1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Amalgamated Yekona I & II OC (Phase-I) with increase in production capacity from 1.0 MTPA to 2.75 MTPA (normative) and 3.44 MTPA (peak) and increase in land area from 680.06 ha to 1679.39 ha of M/s We | (b)Name of the Company / Organisation | Western Coalfields Limited | (c)Registered Address | Coal Estate Civil lines, Nagpur-440001,Coal Estate Civil lines, Nagpur-440001,Nagpur,Maharashtra-440001 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Kaushik Chakraborty | (b)Designation (Owner/ Partner/ CEO) | G.M (MINING)/ ENVIRONMENT. | (c)Address | NIL | (d)Pin code | 440001 | (e)E-mail | gmenvironment.wcl@coalindia.in | (f)STD Code. | 712(f)Telephone No. | 2510151 | (g)Fax No. | 2510151 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | 1(a) Mining of minerals
| (b)Category | A | (c)Proposal Number | IA/MH/CMIN/135434/2019 | (d)Master Proposal Number(Single Window) | SW/135431/2020 | (e)EAC concerned (for category A Projects only) | Coal Mining | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Village Marda, Tehsil Warora, District Chandrapur | (b)Pincode | 442907 | (c)Bounded Latitudes (North) | | From | | Degree | 20.22750000 | Minutes | | Second | | From | | Degree | 20.27055556 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 78.92361111 | Minutes | | Second | | From | | Degree | 98.9733333 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 55 L/15 and 55 L/16 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 203.72 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11015/381/2015-IA-II (M) | (c)Date of Issue of TOR | 21 Jun 2019 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 07 Jan 2020 | (c)Date of Issue of EC | 01 Jan 2021 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 14 Jun 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Project Area, Amalgamated Yekona I & II OC | State : | Maharashtra | District : | Chandrapur | Tehsil : | Warora | Village : | Yekona |
| 200 | Rehabilitation of Marda Village
2. Provision of direct and indirect employment and skill development for
unemployed local youth.
3. Land Compensation
4. Wild vegetation on the land acquired by WCL | Others | ADM | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | EC -106/RON/ 2019-NGP/5622 dated 19.08.2019 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 26 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Coal | 1.0 | 2.44 | 3.44 | Others | Million tonnes per annum | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Opencast Coal Mine Project | Opencast Coal Mine Project | Opencast Coal Mine Project | Opencast Coal Mine Project | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 12 May 2016 | (iv)Valid Upto | 31 Aug 2020 | (v)File No. | BO/ JD (APC) / EPIC no. CH- 1781-15/ O/ CC/ 6269 d | (vi)Application No. | CO1510000244 dated 15.09.2015 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 745.83 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.9709 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 3.63 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.65 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 2.44 | (b)Existing quantity of raw material/fuel | 1.0 | (c)Total quantity of raw material/fuel | 3.44 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Diesel | 1313.51 | Others | KL per annum | IOC | Road | | 0 | Fuel Supply Agreement | | Copy of Linkage | (2.) | Explosives | 12.01 | Others | Million kg per annum | CIL approved vendors | Road | | 0 | Others | Agreement | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2016 To 21 Dec 2016 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 69 | 34 | 68.5 | 300 | (2.) | SO2 | | Micro Gram per Meter Cube | 13.5 | 8.2 | 13.1 | 120 | (3.) | NOx | | Micro Gram per Meter Cube | 19 | 11 | 18.1 | 120 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 38 | 19 | 37.1 | 60 | |
14.2. No. of Ground Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.3 | 7.1 | 6.5 | 8.5 | (2.) | TSS | | | mg/l | | 19 | 15 | 30 | 100 | (3.) | TDS | | | mg/l | | 678 | 649 | 500 | 2000 | (4.) | Total Hardness | | | mg/l | | 329 | 319 | 200 | 600 | (5.) | Fluoride | | | mg/l | | 0.5 | 0.4 | 1 | 1.5 | (6.) | Heavy Metals | | Zinc | mg/l | | 0.36 | 0.30 | 5 | 15 | (7.) | Chlorides | | | mg/l | | 42 | 36 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 6.8 | 6.5 | C | (2.) | BOD | | mg/l | | 2.8 | 2.0 | C | (3.) | COD | | mg/l | | 6.5 | 6.4 | C | (4.) | pH | | NA | | 7.7 | 7.6 | C | |
14.4. No. of Ambient Noise monitoring locations : 6 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 51.2 | 48.8 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 44.5 | 42.1 | 45 | |
14.5. No. of Soil Sample Monitored locations : 3 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 296.2 | 251.8 | (2.) | P(Phosphorus) | Kilogram per hectare | | 27.4 | 21.5 | (3.) | K(Potassium) | Kilogram per hectare | | 151.2 | 122.8 | (4.) | Electric Conductivity | Others | m mhos per cm at 20 degree celcius | 0.68 | 0.39 | (5.) | pH | | | 6.7 | 6.4 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10.64 To 7.75 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 4.65 To 8.10 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | CGWA/NOC/MIN/ORIG/2019/6689 dated 06.12.2019 | (f)Date of Issue | 06 Dec 2019 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Mine Discharge | 4330 | 0.50 | Copy of Permission Letter | Pipeline | | Others | Mine Discharge | CGWA/NOC/MIN/ORIG/2019/6689 dated 06.12.2019 | 06 Dec 2019 | 4330 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Mine Dischrage | 27368 | 27368 | Sedimentation Tank | Discharge into Surface Water Body,Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 810 | 26558 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 27368 | (b)Total Discharged Water (Kilolitre per Day) | 26558 | (c)Total Reused Water (Kilolitre per Day) | 810 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Over Burden | Others | Over burden qantity in Million cubic meter | 26.0 | Tons | 0.4 | Others | Internal Haul road | Others | Internal backfilling | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 26 | 0.1 | 4.51 | 30.52 | 60 | (2.) | PM10 | | Microgram per Meter Cube | 47.54 | 0.1 | 30.6 | 78.15 | 100 | (3.) | SO2 | | Microgram per Meter Cube | 13.4 | 0.1 | 8.62 | 22.03 | 80 | (4.) | NOx | | Microgram per Meter Cube | 16.7 | 0.1 | 10.74 | 27.45 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Not applicable | NA | 0 | 0 | NOx | | 0 | (2.) | Not applicable | NA | 0 | 0 | PM10 | | 0 | (3.) | Not applicable | NA | 0 | 0 | SO2 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 3303 | (b)Source | MSEDCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 1620.80 | (c)Government Land (ha.) | 58.59 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 1679.39 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 959.05 | (b)Waste/Barren Land (ha.) | 44.49 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 675.85 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 1679.3899999999999 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 689.20 | Quarry / excavated area including existing quarry | (2.) | Township | | 10 | Residential Colony | (3.) | Built Up Area | | 130 | Roads and infrastructure | (4.) | OB Dump Area | | 320.02 | External OB dump | (5.) | Safety Zone | | 314.37 | Flood protection blasting safety zone | (6.) | Green belt | | 141.38 | Rationalisation of boundary | (7.) | Water Reservoir | | 58.35 | Nalla Diversion and Irrigation Canal | (8.) | Area for Solid Waste Management | | 0 | | (9.) | Ash Pond | | 0 | | (10.) | Tailing Pond | | 0 | | (11.) | LandFill | | 0 | | (12.) | Desalination Plant | | 0 | | (13.) | Others | in ha | 38.0 | Relocation of Marda Village and railway siding | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Not Applicable | 0 | Not falls in Critically Polluted areas | (2.) | WLS | Not Applicable | 0 | Nil | (3.) | ESZs | Not Applicable | 0 | Nil | (4.) | Wildlife Corridors | Not Applicable | 0 | Nil | (5.) | NPA | Not Applicable | 0 | Nil | (6.) | ESAs | Not Applicable | 0 | Nil | (7.) | Corridors | Not Applicable | 0 | Nil | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Not Applicable | 0 | Nil | (2.) | Archaeological Sites | | Not Applicable | 0 | Nil | (3.) | Defence Installations | | Not Applicable | 0 | Nil | (4.) | Others | NA | Not Applicable | 0 | Nil | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 100 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 675.85 | (b)Land yet to be acquired(Ha) | 1025.47 | (c)Status of Land acquisition if not acquired | Under Process | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 1 | (b)No. of Households | 208 | (c)No. of PDFs (Project Displaced Families) | 208 | (d)No. of PAFs (Project Affected Families) | 797 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 4119.08 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Great Indian Bustard and Indian pied hornbill have been reported within the study area during baseline data generation. | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 30.10 | (iii)Period of Implementation | 3 Years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | • A seasonal nallah flowing in the eastern boundary of the mine. • An irrigation canal passing through the project area | (b)Whether there is Diversion Required ? | Yes | (i)Details of Diversion Required | 1. Seasonal nallah will be diverted along the mine boundary. 2. The canal will also be diverted along the southern boundary of OCP. | (ii)Details of Study Conducted | yet to be conducted | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | 1. Wardha river is flowing in west of project area. 2. The area is also drained by South Westerly flowing fifth order Daiwal nala/nadi situated near North West direction of the mine boundary. This nala ultimately discharges into the Wardha River near Niljai village. | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 0.15 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 557 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 330 | (f)Total Manpower | 557 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 0 | 847 | 847 | (2.) | Percentage of Total Project Area | 0 | 50.43 | 50.43 | (3.) | No. of Plants | 0 | 2117550 | 2117550 | (4.) | Funds Allocated | 0 | 5500000 | 5500000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Conservation of coal. Also it will lead to positive environmental impacts like green cover, mine water utilization , etc. | (2.) | Social | The project will lead to development of roads, ancillary industries, Improvement in social & living standards by providing opportunities of direct & indirect employment to local community | (3.) | Financial | A substantial percentage of population is dependent on mining industry directly or indirectly. Because of this mining project some of the local population may take direct employment but a substantial impact will be on creation of indirect job opportunities and employment. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Coal | Major | (2.) | Coal | Minor | |
|
2. | Mine Capacity in ROM (Run of Mine) | 3.44 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | WCL / BD/ SECTT/ BM 315/ 2019/ 958 | (b)Date of Approval | 12 Oct 2019 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | WCL Board | (e)Approved Mining Lease Area | 1679.39 | (f)Approved Capacity | 3.44 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 78.62 | (b)Mineable Reserves (Million Ton) | 60.92 | (c)Extractable Reserves(Million Ton) | 57.85 | (d)Percent(%) of Extraction | 95 | (e)Grade of Coal /Ore /Mineral | G8 | (f)Stripping Ratio | 1 : 7.82 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA as it a opencast Mine | (h)Average Gradient(Degree) | 4.8 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 25 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | Yes | (c)No. of crushers | 2 | |
|
6.1. Details of crusher: |
---|
S. No. | Crusher ID | Capacity (in PH) | Remarks |
---|
(1.) | 1 | 400 | | (2.) | 2 | 400 | | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | Yes | (b)No. of seams | 1 | (c)Thickness of seams to be worked on | 9.94 | (d)Maximum Thickness of Seams (metres) | 12.47 | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 1679.39 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | Land acquired as per CBA, 1957 | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | Land acquired as per CBA, 1957 | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | Land acquired as per CBA, 1957 | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | (v)No. of year back fill up | | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 16.38 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 16.38 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | | (b)Depth (in meter) | | (c)Volume (in Million Cubic meter) | | |
|
12. | Details of Quarry: | (a)Final Void of 337.20 (hectare) at a Depth of 150 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 689.20 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | Dumper | (b)Surface to Siding/Loading | tipper | (c)Transportation / Conveyor Details | Railway siding is proposed | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (2.) | FOREST LAND | | 0 | 0 | 0 | (3.) | SETTLEMENTS | | 0 | 0 | 0 | (4.) | WASTE LAND | | 58.59 | 0 | 58.59 | (5.) | AGRICULTURE LAND | | 1570.31 | 50.49 | 1620.8 | (6.) | OTHERS(Specify) | NA | 0 | 0 | 0 | (7.) | GRAZING LAND | | 0 | 0 | 0 | |
TOTAL | 1628.9 | 50.49 | 1679.39 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | ROADS | | 5 | 0 | 25 | | 30 | (2.) | VIRGIN AREA | | 100 | 0 | 311.38 | | 411.38 | (3.) | Other | Nallah and canal diversion | 0 | 58.35 | 0 | | 58.35 | (4.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (5.) | EXTERNAL OB DUMPS | | 320.02 | 0 | 0 | | 320.02 | (6.) | EXCAVATION/QUARRY | | 352 | 337.20 | 0 | | 689.2 | (7.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (8.) | GREEN BELT | | 0 | 0 | 0 | | 0 | (9.) | BUILT UP AREA (COLONY/OFFICE) | | 70 | 0 | 122.37 | | 192.37 | |
TOTAL | 847.02 | 395.55 | 458.75 | 0 | 1701.32 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 320.02 | (b)Internal Dump(in hectare) | 352.0 | (c)Quarry(in hectare) | 689.20 | (d)Safety Zone(in hectare) | 270 | (e)Final Void of 337.20 (hectare) at a Depth of 150 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 175 | (h)Total afforestation plant (in hectare) | 847.02 | |
|
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 2007 | 0.60 | 0.60 | 0.60 | 0 | 0 | (2.) | 2008 | 0.60 | 0.60 | 0.60 | 0 | 0 | (3.) | 2009 | 0.60 | 0.60 | 0.60 | 0 | 0 | (4.) | 2010 | 0.60 | 0.60 | 0.60 | 0 | 0 | (5.) | 2011 | 0.60 | 0.60 | 0.60 | 0 | 0 | (6.) | 2014 | 0.60 | 0.60 | 0.60 | 0 | 0 | (7.) | 2017 | 0.60 | 0.60 | 0.60 | 0 | 0 | (8.) | 2019 | 0.60 | 0.60 | 0.60 | 0.113 | 0 | (9.) | 2012 | 0.60 | 0.60 | 0.60 | 0 | 0 | (10.) | 2013 | 0.60 | 0.60 | 0.60 | 0 | 0 | (11.) | 2016 | 0.60 | 0.60 | 0.60 | 0 | 0 | (12.) | 2018 | 0.60 | 0.60 | 0.60 | 0 | 0 | (13.) | 2015 | 0.60 | 0.60 | 0.60 | 0 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA 0092 | (ii)Name of the EIA Consultant | CMPDIL | (iii)Address | Gondwana Place, Kanke Road, Ranchi-834031 | (iv)Mobile No. | 6512231850 | (v)Landline No. | 0651223185 | (vi)Email Id | Gmenv.cmpdi@coalindia.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 01 Oct 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Complying with all the directives of EAC in respect of “Amalgamated Yekona I & II OC (Phase-I) with increase in production capacity from 1.0 MTPA to 2.75 MTPA (normative) and 3.44 MTPA (peak) of M/s Western Coalfields Limited and increase in land area from 680.06 ha to 1679.39 ha located in Tehsil Warora, District Chandrapur (Maharashtra)”, the said proposal may kindly be considered for grant of EC. | 24 Sep 2020 | 2. | NA | The EAC after deliberation observed project lies in Chandrapur Area hence as per Ministry’ OM dated 31st October, 2019 will be stipulated the conditions accordingly. Further, Project proponent cannot have excuse that since Thermal Power Plants (TPPs) is transporting the coal from mine to TPP so responsibility of widening the road lies with TPPs or MIDC. Also, this coal mine is located near the river bank. The embankment is constructed to protect the coal mine from inundation during flood situation. Due to such embankment, the natural river course may be obstructed and water level is likely to increase on upstream side due to backwater, which may result in severity of flooding condition. Based on submission of Project proponent, EAC desires further clarity and response on the following observation:
· PP shall study the impact Assessment on the proposed road route on receptors for environment parameters of as per Ambient Air Quality standards.
· PP shall provide the deliberations with Power Plants, PWD or MIDC for widening of road or similar initiatives of pipe conveyor with Mahagenco to reduce the impact on road and nearby habitations.
· Water Balance diagram with zero liquid discharge considering no untreated mine water discharged in river
· Permission of extraction of ground water from Central Ground Water Authority.
· Study the impact of embankment along river and propose mitigation measures bearing in mind that no villages shall be flooded due to embankment.
· Recommendation of Slope Stability Study of OB dump and Year wise dumping of external and internal OB, along with backfilling and reclamation shall be presented.
Keeping in view above points the proposal was deferred for compliance of the above points | 14 Sep 2020 | 3. | ADS Reply Letter | As desired by MoEF & CC, the point wise reply against the ADS raised on 11-06-2020 has been prepared and enclosed herewith for kind consideration for the grant of EC for Amalgamated Yekona- I & II OCP (Phase-I). | 30 Jun 2020 | 4. | NA | In view of the incomplete compliance/information and unresolved issues, the EAC after due deliberation observed the following and sought information by PP.
· As this project falls in CPA, the details of the Proposed Environmental Protection Mechanism as per Ministry’s OM dated 31st October, 2019 has not yet been submitted. It is to be submitted
· Permission for diversion of the road (Road from Warora to Madhari) which is passing through the proposed quarry of Yekona I
- The location of the mine boundary from the HFL and the bank of the river should be studied and thereby EAC will prescribe the distance of the mine wall from HFL as well as bank of river.
· As the new linkage of the Thermal Power Plants are being worked-out/explored located at different distances, Traffic impact assessment in terms of environmental, habitation and pollution control should be presented for all proposed routes.
· Map showing movement of dumping of External OB excluding Forest land proposed to be diverted in due course of time should be provided.
· Contradictory statement in EIA Report and Response to RO regarding installation of Coal Handling Plant should be avoided and firmed up plan should be presented before this committee.
· HEMM is proposed by PP to be maintained by outsourcing agency, however, the overall responsibility of all the commitment made will rest with the PP.
· In-pit conveyor belt till CHP should be installed and timeline should be given accordingly.
· PH mentions that Overburden is 100 meters away from yekona village, which may cause pollution around the village. Also in the event of an accident which may fall of OB into the river, water may enter into village causing damage. Necessary mitigation measures should be proposed by PP and presented before the committee.
· Road between Naidev village to Warora appears to be causing dust emission due to movement of coal trucks. Plan for upgradation of road up to the specified standard and widening of road along with the environmental mitigation measures should be submitted to the committee.
The proposal was deferred for want of above compliance.
| 11 Jun 2020 | 5. | ADS Reply Letter | The detailed pointwise compliance against the observations of the EAC is enclosed. It is, therefore, most earnestly solicited that, our submission may kindly be considered for grant of EC in the subject project | 11 May 2020 | 6. | NA | 53.6.4