1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed Project for manufacturing of Carbon Black & Power Generation (Green Power) by M/s. Madura Carbon (India) Ltd. | (b)Name of the Company / Organisation | MADURA CARBON INDIA LTD | (c)Registered Address | Survey No. 3705 to 3710, 3712, 3713, 3715, 3717, 3718, 3720, 3722 to 3724, 3726, 3727, 3730, 3733 to 3740, 3742, 3743, 4049, 4084 to 4090, 4095, 4105, 4107, 4108, 4110, 4112, 4133 to 4135, 4301, 4317, 5134, 5220 to 5222, 5226, 5227, 5236, 5264, Villa,,Valsad,Gujarat-396155 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Vipan Kalra | (b)Designation (Owner/ Partner/ CEO) | CMD | (c)Address | 1, Janki Centre, Off-Veera Desai Road, Andheri west, Mumbai-400053,,Andheri,Mumbai City,Maharashtra-400053 | (d)Pin code | 400053 | (e)E-mail | vipankalra@hotmail.com | (f)STD Code. | 22(f)Telephone No. | 26730890 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(e) Petrochemical based processing (processes other than cracking &
| Minor Activity | 1(d) Thermal Power Plants
| (b)Category | A | (c)Proposal Number | IA/GJ/IND2/76156/2018 | (d)Master Proposal Number(Single Window) | SW/134901/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Survey no. 3705, 3708, 3719, 3725, 3738, 4108, 411 | (b)Pincode | 396155 | (c)Bounded Latitudes (North) | | From | | Degree | 20.298489 | Minutes | | Second | | From | | Degree | 20.305154 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.837415 | Minutes | | Second | | From | | Degree | 72.840181 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43S11, F43S15, F43S16 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 41 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 5 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Valsad | Umbergaon | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/266/2018-IA-II(I) | (b)Date of Apply of TOR | 05 Mar 2019 | (c)Date of Issue of TOR / Standard ToR | 06 Apr 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 19 Jul 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Survey no. 3705, 3708, 3719, 3725, 3738, 4108, 4110, 4318, Village: Fansa (Karajgam), Taluka: Umbergaon, Dist.: Valsad, Gujarat | State : | Gujarat | District : | Valsad | Tehsil : | Umbergaon | Village : | Fansa (Karajgam) |
| 374 | A summarized table showing salient points highlighting issues raised by the participants & issues raised by the concerned persons having plausible stake in Environment and responded by the representat | District Collector | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Plant | 230000 TPA | Production Capacity | (2.) | Plant | 45 MW | Power Generation (Green Power) | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Carbon Black | 230000 | Tons per Annum | | Road | | (2.) | Power Generation (Green Power) | 45 | Mega Watt(MW) | | Others | power distribution system | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 440 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 86.5 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 6.6 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 26.45 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 411010 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 411010 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Feed Stock | 363400 | Tons per Annum | | Indian Market & Imported | Road | | 300 | Open Market | | Copy of Linkage | (2.) | Potassium Nitrate | 690 | Tons per Annum | | Local Traders | Road | | 300 | Open Market | | Copy of Linkage | (3.) | FUEL- FURNACE OIL | 46000 | Tons per Annum | | Local Traders | Road | | 300 | Open Market | | Copy of Linkage | (4.) | Molasses | 920 | Tons per Annum | | Local Traders | Road | | 300 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 02 Oct 2018 To 28 Dec 2018 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 89 | 60 | 89 | 100 | (2.) | Others | CO | Mili Gram per Meter Cube | 1.18 | 0.11 | 1.18 | 4 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 44 | 16 | 44 | 60 | (4.) | SO2 | | Micro Gram per Meter Cube | 22 | 9 | 22 | 80 | (5.) | NOx | | Micro Gram per Meter Cube | 26 | 10 | 26 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.82 | 7.51 | 8.5 | 0 | (2.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (3.) | Fluoride | | | mg/l | | 0.6 | 0.1 | 1 | 1.5 | (4.) | Others | Total Alkalinity | | mg/l | | 274 | 206 | 200 | 600 | (5.) | TDS | | | mg/l | | 617 | 484 | 500 | 2000 | (6.) | Total Hardness | | | mg/l | | 296 | 218 | 200 | 600 | (7.) | Chlorides | | | mg/l | | 95 | 63 | 250 | 1000 | (8.) | Heavy Metals | | Iron | mg/l | | 0.3 | 0.1 | 0.3 | 0 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 6.3 | 1.3 | E | (2.) | COD | | mg/l | | 112 | 14 | A | (3.) | BOD | | mg/l | | 32 | 5 | E | (4.) | pH | | NA | | 8.16 | 7.6 | A | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 69.9 | 42.8 | 75-50 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 62.9 | 37.4 | 70-40 | |
14.5. No. of Soil Sample Monitored locations : 4 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.88 | 7.25 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 28 | 22 | (3.) | N(Nitrogen) | Milligram per Kilogram | | 130 | 127 | (4.) | K(Potassium) | Milligram per Kilogram | | 103 | 90 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 1.32 | 1.20 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 40 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 15 To 30 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 2525 | 0.80 | Copy of Permission Letter | Canal | | Others | Damanganga Canal Distry. | DCDD-3/PB-2/Madura Carbon/2031 | 20 Jun 2019 | 2900 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 585 | 585 | ETP, RO & MEE | Reuse within the Plant & Recycling,Others | Losses | 546 | 39 | (2.) | Domestic | 45 | 45 | STP | Green Belt Renewal Plant,Others | Loss | 44 | 1 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 630 | (b)Total Discharged Water (Kilolitre per Day) | 40 | (c)Total Reused Water (Kilolitre per Day) | 590 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 50 | Tons | 300 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Sludge from APCM | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 43625 | Tons | 300 | Road | | Others | Sell to cement/ gypsum board manufacturers. | (3.) | Scrubber Bleed Liquor | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 21900 | Kilolitre | 0 | Others | inhouse pipe | Others | Treatment in In-house ETP. | (4.) | MEE Salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 150 | Tons | 300 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (5.) | Oily Cotton Waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (6.) | Spent Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 100 | Kilolitre | 300 | Road | | Authorized Recyclers | Sale to registered reprocessor/ recycler | (7.) | Discarded Containers | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 5 | Tons | 300 | Road | | Others | Sale to registered recycler | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 89.00 | 2.83 | 1.80 | 90.81 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 44.00 | 2.83 | 1.80 | 45.81 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 22.00 | 2.83 | 6.09 | 28.10 | 80 | (4.) | NOx | | Microgram per Meter Cube | 26 | 3.61 | 1.86 | 27.87 | 80 | (5.) | Others(Specify) | CO | Microgram per Meter Cube | 1180.00 | 0.77 | 29.16 | 1209.17 | 4000 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler-112 TPH+Boiler-72 TPH | Offgas | 110 | 3.2 | Others | PM, SO2, NOx, CO | PM-3.90g/s, SO2-21.36g/s, NOx-8.72g/s, CO-19.56g/s | (2.) | Dryer Combustor + Vapour Bag Collector (Line-1)) | Offgas | 60 | 2 | Others | PM, SO2, NOx | PM-1.62g/s, SO2-4.80g/s, NOx-0.99g/s | (3.) | Dryer Combustor+Vapour Bag Collector (Line-2) | Offgas | 60 | 2 | Others | PM, SO2, NOx | PM-1.08g/s, SO2-3.20g/s, NOx-0.66g/s | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 13000 | (b)Source | Inhouse PP & DGVCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1000 kVA | (e)Stack Height (in m) | 35 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 9.4499 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 9.4499 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 10277 | (b)Waste/Barren Land (ha.) | 8537 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 916 | (e)Settlements (ha.) | 1477 | (f)Industrial (ha.) | 916 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 4093 | (j)Others (ha.) : Floodplains, Roads, Railways, Open Spaces, Quarrie | 5221 | Total (ha.) | 31437 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 3.17 | | (2.) | Green belt | | 2.48 | | (3.) | Others | Open Area (Roads, Drains, Space) | 3.80 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | GIDC Vapi | 8 | None | (2.) | ESZs | None | 0 | None within 10 km study area | (3.) | NPA | None | 0 | None within 10 km study area | (4.) | Corridors | None | 0 | None within 10 km study area | (5.) | Wildlife Corridors | None | 0 | None within 10 km study area | (6.) | WLS | None | 0 | None within 10 km study area | (7.) | ESAs | None | 0 | None within 10 km study area | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | none | 0 | None within study area | (2.) | Forest | | Patches of reserved forest | 0.8 | Distance map obtained from forest department | (3.) | Defence Installations | | none | 0 | No within study area | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 9.45 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Panthera paradus, Pavo cristatus, Varnus bengalensis & Indirana leithii | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 0 | (iii)Period of Implementation | As per conservation plan | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | River Darotha | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 760 | (c)Temporary Employment- During Construction | 300 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 365 | (f)Total Manpower | 1060 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 2.48 | (b)Percentage of Total Project Area | 26.24 | (c)No. of Plants to be Planted | 5000 | (d)Funds Allocated for Plantation | 3000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Development of the social structure & improvement of the quality of life in the surrounding area due to growth in the economic conditions and Rs. 6.6 Cr. will be allocated for next 10 years for CER activities. | (2.) | Financial | Generation of direct employment opportunities. Approximately 760 people will be employed from the proposed project which will result growth in the economic conditions. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1518/RA012 | (ii)Name of the EIA Consultant | M/s. Precitech Laboratories Pvt. Ltd. | (iii)Address | C5/27, 1st floor, Bhanujyot complex,GIDC char rasta, Vapi, Gujarat. | (iv)Mobile No. | 9925008673 | (v)Landline No. | 0260 | (vi)Email Id | rhb@precitechlab.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 05 Nov 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Vipan Kalra | Designation | CMD | Name of Company (Applicant Name should not be given here) | MADURA CARBON INDIA LTD | Address | Survey No. 3705, 3708, 3719, 3725, 3738, 4108, 4110, 4318, Village- Karanj, Taluka- Umbergaon, Dist.- Valsad, Gujarat |
|