1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Appraisal /Development Drilling & Production in onshore Contract Area CB/ONDSF /ELAO | (b)Name of the Company / Organisation | PFH OIL & GAS PRIVATE LIMITED | (c)Registered Address | PFH Oil & Gas PL, 703 Tower 1, PS Srijan Corporate Park, Plot G2, Block GP, Sector 5, Salt Lake City, Kolkata, WB, India,,Kolkata,West Bengal-700091 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Mark Sargon | (b)Designation (Owner/ Partner/ CEO) | Vice President – Operations | (c)Address | PFH Oil Gas PL, 703 Tower 1, PS Srijan Corporate Park, Plot G2, Block GP, Sector 5, Salt Lake City, Kolkata,,,Kolkata,West Bengal-700091 | (d)Pin code | 700091 | (e)E-mail | ss@pfhoil.com | (f)STD Code. | 33(f)Telephone No. | 40508300 | (g)Fax No. | 03340508326 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(b) Offshore and onshore oil and gas exploration, development & production
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/74633/2018 | (d)Master Proposal Number(Single Window) | SW/135950/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Contract Area CB/ONDSF/ELAO2016 | (b)Pincode | 392001 | (c)Bounded Latitudes (North) | | From | | Degree | 21.25 | Minutes | | Second | | From | | Degree | 21.27 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.46 | Minutes | | Second | | From | | Degree | 72.47 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43M10, F43M11, F43M14 & 15 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 8 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.25 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Bharuch | Hansot | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/144/2018-IA-II(I) | (b)Date of Apply of TOR | 17 Apr 2018 | (c)Date of Issue of TOR / Standard ToR | 01 Jun 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 10 Jul 2019 | Distance of Public Hearing Venue from the Proposed Project : | 5 |
| Campur ground Adarsh Kelavni Mandal | State : | Gujarat | District : | Bharuch | Tehsil : | Hansot | Village : | elav |
| 200 | employment, closure of drilled pits, Promotion of Environmental Awareness and about CSR activities | Others | ADDL COLLECTOR | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Rig | Not applicable | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | not applicable | 0 | Others | Not applicable | Others | None | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 50 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.00 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.75 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.25 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | NA | 0 | Others | NA | NA | Pipe Conveyor | | 0 | Others | na | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 05 Oct 2018 To 31 Dec 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 50.9 | 42.6 | 50.8 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 21.5 | 18.4 | 21.4 | 60 | (3.) | NOx | | Micro Gram per Meter Cube | 17.7 | 13.2 | 15.8 | 80 | (4.) | SO2 | | Micro Gram per Meter Cube | 15.1 | 11.0 | 15.1 | 80 | |
14.2. No. of Ground Water monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.11 | 7.06 | 6.5 | 8.5 | (2.) | Total Hardness | | | mg/l | | 1420 | 100 | 200 | 600 | (3.) | TDS | | | mg/l | | 1652 | 388 | 500 | 2000 | (4.) | Chlorides | | | mg/l | | 854 | 78 | 250 | 1000 | (5.) | Fluoride | | | mg/l | | 1.84 | 1.47 | 1.0 | 1.5 | (6.) | Heavy Metals | | All | mg/l | | 0.01 | 0.01 | 0.01 | 0.01 | (7.) | TSS | | | mg/l | | 80 | 50 | 50 | 250 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 280 | 4.0 | E | (2.) | pH | | NA | | 7.68 | 7.52 | D | (3.) | DO | | mg/l | | 8.2 | 6.2 | A | (4.) | COD | | mg/l | | 122 | 5.2 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 41.7 | 39.8 | 55 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 50.6 | 49.4 | 65 | |
14.5. No. of Soil Sample Monitored locations : 7 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.46 | 5.56 | (2.) | Electric Conductivity | Others | micro siemens/cm | 967 | 77 | (3.) | N(Nitrogen) | Kilogram per hectare | | 268.8 | 152.4 | (4.) | P(Phosphorus) | Kilogram per hectare | | 33.5 | 18.2 | (5.) | K(Potassium) | Kilogram per hectare | | 123.7 | 95.6 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1 To 2 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Tankers | 25 | 5 | Copy of Permission Letter | modeOthers | Tanker | Others | Municipal supply | NA | 01 Jun 2018 | 30 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | None | 0 | 0 | Not applicable | Others | No waste water | 0 | 0 | (2.) | na | 0 | 0 | na | Others | NA | 0 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 0 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | NA | Others | NA | 0 | Tons | 0 | Others | NA | Others | NA | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 19.3 | 1.2 | 6.0 | 25.6 | 80 | (2.) | SO2 | | Microgram per Meter Cube | 17.6 | 1.2 | 1.0 | 18.8 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 21.5 | 0 | 0 | 21.6 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 50.9 | 0 | 0 | 51 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NA | NA | 30 | 0.2 | SO2 | | 1.2 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 3440 | (b)Source | DG | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 3 X 1000 kVA & 1 X 440 | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 99800 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 99800 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 29940 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 9980 | (e)Settlements (ha.) | 9980 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : aquaculture | 49900 | Total (ha.) | 99800 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | well | 1 | | (2.) | Main Plant | | 99800 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | None | 50 | None | (2.) | Corridors | None | 50 | None | (3.) | WLS | None | 50 | None | (4.) | ESAs | None | 50 | None | (5.) | Wildlife Corridors | Nil | 50 | None | (6.) | ESZs | Nil | 50 | None | (7.) | Critically Polluted Area | Nil | 50 | None | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Others | None | NA | 50 | None within 10 km | (2.) | Forest | | None | 25 | None within 10 km | (3.) | Archaeological Sites | | None | 50 | None within 10 km | (4.) | Defence Installations | | None | 50 | None within 10 km | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Not applicable | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Kim River branch | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kim River | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 2 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 40 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 300 | (f)Total Manpower | 40 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 1 | (b)Percentage of Total Project Area | 0.00 | (c)No. of Plants to be Planted | 2500 | (d)Funds Allocated for Plantation | 200000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | ? The major benefits of the project include reduction of the oil import bill of the nation as well as reduction of the imbalance in oil production and consumption.
? The commercial development will also lead to investment in Gujarat, bringing oil and gas revenues both to the State and to the Central Government. The presence of PFH in the region will substantially improves the socio-economic conditions of the region.
? The proposed exploration drilling program is expected to generate local employ | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | (xi) ACO in process of Compliance as on 14.08.2019 | (ii)Name of the EIA Consultant | Bhagavathi Ana Labs Pvt Ltd | (iii)Address | BHAGAVATHI ANA LABS, SANATHNAGAR | (iv)Mobile No. | 9866185534 | (v)Landline No. | 68160903 | (vi)Email Id | mv.raghavacharyulu@bureauveritas.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 01 Jun 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) Consultant accreditation was valid upto 01.06.2019, copy of valid accreditation needs to be uploaded.
(ii) Details of Permission received from the concerned authorities for development and production in the PEL/PML (i.e from MoPNG, DGH, State Govt, etc).
(iii) In view of the above, PP/Consultant are requested to revise the application for grant of EC and accordingly revise the Form 2 alongwith EIA/EMP Report. The EIA/EMP Report shall match with the information as filled in Form 2. On examination it is observed that the Consultant has not adequately submitted the application as per the provisions of the EIA Notification, 2006. Consultant has to read the documents before uploading the information in Form 2 /EIA/EMP report. | 05 Feb 2020 | 2. | NA | The correction have been made as per the instruction received | 11 Feb 2020 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | NA | 15 Dec 2022 | 2. | NA | Please provide details of wells to be drilled alongwith coordinates. Also mention proposed drilling to be carried out in CRZ area, if any.
Authorisation certificate for Consultant, who validated the EIA report. | 14 Dec 2022 | 3. | ADS Reply Letter | NA | 06 Dec 2022 | 4. | NA | Matter was examined in the Ministry. It may be noted that PP has not submitted the valid accreditation certificate of the consultant. Therefore, PP needs to get the EIA/ EMP report duly endorsed/ validated by an QCI/NABET accredited consultant and submit the same on priority to enable this office for further necessary action. | 24 Nov 2022 | 5. | ADS Reply Letter | NA | 22 Oct 2022 | 6. | NA | pp has not submitted the following information as desired vide EDS dated 21.05.2021:
(i) Copy of newspaper clippings regarding Public Hearing advertisement.
(ii) Copy of valid accreditation certificate of consultant as the one uploaded has expired in June 2019.
In view of the above, it is once again requested to kindly submit the above documents on priority to enable this office to take further action. | 21 Oct 2022 | 7. | ADS Reply Letter | NA | 16 Sep 2022 | 8. | NA | Please submit the information as under:
(i) Submit the copy of newspaper clippings regarding Public Hearing advertisement.
(ii) Submit the valid accreditation certificate of consultant as the one uploaded has expired in June 2019.
(iii) Submit the NOC from M/s ONGC stating that they have No objection if EC granted in favour of M/s PFH Oil & Gas Private Limited and subject to compliance of certain conditions. | 21 May 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Mark Sargon | Designation | Vice President – Operations | Name of Company (Applicant Name should not be given here) | PFH OIL & GAS PRIVATE LIMITED | Address | PFH Oil & Gas PL, 703 Tower 1, PS Srijan Corporate Park, Plot G2, Block GP, Sector 5, Salt Lake City, Kolkata, WB, India |
|