Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed manufacturing plant of bulk drug intermediates
(b)Name of the Company / Organisation M/S TAPI AGRO CHEM PACK
(c)Registered Address plot no 2207 and 2208 , GIDC Estate ,Panoli , talka ankleshwar ,District Bharuch,,Bharuch,Gujarat-394115
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Pravin Patel
(b)Designation (Owner/ Partner/ CEO) partner
(c)Address Plot no 2207 and 2208 , GIDC Estate Panoli, Taluka Ankleshwar ,District Bharuch,,Anklesvar,Bharuch,Gujarat-394115
(d)Pin code 394115
(e)E-mail tapiagrochempack@gmail.com
(f)STD Code. 261(f)Telephone No. 2460854
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/136204/2019
(d)Master Proposal Number(Single Window) SW/81830/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No 2207 & 2208, GIDC Estate, Panoli, Tal: Ank
(b)Pincode 394116
(c)Bounded Latitudes (North)
From
Degree 21332.39
Minutes
Second
From
Degree 21334.29
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 725927.81
Minutes
Second
From
Degree 725930.16
Minutes
Second
(e)Survey of India Topo Sheet No. F43N2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 26
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 8
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SEIAA/GUJ/TOR/5(f)/1053/2019
(b)Date of Apply of TOR 13 May 2019
(c)Date of Issue of TOR / Standard ToR 12 Jul 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason The project is within notified industrial estate o
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)S.S. Centrifuge48 inches * 01 Nos.
(2.)Stainless steel reactor5 KL * 3 Nos.
(3.)Glass line reactor3 KL * 2 Nos.
(4.)Tray dryer96 Tray * 1 Nos.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Group-2: Intermediates15OthersTons per monthRoad
(2.)Group-1: Active Pharma Intermediates18OthersTons per monthRoad
(3.)Group-3: Speciality chemical15OthersTons per monthRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 4.0
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.56
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.08
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.54
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 3000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Methanol602Tons per AnnumSahyadri rasayanRoad05 Open MarketCopy of Linkage
(2.)Acetone144.36Tons per Annumvivek chemicalRoad12 Open MarketCopy of Linkage
(3.)Toluene196Tons per AnnumBy traderRoad20 Open MarketCopy of Linkage
(4.)ChloroAcetylChloride1042Tons per AnnumBy traderRoad60 Open MarketCopy of Linkage
(5.)Formic Acid132Tons per AnnumNew India chemicalsRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube50.7941.2550.6460
(2.)SO2Micro Gram per Meter Cube26.7216.5425.9480
(3.)NOxMicro Gram per Meter Cube28.5319.8827.8480
(4.)PM10Micro Gram per Meter Cube98.9475.8495.91100
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l1397.56123.182501000
(2.)TDSmg/l38272925002000
(3.)pHNA8.067.0978.5
(4.)TSSmg/l52250100
(5.)Total Hardnessmg/l1295.16133.8300600
(6.)Fluoridemg/l0.050.0011.5
(7.)Heavy MetalsZnmg/l0.220.00515
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.85.8A
(2.)BODmg/l0.80.8A
(3.)pHNA7.487.48A
(4.)CODmg/l2.462.46A
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.446.255
(2.)Leq(Night)A-weighted decibels(dB(A))44.236.345
    14.5.     No. of Soil Sample Monitored locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Kilogram20825.8
(2.)N(Nitrogen)Milligram per Kilogram225.498.5
(3.)K(Potassium)Milligram per Kilogram869207
(4.)pH8.026.97
(5.)Electric ConductivityMillisiemens per Centimetre2.341.37
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 25 To 35
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 25
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC water25.2510 Not Appliacble PipelineOthersGIDCNAO/PNL/2530 Apr 201926.50
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial14.7214.72ETP with primary treatment unitsOthersSent to CMEE of M/s. BEIL, Dahej014.72
(2.)Domestic0.80.8Soakpit & septic tankOthersSoakpit & septic tank00.8
(3.)Scrubber media1.351.35Sell to end users under rule-9 & partly reusedOthersell to end users under rule-9 & partly reused1.350
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 16.87
(b)Total Discharged Water (Kilolitre per Day) 15.52
(c)Total Reused Water (Kilolitre per Day) 1.35
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP sludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)36Tons45RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)AlCl3Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)655Tons10RoadOthersSell to end users under rule-9
(3.)Sodium thiosulfateHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1092Tons20RoadOtherssell to end user under rule-9
(4.)Dilute Nitric acid (30%)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)255Tons0OthersNAOthersRe-use within premises
(5.)Spent solventHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1032Tons0OthersNAOthersin-house recovery and reuse
(6.)Spent carbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)7.68Tons45RoadCo-Processing
(7.)Discarde drums/bags/linersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1800Tons10RoadAuthorized Recyclers
(8.)Used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)180Tons10RoadAuthorized Recyclers
(9.)Dilute HClHazardous Waste (as per Hazardous and Other Waste Management rules 2016)98Tons20RoadOtherssell to end users under rule-9
(10.)HBrHazardous Waste (as per Hazardous and Other Waste Management rules 2016)35Tons20RoadOtherssell to end user under rule-9
(11.)Organic residueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)62Tons45RoadCo-Processing
(12.)Distillation residueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)49Tons45RoadCo-Processing
(13.)Sodium bi sulfiteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)405Tons25RoadOtherssell to end user under rule-9
(14.)Off specification productsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4Tons45RoadOthersCHWIF of M/s. BEIL, Dahej
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube50.792.620.075160
(2.)SO2Microgram per Meter Cube26.725.660.112780
(3.)PM10Microgram per Meter Cube95.945.660.0296100
(4.)NOxMicrogram per Meter Cube28.535.660.042980
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Vent-2NA110.15NOx0.002 g/s
(2.)DG setHSD110.15OthersSPM, SO2, NOx0.0144, 0.0251, 0.009 g/s
(3.)Boiler (600 Kg/hr)Briquettes of Bio-coal300.4OthersSPM, SO2, NOx0.015, 0.2656, 0.09 g/s
(4.)Vent-1NA110.15SO20.003 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source DGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 250 kVA * 1 nos.
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.2959
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.2959
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 22938.39
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 2295.55
(d)Surface Water Bodies (ha.) 1167.40
(e)Settlements (ha.) 1378.23
(f)Industrial (ha.) 3592.74
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Mudflats 44.75
    Total (ha.) 31417.059999999998
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.11
(2.)Built Up Area0.14
(3.)OthersOpen area0.02
Total (ha.) 0.27
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA0No NPA within 10 Kms
(2.)ESZsNA0No ESZs within 10 kms
(3.)CorridorsNA0No corridor within 10 kms
(4.)Critically Polluted AreaAnkleshwar8Located within 10 km of CPA
(5.)Wildlife CorridorsNA0No wildlife corridors within 10 kms
(6.)WLSNA0No WLS within 10 Kms
(7.)ESAsNA0No ESAs within 10 Kms
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0No archaeological sites within 10 kms
(2.)Defence InstallationsNA0No defense installations within 10 kms
(3.)ForestNA0No forest within 10 kms
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.29
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species 10 schedule-I species
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Rs. 202500/-
(iii)Period of Implementation 2 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Umarwada pond
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 4.06
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 10
(d)Temporary Employment- During Operation 20
(e)No. of working days 330
(f)Total Manpower 40
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.11
(b)Percentage of Total Project Area 37.17
(c)No. of Plants to be Planted 240
(d)Funds Allocated for Plantation 400000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Stay order against NABET/QCI
(ii)Name of the EIA Consultant M/s. Aqua-Air Environmental Engineers Pvt. Ltd.
(iii)Address M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD. 403, CENTER POINT, NR. KADIWALA SCHOOL, RING ROAD, SURAT – 395002 (GUJARAT)
(iv)Mobile No. 9904433995
(v)Landline No. 0261246124
(vi)Email Id aqua_eia@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 07 Apr 2026
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i) TOR granted by SEEIA however, now application submitted at Central level please clarify (ii) Submit action plan as per the Ministry’s office memorandum 31st October, 2019 regarding projects located in Critically Polluted Area. (iii) Effluent treatment mechanism with plan for Zero Liquid Discharge needs to be submitted. (iv) Proposed Green belt development programe along-with time line and budgetary allocation needs to be provided(green belt has not mentioned as per Om Dated 31.10.2019-CPA) (v) Details of Raw material linkage (S. no. 13.1 of form 2) and its mitigation measure during transportation needs to be submitted. (vi) All old CTOs not uploaded to verify the violation, if any done by PP. (vii) In view of the above, PP/Consultant are requested to revise the application for grant of EC and accordingly revise the Form 2 alongwith EIA/EMP Report. The EIA/EMP Report shall match with the information as filled in Form 2. On examination it is observed that the Consultant has not adequately submitted the application as per the provisions of the EIA Notification, 2006. Consultant has to read the documents before uploading the information in Form 2 /EIA/EMP report. 05 Feb 2020
2.NAThe correction have been made as per the instruction received 07 Feb 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPravin Patel
Designationpartner
Name of Company (Applicant Name should not be given here)M/S TAPI AGRO CHEM PACK
Addressplot no 2207 and 2208 , GIDC Estate ,Panoli , talka ankleshwar ,District Bharuch