1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Jawahar Shetakari Sahakari Sakhar Karkhana Ltd. (JSSSKL) | (b)Name of the Company / Organisation | JAWAHAR SHETKARI SAHKARI SAKHAR KARKHANA LTD HUPARI | (c)Registered Address | Jawahar Shetkari Sahkari Sakhar Karkhana Ltd. Hupari, Tal- Hatkanagale,Dist- Kolhapur,,Kolhapur,Maharashtra-416203 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Manohar G Joshi | (b)Designation (Owner/ Partner/ CEO) | MD | (c)Address | Jawahar Shetkari Sahkari Sakhar Karkhana Ltd., Hupari Tal- Hatkanagale, Dist- Kolhapur,,,Kolhapur,Maharashtra-416203 | (d)Pin code | 416203 | (e)E-mail | kprjsssk@gmail.com | (f)STD Code. | 230(f)Telephone No. | 2450402 | (g)Fax No. | 02302450401 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(j) Sugar Industry
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MH/IND2/38479/2014 | (d)Master Proposal Number(Single Window) | SW/136894/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 315/7, 315/8, 315/9, 315/10, 315/11, 315/12, 315/1 | (b)Pincode | 416203 | (c)Bounded Latitudes (North) | | From | | Degree | 16360341 | Minutes | | Second | | From | | Degree | 16364449 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 74235432 | Minutes | | Second | | From | | Degree | 74244875 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 47L6 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 568 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 3.5 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Maharashtra | Kolhapur | Hatkanangle | | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/27/2016-IA-II(I) | (c)Date of Issue of TOR | 02 Aug 2014 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 06 Jan 2016 | (c)Date of Issue of EC | 01 Dec 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 12 Dec 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| At the Factory site - M/s. Jawahar Shetakari Sahakari Sakhar Karkhana Ltd. (JSSSKL) Gat No..: 315/7 to 315/15, Tal. - Hatkanangale, Dist.-Kolhapur, Maharashtra. | State : | Maharashtra | District : | Kolhapur | Tehsil : | Hatkanangle | Village : | Yalgud |
| 83 | There was no any major issues raised during Public hearing. | District Magistrate | | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | EC-386/RON/2017-NGP/6149 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jan 21 2020 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Sugar | 12000 | 4000 | 16000 | Tons Crushed per Day(TCD) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Sugar Factory | 12000 | 4000 | 16000 | | (2.) | Co-gen Plant | 28.5 | 00 | 28.5 | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 26 Feb 2020 | (iv)Valid Upto | 31 Jul 2020 | (v)File No. | Format1.0/CAC-/UAN No. MPCB-CONSENT-0000074209/CR- | (vi)Application No. | MPCB-CONSENT-0000074209 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 34 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.10 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 2.60 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.12 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | d)Inter-State boundaries and international boundaries | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 720000 | (b)Existing quantity of raw material/fuel | 2160000 | (c)Total quantity of raw material/fuel | 2880000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Sugar cane | 2880000 | Tons per Annum | | Nearby Farmland | Road | | 30 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Jan 2019 To 31 Mar 2019 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 69.4 | 50.10 | 69.34 | 100 | (2.) | Others | CO | Mili Gram per Meter Cube | 0.9 | 0.01 | 0.9 | 2 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 29.80 | 12.80 | 23.05 | 60 | (4.) | SO2 | | Micro Gram per Meter Cube | 29.80 | 12.80 | 29.75 | 80 | (5.) | NOx | | Micro Gram per Meter Cube | 35.70 | 20.10 | 35.24 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.95 | 7.55 | 8.5 | 8.5 | (2.) | Fluoride | | | mg/l | | 0.83 | 0.21 | 1 | 1 | (3.) | TSS | | | mg/l | | 26.87 | 8.18 | 0 | 0 | (4.) | Total Hardness | | | mg/l | | 204.14 | 72.12 | 200 | 200 | (5.) | TDS | | | mg/l | | 818.68 | 215.83 | 500 | 500 | (6.) | Chlorides | | | mg/l | | 197.43 | 68.19 | 250 | 250 | |
14.3. No. of Surface Water monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 59.35 | 8.15 | E | (2.) | pH | | mg/l | | 7.42 | 7.24 | E | (3.) | COD | | mg/l | | 136.98 | 20.69 | E | (4.) | DO | | mg/l | | 4.00 | 1.2 | E | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 70.6 | 50.5 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 53.1 | 40.6 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.08 | 7.06 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 3220.67 | 1149.96 | (3.) | N(Nitrogen) | Kilogram per hectare | | 852.34 | 296.74 | (4.) | K(Potassium) | Milligram per Litre | | 459.61 | 154.79 | (5.) | P(Phosphorus) | Milligram per Litre | | 196.89 | 70.38 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 513 | 1.2 | Copy of Permission Letter | Pipeline | | Jack Well | | O.N.KID(N)/PS-3/(37)/Non-irrigation/4944/Year 2018 | 04 May 2018 | 934 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial Effluent | 1430 | 3000 | Existing ETP | Green Belt Renewal Plant | | 1430 | | (2.) | Domestic Effluent | 125 | 130 | Proposed STP | Green Belt Renewal Plant | | 125 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1555 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 1555 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Boiler Ash | Bottom Ash | | 5400 | Tons | 15 | Road | | Others | Given to Farmers for use as manure. | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 23.05 | 0 | 0 | 23.06 | 60 | (2.) | PM10 | | Microgram per Meter Cube | 69.35 | 100 | 0 | 69.36 | 0 | (3.) | NOx | | Microgram per Meter Cube | 35.24 | 0 | 0 | 35.25 | 80 | (4.) | SO2 | | Microgram per Meter Cube | 29.75 | 0 | 0 | 29.76 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 90 TPH Boiler (Existing) | Bagasse | 75 | 5.2 | PM10 | | 4.8 | (2.) | 75 TPH Boiler (Existing) | Bagasse | 72 | 3.7 | PM10 | | 2.9 | (3.) | 20 TPH Boiler (Existing) | Bagasse | 75 | 5.2 | PM10 | | 5.2 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 17000 | (b)Source | Own Co-gen Plant | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | KVA 1320 and KVA 515 | (e)Stack Height (in m) | 6 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 00 | (b)Private Land (ha.) | 99.57 | (c)Government Land (ha.) | 00 | (d)Revenue Land (ha.) | 00 | (e)Other Land (ha.) | 00 | Total Land (ha.) | 99.57 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 18745 | (b)Waste/Barren Land (ha.) | 1536 | (c)Grazing/ Community Land (ha.) | 00 | (d)Surface Water Bodies (ha.) | 320 | (e)Settlements (ha.) | 3135 | (f)Industrial (ha.) | 00 | (g)Forest (ha.) | 00 | (h)Mangroves (ha.) | 00 | (i)Marine Area (ha.) | 00 | (j)Others (ha.) : Follow land | 7679 | Total (ha.) | 31415.0000 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Built Up Area | | 23.78 | | (2.) | Green belt | | 39.37 | | (3.) | Others | Open space | 36.41 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | Nil | 0 | There is no presence of any NPA in 10 Km radius of project | (2.) | Critically Polluted Area | Nil | 0 | There is no presence of any critically polluted area in 10 Km radius of project | (3.) | ESZs | Nil | 0 | There is no presence of any ESZs in 10 Km radius of project | (4.) | Wildlife Corridors | Nil | 0 | There is no presence of any wildlife corridors in 10 Km radius of project | (5.) | Corridors | Nil | 0 | There is no presence of any corridors in 10 Km radius of project | (6.) | WLS | Nil | 0 | There is no presence of any WLS in 10 Km radius of project | (7.) | ESAs | Nil | 0 | There is no presence of any ESAs in 10 Km radius of project | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Nil | 0 | There is no presence of any forest in 10 Km radius of project | (2.) | Defence Installations | | Nil | 0 | There is no presence of defense installation in 10 Km radius of project | (3.) | Archaeological Sites | | Nil | 0 | There is no presence of any archaeological sites in 10 Km radius of project | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 00 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 99.57 | (b)Land yet to be acquired(Ha) | 00 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 00 | (b)No. of Households | 00 | (c)No. of PDFs (Project Displaced Families) | 00 | (d)No. of PAFs (Project Affected Families) | 00 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 00 | (f)Status of R&R | NA | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Indian peafowl, Indian monitor lizard | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 30 lakhs | (iii)Period of Implementation | 3 Years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Panchganga River, Dudhganga river | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 4 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 00 | (b)Permanent Employment-During Operation | 99 | (c)Temporary Employment- During Construction | 31 | (d)Temporary Employment- During Operation | 00 | (e)No. of working days | 180 | (f)Total Manpower | 130 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 343983.10 | 49785.0 | 393768.1 | (2.) | Percentage of Total Project Area | 34.55 | 5 | 39.55 | (3.) | No. of Plants | 7376 | 1624 | 9000 | (4.) | Funds Allocated | 7500000 | 1000000 | 8500000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | 1. Augmentation of existing green belt in the industrial area and its surrounding shall help in improving the aesthetic beauty of the surrounding environment giving a pleasant look and improvising the air quality.
2. Green belt will help in arresting dust emissions as well as noise. | (2.) | Financial | 1. The community that resides in the nearby areas will be benefited directly or indirectly by this project | (3.) | Social | 1. Upliftment of local peoples
2. Improvement in the Physical & Social Infrastructure
3.Employment generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | Yes | (b)Name of the Court | Districts Courts | (c)Name of the Sub Court | kolhapur | (d)Case No. | Crim. Misc. Appln. No. R-C.C/181/18/2016 | (e)Orders/Directions of the court ,if any and its relevance with the proposed project | No | (f)Case Details | Excess Crushing in 2015-16 season | (g)Uploaded Court Order | Copy of Court Order | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1821/RA 0135 | (ii)Name of the EIA Consultant | Equinox Environments (I) Pvt. Ltd. | (iii)Address | F-11, Namdev Nest, 1160 āEā ward, Opp. Kamala College, Sykes Extension, Kolhapu | (iv)Mobile No. | 9657865122 | (v)Landline No. | 0231253123 | (vi)Email Id | eia@equinoxenvi.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 21 Oct 2021 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (Sno. 7.1)
(ii) All old CTOs not uploaded to verify the violation, if any done by PP.
(iii) Copy of earlier EC is not uploaded in at S. No. 6 of Form 2.
(iv) TOR compliance is not adequate in EIA/EMP report and need to revise as per the terms of reference granted for the project, and shall conform to Appendix III of the EIA Notification, 2006.
(v) Status of Conservation Plan approval from CWLW.
(vi) Details of R&R completed as claimed by PP in from 2
(vii) In view of the above, PP/Consultant are requested to revise the application for grant of EC and accordingly revise the Form 2 alongwith EIA/EMP Report. The EIA/EMP Report shall match with the information as filled in Form 2. On examination it is observed that the Consultant has not adequately submitted the application as per the provisions of the EIA Notification, 2006. Consultant has to read the documents before uploading the information in Form 2 /EIA/EMP report | 05 Mar 2020 | 2. | NA | The correction have been made as per the instruction received | 19 Jun 2020 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | We are hereby submitting the Additional Detail Sought (ADS) reply raised during 21st EAC meeting for industry-II held on 14th - 16th July, 2020. | 07 Sep 2020 | 2. | NA | The EAC during deliberations noted that the project proponent proposed to lift fresh water from the Dudhganga river and treated effluent/cane condensate are proposed to send to nearby farm/share holders farm land. The Committee was of the view that such discharge shall lead to contamination of the farm land and the PP shall reuse the treated water and accordingly fresh water requirement shall be reduced. The Minutes of 21st EAC Meeting held during July 14-16, 2020 Page 8 of 145 Committee after detailed deliberations insisted for following requisite information/inputs in respect of the following: (i). Revised Water balance with complete Zero Liquid Discharge Plan. PP can drop the fresh water requirement by utilizing water from harvested rain water, cane condensate and reuse of treated water. (ii). Current status of court case. Details of action taken by SPCB along with copies/CTO etc.. (iii). Commitment that no treated/untreated waste water shall be discharged outside the plant premises. (iv). Plan for rain water harvesting. (v). Committee sought the plan for green energy viz. solar power generation (at least 2.5 MW for use in the unit). (vi). Commitment for employment to the local people along with details. (vii). Issues raised during public hearing, action plan, and as committed for utilization of Rs 5.0 crore for CER, revised action plan. (viii). Earlier EC was granted in 2016. The Committee noted that there is Schedule-I species in the study area and PP has still not taken the approval of conservation plan. (ix). Consultant needs to upload all the required details in Form 2 (Parivesh Portal), [for eg. Letter of SPCB forwarding the Public Hearing to MoEFCC at S No. 7.1 has not uploaded; In S No. 6, in place of TOR, minutes uploaded etc.] The proposal was accordingly DEFERRED for the needful. | 07 Sep 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Manohar G Joshi | Designation | MD | Name of Company (Applicant Name should not be given here) | JAWAHAR SHETKARI SAHKARI SAKHAR KARKHANA LTD HUPARI | Address | Jawahar Shetkari Sahkari Sakhar Karkhana Ltd. Hupari, Tal- Hatkanagale,Dist- Kolhapur |
|