Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Environmental Clearance as per MoEF&CC Notification dated 06th April, 2018 for Existing Kaoni Gypsum (Minor Mineral) Mining project(ML No 01/02,) with production capacity 50,000 TPA Gypsum &136191cum/
(b)Name of the Company / Organisation FCI ARAVALI GYPSUM AND MINERALS INDIA LIMITED
(c)Registered Address NIL
(d)Legal Status of the Company NIL
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Surendra singh shekhawat
(b)Designation (Owner/ Partner/ CEO) GM
(c)Address NIL
(d)Pin code 342010
(e)E-mail fagmilrp@gmail.com
(f)STD Code. 291(f)Telephone No. 2544392
(g)Fax No. 2544523
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/RJ/MIN/86968/2018
(d)Master Proposal Number(Single Window) SW/136013/2020
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 74,75,161/1,161/13,162,165/1,165/2,166/1,131/5,131
(b)Pincode 334001
(c)Bounded Latitudes (North)
From
Degree 28.10.9.76
Minutes
Second
From
Degree 28.9.14.11
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.05.9.15
Minutes
Second
From
Degree 73.06.44.83
Minutes
Second
(e)Survey of India Topo Sheet No. 44 H/4, 44 H/3, 44 D/15, 44 D/14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 178
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 000000
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanBikanerKolayat
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11015/2/2019-IA-II(M)
(b)Date of Apply of TOR 29 Nov 2018
(c)Date of Issue of TOR / Standard ToR 27 Mar 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :19 Oct 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :20 Nov 2019
Distance of Public Hearing Venue from the Proposed Project :1
Rajiv Gandhi Seva Kendra, Kaoni
State :Rajasthan
District :Bikaner
Tehsil :Kolayat
Village :Kaoni
47Mainly issue raised related to Plantation, road maintenance,OthersAdditional District Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)ExcavatorCapacity 20000 to 40000 tons of OB per month1 no.
(2.)Dumper20 tons2 Nos
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Overburden136191OthersCum/YrOthersUsed for backfilling
(2.)Mineral- Gypsum50000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? Obtained
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 05 Mar 2018
(iv)Valid Upto 31 Dec 2022
(v)File No. F(Mines)/Bikaner(Kolayat)/1940(1)/2015-2016/9791-9
(vi)Application No. 2017-2018/mines/9720
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 0.4247
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.01
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.0042
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.04
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 100
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 100
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD100OthersLPDnearby open Market/ petrol PumpRoad25 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2019 To 28 Feb 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube825280.36100
(2.)NOxMicro Gram per Meter Cube3017.629.480
(3.)PM2.5Micro Gram per Meter Cube483047.0360
(4.)SO2Micro Gram per Meter Cube145.013.7080
    14.2.     No. of Ground Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSNA0000
(2.)pHNA0000
(3.)TDSNA0000
(4.)Total HardnessNA0000
(5.)ChloridesNA0000
(6.)FluorideNA0000
(7.)Heavy MetalsIronNA0000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.55.2D
(2.)pHNA7.537.48D
(3.)BODmg/l6438D
(4.)CODmg/l196104D
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))52.4044.6055
(2.)Leq(Night)A-weighted decibels(dB(A))42.6036.2050
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.467.51
(2.)P(Phosphorus)Othersmg/100gm0.940.62
(3.)N(Nitrogen)Othersmg/100gm13.47.8
(4.)K(Potassium)Othersmg/100gm3.41.6
(5.)Electric ConductivityOthersmicro mhos/cm462.6354.8
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 45 To 50
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 40 To 45
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTanker Supply43.5500Copy of Permission LettermodeOthersTanker SupplyOthersTanker Supply000005 Mar 202043.55
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic1.122septic tankGreen Belt Renewal Plant1.12
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1.12
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1.12
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)OverburdenOthersover burden waste136191Kilolitre0OthersOB will be used for backfillingOthersOB will be used for backfilling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube8200.3382.35100
(2.)PM2.5Microgram per Meter Cube4800.3448.3560
(3.)SO2Microgram per Meter Cube1400.0214.280
(4.)NOxMicrogram per Meter Cube3000.0530.1580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NA000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source NA
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 32.68
(c)Government Land (ha.) 217.85
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 250.53
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Mine Lease area 250.53
    Total (ha.) 250.53
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt9.35217.85 backfilled area developed as green belt
(2.)Quarry Area241.1832.68 developed as agriculture
(3.)Othersroad0.60
Total (ha.) 251.13
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNone0000not present with 10 km study area
(2.)Critically Polluted AreaNOT ANY0000not present with 10 km study area
(3.)ESZsNone0000not present with 10 km study area
(4.)CorridorsNone0000not present with 10 km study area
(5.)WLSNone00000not present with 10 km study area
(6.)NPANone0000not present with 10 km study area
(7.)Wildlife CorridorsNone000not present with 10 km study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence Installationsnone00000not present within 10 km study area
(2.)Forestnone000not present within 10 km study area
(3.)Archaeological Sitesnone00000not present within 10 km study area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Monitor Lizard (Goh/ Goyra), Desert, Honey badger Monitor, Great Indian Bustard, Indian Peafowl, Caracal, Wild cat/Desert cat, Chinkara, Indian pangolin
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 10 lakhs
(iii)Period of Implementation 2020-2021
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Indira Gandhi Canal
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 2.34
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 31
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 31
32.
Green Belt in Ha:
(a)Total Area of Green Belt 53
(b)Percentage of Total Project Area 21.16
(c)No. of Plants to be Planted 5000
(d)Funds Allocated for Plantation 337000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialBy the production of huge quantity of Gypsum from this mine will definitely improve the living standards of the inhabitants in the surrounding area as there is a scarcity of industries.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)GypsumMinor
2.
Mine Capacity in ROM (Run of Mine) 50000 TPA, OB 136191 cum/Year
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. SME/BKN/CC-III/M.S/ML-01/02/679
(b)Date of Approval 01 Jul 2017
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Mining & Geology Department, Bikaner
(e)Approved Mining Lease Area 250.53
(f)Approved Capacity 50000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 852227
(b)Mineable Reserves (Million Ton) 702716
(c)Extractable Reserves(Million Ton) 702716
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 52
(f)Stripping Ratio 1 : 0.48
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 14.05
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 250.53
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 17 Oct 2011
(iii)Validity of LOI 20
(iv)Reference No. of LOI F-3(141) Khan/Group-2/07
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 250.53
(iii)Validity of the lease deed From : 01 Apr 2003 To : 31 Mar 2023
(iv)Date of Execution of Mining Lese 17 Oct 2011
(v)Reference Number F-3(141) Khan/Group-2/07
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof NA
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 137.37
(iii)Height (in meter) 3.5
(iv)Quantity (in Million Cubic meter) 682589
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 137.37
(b)Depth (in meter) 3.5
(c)Volume (in Million Cubic meter) 682589
12.
Details of Quarry:
(a)Final Void of 137.37 (hectare) at a Depth of 3.5 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 154.99
13.
Details of Transportation:
(a)In Pit/Underground to Surface from pits
(b)Surface to Siding/Loading by excavator
(c)Transportation / Conveyor Details transported to end user by trucks/dumpers
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)GRAZING LAND000
(2.)WASTE LAND217.850217.85
(3.)FOREST LAND000
(4.)SURFACE WATER BODIES000
(5.)AGRICULTURE LAND32.68032.68
(6.)SETTLEMENTS000
TOTAL250.530250.53
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY241.1800241.18
(2.)GREEN BELT9.35009.35
(3.)BUILT UP AREA (COLONY/OFFICE)0000
(4.)VIRGIN AREA0000
(5.)TOP SOIL STORAGE0000
(6.)EXTERNAL OB DUMPS0000
(7.)INTERNAL OB DUMPS0000
(8.)ROADS0000
TOTAL250.53000250.53
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 154.99
(d)Safety Zone(in hectare) 0.00075
(e)Final Void of 154.99 (hectare) at a Depth of 3.5 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 833
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 53
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)2014500005000050000500000
(2.)2015500005000050000500000
(3.)201750000500005000090000
(4.)2012500005000050000495110
(5.)2013500005000050000500000
(6.)2016500005000050000500000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA083(Rev.01)
(ii)Name of the EIA Consultant Mantec Consultants Pvt. Ltd
(iii)Address D-36, sector 6 Noida
(iv)Mobile No. 9911994264
(v)Landline No. 0120421500
(vi)Email Id envmantec@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 18 Apr 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report Copy of District Survey Report
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data Copy of Replenishment Study Report & Baseline Survey Data
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPP is requested to submit the following parts of Form 2 such as: 1) Proof of Competence/authority of the person is not proper. 2) Permission Letter for water uptake is not proper. 3) Cluster certifcate from DMG is not submitted. 4) Mining Plan Approval Letter is not uploaded in the earmarked section of Form 2. 5) Undertaking in EIA report not signed by PP. 6) NABL Certificate in Annexure-VI of EIA Report is expired on 10.09.2019. 13 Feb 2020
2.NAThe correction have been made as per the instruction received 06 Mar 2020
3.NAReply to the EDS is not attached with the application 02 Apr 2020
4.NAThe correction have been made as per the instruction received 20 Apr 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSurendra singh shekhawat
DesignationGM
Name of Company (Applicant Name should not be given here)FCI ARAVALI GYPSUM AND MINERALS INDIA LIMITED
AddressR/o Mangu Singh Rajiv Marg, Paota B Road, Jodhpur
Print