1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed Expansion of existing capacity of Butadiene based Synthetic Lattices and Setting up facility of Adhesives and Wood Finishes Manufacturing Plant at Block no. 129, Village Samlaya, Taluka Savli | (b)Name of the Company / Organisation | JUBILANT AGRI & CONSUMER PRODUCTS LTD. | (c)Registered Address | Block No. 129, Village Samlaya, Taluka Savli,,Vadodara,Gujarat-391520 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Tarunkumar Kiritbhai Modi | (b)Designation (Owner/ Partner/ CEO) | Unithead | (c)Address | Block No. 129, Village Samlaya, Taluka Savli,,Savli,Vadodara,Gujarat-391520 | (d)Pin code | 391520 | (e)E-mail | tarun.modi@jubl.com | (f)STD Code. | 266(f)Telephone No. | 7268304 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/108562/2019 | (d)Master Proposal Number(Single Window) | SW/134840/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 129 | (b)Pincode | 391520 | (c)Bounded Latitudes (North) | | From | | Degree | 22.5106944 | Minutes | | Second | | From | | Degree | 22.5131417 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.263063 | Minutes | | Second | | From | | Degree | 73.2649527 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43H2 F43H3 F43H6 F43H7 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 56 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Vadodara | Savli | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/209/2019-IA-II(I) | (b)Date of Apply of TOR | 26 Jun 2019 | (c)Date of Issue of TOR / Standard ToR | 01 Aug 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 13 Dec 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| JUBILANT AGRI & CONSUMER PRODUCTS LIMITED, Block no. 129, Village Samlaya, Taluka Savli, District Vadodara | State : | Gujarat | District : | Vadodara | Tehsil : | Savli | Village : | Samlaya |
| 152 | Water Consumption, conservation/ Rain water harvesting
Wastewater storage and disposal
Safety Related Issue/ Accident
Health related issue
CSR/ Employment | District Magistrate | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | - | - | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Adhesives | 18000 | Tons per Annum | | Road | | (2.) | Butadiene Based Synthetic Lattices | 80000 | Tons per Annum | | Road | | (3.) | Wood Finishes | 6000 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 31 Mar 2016 | (iv)Valid Upto | 19 Sep 2020 | (v)File No. | AWH-74509 | (vi)Application No. | 98258 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 151 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 6.83 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.3825 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 2.161 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 58428 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 58428 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Dresinate | 763 | Tons per Annum | | Germany/ Mumbai | Road | | 411 | Others | - | Copy of Linkage | (2.) | Acrylonitrile | 230 | Tons per Annum | | Kandla /Hajira / Mumbai | Road | | 407 | Open Market | | Copy of Linkage | (3.) | JJ D3 (DPN 15 Equivalent | 1172 | Tons per Annum | | In House Production | Road | | 0 | Others | - | Copy of Linkage | (4.) | refer attachment | 0 | Tons per Annum | | Kandla /Hajira / Mumbai | Road | | 0 | Others | - | Copy of Linkage | (5.) | Butydine | 4550 | Tons per Annum | | Baroda / Panipat | Others | Pressurized Vessel | 135 | Others | - | Copy of Linkage | (6.) | Maize Starch | 338 | Tons per Annum | | Sitarganj Uttarakhand | Road | | 1375 | Others | - | Copy of Linkage | (7.) | PVA Bf-17e | 431 | Tons per Annum | | Nhava Sheva Port | Road | | 442 | Others | - | Copy of Linkage | (8.) | Normal Butyl Alcohol (Nba) | 28 | Tons per Annum | | Kandla | Road | | 407 | Others | - | Copy of Linkage | (9.) | sapco | 1 | Tons per Annum | | Mumbai | Road | | 411 | Others | - | Copy of Linkage | (10.) | 2-Vinylpyridine | 1638 | Tons per Annum | | China /Mumbai | Road | | 411 | Others | - | Copy of Linkage | (11.) | Sodium Bi Carbonate | 9 | Tons per Annum | | Vadodara | Road | | 50 | Others | - | Copy of Linkage | (12.) | PVA 117/Pva-173 (Kuraray) | 124 | Tons per Annum | | Nhava Sheva Port | Road | | 442 | Others | - | Copy of Linkage | (13.) | Vinapass Ep-705-K /Celvolit149 | 2149 | Tons per Annum | | Nhava Sheva Port | Road | | 442 | Others | - | Copy of Linkage | (14.) | PVA Gh-17r | 273 | Tons per Annum | | Nhava Sheva Port | Road | | 442 | Others | - | Copy of Linkage | (15.) | Benzo Plast (Benzode Ester | 32 | Tons per Annum | | Palghar Mumbai | Road | | 344 | Others | - | Copy of Linkage | (16.) | Formalin | 26 | Tons per Annum | | Vadodara | Road | | 50 | Others | - | Copy of Linkage | (17.) | Styrene | 1762 | Tons per Annum | | Kandla /Hajira | Road | | 407 | Others | - | Copy of Linkage | (18.) | Vinyl acetate monomer | 3630 | Tons per Annum | | Kandla Port, Mumbai | Road | | 407 | Others | - | Copy of Linkage | (19.) | Toluene | 16 | Tons per Annum | | Kandla | Road | | 407 | Others | - | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2019 To 31 May 2019 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 47 | 12 | 47 | 60 | (2.) | NOx | | Micro Gram per Meter Cube | 23.2 | 6 | 22.1 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 110 | 34 | 105 | 100 | (4.) | SO2 | | Micro Gram per Meter Cube | 20.4 | 3.7 | 16.5 | 80 | (5.) | Others | CO | Mili Gram per Meter Cube | 1.51 | 1 | 1.51 | 4 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.17 | 7.26 | 8.5 | 0 | (2.) | Total Hardness | | | mg/l | | 620 | 140 | 200 | 600 | (3.) | Fluoride | | | mg/l | | 1.41 | 0.06 | 1 | 1.5 | (4.) | TDS | | | mg/l | | 1720 | 428 | 500 | 2000 | (5.) | Chlorides | | | mg/l | | 709 | 160 | 250 | 1000 | (6.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.43 | 6.89 | E | (2.) | COD | | mg/l | | 0 | 0 | E | (3.) | BOD | | mg/l | | 15 | 4 | E | (4.) | DO | | mg/l | | 8.2 | 4.2 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 68.5 | 54.1 | 75 Industrial 55 Residential | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 62.1 | 43.1 | 70 Industrial 45 Residential | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | | | 0 | 0 | (2.) | Electric Conductivity | Others | ds/m | 0.21 | 0.08 | (3.) | N(Nitrogen) | | | 0 | 0 | (4.) | pH | | | 7.23 | 6.14 | (5.) | K(Potassium) | Others | gm/kg | 0.18 | 0.02 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 16 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 14 To 7 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Borewell | 588 | 0 | Copy of Permission Letter | Pipeline | | Others | Bore Well | CGWA/NOC/IND/ORIG/2019/5038 | 30 Mar 2019 | 141 | (2.) | Others | Borewell | 588 | 0 | Copy of Permission Letter | Pipeline | | Others | Bore Well | 21-4/5429/GJ/IND/2019 | 07 Oct 2019 | 0 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 26 | 31 | 3 Stage RO System | Others | Through Approved Tankers | 0 | 26 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 26 | (b)Total Discharged Water (Kilolitre per Day) | 26 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Solid Waste | Others | solid waste | 25 | Tons | 25.2 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Discarded Liners/Bags | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 30.8 | Tons | 40 | Road | | Authorized Recyclers | | (3.) | Process Waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 171.7 | Tons | 25.2 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (4.) | Used/Spent Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 5.5 | Tons | 40 | Road | | Others | registered re-refiners | (5.) | Discarded Drums | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 806.25 | Tons | 40 | Road | | Authorized Recyclers | | (6.) | Spent Solvent | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1.4 | Tons | 40 | Road | | Others | registered re-refiners | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 13.1 | 0.5 | 2.26 | 16 | 80 | (2.) | SO2 | | Microgram per Meter Cube | 9 | 0.5 | 3.92 | 13 | 80 | (3.) | Others(Specify) | HC | Microgram per Meter Cube | 1215 | 2.5 | 31.3 | 1247 | 0 | (4.) | PM10 | | Microgram per Meter Cube | 78.0 | 0.5 | 2.2 | 81 | 100 | (5.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 1 | 0 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler 1 | HSD | 30 | 1 | NOx | | 50 ppm | (2.) | DG Set 2 | HSD | 30 | 0.6 | PM10 | | 150 mg/Nm3 | (3.) | DG Set 1 | HSD | 30 | 0.6 | SO2 | | 100 ppm | (4.) | DG Set 1 | HSD | 30 | 0.6 | PM10 | | 150 mg/NM3 | (5.) | Boiler 1 | HSD /Agro Waste | 30 | 1 | PM10 | | 150 mg/Nm3 | (6.) | Boiler 1 | HSD/Agro Waste | 30 | 1 | SO2 | | 100 ppm | (7.) | Boiler 2 Standby | HSD / Agro Waste | 30 | 1 | PM10 | | 150 mg/Nm3 | (8.) | Boiler 2 Standby | HSD / Agro Waste | 30 | 1 | NOx | | 50 ppm | (9.) | DG Set 2 | HSD | 30 | 0.6 | SO2 | | 100 ppm | (10.) | DG Set 2 | HSD | 30 | 0.6 | NOx | | 50 ppm | (11.) | DG Set 3 Standby | HSD | 30 | 0.6 | PM10 | | 150 mg/Nm3 | (12.) | DG Set 3 Standby | HSD | 30 | 0.6 | SO2 | | 100 ppm | (13.) | DG Set 1 | HSD | 30 | 0.6 | NOx | | 50 ppm | (14.) | Boiler 2 Standby | HSD/Agro Waste | 30 | 1 | SO2 | | 100 ppm | (15.) | DG Set 3 Stnadby | HSD | 30 | 0.6 | NOx | | 50 ppm | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 3000 | (b)Source | MGVCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | Existing DG 1,010 KVA 2 Proposed DG 1010 KVA | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 7.5057 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 7.5057 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 23792.93 | (b)Waste/Barren Land (ha.) | 293.09 | (c)Grazing/ Community Land (ha.) | 1452.89 | (d)Surface Water Bodies (ha.) | 773.89 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Vegetation cover and Grasslands | 6422.06 | Total (ha.) | 32734.86 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 1.02 | | (2.) | Built Up Area | | 1.70 | | (3.) | Green belt | | 2.90 | | (4.) | Others | Remaining land area | 1.88 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | None | 0 | 0 | (2.) | WLS | None | 0 | 0 | (3.) | NPA | None | 0 | 0 | (4.) | ESZs | None | 0 | 0 | (5.) | Corridors | None | 0 | 0 | (6.) | Wildlife Corridors | None | 0 | 0 | (7.) | ESAs | None | 0 | 0 | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | - | 0 | 0 | (2.) | Archaeological Sites | | - | 0 | 0 | (3.) | Defence Installations | | - | 0 | 0 | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 7.50 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Not applicable as land is already acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Pavo crestatus Peacock Haliastur indus Brahminy Kite Milvus migrans Pariah Kite | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 575000 | (iii)Period of Implementation | 5 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Vishwamitri River | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 9 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 458 | (e)No. of working days | 350 | (f)Total Manpower | 458 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 2.90 | (b)Percentage of Total Project Area | 38.64 | (c)No. of Plants to be Planted | 1160 | (d)Funds Allocated for Plantation | 116000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | • Help to needy children in the schools;
• Providing drinking water to nearby villagers;
• Helping Gram Panchayat in improving sanitation facilities | (2.) | Financial | • The proposed expansion will give employment for transportation, facilities management, testing and calibration, security and similar services.
Construction workers: ~150 (for a few months only when construction takes place)
Existing employment: 84 (54 Permanent + 30 contractual)
Proposed employment: 224 (100 Permanent + 124 contractual)
• Enhanced direct employment for technical/ administrative works and indirect employment opportunities for transporters of raw materials and finished goods;
• | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1922/RA 0138 | (ii)Name of the EIA Consultant | Kadam Environmental Consultants | (iii)Address | 871/B/3, GIDC Makarpura, Near Himalaya Machinery, Vadoara, India - 390010 | (iv)Mobile No. | 9998957927 | (v)Landline No. | 0265661310 | (vi)Email Id | kadam@kadamenviro.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 25 May 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | NA | 15 Oct 2020 | 2. | NA | The matter was further examined in the Ministry. Accordingly, following information needs to be submitted by the PP within two days
(i) The project proponent has undertaken product mix change in the year 2015 without obtaining prior EC. As per the EIA Notification, 2006, the project required prior Environmental Clearance. However, the Ministry has given certain clarifications in this regard and OM has been issued. The project proponent shall provide adequate justification for not taking EC along with the supporting OMs, if any. The project proponent shall also submit an undertaking that the dry weight/wet weight mentioned in the CTOs are equal in quantity and PP has not increased any production after 2006.
(ii) The PP has proposed for discharge of effluents in the CETP and Committee has suggested for ZLD. Accordingly, revised water balance and detailed ZLD plan shall be submitted.
(iii). Ground water permission for existing operation and status of permission for the proposed usage. Adequate justification for not obtaining ground water permission for the existing unit, if applicable, shall be provided.
This issues with the approval of the competent Authority. | 13 Oct 2020 | 3. | ADS Reply Letter | ADS reply generated in 17th meeting of the EAC(industry-2) during 25-27 February 2020 | 14 Aug 2020 | 4. | NA | Deferred | 11 Mar 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Tarunkumar Kiritbhai Modi | Designation | Unithead | Name of Company (Applicant Name should not be given here) | JUBILANT AGRI & CONSUMER PRODUCTS LTD. | Address | Block No. 129, Village Samlaya, Taluka Savli |
|