Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Amalgamated Yekona I & II OC (Phase-I) with increase in production capacity from 1.0 MTPA to 2.75 MTPA (normative) and 3.44 MTPA (peak) and increase in land area from 680.06 ha to 1679.39 ha of M/s We
(b)Name of the Company / Organisation Western Coalfields Limited
(c)Registered Address Coal Estate Civil lines, Nagpur-440001,Coal Estate Civil lines, Nagpur-440001,Nagpur,Maharashtra-440001
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Kaushik Chakraborty
(b)Designation (Owner/ Partner/ CEO) G.M (MINING)/ ENVIRONMENT.
(c)Address NIL
(d)Pin code 440001
(e)E-mail gmenvironment.wcl@coalindia.in
(f)STD Code. 712(f)Telephone No. 2510151
(g)Fax No. 2510151
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity1(a) Mining of minerals
(b)Category A
(c)Proposal Number IA/MH/CMIN/135434/2019
(d)Master Proposal Number(Single Window) SW/135431/2020
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Village Marda, Tehsil Warora, District Chandrapur
(b)Pincode 442907
(c)Bounded Latitudes (North)
From
Degree 20.22750000
Minutes
Second
From
Degree 20.27055556
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 78.92361111
Minutes
Second
From
Degree 98.9733333
Minutes
Second
(e)Survey of India Topo Sheet No. 55 L/15 and 55 L/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 203.72
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/381/2015-IA-II (M)
(c)Date of Issue of TOR 21 Jun 2019
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 07 Jan 2020
(c)Date of Issue of EC 01 Jan 2021
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :09 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :14 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :0
Project Area, Amalgamated Yekona I & II OC
State :Maharashtra
District :Chandrapur
Tehsil :Warora
Village :Yekona
200Rehabilitation of Marda Village 2. Provision of direct and indirect employment and skill development for unemployed local youth. 3. Land Compensation 4. Wild vegetation on the land acquired by WCLOthersADM
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. EC -106/RON/ 2019-NGP/5622 dated 19.08.2019
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 26 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Coal1.02.443.44OthersMillion tonnes per annumRoad,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Opencast Coal Mine ProjectOpencast Coal Mine ProjectOpencast Coal Mine ProjectOpencast Coal Mine Project
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 12 May 2016
(iv)Valid Upto 31 Aug 2020
(v)File No. BO/ JD (APC) / EPIC no. CH- 1781-15/ O/ CC/ 6269 d
(vi)Application No. CO1510000244 dated 15.09.2015
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 745.83
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.9709
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.63
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.65
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 2.44
(b)Existing quantity of raw material/fuel 1.0
(c)Total quantity of raw material/fuel 3.44
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel1313.51OthersKL per annumIOCRoad0 Fuel Supply AgreementCopy of Linkage
(2.)Explosives12.01OthersMillion kg per annumCIL approved vendorsRoad0 OthersAgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2016 To 21 Dec 2016
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube693468.5300
(2.)SO2Micro Gram per Meter Cube13.58.213.1120
(3.)NOxMicro Gram per Meter Cube191118.1120
(4.)PM2.5Micro Gram per Meter Cube381937.160
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.37.16.58.5
(2.)TSSmg/l191530100
(3.)TDSmg/l6786495002000
(4.)Total Hardnessmg/l329319200600
(5.)Fluoridemg/l0.50.411.5
(6.)Heavy MetalsZincmg/l0.360.30515
(7.)Chloridesmg/l42362501000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.86.5C
(2.)BODmg/l2.82.0C
(3.)CODmg/l6.56.4C
(4.)pHNA7.77.6C
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))51.248.855
(2.)Leq(Night)A-weighted decibels(dB(A))44.542.145
    14.5.     No. of Soil Sample Monitored locations : 3
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare296.2251.8
(2.)P(Phosphorus)Kilogram per hectare27.421.5
(3.)K(Potassium)Kilogram per hectare151.2122.8
(4.)Electric ConductivityOthersm mhos per cm at 20 degree celcius0.680.39
(5.)pH6.76.4
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.64 To 7.75
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 4.65 To 8.10
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. CGWA/NOC/MIN/ORIG/2019/6689 dated 06.12.2019
(f)Date of Issue 06 Dec 2019
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMine Discharge43300.50Copy of Permission LetterPipelineOthersMine DischargeCGWA/NOC/MIN/ORIG/2019/6689 dated 06.12.201906 Dec 20194330
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Mine Dischrage2736827368Sedimentation TankDischarge into Surface Water Body,Reuse within the Plant & Recycling,Green Belt Renewal Plant81026558
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 27368
(b)Total Discharged Water (Kilolitre per Day) 26558
(c)Total Reused Water (Kilolitre per Day) 810
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Over BurdenOthersOver burden qantity in Million cubic meter26.0Tons0.4OthersInternal Haul roadOthersInternal backfilling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube260.14.5130.5260
(2.)PM10Microgram per Meter Cube47.540.130.678.15100
(3.)SO2Microgram per Meter Cube13.40.18.6222.0380
(4.)NOxMicrogram per Meter Cube16.70.110.7427.4580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Not applicableNA00NOx0
(2.)Not applicableNA00PM100
(3.)Not applicableNA00SO20
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3303
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1620.80
(c)Government Land (ha.) 58.59
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1679.39
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 959.05
(b)Waste/Barren Land (ha.) 44.49
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 675.85
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 1679.3899999999999
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area689.20Quarry / excavated area including existing quarry
(2.)Township10Residential Colony
(3.)Built Up Area130Roads and infrastructure
(4.)OB Dump Area320.02External OB dump
(5.)Safety Zone314.37Flood protection blasting safety zone
(6.)Green belt141.38Rationalisation of boundary
(7.)Water Reservoir58.35Nalla Diversion and Irrigation Canal
(8.)Area for Solid Waste Management0
(9.)Ash Pond0
(10.)Tailing Pond0
(11.)LandFill0
(12.)Desalination Plant0
(13.)Othersin ha38.0Relocation of Marda Village and railway siding
Total (ha.) 1701.32
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNot Applicable0Not falls in Critically Polluted areas
(2.)WLSNot Applicable0Nil
(3.)ESZsNot Applicable0Nil
(4.)Wildlife CorridorsNot Applicable0Nil
(5.)NPANot Applicable0Nil
(6.)ESAsNot Applicable0Nil
(7.)CorridorsNot Applicable0Nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNot Applicable0Nil
(2.)Archaeological SitesNot Applicable0Nil
(3.)Defence InstallationsNot Applicable0Nil
(4.)OthersNANot Applicable0Nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 100
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 675.85
(b)Land yet to be acquired(Ha) 1025.47
(c)Status of Land acquisition if not acquired Under Process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 1
(b)No. of Households 208
(c)No. of PDFs (Project Displaced Families) 208
(d)No. of PAFs (Project Affected Families) 797
(e)Funds Allocated for R&R(in INR) (in Lacs) 4119.08
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Great Indian Bustard and Indian pied hornbill have been reported within the study area during baseline data generation.
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 30.10
(iii)Period of Implementation 3 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area • A seasonal nallah flowing in the eastern boundary of the mine. • An irrigation canal passing through the project area
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required 1. Seasonal nallah will be diverted along the mine boundary. 2. The canal will also be diverted along the southern boundary of OCP.
(ii)Details of Study Conducted yet to be conducted
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area 1. Wardha river is flowing in west of project area. 2. The area is also drained by South Westerly flowing fifth order Daiwal nala/nadi situated near North West direction of the mine boundary. This nala ultimately discharges into the Wardha River near Niljai village.
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 0.15
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 557
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 557
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt0847847
(2.)Percentage of Total Project Area050.4350.43
(3.)No. of Plants021175502117550
(4.)Funds Allocated055000005500000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalConservation of coal. Also it will lead to positive environmental impacts like green cover, mine water utilization , etc.
(2.)SocialThe project will lead to development of roads, ancillary industries, Improvement in social & living standards by providing opportunities of direct & indirect employment to local community
(3.)FinancialA substantial percentage of population is dependent on mining industry directly or indirectly. Because of this mining project some of the local population may take direct employment but a substantial impact will be on creation of indirect job opportunities and employment.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)CoalMajor
(2.)CoalMinor
2.
Mine Capacity in ROM (Run of Mine) 3.44
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. WCL / BD/ SECTT/ BM 315/ 2019/ 958
(b)Date of Approval 12 Oct 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department WCL Board
(e)Approved Mining Lease Area 1679.39
(f)Approved Capacity 3.44
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 78.62
(b)Mineable Reserves (Million Ton) 60.92
(c)Extractable Reserves(Million Ton) 57.85
(d)Percent(%) of Extraction 95
(e)Grade of Coal /Ore /Mineral G8
(f)Stripping Ratio 1 : 7.82
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA as it a opencast Mine
(h)Average Gradient(Degree) 4.8
(i)Mining Method Opencast
(j)Life of Mine (Years) 25
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area Yes
(c)No. of crushers 2
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)1400
(2.)2400
7.
Details of Seams:
(a)Whether details of seam applicable Yes
(b)No. of seams 1
(c)Thickness of seams to be worked on 9.94
(d)Maximum Thickness of Seams (metres) 12.47
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 1679.39
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Land acquired as per CBA, 1957
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Land acquired as per CBA, 1957
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Land acquired as per CBA, 1957
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
(v)No. of year back fill up
(b) Details of Internal Dumps:
(i)No. of Internal Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 16.38
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 16.38
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare)
(b)Depth (in meter)
(c)Volume (in Million Cubic meter)
12.
Details of Quarry:
(a)Final Void of 337.20 (hectare) at a Depth of 150 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 689.20
13.
Details of Transportation:
(a)In Pit/Underground to Surface Dumper
(b)Surface to Siding/Loading tipper
(c)Transportation / Conveyor Details Railway siding is proposed
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)SURFACE WATER BODIES000
(2.)FOREST LAND000
(3.)SETTLEMENTS000
(4.)WASTE LAND58.59058.59
(5.)AGRICULTURE LAND1570.3150.491620.8
(6.)OTHERS(Specify)NA000
(7.)GRAZING LAND000
TOTAL1628.950.491679.39
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)ROADS502530
(2.)VIRGIN AREA1000311.38411.38
(3.)OtherNallah and canal diversion058.35058.35
(4.)INTERNAL OB DUMPS0000
(5.)EXTERNAL OB DUMPS320.0200320.02
(6.)EXCAVATION/QUARRY352337.200689.2
(7.)TOP SOIL STORAGE0000
(8.)GREEN BELT0000
(9.)BUILT UP AREA (COLONY/OFFICE)700122.37192.37
TOTAL847.02395.55458.7501701.32
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 320.02
(b)Internal Dump(in hectare) 352.0
(c)Quarry(in hectare) 689.20
(d)Safety Zone(in hectare) 270
(e)Final Void of 337.20 (hectare) at a Depth of 150 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 175
(h)Total afforestation plant (in hectare) 847.02
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan No
Total Area Excavated (in hectare) 28.90
Total Area Backfilled after Excavation (in hectare) 0
Total Area Reclaimed (in hectare) 0
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20070.600.600.6000
(2.)20080.600.600.6000
(3.)20090.600.600.6000
(4.)20100.600.600.6000
(5.)20110.600.600.6000
(6.)20140.600.600.6000
(7.)20170.600.600.6000
(8.)20190.600.600.600.1130
(9.)20120.600.600.6000
(10.)20130.600.600.6000
(11.)20160.600.600.6000
(12.)20180.600.600.6000
(13.)20150.600.600.6000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA 0092
(ii)Name of the EIA Consultant CMPDIL
(iii)Address Gondwana Place, Kanke Road, Ranchi-834031
(iv)Mobile No. 6512231850
(v)Landline No. 0651223185
(vi)Email Id Gmenv.cmpdi@coalindia.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 01 Oct 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterComplying with all the directives of EAC in respect of “Amalgamated Yekona I & II OC (Phase-I) with increase in production capacity from 1.0 MTPA to 2.75 MTPA (normative) and 3.44 MTPA (peak) of M/s Western Coalfields Limited and increase in land area from 680.06 ha to 1679.39 ha located in Tehsil Warora, District Chandrapur (Maharashtra)”, the said proposal may kindly be considered for grant of EC. 24 Sep 2020
2.NA

The EAC after deliberation observed project lies in Chandrapur Area hence as per Ministry’ OM dated 31st October, 2019 will be stipulated the conditions accordingly. Further, Project proponent cannot have excuse that since Thermal Power Plants (TPPs) is transporting the coal from mine to TPP so responsibility of widening the road lies with TPPs or MIDC. Also, this coal mine is located near the river bank. The embankment is constructed to protect the coal mine from inundation during flood situation. Due to such embankment, the natural river course may be obstructed and water level is likely to increase on upstream side due to backwater, which may result in severity of flooding condition. Based on submission of Project proponent, EAC desires further clarity and response on the following observation:

·                PP shall study the impact Assessment on the proposed road route on receptors for environment parameters of as per Ambient Air Quality standards.

·                PP shall provide the deliberations with Power Plants, PWD or MIDC for widening of road or similar initiatives of pipe conveyor with Mahagenco to reduce the impact on road and nearby habitations.

·                Water Balance diagram with zero liquid discharge considering no untreated mine water discharged in river

·                Permission of extraction of ground water from Central Ground Water Authority.

·                Study the impact of embankment along river and propose mitigation measures bearing in mind that no villages shall be flooded due to embankment.

·                Recommendation of Slope Stability Study of OB dump and Year wise dumping of external and internal OB, along with backfilling and reclamation shall be presented.

Keeping in view above points the proposal was deferred for compliance of the above points

14 Sep 2020
3. ADS Reply LetterAs desired by MoEF & CC, the point wise reply against the ADS raised on 11-06-2020 has been prepared and enclosed herewith for kind consideration for the grant of EC for Amalgamated Yekona- I & II OCP (Phase-I). 30 Jun 2020
4.NA

In view of the incomplete compliance/information and unresolved issues, the EAC after due deliberation observed the following and sought information by PP.

·         As this project falls in CPA, the details of the Proposed Environmental Protection Mechanism as per Ministry’s OM dated 31st October, 2019 has not yet been submitted. It is to be submitted

·         Permission for diversion of the road (Road from Warora to Madhari) which is passing through the proposed quarry of Yekona I

  • The location of the mine boundary from the HFL and the bank of the river should be studied and thereby EAC will prescribe the distance of the mine wall from HFL as well as bank of river. 

·         As the new linkage of the Thermal Power Plants are being worked-out/explored located at different distances, Traffic impact assessment in terms of environmental, habitation and pollution control should be presented for all proposed routes.

·         Map showing movement of dumping of External OB excluding Forest land proposed to be diverted in due course of time should be provided.

·         Contradictory statement in EIA Report and Response to RO regarding installation of Coal Handling Plant should be avoided and firmed up plan should be presented before this committee.

·         HEMM is proposed by PP to be maintained by outsourcing agency, however, the overall responsibility of all the commitment made will rest with the PP.

·         In-pit conveyor belt till CHP should be installed and timeline should be given accordingly.

·         PH mentions that Overburden is 100 meters away from yekona village, which may cause pollution around the village. Also in the event of an accident which may  fall of OB  into the river,  water may enter into village causing damage. Necessary mitigation measures should be proposed by PP and presented before the committee.

·         Road between Naidev village to Warora appears to be causing dust emission due to movement of coal trucks. Plan for upgradation of road up to the specified standard and widening of road along with the environmental mitigation measures should be submitted to the committee.

 

The proposal was deferred for want of above compliance.

 

11 Jun 2020
5. ADS Reply LetterThe detailed pointwise compliance against the observations of the EAC is enclosed. It is, therefore, most earnestly solicited that, our submission may kindly be considered for grant of EC in the subject project 11 May 2020
6.NA

53.6.4       