1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Kumaraswamy Iron Ore Mine (ML No: 1111, M.L. area 639.80 Ha, 8.6 MTPA (ROM 7 MTPA and Waste Excavation 1.6 MTPA) Iron ore production capacity) of M/s. NMDC Limited, Tehsil Sandur, Ballari District, Karnataka | (b)Name of the Company / Organisation | NMDC LIMITED DONIMALAI | (c)Registered Address | Donimalai Township, Dist. Bellary Pin: 5,Donimalai Township, Dist. Bellary Pin: 5,Bellary,Karnataka-583118 | (d)Legal Status of the Company | State PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | SANJEEV SAHI | (b)Designation (Owner/ Partner/ CEO) | GENERAL MANAGER | (c)Address | Donimalai Township, Dist. Bellary Pin: 583 118 (Karnataka),Donimalai Township, Dist. Bellary Pin: 583 118 (Karnataka),Sandur,Bellary,Karnataka-583118 | (d)Pin code | 583118 | (e)E-mail | envdiom@gmail.com | (f)STD Code. | 8395(f)Telephone No. | 274624 | (g)Fax No. | 08395274649 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/KA/MIN/75088/2018 | (d)Master Proposal Number(Single Window) | SW/134443/2019 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Swamimalai Block | (b)Pincode | 583118 | (c)Bounded Latitudes (North) | | From | | Degree | 15.001919 | Minutes | | Second | | From | | Degree | 15.023 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 76.566472 | Minutes | | Second | | From | | Degree | 76.617933 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | D43 E12 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 1078 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Karnataka | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Karnataka | Bellary | Sandur | | (2.) | Karnataka | Bellary | Sandur | Devogiri | (3.) | Orissa | Sundargarh | Hemgir | Gopalpur (Telendih), Ratansara | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11015/93/2018-IA-II(M) | (b)Date of Apply of TOR | 26 Jul 2018 | (c)Date of Issue of TOR / Standard ToR | 01 Jan 1900 | (d)Previous TOR Letter | NA | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Earlier Public Hearing was conducted on 6.08.2001 | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | SemifixedJawCrusherwithintegratedscreeningfacility | 5nos.of450TPH | Utilisedforcrushingandscreeningoreatminehead | (2.) | GyratoryCrusherwithintegratedscreeningfacility | 01Nosof1800TPH | Utilisedforcrushingandscreeningoreatminehead | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | ROM Iron Ore | 7000000 | Tons per Annum | | Road,Rail,Conveyor Belt | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | Obtained | (ii)Copies of all Consent to operate obtained since inception | Copy of Consent to Operate | (iii)Date of Issue | 30 Jun 2016 | (iv)Valid Upto | 30 Jun 2021 | (v)File No. | AWH-300522 | (vi)Application No. | PCB ID: 19767 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 10.193999999999999 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 7.144 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 3.05 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 9.71 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 562.8 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 562.8 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Industrial Gas | 0.6 | Others | KL/annum | IOCL | Road | | 35 | Others | PURCHASEORDER | Copy of Linkage | (2.) | HSD | 562.2 | Others | KL/annum | IOCL and HPCL | Road | | 260 | Others | PURCHASEORDER | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2019 To 31 May 2019 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | Others | CO | Micro Gram per Meter Cube | 838.25 | 411.25 | 797.89 | 2000 | (2.) | NOx | | Micro Gram per Meter Cube | 28.10 | 10.66 | 27.70 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 95.2 | 46.5 | 94.6 | 100 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 58.6 | 24.2 | 57.68 | 60 | (5.) | SO2 | | Micro Gram per Meter Cube | 17 | 6.81 | 16.50 | 80 | |
14.2. No. of Ground Water monitoring locations : 05 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 232 | 188 | 200 | 600 | (2.) | Others | Iron | | mg/l | | 0.26 | 0.18 | 0.3 | 0.3 | (3.) | pH | | | NA | | 7.51 | 7.29 | 6.5 | 8.5 | (4.) | Chlorides | | | mg/l | | 48 | 26 | 250 | 1000 | (5.) | Fluoride | | | mg/l | | 0.58 | 0.46 | 1 | 1.5 | (6.) | Others | Nitrate | | mg/l | | 14.4 | 8.26 | 45 | 45 | (7.) | TDS | | | mg/l | | 652 | 512 | 500 | 2000 | (8.) | Heavy Metals | | Lead | mg/l | | 0.01 | 0.01 | 0.01 | 0.05 | (9.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 01 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.48 | 7.48 | C | (2.) | BOD | | mg/l | | 1.9 | 1.9 | C | (3.) | Others | Chloride | mg/l | | 80 | 80 | C | (4.) | Others | Fluoride | mg/l | | 0.23 | 0.23 | C | (5.) | Others | Nitrate | mg/l | | 20.20 | 20.20 | C | (6.) | Others | Iron | mg/l | | 0.35 | 0.35 | C | (7.) | DO | | mg/l | | 5.1 | 5.1 | C | (8.) | Others | Total Coliforms | Others | MPN/100ml | 200 | 200 | C | (9.) | COD | | mg/l | | 0 | 0 | C | |
14.4. No. of Ambient Noise monitoring locations : 08 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 65.9 | 52.2 | 75 (Industrial) and 55 (Residential) | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 53.6 | 41.9 | 70 (Industrial) and 45 (Residential) | |
14.5. No. of Soil Sample Monitored locations : 04 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Kilogram per hectare | | 118 | 78 | (2.) | pH | | | 7.62 | 6.89 | (3.) | N(Nitrogen) | Kilogram per hectare | | 180 | 148 | (4.) | P(Phosphorus) | Kilogram per hectare | | 130 | 96 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 0.30 | 0.26 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 23.31 To 61.00 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 59.13 To 6.90 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 1150 | 16 | Copy of Permission Letter | Pipeline | | Intake Well | | WRE67MTP2013 | 16 Feb 2017 | 32906.44 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Wastewater from Canteen | 24 | 30 | Septic Tank followed by Soak Pit | Others | Soak Pit | 24 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 24 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 24 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Usedoil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 71.14 | Kilolitre | 10 | Others | BarrelthroughTruck | Others | eauctiontoauthorizedvendors | (2.) | wasterockmaterialmostlyconsistsofBHQandshale | Others | minewaste | 1600000 | Tons | 0 | Others | ByDumpersandTippers | Others | dump | (3.) | cartridges,printer,CPU | E Waste | | 0.33 | Tons | 10 | Others | ByDepartmentalServiceTruck | Others | BuyBacksystemoreauction | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 28.1 | 00 | 00 | 28.11 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 95.2 | 00 | 00 | 95.21 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 58.6 | 00 | 00 | 58.61 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 17 | 00 | 00 | 17.01 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG Set | Deisel | 4 | 0.15 | Others | PM | 0.013 | (2.) | DG Set | Deisel | 4 | 0.15 | Others | PM | 0.013 | (3.) | DG Set | Deisel | 4 | 0.15 | Others | PM | 0.013 | (4.) | DG Set | Deisel | 4 | 0.15 | Others | PM | 0.013 | (5.) | DG Set | Deisel | 4 | 0.15 | Others | PM | 0.013 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 5000 | (b)Source | GESCOM, Munirabad substation | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 625 KVA x 5 nos. | (e)Stack Height (in m) | 4 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 480.79 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 159.01 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 639.8000 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 480.79 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Revenue Land | 159.01 | Total (ha.) | 639.8000 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 150.43 | | (2.) | OB Dump Area | | 56.1 | | (3.) | Main Plant | | 45.4 | | (4.) | Safety Zone | | 14.03 | | (5.) | Green belt | | 161.4 | | (6.) | Built Up Area | | 42.51 | | (7.) | Township | | 0 | | (8.) | Ash Pond | | 0 | | (9.) | Tailing Pond | | 0 | | (10.) | LandFill | | 0 | | (11.) | Water Reservoir | | 0 | | (12.) | Desalination Plant | | 0 | | (13.) | Area for Solid Waste Management | | 0 | | (14.) | Others | Biodiversity undiverted forest land unused area | 169.93 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Nil | 0 | NOT APPLICABLE | (2.) | Corridors | Nil | 0 | NOT APPLICABLE | (3.) | Critically Polluted Area | Nil | 0 | NOT APPLICABLE | (4.) | NPA | Nil | 0 | NOT APPLICABLE | (5.) | ESAs | Nil | 0 | NOT APPLICABLE | (6.) | ESZs | Nil | 0 | NOT APPLICABLE | (7.) | Wildlife Corridors | Nil | 0 | NOT APPLICABLE | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | Nil | 0 | NOT APPLICABLE | (2.) | Forest | | KumaraswamyBetta Reserve Forest | 1.5 | North | (3.) | Others | Nil | Nil | 0 | NOT APPLICABLE | (4.) | Archaeological Sites | | Nil | 0 | NOT APPLICABLE | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Final(Stage-II) Approval Obtained | (i)MoEFCC file number | FP/KA/MIN/917/2005 | (ii)Date of final approval | 24 Jul 2006 | (iii)Date of In-Principle Approval | 24 Jul 2006 | (iv)Area diverted | 341.2 | (v)Uploaded FC Letter | Copy of FC Letter | (b)Legal Status of Forest Land | Reserved | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Not Applicable | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Narihalla Dam, KattarsinghKollar | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 10 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 169 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 271 | (e)No. of working days | 360 | (f)Total Manpower | 440 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 161.4 | (b)Percentage of Total Project Area | 25.23 | (c)No. of Plants to be Planted | 455750 | (d)Funds Allocated for Plantation | 120000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | The company takes care of the environment & will continue in the future also as per statutory requirement. | (2.) | Financial | Operation of Kumaraswamy iron mine provide economic benefits to employees, local population nearby the project vicinity through CSR and to Government in the form of royalty and taxes. | (3.) | Social | Mine is an existing operating mine, which has strengthened and developed basic infrastructure facilities for the communities in and around the mines. . | (4.) | Environmental | Project takes care of the environment and will continue to do so in the future also. | (5.) | Financial | State gets royalty which is used for the development of the area and people | (6.) | Social | The project gives direct and indirect employment, expenses are incurred under CSR activities | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | iron | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 7 MTPA | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | No.279/290/91/BNG/1332 | (b)Date of Approval | 13 Jul 2018 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 639.8 | (f)Approved Capacity | 7 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 232.06 | (b)Mineable Reserves (Million Ton) | 162.64 | (c)Extractable Reserves(Million Ton) | 162.64 | (d)Percent(%) of Extraction | 100 | (e)Grade of Coal /Ore /Mineral | 62.35 | (f)Stripping Ratio | 1 : 0.22 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | NA | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 23 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | Yes | (c)No. of crushers | 5 | |
|
6.1. Details of crusher: |
---|
S. No. | Crusher ID | Capacity (in PH) | Remarks |
---|
(1.) | 1 | 1800 | GYRATORY CRUSHER | (2.) | 2 | 450 | JAW CRUSHER | (3.) | 3 | 450 | JAW CRUSHER | (4.) | 4 | 450 | JAW CRUSHER | (5.) | 5 | 900 | 2 JAW CRUSHERS OF CAPACITY 450 TPH EACH | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 639.8 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 14 Aug 2019 | (iii)Validity of LOI | 3 | (iv)Reference No. of LOI | CI 218 MMM 2015 | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 647.5 | (iii)Validity of the lease deed | From : 18 Oct 1972 To : 17 Oct 2002 | (iv)Date of Execution of Mining Lese | 14 Aug 2019 | (v)Reference Number | CI 218 MMM 2015 | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | Request letter to DMG, Bangalore for lease deed ex | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 4 | (ii)Total Area (in Hectare) | 40.1 | (iii)Height (in meter) | 130 | (iv)Quantity (in Million Cubic meter) | 12.91 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 0 | (b)Depth (in meter) | 0 | (c)Volume (in Million Cubic meter) | 0 | |
|
12. | Details of Quarry: | (a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 150.43 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | Dumpers & Trucks | (b)Surface to Siding/Loading | The crushed material is transported through downhi | (c)Transportation / Conveyor Details | The sized ore is transported to customers through | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | WASTE LAND | | 0 | 0 | 0 | (2.) | SETTLEMENTS | | 0 | 0 | 0 | (3.) | AGRICULTURE LAND | | 0 | 0 | 0 | (4.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (5.) | OTHERS(Specify) | REVENUE LAND | 159.01 | 0 | 159.01 | (6.) | FOREST LAND | | 480.79 | 0 | 480.79 | (7.) | GRAZING LAND | | 0 | 0 | 0 | |
TOTAL | 639.8 | 0 | 639.8 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXCAVATION/QUARRY | | 137.5 | 12.93 | 0 | | 150.43 | (2.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (3.) | GREEN BELT | | 161.4 | 0 | 0 | | 161.4 | (4.) | VIRGIN AREA | | 159.01 | 0 | 0 | | 159.01 | (5.) | Other | safety zone plantation biodiversity area etc | 26.16 | 0 | 0 | | 26.16 | (6.) | INTERNAL OB DUMPS | | 56.1 | 0 | 0 | | 56.1 | (7.) | BUILT UP AREA (COLONY/OFFICE) | | 45.4 | 0 | 0 | | 45.4 | (8.) | ROADS | | 20.55 | 0 | 20 | | 40.55 | (9.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | |
TOTAL | 606.12 | 12.93 | 20 | 0 | 639.05 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 40.1 | (c)Quarry(in hectare) | 150.43 | (d)Safety Zone(in hectare) | 14.03 | (e)Final Void of 0 (hectare) at a Depth of 24 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 402.31 | (h)Total afforestation plant (in hectare) | 606.87 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 1997 | 0 | 0 | 2.0 | 0.5567 | 0 | (2.) | 2001 | 0 | 0 | 3.0 | 1.21290 | 0 | (3.) | 2003 | 0 | 0 | 2.5 | 1.55481 | 0 | (4.) | 2005 | 7 | 7 | 29 | 1.79392 | 0 | (5.) | 2006 | 7 | 7 | 40 | 6.03563 | 0 | (6.) | 2008 | 7 | 7 | 17.8 | 31.21787 | 13.41787 | (7.) | 2014 | 7 | 7 | 60 | 50.3502491 | 0 | (8.) | 2016 | 7 | 7 | 60 | 59.90607 | 0 | (9.) | 2004 | 7 | 7 | 16.80 | 1.70682 | 0 | (10.) | 1993 | 0 | 0 | 0 | 0.1159 | 0 | (11.) | 1995 | 0 | 0 | 0 | 0.08521 | 0 | (12.) | 2000 | 0 | 0 | 3.0 | 2.71654 | 0 | (13.) | 2007 | 7 | 7 | 14 | 15.07488 | 1.07488 | (14.) | 2010 | 7 | 7 | 29 | 0 | 0 | (15.) | 2012 | 7 | 7 | 30 | 39.0802255 | 9.0802255 | (16.) | 2013 | 7 | 7 | 45 | 40.3835378 | 0 | (17.) | 2015 | 7 | 7 | 65 | 56.5966697 | 0 | (18.) | 2017 | 7 | 7 | 60 | 59.9989998 | 0 | (19.) | 2018 | 7 | 7 | 70 | 69.9990065 | 0 | (20.) | 2009 | 7 | 7 | 17.5 | 4.5705262 | 0 | (21.) | 1996 | 0 | 0 | 0 | 0.37 | 0 | (22.) | 1998 | 0 | 0 | 2.0 | 2.58331 | 0.58331 | (23.) | 1994 | 0 | 0 | 0 | 0.11537 | 0 | (24.) | 1999 | 0 | 0 | 3.0 | 2.87604 | 0 | (25.) | 2002 | 0 | 0 | 2.5 | 1.56689 | 0 | (26.) | 2011 | 7 | 7 | 40 | 14.6312462 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/SA 95 | (ii)Name of the EIA Consultant | Ecomen Laboratories Pvt. Ltd., Lucknow | (iii)Address | Flat No. 8, 2ndFloor ,Arif Chamber –V, Sector –H, Aliganj, Lucknow-226024 | (iv)Mobile No. | 9335205453 | (v)Landline No. | 0522276188 | (vi)Email Id | ravi.bhargava@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 20 Sep 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | PP is requested to submit the following:
(i) Past production details duly authenticated by the Department of Mines and geology, State Govt from the inception of the mine,
(ii) CTO/CTE since inception of the mine,
(iii) List of Schedule species duly authenticated by the Department of Forest/Wild life, state government | 13 Feb 2020 | 2. | NA | The correction have been made as per the instruction received | 05 May 2020 | 3. | NA | On scrutiny of application, it is observed that 1) Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency do not match with applicant. 2) Complete copy of Mining Plan is not uploaded, format of mining plan needs to be checked as it does not have chapter on environement managment plan, plan and section is also not provided in mining plan.
You are requested to submit the reply for the above points | 05 Jun 2020 | 4. | NA | The correction have been made as per the instruction received | 16 Jun 2020 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Reply to ADS on four point query raised during the EAC meeting held on 23rd September 2020 at Agenda number 2.2 for issuance of EC for Kumaraswamy Iron Ore Mine of NMDC Limited (ML: 1111, 639.80 Ha) is submitted for kind consideration please. | 28 Oct 2020 | 2. | NA | Deferred | 06 Oct 2020 | 3. | ADS Reply Letter | Reply to ADS during the EAC meeting held on 23rd July 2020 at Agenda number 2.9 for issuance of EC for Kumaraswamy Iron Ore Mine of NMDC Limited (ML: 1111, 639.80 Ha) is submitted for kind consideration please. | 26 Aug 2020 | 4. | NA | Deferred | 02 Aug 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | SANJEEV SAHI | Designation | GENERAL MANAGER | Name of Company (Applicant Name should not be given here) | NMDC LIMITED DONIMALAI | Address | |
|