1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Tubachi Bableshwara LIS
(b)Name of the Company / Organisation KARNATAKA NEERAVARI NIGAM LTD
(c)Registered Address Chief Engineer KNNL Irrigation North Zone Club Road Belgaum Karnataka,,Belgaum,Karnataka-590001
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Chief Engineer Chief
(b)Designation (Owner/ Partner/ CEO) Chief Engineer
(c)Address Chief Engineer KNNL Irrigation North Zone Club road Belgaum Karnataka,,Bangalore South,Bangalore Urban,Karnataka-560001
(d)Pin code 590001
(e)E-mail tubachilis@gmail.com
(f)STD Code. 831(f)Telephone No. 2422639
(g)Fax No. 22267314
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(c) River Valley projects
Minor Activity
(b)Category A
(c)Proposal Number IA/KA/RIV/70372/2017
(d)Master Proposal Number(Single Window) SW/135899/2020
(e)EAC concerned (for category A Projects only) River Valley and Hydroelectric Projects
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Kavatagi village
(b)Pincode 590001
(c)Bounded Latitudes (North)
From
Degree 1640.634
Minutes
Second
From
Degree 1659.956
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 7537.62
Minutes
Second
From
Degree 7541.28
Minutes
Second
(e)Survey of India Topo Sheet No. 47 P2 P3 P5 P6 P7 P9 P10 P11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 650
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)JharkhandChatraTandwaTandwa
(2.)KarnatakaBelgaumAthni
(3.)KarnatakaBagalkotJamkhandi
(4.)KarnatakaBijapurBijapur
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-12011/33/2017-IA.I (R)
(b)Date of Apply of TOR 17 Oct 2017
(c)Date of Issue of TOR / Standard ToR 29 Nov 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason The new command area added in the project is withi
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)52700 hacommand area
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)command area52700HectaresRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 3572
(b) Funds Allocated for Environment Management (Capital) (in Crores) 358.50
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 9.83
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 58.22
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 28188
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 28188
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Cement28188OthersMTBagalkotRoad130 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2018 To 30 Sep 2018
(b)Season Three-Sesions
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube705869.54100
(2.)NOxMicro Gram per Meter Cube14.7910.5614.7180
(3.)PM2.5Micro Gram per Meter Cube252024.5460
(4.)SO2Micro Gram per Meter Cube8.774.18.5980
    14.2.     No. of Ground Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.447.126.58.5
(2.)TSSNA0000
(3.)TDSmg/l26806865002000
(4.)Total Hardnessmg/l1040272200600
(5.)Chloridesmg/l0.790.2911.5
(6.)Heavy Metalspbmg/l0.0100.010.01
(7.)Othersironmg/l00515
(8.)Fluoridemg/l0.75011.5
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.55.4C
(2.)CODmg/l4016C
(3.)BODmg/l65C
(4.)pHNA8.197.89C
    14.4.     No. of Ambient Noise monitoring locations : 2
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))48.6946.755
(2.)Leq(Night)A-weighted decibels(dB(A))36.935.845
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare182.6248.15
(2.)Electric ConductivityMillisiemens per Centimetre492305
(3.)pH7.657.6
(4.)P(Phosphorus)Kilogram per hectare56.014.3
(5.)K(Potassium)Kilogram per hectare113.564.28
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 130 To 55
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 130 To 55
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface2.251.5 Not Appliacble CanalJack WellWRD 52 VBE 201428 Feb 20142.25
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)waste water from labour colonies2022septic tankOthersseptic tank182
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 20
(b)Total Discharged Water (Kilolitre per Day) 2
(c)Total Reused Water (Kilolitre per Day) 18
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)LABOUR CAMPSMunicipal Solid Waste15Tons1.5RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube64.77058130100
(2.)NOxMicrogram per Meter Cube12.09010.563580
(3.)PM2.5Microgram per Meter Cube22.080204560
(4.)SO2Microgram per Meter Cube5.9804.11280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DGHSD40.01PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 52
(b)Source HESCOM
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 125
(e)Stack Height (in m) 4
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0.73
(b)Private Land (ha.) 2418.27
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 2419
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 96400.62
(b)Waste/Barren Land (ha.) 18469.20
(c)Grazing/ Community Land (ha.) 2314.06
(d)Surface Water Bodies (ha.) 1645.95
(e)Settlements (ha.) 2499.53
(f)Industrial (ha.) 0
(g)Forest (ha.) 187.58
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : scrub forest 3643.50
    Total (ha.) 125160.43999999999
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersProject components2419
Total (ha.) 2419
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Wildlife CorridorsNA0NA
(2.)ESZsNA0NA
(3.)CorridorsNA0NA
(4.)Critically Polluted AreaNA00
(5.)WLSNA0NA
(6.)NPANA0NA
(7.)ESAsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA0NA
(2.)Archaeological SitesNA0NA
(3.)ForestJamakhandi Reserve forest6.18RF
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 97
(b)Land yet to be acquired(Ha) 2322
(c)Status of Land acquisition if not acquired Under progress
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Peafoul
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 300000
(iii)Period of Implementation 2
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 150
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 80
(d)Temporary Employment- During Operation 20
(e)No. of working days 1095
(f)Total Manpower 300
32.
Green Belt in Ha:
(a)Total Area of Green Belt 30
(b)Percentage of Total Project Area 1.24
(c)No. of Plants to be Planted 102216
(d)Funds Allocated for Plantation 1074000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalAgro forestry will be taken up in command area and it improves the ecosystem services. Canal Bank plantation improves local biological diversity.
(2.)SocialNo Rehabilitation and Resettlement. Direct employment opportunities for 300 peoples (50 Technical and 250 construction labourers) are expected to get employment for the construction of intake channel, jack well cum pump house, raising main, delivery chambers and distribution network consisting of Lift cum Flow Irrigation System. During operation phase indirectly labourers will be appointed operation and maintenance of the jack well.
(3.)FinancialAgricultural linkages will be considerably improved. The project improves total farm output and hence raises farm income. Project improves yields through reduced crop loss due to erratic, unreliable or insufficient rainfall. Extensive agricultural production supplies raw materials to the nearby small scale industries thereby increasing the economy in the region.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For River Valley and Hydroelectric Projects
S. No.Item Details
1. Project Sub Sector Irrigation Project
2. Name of the River Krishna
3.
Whether Cumulative Impact Assessment and Carrying Capacity Study of River Basin is Carried Out? No
     4.      Type of Project: (Construction of Dam/ Barrage/ Run of the River/ Lift Irrigation Scheme)
S. No.Project TypeDam Height (in meters)Dam Length (in meters)Total Submergence Area (in hectare)Gross Command Area (GCA) (in hectare)Irrigable Command Area (ICA) (in hectare)Culturable Command Area (CCA) (in hectare)Total Command Area (in hectare)
(1.)Lift Irrigation Scheme0000000
5.
Powerhouse Installed Capacity No
(a) Type of Powerhouse Underground
(b) Capacity (in megawatts) 0
(c) No. of Tunnels 0
(d) No. of Units 0
(e) Bank of River Right
6.
Generation of Electricity Annually.
(a) Quantity of Generation of Electricity Annually (in giga watt hours) 0
(b) Water Availability at Various percentage
S. No.PercentageWater availability (in cusecs)Dependable yearRemarks
(1.)50 %229391
(2.)75 %21852001
(3.)90 %32302007
(c) Machine Availability (in percent) 0
(d) Cost of Electricity Generation (in INR) 0
(e) Internal Rate of Return (in percent) 0
(f) Year of achievement of Internal Rate of Return 0
7. Catchment Area Treatment Plan Copy of Catchment Plan
8.
Muck Management Plan
(a)Muck Management Plan Copy of Muck Management Plan
(b) Total Excavation Muck (in cubic meter) 3952500
(c) Utilized for Construction (in cubic meter)1185750
(d) No. of Muck Disposal sites0
(e) Total Muck Disposal Area (in hectare)0
9.
Fishery Development and Management Plan
(a)Fishery Development and Management Plan Copy of Fishery Development and Management Plan
(b) No. of Fish Species 28
(c) Name of the umbrella Fish Species (Scientific Name)Hypselobarbus pulchellus
10.
Status of Environmental Flow
S. No.SeasonAverage Inflow (in cumec)Percent of Flow
(1.)Lean5025
(2.)Monsoon20036.4
(3.)Non-Lean Non-Monsoon20036.4
11. Free Flow Stretch (in km) 5
12.
Approval of Central Water Commission No
13.
Approval of Central Electricity Authority No
14.
Details of Coffer Dam (Upstream) Yes
(a) Quantity of the material (in cubic meter). 0
(b) Length of the dam (in meter) 0
(c) Decommissioning Plan Copy of Decommissioning Plan
15.
Details of Coffer Dam (Downstream) None
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 1821
(ii)Name of the EIA Consultant Environemntal Health and Safety Consultants Privat
(iii)Address 174 new No. 13/2 14th E CROSS INDUSTRIAL TOWN AGRAHARA DASARAHALLI BANGALORE
(iv)Mobile No. 9448094164
(v)Landline No. 0802301620
(vi)Email Id ehscblr1974@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation River Valley and Hydroelectric Projects
(ix)Validity of Accreditation 22 Apr 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterSubmission of compliance to oberservations sought from EAC during the meeting held on 27.01.2020 26 May 2020
2.NA

EAC opined that instant proposal involving flood irrigation shall be revised. EAC after detailed deliberation deferred the proposal for want of following information:

 

Print