Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Kumaraswamy Iron Ore Mine (ML No: 1111, M.L. area 639.80 Ha, 8.6 MTPA (ROM 7 MTPA and Waste Excavation 1.6 MTPA) Iron ore production capacity) of M/s. NMDC Limited, Tehsil Sandur, Ballari District, Karnataka
(b)Name of the Company / Organisation NMDC LIMITED DONIMALAI
(c)Registered Address Donimalai Township, Dist. Bellary Pin: 5,Donimalai Township, Dist. Bellary Pin: 5,Bellary,Karnataka-583118
(d)Legal Status of the Company State PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant SANJEEV SAHI
(b)Designation (Owner/ Partner/ CEO) GENERAL MANAGER
(c)Address Donimalai Township, Dist. Bellary Pin: 583 118 (Karnataka),Donimalai Township, Dist. Bellary Pin: 583 118 (Karnataka),Sandur,Bellary,Karnataka-583118
(d)Pin code 583118
(e)E-mail envdiom@gmail.com
(f)STD Code. 8395(f)Telephone No. 274624
(g)Fax No. 08395274649
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/KA/MIN/75088/2018
(d)Master Proposal Number(Single Window) SW/134443/2019
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Swamimalai Block
(b)Pincode 583118
(c)Bounded Latitudes (North)
From
Degree 15.001919
Minutes
Second
From
Degree 15.023
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.566472
Minutes
Second
From
Degree 76.617933
Minutes
Second
(e)Survey of India Topo Sheet No. D43 E12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1078
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KarnatakaBellarySandur
(2.)KarnatakaBellarySandurDevogiri
(3.)OrissaSundargarhHemgirGopalpur (Telendih), Ratansara
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11015/93/2018-IA-II(M)
(b)Date of Apply of TOR 26 Jul 2018
(c)Date of Issue of TOR / Standard ToR 01 Jan 1900
(d)Previous TOR Letter NA
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Earlier Public Hearing was conducted on 6.08.2001
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)SemifixedJawCrusherwithintegratedscreeningfacility5nos.of450TPHUtilisedforcrushingandscreeningoreatminehead
(2.)GyratoryCrusherwithintegratedscreeningfacility01Nosof1800TPHUtilisedforcrushingandscreeningoreatminehead
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)ROM Iron Ore7000000Tons per AnnumRoad,Rail,Conveyor Belt
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? Obtained
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 30 Jun 2016
(iv)Valid Upto 30 Jun 2021
(v)File No. AWH-300522
(vi)Application No. PCB ID: 19767
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 10.193999999999999
(b) Funds Allocated for Environment Management (Capital) (in Crores) 7.144
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.05
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 9.71
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 562.8
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 562.8
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Industrial Gas0.6OthersKL/annumIOCLRoad35 OthersPURCHASEORDERCopy of Linkage
(2.)HSD562.2OthersKL/annumIOCL and HPCLRoad260 OthersPURCHASEORDERCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)OthersCOMicro Gram per Meter Cube838.25411.25797.892000
(2.)NOxMicro Gram per Meter Cube28.1010.6627.7080
(3.)PM10Micro Gram per Meter Cube95.246.594.6100
(4.)PM2.5Micro Gram per Meter Cube58.624.257.6860
(5.)SO2Micro Gram per Meter Cube176.8116.5080
    14.2.     No. of Ground Water monitoring locations : 05
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l232188200600
(2.)OthersIronmg/l0.260.180.30.3
(3.)pHNA7.517.296.58.5
(4.)Chloridesmg/l48262501000
(5.)Fluoridemg/l0.580.4611.5
(6.)OthersNitratemg/l14.48.264545
(7.)TDSmg/l6525125002000
(8.)Heavy MetalsLeadmg/l0.010.010.010.05
(9.)TSSmg/l0000
    14.3.     No. of Surface Water monitoring locations : 01
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.487.48C
(2.)BODmg/l1.91.9C
(3.)OthersChloridemg/l8080C
(4.)OthersFluoridemg/l0.230.23C
(5.)OthersNitratemg/l20.2020.20C
(6.)OthersIronmg/l0.350.35C
(7.)DOmg/l5.15.1C
(8.)OthersTotal ColiformsOthersMPN/100ml200200C
(9.)CODmg/l00C
    14.4.     No. of Ambient Noise monitoring locations : 08
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))65.952.275 (Industrial) and 55 (Residential)
(2.)Leq(Night)A-weighted decibels(dB(A))53.641.970 (Industrial) and 45 (Residential)
    14.5.     No. of Soil Sample Monitored locations : 04
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Kilogram per hectare11878
(2.)pH7.626.89
(3.)N(Nitrogen)Kilogram per hectare180148
(4.)P(Phosphorus)Kilogram per hectare13096
(5.)Electric ConductivityMillisiemens per Centimetre0.300.26
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 23.31 To 61.00
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 59.13 To 6.90
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface115016Copy of Permission LetterPipelineIntake WellWRE67MTP201316 Feb 201732906.44
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Wastewater from Canteen2430Septic Tank followed by Soak PitOthersSoak Pit240
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 24
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 24
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)UsedoilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)71.14Kilolitre10OthersBarrelthroughTruckOtherseauctiontoauthorizedvendors
(2.)wasterockmaterialmostlyconsistsofBHQandshaleOthersminewaste1600000Tons0OthersByDumpersandTippersOthersdump
(3.)cartridges,printer,CPUE Waste0.33Tons10OthersByDepartmentalServiceTruckOthersBuyBacksystemoreauction
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube28.1000028.1180
(2.)PM10Microgram per Meter Cube95.2000095.21100
(3.)PM2.5Microgram per Meter Cube58.6000058.6160
(4.)SO2Microgram per Meter Cube17000017.0180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetDeisel40.15OthersPM0.013
(2.)DG SetDeisel40.15OthersPM0.013
(3.)DG SetDeisel40.15OthersPM0.013
(4.)DG SetDeisel40.15OthersPM0.013
(5.)DG SetDeisel40.15OthersPM0.013
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 5000
(b)Source GESCOM, Munirabad substation
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 625 KVA x 5 nos.
(e)Stack Height (in m) 4
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 480.79
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 159.01
(e)Other Land (ha.) 0
    Total Land (ha.) 639.8000
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 480.79
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Revenue Land 159.01
    Total (ha.) 639.8000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area150.43
(2.)OB Dump Area56.1
(3.)Main Plant45.4
(4.)Safety Zone14.03
(5.)Green belt161.4
(6.)Built Up Area42.51
(7.)Township0
(8.)Ash Pond0
(9.)Tailing Pond0
(10.)LandFill0
(11.)Water Reservoir0
(12.)Desalination Plant0
(13.)Area for Solid Waste Management0
(14.)OthersBiodiversity undiverted forest land unused area169.93
Total (ha.) 639.8
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNil0NOT APPLICABLE
(2.)CorridorsNil0NOT APPLICABLE
(3.)Critically Polluted AreaNil0NOT APPLICABLE
(4.)NPANil0NOT APPLICABLE
(5.)ESAsNil0NOT APPLICABLE
(6.)ESZsNil0NOT APPLICABLE
(7.)Wildlife CorridorsNil0NOT APPLICABLE
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNil0NOT APPLICABLE
(2.)ForestKumaraswamyBetta Reserve Forest1.5North
(3.)OthersNilNil0NOT APPLICABLE
(4.)Archaeological SitesNil0NOT APPLICABLE
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Final(Stage-II) Approval Obtained
(i)MoEFCC file number FP/KA/MIN/917/2005
(ii)Date of final approval 24 Jul 2006
(iii)Date of In-Principle Approval 24 Jul 2006
(iv)Area diverted 341.2
(v)Uploaded FC Letter Copy of FC Letter
(b)Legal Status of Forest Land Reserved
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not Applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Narihalla Dam, KattarsinghKollar
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 10
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 169
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 271
(e)No. of working days 360
(f)Total Manpower 440
32.
Green Belt in Ha:
(a)Total Area of Green Belt 161.4
(b)Percentage of Total Project Area 25.23
(c)No. of Plants to be Planted 455750
(d)Funds Allocated for Plantation 120000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThe company takes care of the environment & will continue in the future also as per statutory requirement.
(2.)FinancialOperation of Kumaraswamy iron mine provide economic benefits to employees, local population nearby the project vicinity through CSR and to Government in the form of royalty and taxes.
(3.)SocialMine is an existing operating mine, which has strengthened and developed basic infrastructure facilities for the communities in and around the mines. .
(4.)EnvironmentalProject takes care of the environment and will continue to do so in the future also.
(5.)FinancialState gets royalty which is used for the development of the area and people
(6.)SocialThe project gives direct and indirect employment, expenses are incurred under CSR activities
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)ironMajor
2.
Mine Capacity in ROM (Run of Mine) 7 MTPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. No.279/290/91/BNG/1332
(b)Date of Approval 13 Jul 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 639.8
(f)Approved Capacity 7
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 232.06
(b)Mineable Reserves (Million Ton) 162.64
(c)Extractable Reserves(Million Ton) 162.64
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 62.35
(f)Stripping Ratio 1 : 0.22
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) NA
(i)Mining Method Opencast
(j)Life of Mine (Years) 23
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area Yes
(c)No. of crushers 5
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)11800 GYRATORY CRUSHER
(2.)2450 JAW CRUSHER
(3.)3450 JAW CRUSHER
(4.)4450 JAW CRUSHER
(5.)5900 2 JAW CRUSHERS OF CAPACITY 450 TPH EACH
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 639.8
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 14 Aug 2019
(iii)Validity of LOI 3
(iv)Reference No. of LOI CI 218 MMM 2015
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 647.5
(iii)Validity of the lease deed From : 18 Oct 1972 To : 17 Oct 2002
(iv)Date of Execution of Mining Lese 14 Aug 2019
(v)Reference Number CI 218 MMM 2015
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Request letter to DMG, Bangalore for lease deed ex
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 4
(ii)Total Area (in Hectare) 40.1
(iii)Height (in meter) 130
(iv)Quantity (in Million Cubic meter) 12.91
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0
(b)Depth (in meter) 0
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 150.43
13.
Details of Transportation:
(a)In Pit/Underground to Surface Dumpers & Trucks
(b)Surface to Siding/Loading The crushed material is transported through downhi
(c)Transportation / Conveyor Details The sized ore is transported to customers through
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)WASTE LAND000
(2.)SETTLEMENTS000
(3.)AGRICULTURE LAND000
(4.)SURFACE WATER BODIES000
(5.)OTHERS(Specify)REVENUE LAND159.010159.01
(6.)FOREST LAND480.790480.79
(7.)GRAZING LAND000
TOTAL639.80639.8
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY137.512.930150.43
(2.)EXTERNAL OB DUMPS0000
(3.)GREEN BELT161.400161.4
(4.)VIRGIN AREA159.0100159.01
(5.)Othersafety zone plantation biodiversity area etc26.160026.16
(6.)INTERNAL OB DUMPS56.10056.1
(7.)BUILT UP AREA (COLONY/OFFICE)45.40045.4
(8.)ROADS20.5502040.55
(9.)TOP SOIL STORAGE0000
TOTAL606.1212.93200639.05
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 40.1
(c)Quarry(in hectare) 150.43
(d)Safety Zone(in hectare) 14.03
(e)Final Void of 0 (hectare) at a Depth of 24 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 402.31
(h)Total afforestation plant (in hectare) 606.87
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)1997002.00.55670
(2.)2001003.01.212900
(3.)2003002.51.554810
(4.)200577291.793920
(5.)200677406.035630
(6.)20087717.831.2178713.41787
(7.)2014776050.35024910
(8.)2016776059.906070
(9.)20047716.801.706820
(10.)19930000.11590
(11.)19950000.085210
(12.)2000003.02.716540
(13.)2007771415.074881.07488
(14.)2010772900
(15.)2012773039.08022559.0802255
(16.)2013774540.38353780
(17.)2015776556.59666970
(18.)2017776059.99899980
(19.)2018777069.99900650
(20.)20097717.54.57052620
(21.)19960000.370
(22.)1998002.02.583310.58331
(23.)19940000.115370
(24.)1999003.02.876040
(25.)2002002.51.566890
(26.)2011774014.63124620
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/SA 95
(ii)Name of the EIA Consultant Ecomen Laboratories Pvt. Ltd., Lucknow
(iii)Address Flat No. 8, 2ndFloor ,Arif Chamber –V, Sector –H, Aliganj, Lucknow-226024
(iv)Mobile No. 9335205453
(v)Landline No. 0522276188
(vi)Email Id ravi.bhargava@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 20 Sep 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPP is requested to submit the following: (i) Past production details duly authenticated by the Department of Mines and geology, State Govt from the inception of the mine, (ii) CTO/CTE since inception of the mine, (iii) List of Schedule species duly authenticated by the Department of Forest/Wild life, state government 13 Feb 2020
2.NAThe correction have been made as per the instruction received 05 May 2020
3.NAOn scrutiny of application, it is observed that 1) Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency do not match with applicant. 2) Complete copy of Mining Plan is not uploaded, format of mining plan needs to be checked as it does not have chapter on environement managment plan, plan and section is also not provided in mining plan. You are requested to submit the reply for the above points 05 Jun 2020
4.NAThe correction have been made as per the instruction received 16 Jun 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterReply to ADS on four point query raised during the EAC meeting held on 23rd September 2020 at Agenda number 2.2 for issuance of EC for Kumaraswamy Iron Ore Mine of NMDC Limited (ML: 1111, 639.80 Ha) is submitted for kind consideration please. 28 Oct 2020
2.NA

Deferred

06 Oct 2020
3. ADS Reply LetterReply to ADS during the EAC meeting held on 23rd July 2020 at Agenda number 2.9 for issuance of EC for Kumaraswamy Iron Ore Mine of NMDC Limited (ML: 1111, 639.80 Ha) is submitted for kind consideration please. 26 Aug 2020
4.NA

Deferred

02 Aug 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSANJEEV SAHI
DesignationGENERAL MANAGER
Name of Company (Applicant Name should not be given here)NMDC LIMITED DONIMALAI
Address
Print