Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Integrated Common Hazardous Waste Treatment, Storage, Disposal & Recycling Facility at Industrial Growth Centre, Maneri (V), Mandla (D), Madhya Pradesh
(b)Name of the Company / Organisation RAMKY ENVIRO ENGINEERS LTD
(c)Registered Address Ramky Enviro Engineers Limited 13th Floor Ramky Grandiose Ramky Tower Complex Gachibowli Hyderabad,,Rangareddi,Telangana-500032
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sanjiv Kumar
(b)Designation (Owner/ Partner/ CEO) IWMHead
(c)Address Ramky Enviro Engineers Limited 13 th Floor Ramky Grandiose Ramky Tower Complex Gachibowli Hyderabad,,Serilingampalle,Rangareddi,Telangana-500032
(d)Pin code 500032
(e)E-mail consultancygroup@ramky.com
(f)STD Code. 0(f)Telephone No. 23015000
(g)Fax No. 04023015000
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
Minor Activity7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
(b)Category A
(c)Proposal Number IA/MP/MIS/117811/2019
(d)Master Proposal Number(Single Window) SW/136159/2020
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No.11to14,18to21,27to29,31to36,43,44 (Plot 2)
(b)Pincode 481885
(c)Bounded Latitudes (North)
From
Degree 23.107168
Minutes
Second
From
Degree 23.112169
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 80.217770
Minutes
Second
From
Degree 80.220700
Minutes
Second
(e)Survey of India Topo Sheet No. F44C4, F44C8
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 461
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshMandlaNiwas
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-40/2019-IA-III
(c)Date of Apply of TOR 13 Sep 2019
(d)Date of Issue of TOR / Standard ToR 05 Dec 2019
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason as per para 7(i) III Stage (3)(i)(b) of EIA Notifi
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)ICHWTSDRF19.77 Acres (8 Ha)Land Area
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Bio Medical Waste Treatment12.5OthersTons per Day (TPD)Road
(2.)Alternative Fuel and Raw Material Facility55OthersTons per Day (TPD)Road
(3.)Drum Decontamination Recycling Plant10OthersTons per Day (TPD)Road
(4.)Secured Landfill (Direct to Landfill)250OthersTons per Day (TPD)Road
(5.)E-Waste Recycling Facility (with Precious Metal Recovery)82OthersTons per Day (TPD)Road
(6.)Plastics Recycling Facility10OthersTons per Day (TPD)Road
(7.)Spent Pot Liner (Carbon portion) Reprocessing Facility165OthersTons per Day (TPD)Road
(8.)Renewable Energy2Mega Watt(MW)Road
(9.)Common Incineration (HZW, BMW, E-waste and other Waste)55OthersTons per Day (TPD)Road
(10.)Used/Spent Oil Recycling Facility54Kilo Litre per DayRoad
(11.)Aluminium Dross Reprocessing Facility165OthersTons per Day (TPD)Road
(12.)Paper Recycling Facility10OthersTons per Day (TPD)Road
(13.)Landfill After Treatment400OthersTons per Day (TPD)Road
(14.)Lead Recycling Facility65OthersTons per Day (TPD)Road
(15.)Solvent Recovery Facility27Kilo Litre per DayRoad
(16.)Spent Pot Liner (Refractory portion) Reprocessing and Disposal Facility165OthersTons per Day (TPD)Road
(17.)Waste to Energy2Mega Watt(MW)Road
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 40
(b) Funds Allocated for Environment Management (Capital) (in Crores) 4
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.8
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.4
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 10
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 10
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD10Kilo Litre per DayFrom nearby agencyRoad5 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2019 To 31 Dec 2019
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube56.143.856.1100
(2.)PM2.5Micro Gram per Meter Cube34.522.834.560
(3.)SO2Micro Gram per Meter Cube14.88.314.880
(4.)NOxMicro Gram per Meter Cube25.117.625.180
(5.)OthersCOMicro Gram per Meter Cube6404506402000
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.96.96.58.5
(2.)TSSmg/l0000
(3.)Chloridesmg/l85382501000
(4.)Fluoridemg/l1.18111.5
(5.)TDSmg/l5242255002000
(6.)Total Hardnessmg/l308107200600
(7.)OthersIronmg/l0.280.210.30.3
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l328E
(2.)BODmg/l124D
(3.)pHNA7.87.2A
(4.)DOmg/l6.65.6A
(5.)OthersTDSmg/l210168E
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.549.7Residential - 55/45 Commercial 65/55
(2.)Leq(Night)A-weighted decibels(dB(A))43.839.6Residential - 55/45 Commercial 65/55
    14.5.     No. of Soil Sample Monitored locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.67.2
(2.)P(Phosphorus)Kilogram per hectare10.16.5
(3.)N(Nitrogen)Kilogram per hectare276152
(4.)Electric ConductivityOthersMicrosiemens per Centimeter224145
(5.)K(Potassium)Kilogram per hectare217152
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 4 To 8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 4 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMP AKVN supply/Tankers/Borewell1205 Not Appliacble modeOthersMP AKVN supply/Tankers/BorewellOthersMP AKVN supply/Tankers/Borewell010 Jan 2020120
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial6070Effluent treatment plantReuse within the Plant & Recycling60
(2.)Domestic58Septic tank & soak pit/ mobile STPGreen Belt Renewal Plant5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 65
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 65
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Incineration AshHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1500Tons0.1RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube34.50.90.6135.1260
(2.)SO2Microgram per Meter Cube14.80.92.917.7180
(3.)NOxMicrogram per Meter Cube25.10.93.628.7180
(4.)PM10Microgram per Meter Cube56.10.90.6156.72100
(5.)Others(Specify)LeadMicrogram per Meter Cube00.90.030.041
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)IncineratorWaste300.85PM100.40 g/s
(2.)IncineratorWaste300.85NOx3.16 g/s
(3.)Lead RecyclingWaste300.5OthersLead0.02 g/s
(4.)Boiler 1Coal300.5PM100.185 g/s
(5.)Boiler 1Coal300.5SO21.16 g/s
(6.)Boiler 1Coal300.5NOx0.76 g/s
(7.)Boiler 2Coal300.5PM100.09 g/s
(8.)Boiler 2Coal300.5NOx0.38 g/s
(9.)DG SetHSD70.2SO20.007 g/s
(10.)Boiler 2Coal300.5SO20.58 g/s
(11.)IncineratorWaste300.85SO21.58 g/s
(12.)DG SetHSD70.2PM100.009 g/s
(13.)DG SetHSD70.2NOx0.18 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 375
(b)Source Madhya Pradesh State Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2x200 kVA
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 8
    Total Land (ha.) 8
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 8
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Others 0
    Total (ha.) 8
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)LandFill2.77
(2.)Built Up Area2.59
(3.)Green belt2.64
Total (ha.) 8
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone10None in 10 km radius
(2.)ESAsNone10None in 10 km radius
(3.)Wildlife CorridorsNone10None in 10 km radius
(4.)ESZsNone10None in 10 km radius
(5.)CorridorsNone10None in 10 km radius
(6.)WLSNone10None in 10 km radius
(7.)NPANone10None in 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestParariya RF5Reserve Forest
(2.)Defence InstallationsNone10None in 10 km radius
(3.)Archaeological SitesNone10None in 10 km radius
(4.)OthersOtherNone10None in 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 8
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Completed
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Jhamil Nadi
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 0.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 25
(d)Temporary Employment- During Operation 50
(e)No. of working days 365
(f)Total Manpower 90
32.
Green Belt in Ha:
(a)Total Area of Green Belt 2.64
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 1050
(d)Funds Allocated for Plantation 2000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalFacilitating better management of hazardous wastes. Provides a one stop solution for the management of various types of wastes. Minimizes pollution load on environment with an additional benefit of green and clean surroundings. Possibility for recovery of materials thereby conserving the natural resources. Management of wastes is relatively easier and economically viable at a common facility. Reduced environmental liability due to captive storage of hazardous waste in the premises of industries
(2.)SocialThe proposed project would proactively promote the public interest through provision of basic amenities such as roads, transportation, electricity, education, sanitation and healthcare facilities, this would also encourage community growth, development, and improved Socio-economic conditions and quality of life of the people living in the project area. Better standards of living and greater social awareness.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 10
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 80000
(e)Total built up area (sqm) 25900
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 1
(b)Capacity 1000
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 400 sqm
5.
Energy Saving Measures:
(a)Source/Mode LED Bulbs, High Efficient Motors
(b)Percentage 10
(c)Quantity 1000
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Wastewater from process shall be treated and reuse
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0140
(ii)Name of the EIA Consultant Ramky Enviro Services Private Limited
(iii)Address Ramky Grandiose, Ramky Towers Complex, Gachibowli, Hyderabad - 500032
(iv)Mobile No. 9246782274
(v)Landline No. 0402301536
(vi)Email Id drchakradhar@ramky.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 21 May 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterDuring the appraisal of our proposal for ‘Environmental Clearance’ in 48th EAC meeting held on 29th January, 2020, the EAC deliberated upon the EIA Report and observed some deficiencies. The EAC asked us to review the EIA and resubmit the Revised EIA Report. We are hereby submitting the Revised EIA Report addressing all the deficiencies identified by the EAC. 22 Jul 2020
2.NA

Kindly see final minutes of 48th EAC Infra 2 meeting hedl during 28 to 29 January 2020

06 Feb 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSanjiv Kumar
DesignationIWMHead
Name of Company (Applicant Name should not be given here)RAMKY ENVIRO ENGINEERS LTD
AddressRamky Enviro Engineers Limited 13th Floor Ramky Grandiose Ramky Tower Complex Gachibowli Hyderabad
Print