey No.13 | (b)Pincode | 582118 | (c)Bounded Latitudes (North) | | From | | Degree | 15.0521 | Minutes | | Second | | From | | Degree | 75.5203 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 15.0517 | Minutes | | Second | | From | | Degree | 75.5241 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | D43D16 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 522 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 2 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Karnataka | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bangalore | (iii)Letter No. | EP/12.1/548/Karnataka dated 2nd March 2020 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jan 23 2020 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Distillery | 120 | 180 | 300 | Kilo Litre per Day(KLD) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Incineration Bolier | 32 | 8 | 40 | TPH | (2.) | Distillation | 7 | 7 | 14 | Columns | (3.) | Evaporation | 540 | 740 | 1280 | TPD | (4.) | Biocomposting | 0 | 10 | 10 | Acres | (5.) | Fermentation | 6 | 6 | 12 | Tanks | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 30 Nov 2016 | (iv)Valid Upto | 30 Jun 2021 | (v)File No. | AW-301529 | (vi)Application No. | 10666 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 225 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 9.75 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.7 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 3.18 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 604 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 604 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Grains – Maize, jowar, broken rice | 800 | Others | TPD | Procured from local farmers | Road | | 30 | Open Market | | Copy of Linkage | (2.) | Molasses as raw material for distillery | 604 | Others | TPD | captive | Pipe Conveyor | | 0 | Captive | | Copy of Linkage | (3.) | Sugarcane Juice | 1720 | Kilo Litre per Day | | captive | Pipe Conveyor | | 0 | Captive | | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 4.22 To 5.3 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 23.6 To 24.7 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 3755 | 8.5 | Copy of Permission Letter | Pipeline | | Jack Well | | WRD151MTP2018 | 24 Jul 2019 | 15750 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Condensate, spent lees and utility effluents | 2324 | 2500 | Biological treatment | Reuse within the Plant & Recycling | | 2324 | 0 | (2.) | Spent wash | 1020 | 1200 | MEE and incineration boiler | Others | ZLD | 1020 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 3344 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 3344 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Boiler ash | Industrial Waste | | 12000 | Tons | 0 | Conveyor Belt,Others | Trolley | Others | Brick making,given to farmers after bio composting | (2.) | DDGS | Industrial Waste | | 84000 | Tons | 0 | Others | Trucks | Others | Cattle feed | (3.) | Yeast sludge | Industrial Waste | | 4500 | Tons | 0 | Others | Tractors | Others | Composting | (4.) | ETP sludge | Industrial Waste | | 300 | Tons | 0 | Others | Tractor | Others | Composting | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 45.3 | 2.84 | 14 | 60 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 29.8 | 2.67 | 8.7 | 39 | 60 | (3.) | NOx | | Microgram per Meter Cube | 9.9 | 2.86 | 2.98 | 13 | 80 | (4.) | SO2 | | Microgram per Meter Cube | 4.3 | 2.78 | 1.38 | 5.9 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler - 20 TPH | Coal /bagasse | 30 | 1.1 | Others | PM | 100 | (2.) | Boiler - 60 TPH | Coal/bagasse | 60 | 3 | Others | PM | 100 | (3.) | Incineration boiler - 40 TPH | slop and coal | 45 | 3 | Others | PM | 45 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 6200 | (b)Source | Captive | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 2 x 1250 kVA and 1 x 250 kVA | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 53.82 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 53.82 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 53.82 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Industrial | 0 | Total (ha.) | 53.82 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Industrial | 53.82 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | None | 0 | None | (2.) | Corridors | None | 0 | None | (3.) | ESZs | None | 0 | None | (4.) | Critically Polluted Area | None | 0 | None | (5.) | WLS | None | 0 | None | (6.) | NPA | None | 0 | None | (7.) | Wildlife Corridors | None | 0 | None | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | None | 0 | None | (2.) | Forest | | Kappatagudda Reserve forest | 3 | Reserve forest | (3.) | Defence Installations | | None | 0 | None | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 53.82 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Tungabhadra River | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 2 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 60 | (c)Temporary Employment- During Construction | 40 | (d)Temporary Employment- During Operation | 10 | (e)No. of working days | 300 | (f)Total Manpower | 110 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 85 | 5 | 90 | (2.) | Percentage of Total Project Area | 63 | 3.7 | 66.7 | (3.) | No. of Plants | 42070 | 5000 | 47070 | (4.) | Funds Allocated | 235 | 20 | 255 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employment Opportunities | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1922/IA0051 | (ii)Name of the EIA Consultant | Samrakshan | (iii)Address | F4, 1st floor, Swastik Manandi Arcade, S C Road, Sheshadripuram, Bangalore | (iv)Mobile No. | 9845381819 | (v)Landline No. | 0802346010 | (vi)Email Id | samrakshanblr@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 24 Jul 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) Copy of earlier EC in SNo. 6 of Form 2 has not been uploaded.
(ii) Details of old Consent to Operate not uploaded to check the violation if any.
(iii) This is an expansion case kindly upload the latest certified compliance report of RO MoEFCC.
(iv) Details of Court case if any.
(v) Air Quality Impact Prediction mentioned (18.1 of form 2) is inadequate kindly correct it.
(vi) Certificate of MOPNG as per Ministry notification dated 17.01.2019 needs to be uploaded.
(vii) In view of the above, PP/Consultant are requested to revise the application for grant of EC and accordingly revise the Form 2 alongwith EIA/EMP Report. The EIA/EMP Report shall match with the information as filled in Form 2. On examination it is observed that the Consultant has not adequately submitted the application as per the provisions of the EIA Notification, 2006. Consultant has to read the documents before uploading the information in Form 2 /EIA/EMP report. | 05 Feb 2020 | 2. | NA | The correction have been made as per the instruction received | 02 Mar 2020 | 3. | NA | The matter has been examined and it is noted that PP has not revised the Form 2.
PP has only attached the earlier EDS in additional documents. It seems that PP/consultant is not serious about the instruction given in earlier EDS.
Further this is an expansion case, PP has not uploaded the certified compliance report and only uploaded a communication letter of RO MoEFCC wherein no certified compliance report is uploaded.
Consultant while uploading the complete information read the instruction carefully and upload the requisite documents other wise necessary action against the consultant will be taken by the Ministry.
In view of the above please read the instruction carefully and upload all the documents and revise Form 2 as in the Ministry the processing of the EC proposals are through Parivesh Portal only. | 23 Mar 2020 | 4. | NA | The correction have been made as per the instruction received | 24 Apr 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | SivaramiReddy B | Designation | Directoroperations | Name of Company (Applicant Name should not be given here) | M/S. VIJAYANAGAR SUGAR PVT. LTD., | Address | M/s. Vijayanagar Sugar Pvt. Ltd., Plot No.359, Road No. 80, Jubilee Hills, Hyderabad |
|