1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed malt based distillery unit of 30 KLD by Microbrew Bistro Pvt. Ltd | (b)Name of the Company / Organisation | MICROBREW BISTRO PVT. LTD. | (c)Registered Address | 308 competent House, F 14 Connaught Place , New Delhi,,New Delhi,Delhi-110001 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Anil Kejriwal | (b)Designation (Owner/ Partner/ CEO) | AS | (c)Address | 308 competent house F 14 connaught Place, New Delhi,,Connaught Place,New Delhi,Delhi-110001 | (d)Pin code | 110001 | (e)E-mail | microbrew2019@gmail.com | (f)STD Code. | 11(f)Telephone No. | 41087888 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(g) Distilleries
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/UK/IND2/98132/2019 | (d)Master Proposal Number(Single Window) | SW/134996/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Khasra Nos.933, 934, 936, 937, 938, 940, village M | (b)Pincode | 244713 | (c)Bounded Latitudes (North) | | From | | Degree | 29820.67 | Minutes | | Second | | From | | Degree | 29821.77 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 785723.11 | Minutes | | Second | | From | | Degree | 785733.55 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 53K/16 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 222 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 6 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Uttarakhand | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Andhra Pradesh | Visakhapatnam | Visakhapatnam (Urban) | Kanchara Palem | (2.) | Uttarakhand | Udham Singh Nagar | Kashipur | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/66/2019-IA-II(I) | (b)Date of Apply of TOR | 05 Mar 2019 | (c)Date of Issue of TOR / Standard ToR | 12 Mar 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 16 Aug 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| project site | State : | Uttarakhand | District : | Udham Singh Nagar | Tehsil : | Kashipur | Village : | Mahuakheraganj |
| 68 | The issues raised during the public hearing includes pollution, water conservation, employment and waste water discharge. | Others | municipal commissioner | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | BOILER | 15 TPH | 2 Nos. | (2.) | Plot area | 15 acres | | (3.) | Malt Spirit | 30 KLD | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | MALT SPIRIT | 30 | Kilo Litre per Day | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 195 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 2.25 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 2.9 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.34 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | d)Inter-State boundaries and international boundaries | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 60 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 60 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Rice husk | 4395 | Others | kg per day | local market | Road | | 10 | Open Market | | Copy of Linkage | (2.) | Enzymes | 15 | Others | kg per day | local market | Road | | 10 | Open Market | | Copy of Linkage | (3.) | Yeast | 65 | Others | Kg/day | local market | Road | | 10 | Open Market | | Copy of Linkage | (4.) | barley malt | 60 | Others | MT/ day | local market | Road | | 10 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 03 Dec 2018 To 26 Feb 2019 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 13.5 | 5.5 | 12.6 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 116.2 | 56.4 | 114.6 | 100 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 47.5 | 18 | 47 | 60 | (4.) | NOx | | Micro Gram per Meter Cube | 28 | 7.6 | 27.4 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.85 | 7.19 | 8.5 | 8.5 | (2.) | Total Hardness | | | mg/l | | 259.3 | 190.1 | 300 | 600 | (3.) | TSS | | | mg/l | | 500 | 350 | 1500 | 2000 | (4.) | TDS | | | mg/l | | 429 | 342 | 500 | 2000 | (5.) | Chlorides | | | mg/l | | 78.5 | 56.6 | 250 | 1000 | (6.) | Fluoride | | | mg/l | | 0.81 | 0.32 | 1.0 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 46.2 | 9.7 | E | (2.) | COD | | mg/l | | 98.7 | 28.7 | D | (3.) | DO | | mg/l | | 3.9 | 1.6 | E | (4.) | pH | | NA | | 7.82 | 6.91 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 56.6 | 51.9 | 65 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 37.2 | 33.8 | 55 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 192 | 126 | (2.) | P(Phosphorus) | Kilogram per hectare | | 61 | 19 | (3.) | Electric Conductivity | Others | µmhos /cm. | 472 | 329 | (4.) | K(Potassium) | Kilogram per hectare | | 205 | 119 | (5.) | pH | | | 7.82 | 7.22 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.27 To 14 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.42 To 13 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 578 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | 21-4/1248/UT/IND/2019 | 18 Sep 2019 | 578 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 7.5 | 10 | STP-MBBR | Reuse within the Plant & Recycling | | 7.5 | | (2.) | Trade | 309 | 350 | ETP | Reuse within the Plant & Recycling | | 309 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 316.5 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 316.5 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | municipal solid waste | Municipal Solid Waste | | 8.58 | Tons | 10 | Road | | Others | municipal department | (2.) | Boiler ash | Bottom Ash | | 130 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Paper waste carton | Industrial Waste | | 2 | Tons | 10 | Road | | Authorized Recyclers | | (4.) | PPE bags | Industrial Waste | | 20 | Tons | 10 | Road | | Authorized Recyclers | | (5.) | Plastic waste | Plastic Waste | | 0.5 | Tons | 10 | Road | | Authorized Recyclers | | (6.) | Spent grain | Industrial Waste | | 20000 | Tons | 10 | Road | | Others | cattle feed | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 75.6 | 0 | 0.01 | 76.61 | 100 | (2.) | NOx | | Microgram per Meter Cube | 15.7 | 0 | 20.44 | 36.15 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 1 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 9.6 | 0 | 2.44 | 12.05 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG SET | HSD | 30 | 0.25 | PM10 | | 0.3 | (2.) | Boiler | Rice husk | 30 | 5 | PM10 | | 150 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 4375 | (b)Source | nearest GSS | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | D.G Sets of cumulative capacity 2000kVA(1000 kAV e | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 6.07 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 6.07 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 13237.0 | (b)Waste/Barren Land (ha.) | 4198.7 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 321.8 | (e)Settlements (ha.) | 2603.8 | (f)Industrial (ha.) | 157.8 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : sandy area,Fallow Land and Open Scrub | 12154.4 | Total (ha.) | 32673.5 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 2.0 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | NA | 0 | None within 10 kms of study area | (2.) | NPA | NA | 0 | None within 10 kms of study area | (3.) | ESAs | NA | 0 | None within 10 kms of study area | (4.) | ESZs | NA | 0 | None within 10 kms of study area | (5.) | Corridors | NA | 0 | None within 10 kms of study area | (6.) | Wildlife Corridors | NA | 0 | None within 10 kms of study area | (7.) | Critically Polluted Area | NA | 0 | 0 | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Lalipur R.F | 9.3 | towards NNW | (2.) | Archaeological Sites | | None | 0 | 0 | (3.) | Defence Installations | | None | 0 | 0 | (4.) | Others | NA | None | 0 | 0 | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 6.07 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Peacock or Indian peafowl (Pavocristatus) | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 202500 | (iii)Period of Implementation | 3 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Bahalla Nadi | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 1.7 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 30 | (b)Permanent Employment-During Operation | 150 | (c)Temporary Employment- During Construction | 20 | (d)Temporary Employment- During Operation | 30 | (e)No. of working days | 330 | (f)Total Manpower | 230 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 2 | (b)Percentage of Total Project Area | 32.95 | (c)No. of Plants to be Planted | 2230 | (d)Funds Allocated for Plantation | 1500000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | provide employment | (2.) | Financial | Generate revenue | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/IA0026(Rev.01) | (ii)Name of the EIA Consultant | Gaurang Environmental Solutions Private Limited | (iii)Address | 102, SNG Shri ratna Apartment, near tambi Petrol Pump, Jhotwara road Banipark Jaipur | (iv)Mobile No. | 9784671462 | (v)Landline No. | 0141402911 | (vi)Email Id | gaurangenviro@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 22 Jan 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) Action plan with budgetary allocation on the issues raised during the Public hearing need to be submitted. Form 2 (S. no. 7.1)
(ii) Details of Raw material linkage (S. no. 13.1 of form 2) and its mitigation measure during transportation needs to be submitted.
(iii) Consultant accreditation was valid upto 22.01.2020, copy of valid accreditation needs to be uploaded.
(iv) Proposed Green belt development programe along-with time line and budgetary allocation needs to be provided
(v) S No. 2 of Form 2 uploaded the authority letter of PP, however there is no date mentioned in the letter.
(vi) S No. 39 of Form 2 uploaded the covering letter of PP, however there is no date mentioned in the letter.
(vii) Status of Conservation Plan approval from CWLW
(viii) Status of Water approval
(ix) In view of the above, PP/Consultant are requested to revise the application for grant of EC and accordingly revise the Form 2 alongwith EIA/EMP Report. The EIA/EMP Report shall match with the information as filled in Form 2. On examination it is observed that the Consultant has not adequately submitted the application as per the provisions of the EIA Notification, 2006. Consultant has to read the documents before uploading the information in Form 2 /EIA/EMP report. | 05 Feb 2020 | 2. | NA | The correction have been made as per the instruction received | 07 Feb 2020 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Kindly find the attached Reply of the ADS received in 21st EAC meeting dated 14-16 july. | 19 Aug 2020 | 2. | NA | The EAC during deliberation observed that the reply submitted by the project proponent in respect of alternate source of water, revised water balance with the details of MEE and details of treatment of spent wash are not in line with the observation of the EAC. The EAC also observed that the consultant was not fully prepared and was unable to give the reply. The Committee is of the opinion that the Consultant shall come before the EAC with all preparation so that project is not delayed. The EAC suggested to re-examine/rework and submit the revised reply in respect of the following: - (i) PP reported that they have to lay the pipeline of water in 9 km. EAC noted that the reply submitted by Consultant/PP is not satisfactory and suggested to rework on the alternate source of water and details of how the fresh water will be drawn. Also cost of the pipeline, its impact and mitigation measure and cost of water shall also be included in the project cost. (ii) Revised water balance with details of total water and fresh water requirement and reduction in fresh water demand as per 5 KL/kl of production. Also plan to construct RCC tank to collect rain water from the roof top (iii) Complete flowsheet for treatment of waste water and its management needs to be submitted. (iv) Plan for management of CO2. (v) Truck parking plan to be submitted. The proposal is therefore deferred. | 14 Aug 2020 | 3. | ADS Reply Letter | Reply for the ADS generated during the 18th EAC Meeting dated 13-15 april 2020. for youyr kind perusal. | 10 Jul 2020 | 4. | ADS Reply Letter | s | 10 Jul 2020 | 5. | ADS Reply Letter | Reply for the ADS generated during the 18th EAC Meeting dated 13-15 april 2020. for youyr kind perusal. | 01 Jun 2020 | 6. | NA | The EAC, after detailed deliberations decided to defer for want of requisite information as under and have asked the
PP to revise the Report alongwith following clarification/inputs:- | 24 Apr 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Anil Kejriwal | Designation | AS | Name of Company (Applicant Name should not be given here) | MICROBREW BISTRO PVT. LTD. | Address | 308 competent House, F 14 Connaught Place , New Delhi |
|