Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Expansion of existing capacity of Butadiene based Synthetic Lattices and Setting up facility of Adhesives and Wood Finishes Manufacturing Plant at Block no. 129, Village Samlaya, Taluka Savli
(b)Name of the Company / Organisation JUBILANT AGRI & CONSUMER PRODUCTS LTD.
(c)Registered Address Block No. 129, Village Samlaya, Taluka Savli,,Vadodara,Gujarat-391520
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Tarunkumar Kiritbhai Modi
(b)Designation (Owner/ Partner/ CEO) Unithead
(c)Address Block No. 129, Village Samlaya, Taluka Savli,,Savli,Vadodara,Gujarat-391520
(d)Pin code 391520
(e)E-mail tarun.modi@jubl.com
(f)STD Code. 266(f)Telephone No. 7268304
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/108562/2019
(d)Master Proposal Number(Single Window) SW/134840/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 129
(b)Pincode 391520
(c)Bounded Latitudes (North)
From
Degree 22.5106944
Minutes
Second
From
Degree 22.5131417
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.263063
Minutes
Second
From
Degree 73.2649527
Minutes
Second
(e)Survey of India Topo Sheet No. F43H2 F43H3 F43H6 F43H7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 56
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratVadodaraSavli
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/209/2019-IA-II(I)
(b)Date of Apply of TOR 26 Jun 2019
(c)Date of Issue of TOR / Standard ToR 01 Aug 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :12 Nov 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :13 Dec 2019
Distance of Public Hearing Venue from the Proposed Project :0
JUBILANT AGRI & CONSUMER PRODUCTS LIMITED, Block no. 129, Village Samlaya, Taluka Savli, District Vadodara
State :Gujarat
District :Vadodara
Tehsil :Savli
Village :Samlaya
152Water Consumption, conservation/ Rain water harvesting Wastewater storage and disposal Safety Related Issue/ Accident Health related issue CSR/ EmploymentDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)--
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Adhesives18000Tons per AnnumRoad
(2.)Butadiene Based Synthetic Lattices80000Tons per AnnumRoad
(3.)Wood Finishes6000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 31 Mar 2016
(iv)Valid Upto 19 Sep 2020
(v)File No. AWH-74509
(vi)Application No. 98258
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 151
(b) Funds Allocated for Environment Management (Capital) (in Crores) 6.83
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.3825
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.161
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 58428
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 58428
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Dresinate763Tons per AnnumGermany/ MumbaiRoad411 Others-Copy of Linkage
(2.)Acrylonitrile230Tons per AnnumKandla /Hajira / MumbaiRoad407 Open MarketCopy of Linkage
(3.)JJ D3 (DPN 15 Equivalent1172Tons per AnnumIn House ProductionRoad0 Others-Copy of Linkage
(4.)refer attachment0Tons per AnnumKandla /Hajira / MumbaiRoad0 Others-Copy of Linkage
(5.)Butydine4550Tons per AnnumBaroda / PanipatOthersPressurized Vessel135 Others-Copy of Linkage
(6.)Maize Starch338Tons per AnnumSitarganj UttarakhandRoad1375 Others-Copy of Linkage
(7.)PVA Bf-17e431Tons per AnnumNhava Sheva PortRoad442 Others-Copy of Linkage
(8.)Normal Butyl Alcohol (Nba)28Tons per AnnumKandlaRoad407 Others-Copy of Linkage
(9.)sapco1Tons per AnnumMumbaiRoad411 Others-Copy of Linkage
(10.)2-Vinylpyridine1638Tons per AnnumChina /MumbaiRoad411 Others-Copy of Linkage
(11.)Sodium Bi Carbonate9Tons per AnnumVadodaraRoad50 Others-Copy of Linkage
(12.)PVA 117/Pva-173 (Kuraray)124Tons per AnnumNhava Sheva PortRoad442 Others-Copy of Linkage
(13.)Vinapass Ep-705-K /Celvolit1492149Tons per AnnumNhava Sheva PortRoad442 Others-Copy of Linkage
(14.)PVA Gh-17r273Tons per AnnumNhava Sheva PortRoad442 Others-Copy of Linkage
(15.)Benzo Plast (Benzode Ester32Tons per AnnumPalghar MumbaiRoad344 Others-Copy of Linkage
(16.)Formalin26Tons per AnnumVadodaraRoad50 Others-Copy of Linkage
(17.)Styrene1762Tons per AnnumKandla /HajiraRoad407 Others-Copy of Linkage
(18.)Vinyl acetate monomer3630Tons per AnnumKandla Port, MumbaiRoad407 Others-Copy of Linkage
(19.)Toluene16Tons per AnnumKandlaRoad407 Others-Copy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube47124760
(2.)NOxMicro Gram per Meter Cube23.2622.180
(3.)PM10Micro Gram per Meter Cube11034105100
(4.)SO2Micro Gram per Meter Cube20.43.716.580
(5.)OthersCOMili Gram per Meter Cube1.5111.514
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.177.268.50
(2.)Total Hardnessmg/l620140200600
(3.)Fluoridemg/l1.410.0611.5
(4.)TDSmg/l17204285002000
(5.)Chloridesmg/l7091602501000
(6.)TSSmg/l0000
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.436.89E
(2.)CODmg/l00E
(3.)BODmg/l154E
(4.)DOmg/l8.24.2E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))68.554.175 Industrial 55 Residential
(2.)Leq(Night)A-weighted decibels(dB(A))62.143.170 Industrial 45 Residential
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)00
(2.)Electric ConductivityOthersds/m0.210.08
(3.)N(Nitrogen)00
(4.)pH7.236.14
(5.)K(Potassium)Othersgm/kg0.180.02
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 16
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 14 To 7
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersBorewell5880Copy of Permission LetterPipelineOthersBore WellCGWA/NOC/IND/ORIG/2019/503830 Mar 2019141
(2.)OthersBorewell5880Copy of Permission LetterPipelineOthersBore Well21-4/5429/GJ/IND/201907 Oct 20190
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial26313 Stage RO SystemOthersThrough Approved Tankers026
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 26
(b)Total Discharged Water (Kilolitre per Day) 26
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid WasteOtherssolid waste25Tons25.2RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Discarded Liners/BagsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)30.8Tons40RoadAuthorized Recyclers
(3.)Process WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)171.7Tons25.2RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Used/Spent OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5.5Tons40RoadOthersregistered re-refiners
(5.)Discarded DrumsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)806.25Tons40RoadAuthorized Recyclers
(6.)Spent SolventHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.4Tons40RoadOthersregistered re-refiners
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube13.10.52.261680
(2.)SO2Microgram per Meter Cube90.53.921380
(3.)Others(Specify)HCMicrogram per Meter Cube12152.531.312470
(4.)PM10Microgram per Meter Cube78.00.52.281100
(5.)PM2.5Microgram per Meter Cube00010
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler 1HSD301NOx50 ppm
(2.)DG Set 2HSD300.6PM10150 mg/Nm3
(3.)DG Set 1HSD300.6SO2100 ppm
(4.)DG Set 1HSD300.6PM10150 mg/NM3
(5.)Boiler 1HSD /Agro Waste301PM10150 mg/Nm3
(6.)Boiler 1HSD/Agro Waste301SO2100 ppm
(7.)Boiler 2 StandbyHSD / Agro Waste301PM10150 mg/Nm3
(8.)Boiler 2 StandbyHSD / Agro Waste301NOx50 ppm
(9.)DG Set 2HSD300.6SO2100 ppm
(10.)DG Set 2HSD300.6NOx50 ppm
(11.)DG Set 3 StandbyHSD300.6PM10150 mg/Nm3
(12.)DG Set 3 StandbyHSD300.6SO2100 ppm
(13.)DG Set 1HSD300.6NOx50 ppm
(14.)Boiler 2 StandbyHSD/Agro Waste301SO2100 ppm
(15.)DG Set 3 StnadbyHSD300.6NOx50 ppm
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3000
(b)Source MGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) Existing DG 1,010 KVA 2 Proposed DG 1010 KVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 7.5057
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 7.5057
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 23792.93
(b)Waste/Barren Land (ha.) 293.09
(c)Grazing/ Community Land (ha.) 1452.89
(d)Surface Water Bodies (ha.) 773.89
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Vegetation cover and Grasslands 6422.06
    Total (ha.) 32734.86
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant1.02
(2.)Built Up Area1.70
(3.)Green belt2.90
(4.)OthersRemaining land area1.88
Total (ha.) 7.5
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone00
(2.)WLSNone00
(3.)NPANone00
(4.)ESZsNone00
(5.)CorridorsNone00
(6.)Wildlife CorridorsNone00
(7.)ESAsNone00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest-00
(2.)Archaeological Sites-00
(3.)Defence Installations-00
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 7.50
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not applicable as land is already acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pavo crestatus Peacock Haliastur indus Brahminy Kite Milvus migrans Pariah Kite
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 575000
(iii)Period of Implementation 5 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Vishwamitri River
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 9
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 458
(e)No. of working days 350
(f)Total Manpower 458
32.
Green Belt in Ha:
(a)Total Area of Green Belt 2.90
(b)Percentage of Total Project Area 38.64
(c)No. of Plants to be Planted 1160
(d)Funds Allocated for Plantation 116000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Social• Help to needy children in the schools; • Providing drinking water to nearby villagers; • Helping Gram Panchayat in improving sanitation facilities
(2.)Financial• The proposed expansion will give employment for transportation, facilities management, testing and calibration, security and similar services. Construction workers: ~150 (for a few months only when construction takes place) Existing employment: 84 (54 Permanent + 30 contractual) Proposed employment: 224 (100 Permanent + 124 contractual) • Enhanced direct employment for technical/ administrative works and indirect employment opportunities for transporters of raw materials and finished goods; •
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0138
(ii)Name of the EIA Consultant Kadam Environmental Consultants
(iii)Address 871/B/3, GIDC Makarpura, Near Himalaya Machinery, Vadoara, India - 390010
(iv)Mobile No. 9998957927
(v)Landline No. 0265661310
(vi)Email Id kadam@kadamenviro.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 25 May 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterNA 15 Oct 2020
2.NAThe matter was further examined in the Ministry. Accordingly, following information needs to be submitted by the PP within two days (i) The project proponent has undertaken product mix change in the year 2015 without obtaining prior EC. As per the EIA Notification, 2006, the project required prior Environmental Clearance. However, the Ministry has given certain clarifications in this regard and OM has been issued. The project proponent shall provide adequate justification for not taking EC along with the supporting OMs, if any. The project proponent shall also submit an undertaking that the dry weight/wet weight mentioned in the CTOs are equal in quantity and PP has not increased any production after 2006. (ii) The PP has proposed for discharge of effluents in the CETP and Committee has suggested for ZLD. Accordingly, revised water balance and detailed ZLD plan shall be submitted. (iii). Ground water permission for existing operation and status of permission for the proposed usage. Adequate justification for not obtaining ground water permission for the existing unit, if applicable, shall be provided. This issues with the approval of the competent Authority. 13 Oct 2020
3. ADS Reply LetterADS reply generated in 17th meeting of the EAC(industry-2) during 25-27 February 2020 14 Aug 2020
4.NA

Deferred

11 Mar 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantTarunkumar Kiritbhai Modi
DesignationUnithead
Name of Company (Applicant Name should not be given here)JUBILANT AGRI & CONSUMER PRODUCTS LTD.
AddressBlock No. 129, Village Samlaya, Taluka Savli