1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Environmental Clearance as per MoEF&CC Notification dated 06th April, 2018 for Existing Kaoni Gypsum (Minor Mineral) Mining project(ML No 01/02,) with production capacity 50,000 TPA Gypsum &136191cum/ | (b)Name of the Company / Organisation | FCI ARAVALI GYPSUM AND MINERALS INDIA LIMITED | (c)Registered Address | NIL | (d)Legal Status of the Company | NIL | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Surendra singh shekhawat | (b)Designation (Owner/ Partner/ CEO) | GM | (c)Address | NIL | (d)Pin code | 342010 | (e)E-mail | fagmilrp@gmail.com | (f)STD Code. | 291(f)Telephone No. | 2544392 | (g)Fax No. | 2544523 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/RJ/MIN/86968/2018 | (d)Master Proposal Number(Single Window) | SW/136013/2020 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 74,75,161/1,161/13,162,165/1,165/2,166/1,131/5,131 | (b)Pincode | 334001 | (c)Bounded Latitudes (North) | | From | | Degree | 28.10.9.76 | Minutes | | Second | | From | | Degree | 28.9.14.11 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.05.9.15 | Minutes | | Second | | From | | Degree | 73.06.44.83 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 44 H/4, 44 H/3, 44 D/15, 44 D/14 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 178 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 000000 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Rajasthan | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Rajasthan | Bikaner | Kolayat | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11015/2/2019-IA-II(M) | (b)Date of Apply of TOR | 29 Nov 2018 | (c)Date of Issue of TOR / Standard ToR | 27 Mar 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 20 Nov 2019 | Distance of Public Hearing Venue from the Proposed Project : | 1 |
| Rajiv Gandhi Seva Kendra, Kaoni | State : | Rajasthan | District : | Bikaner | Tehsil : | Kolayat | Village : | Kaoni |
| 47 | Mainly issue raised related to Plantation, road maintenance, | Others | Additional District Collector | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Excavator | Capacity 20000 to 40000 tons of OB per month | 1 no. | (2.) | Dumper | 20 tons | 2 Nos | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Overburden | 136191 | Others | Cum/Yr | Others | Used for backfilling | (2.) | Mineral- Gypsum | 50000 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | Obtained | (ii)Copies of all Consent to operate obtained since inception | Copy of Consent to Operate | (iii)Date of Issue | 05 Mar 2018 | (iv)Valid Upto | 31 Dec 2022 | (v)File No. | F(Mines)/Bikaner(Kolayat)/1940(1)/2015-2016/9791-9 | (vi)Application No. | 2017-2018/mines/9720 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 0.4247 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.01 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.0042 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.04 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 100 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 100 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | HSD | 100 | Others | LPD | nearby open Market/ petrol Pump | Road | | 25 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Jan 2019 To 28 Feb 2019 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 82 | 52 | 80.36 | 100 | (2.) | NOx | | Micro Gram per Meter Cube | 30 | 17.6 | 29.4 | 80 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 48 | 30 | 47.03 | 60 | (4.) | SO2 | | Micro Gram per Meter Cube | 14 | 5.0 | 13.70 | 80 | |
14.2. No. of Ground Water monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (2.) | pH | | | NA | | 0 | 0 | 0 | 0 | (3.) | TDS | | | NA | | 0 | 0 | 0 | 0 | (4.) | Total Hardness | | | NA | | 0 | 0 | 0 | 0 | (5.) | Chlorides | | | NA | | 0 | 0 | 0 | 0 | (6.) | Fluoride | | | NA | | 0 | 0 | 0 | 0 | (7.) | Heavy Metals | | Iron | NA | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 5.5 | 5.2 | D | (2.) | pH | | NA | | 7.53 | 7.48 | D | (3.) | BOD | | mg/l | | 64 | 38 | D | (4.) | COD | | mg/l | | 196 | 104 | D | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 52.40 | 44.60 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 42.60 | 36.20 | 50 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.46 | 7.51 | (2.) | P(Phosphorus) | Others | mg/100gm | 0.94 | 0.62 | (3.) | N(Nitrogen) | Others | mg/100gm | 13.4 | 7.8 | (4.) | K(Potassium) | Others | mg/100gm | 3.4 | 1.6 | (5.) | Electric Conductivity | Others | micro mhos/cm | 462.6 | 354.8 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 45 To 50 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 40 To 45 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Tanker Supply | 43.55 | 00 | Copy of Permission Letter | modeOthers | Tanker Supply | Others | Tanker Supply | 0000 | 05 Mar 2020 | 43.55 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 1.12 | 2 | septic tank | Green Belt Renewal Plant | | 1.12 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1.12 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 1.12 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Overburden | Others | over burden waste | 136191 | Kilolitre | 0 | Others | OB will be used for backfilling | Others | OB will be used for backfilling | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 82 | 0 | 0.33 | 82.35 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 48 | 0 | 0.34 | 48.35 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 14 | 0 | 0.02 | 14.2 | 80 | (4.) | NOx | | Microgram per Meter Cube | 30 | 0 | 0.05 | 30.15 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NA | 0 | 0 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 0 | (b)Source | NA | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 32.68 | (c)Government Land (ha.) | 217.85 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 250.53 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Mine Lease area | 250.53 | Total (ha.) | 250.53 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 9.35 | 217.85 backfilled area developed as green belt | (2.) | Quarry Area | | 241.18 | 32.68 developed as agriculture | (3.) | Others | road | 0.60 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | None | 0000 | not present with 10 km study area | (2.) | Critically Polluted Area | NOT ANY | 0000 | not present with 10 km study area | (3.) | ESZs | None | 0000 | not present with 10 km study area | (4.) | Corridors | None | 0000 | not present with 10 km study area | (5.) | WLS | None | 00000 | not present with 10 km study area | (6.) | NPA | None | 0000 | not present with 10 km study area | (7.) | Wildlife Corridors | None | 000 | not present with 10 km study area | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | none | 00000 | not present within 10 km study area | (2.) | Forest | | none | 000 | not present within 10 km study area | (3.) | Archaeological Sites | | none | 00000 | not present within 10 km study area | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Monitor Lizard (Goh/ Goyra), Desert, Honey badger Monitor, Great Indian Bustard, Indian Peafowl, Caracal, Wild cat/Desert cat, Chinkara, Indian pangolin | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 10 lakhs | (iii)Period of Implementation | 2020-2021 | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Indira Gandhi Canal | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 2.34 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 31 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 300 | (f)Total Manpower | 31 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 53 | (b)Percentage of Total Project Area | 21.16 | (c)No. of Plants to be Planted | 5000 | (d)Funds Allocated for Plantation | 337000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | By the production of huge quantity of Gypsum from this mine will definitely improve the living standards of the inhabitants in the surrounding area as there is a scarcity of industries. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Gypsum | Minor | |
|
2. | Mine Capacity in ROM (Run of Mine) | 50000 TPA, OB 136191 cum/Year | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | SME/BKN/CC-III/M.S/ML-01/02/679 | (b)Date of Approval | 01 Jul 2017 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | Mining & Geology Department, Bikaner | (e)Approved Mining Lease Area | 250.53 | (f)Approved Capacity | 50000 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 852227 | (b)Mineable Reserves (Million Ton) | 702716 | (c)Extractable Reserves(Million Ton) | 702716 | (d)Percent(%) of Extraction | 100 | (e)Grade of Coal /Ore /Mineral | 52 | (f)Stripping Ratio | 1 : 0.48 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 45 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 14.05 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 250.53 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 17 Oct 2011 | (iii)Validity of LOI | 20 | (iv)Reference No. of LOI | F-3(141) Khan/Group-2/07 | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 250.53 | (iii)Validity of the lease deed | From : 01 Apr 2003 To : 31 Mar 2023 | (iv)Date of Execution of Mining Lese | 17 Oct 2011 | (v)Reference Number | F-3(141) Khan/Group-2/07 | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | NA | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 0 | (ii)Total Area (in Hectare) | 137.37 | (iii)Height (in meter) | 3.5 | (iv)Quantity (in Million Cubic meter) | 682589 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 137.37 | (b)Depth (in meter) | 3.5 | (c)Volume (in Million Cubic meter) | 682589 | |
|
12. | Details of Quarry: | (a)Final Void of 137.37 (hectare) at a Depth of 3.5 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 154.99 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | from pits | (b)Surface to Siding/Loading | by excavator | (c)Transportation / Conveyor Details | transported to end user by trucks/dumpers | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | GRAZING LAND | | 0 | 0 | 0 | (2.) | WASTE LAND | | 217.85 | 0 | 217.85 | (3.) | FOREST LAND | | 0 | 0 | 0 | (4.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (5.) | AGRICULTURE LAND | | 32.68 | 0 | 32.68 | (6.) | SETTLEMENTS | | 0 | 0 | 0 | |
TOTAL | 250.53 | 0 | 250.53 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXCAVATION/QUARRY | | 241.18 | 0 | 0 | | 241.18 | (2.) | GREEN BELT | | 9.35 | 0 | 0 | | 9.35 | (3.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0 | | 0 | (4.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | (5.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (6.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (7.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (8.) | ROADS | | 0 | 0 | 0 | | 0 | |
TOTAL | 250.53 | 0 | 0 | 0 | 250.53 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 154.99 | (d)Safety Zone(in hectare) | 0.00075 | (e)Final Void of 154.99 (hectare) at a Depth of 3.5 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 833 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 53 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 2014 | 50000 | 50000 | 50000 | 50000 | 0 | (2.) | 2015 | 50000 | 50000 | 50000 | 50000 | 0 | (3.) | 2017 | 50000 | 50000 | 50000 | 9000 | 0 | (4.) | 2012 | 50000 | 50000 | 50000 | 49511 | 0 | (5.) | 2013 | 50000 | 50000 | 50000 | 50000 | 0 | (6.) | 2016 | 50000 | 50000 | 50000 | 50000 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/SA083(Rev.01) | (ii)Name of the EIA Consultant | Mantec Consultants Pvt. Ltd | (iii)Address | D-36, sector 6 Noida | (iv)Mobile No. | 9911994264 | (v)Landline No. | 0120421500 | (vi)Email Id | envmantec@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 18 Apr 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | PP is requested to submit the following parts of Form 2 such as:
1) Proof of Competence/authority of the person is not proper.
2) Permission Letter for water uptake is not proper.
3) Cluster certifcate from DMG is not submitted.
4) Mining Plan Approval Letter is not uploaded in the earmarked section of Form 2.
5) Undertaking in EIA report not signed by PP.
6) NABL Certificate in Annexure-VI of EIA Report is expired on 10.09.2019. | 13 Feb 2020 | 2. | NA | The correction have been made as per the instruction received | 06 Mar 2020 | 3. | NA | Reply to the EDS is not attached with the application | 02 Apr 2020 | 4. | NA | The correction have been made as per the instruction received | 20 Apr 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Surendra singh shekhawat | Designation | GM | Name of Company (Applicant Name should not be given here) | FCI ARAVALI GYPSUM AND MINERALS INDIA LIMITED | Address | R/o Mangu Singh Rajiv Marg, Paota B Road, Jodhpur |
|