Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Setting up 500 KTA Propane Dehydrogenation unit integrated with Polypropylene Unit
(b)Name of the Company / Organisation GAIL INDIA LIMITED
(c)Registered Address GAIL INDIA LIMITED,GAIL JUBILEE TOWER,PLOT NO B-35-36 SECTOR-1,NOIDA,UP,,Gautam Buddha Nagar,Uttar Pradesh-201301
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant MISSULA V S Murthy
(b)Designation (Owner/ Partner/ CEO) ChiefManager
(c)Address GAIL INDIA LIMITED,GAIL JUBILEE TOWER,PLOT NO B-35-36 SECTOR-1,NOIDA,UP,,Gautam Buddha Nagar,Gautam Buddha Nagar,Uttar Pradesh-201301
(d)Pin code 201301
(e)E-mail mvsmurthy@gail.co.in
(f)STD Code. 120(f)Telephone No. 2446400
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(c) Petro-chemical complexes (industries based on processing of
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/IND2/69404/2017
(d)Master Proposal Number(Single Window) SW/134386/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. A-1, Usar Industrial Area
(b)Pincode 402203
(c)Bounded Latitudes (North)
From
Degree 183541
Minutes
Second
From
Degree 183632
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 725740
Minutes
Second
From
Degree 725847
Minutes
Second
(e)Survey of India Topo Sheet No. E43G14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 83
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 10
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraRaigadAlibag
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/464/2017-IA-II(I)
(b)Date of Apply of TOR 15 Sep 2017
(c)Date of Issue of TOR / Standard ToR 26 Oct 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :20 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :21 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :3
Ganesh Mangal Karyalaya, Sahan Bypass Road, Alibag Roha Road, Sahan
State :Maharashtra
District :Raigad
Tehsil :Alibag
Village :Sahan
500Employment to Project Affected Persons (PAP), Land Compensation to PAP, Employment to Locals, Employment after imparting training / Skill development program, CSR, Insurance to Nearby VillagersOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Propane Dehydrogenation and Polypropylene UnitsPolypropylene production
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Polypropylene500000Tons per AnnumRoad
(2.)C4 LPG25000Tons per AnnumOthersROAD/ PIPELINE
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 07 Jan 2020
(iv)Valid Upto 31 Aug 2020
(v)File No. 2001000585
(vi)Application No. 0000075720
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 6707.67
(b) Funds Allocated for Environment Management (Capital) (in Crores) 10.25
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 20.77
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.38
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 601000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 601000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Propane601000Tons per AnnumJNPTOthersPipeline58 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 15 Dec 2017 To 15 Mar 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube352232.560
(2.)NOxMicro Gram per Meter Cube17.813.016.580
(3.)PM10Micro Gram per Meter Cube735267.8100
(4.)SO2Micro Gram per Meter Cube15.710.514.780
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l4162695002000
(2.)TSSmg/l441520
(3.)Total Hardnessmg/l195110200600
(4.)Chloridesmg/l107212501000
(5.)Heavy MetalsLeadmg/l0.000.000.010.01
(6.)pHNA7.757.426.58.5
(7.)Fluoridemg/l0.50.011.01.5
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.27.3C
(2.)CODmg/l360245C
(3.)DOmg/l3.72.7C
(4.)BODmg/l15427C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))42.740.445
(2.)Leq(Day)A-weighted decibels(dB(A))52.150.255
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare13456
(2.)K(Potassium)Kilogram per hectare364175
(3.)pH6.776.25
(4.)P(Phosphorus)Kilogram per hectare237.18
(5.)Electric ConductivityOthersµmhos/cm46051.3
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 2
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMIDC1152023Copy of Permission LetterPipelineOthersPipeline from MIDCNO/EE(Alibag)/B14566/of201928 Mar 201915600
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Cooling tower blowdown21122112RO based recycle plantReuse within the Plant & Recycling2112
(2.)Process units360360Effluent treatment plant+RO based recycle plantReuse within the Plant & Recycling360
(3.)Sewage water192192Sewage treatment plantGreen Belt Renewal Plant192
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2664
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 2664
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Spent catalysts/ AdsorbentsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)537.5Tons80RoadAuthorized Recyclers
(2.)Inert grain/ Alumina ballsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)15Tons80RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Support ballsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)20Tons80RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube16.541.5518.0680
(2.)PM10Microgram per Meter Cube67.80067.9100
(3.)SO2Microgram per Meter Cube14.740.1314.8480
(4.)PM2.5Microgram per Meter Cube32.50032.660
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Reactor Charge HeaterFuel Gas551.8SO20.36
(2.)Reactor Charge HeaterFuel Gas551.8NOx4.17
(3.)Air HeaterFuel Gas706SO21.0
(4.)Air HeaterFuel Gas706NOx20.28
(5.)Utility BoilerFuel Gas601.3SO20.30
(6.)Utility BoilerFuel Gas601.3NOx3.33
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 156000
(b)Source State Grid
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 130
    Total Land (ha.) 130
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 130
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Other than Industrial landuse 0
    Total (ha.) 130
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant87
(2.)Green belt43
Total (ha.) 130
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNO0Not Applicable
(2.)WLSNo0Not Applicable
(3.)NPANo0Not Applicable
(4.)ESAsNo0Not Applicable
(5.)ESZsNo0Not Applicable
(6.)CorridorsNo0Not Applicable
(7.)Wildlife CorridorsNo0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNo0Not Applicable
(2.)ForestBherse RF2.5Open jungle
(3.)Defence InstallationsNo0Not Applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 130
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not Applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kundalika River
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 230
(c)Temporary Employment- During Construction 2500
(d)Temporary Employment- During Operation 100
(e)No. of working days 333
(f)Total Manpower 2830
32.
Green Belt in Ha:
(a)Total Area of Green Belt 43
(b)Percentage of Total Project Area 33.08
(c)No. of Plants to be Planted 64500
(d)Funds Allocated for Plantation 25000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment Generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0041
(ii)Name of the EIA Consultant Engineers India Limited
(iii)Address Engineers India Limited, Research & Development Complex, Sector-16 (on NH48), Gurgaon
(iv)Mobile No. 9818669575
(v)Landline No. 0124380203
(vi)Email Id jk.joshi@eil.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 18 May 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i) On perusal it is noted that the Ministry has earlier granted EC, however PP has not uploaded the certified compliance report of RO MoEFCC. (ii) Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1) (iii) Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details. (iv) PP mentioned zero incremental value for PM10 & PM2.5. Air Quality Impact Prediction mentioned (18.1 of form 2) is inadequate kindly correct it. (v) All old CTOs not uploaded to verify the violation, if any done by PP. (vi) Effluent treatment mechanism with plan for Zero Liquid Discharge needs to be submitted. (vii) Proposed Green belt development programe along-with time line and budgetary allocation needs to be provided (viii) Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2) (ix) In view of the above, PP/Consultant are requested to revise the application for grant of EC and accordingly revise the Form 2 alongwith EIA/EMP Report. The EIA/EMP Report shall match with the information as filled in Form 2. On examination it is observed that the Consultant has not adequately submitted the application as per the provisions of the EIA Notification, 2006. Consultant has to read the documents before uploading the information in Form 2 /EIA/EMP report. 24 Mar 2020
2.NAThe correction have been made as per the instruction received 15 Apr 2020
3.NA1. Please read the earlier EDS sought by the Ministry. The matter was again examined and noted that PP has not revised the Form 2 and not uploaded the requisite information. 2. It is pertain to mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. 3. It is also mentioned that after acceptance the Form 2 and EIA/EMP report can not be revise. Therefore, PP/Consultant is again requested to kindly do needful. 22 Apr 2020
4.NA1. Please read the earlier EDS sought by the Ministry. The matter was again examined and noted that PP has not revised the Form 2 and not uploaded the requisite information. 2. It is pertain to mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. 3. It is also mentioned that after acceptance the Form 2 and EIA/EMP report can not be revise. Therefore, PP/Consultant is again requested to kindly do needful. 22 Apr 2020
5.NA1. Please read the earlier EDS sought by the Ministry. The matter was again examined and noted that PP has not revised the Form 2 and not uploaded the requisite information. 2. It is pertain to mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. 3. It is also mentioned that after acceptance the Form 2 and EIA/EMP report can not be revise. Therefore, PP/Consultant is again requested to kindly do needful. 22 Apr 2020
6.NAThe correction have been made as per the instruction received 23 Apr 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterWe are submitting replies to ADS as desired by EAC. Kindly consider our proposal for environmental clearance. 06 Jul 2020
2.NA

The EAC during deliberations noted that the proposed project for production of Polypropylene through Propane Dehydrogenation (PDH) unit is new technology to the nation. The Committee noted that the fresh water requirement and effluent management proposed requires revision. The Committee also showed its displeasure over the poor presentation of the socio-economic status of the region.

 

The Committee after detailed deliberations desired for additional information/inputs in respect of the following:

 

 (i).        Public hearing issues, action plan along with budget provisions.

(ii).        Revised water balance with improvement in evaporation loss.

(iii).        Plan for ZLD along with MEE/modern technology.

(iv).        Plan for need based health programme.

(v).        Socio-economic status report of the study area

(vi).        Detailed CER plan along with action plan for drinking water facility for the people.

(vii).        Provision for employment to the local people.

(viii).        In view of several recent  chemical accidents occurred in various parts of  the country, the risk studies need to be carried out  basedon the following protocolusing 3 D modelling which incorporates dispersion of vertical component vital for developing&placing accident prevention programin place:

 

        Material Safety Data Sheet (MSDS/MDS)

        Hazard Identification, Consequence analysis in terms of effect / threat zone distances.

        Risk need to be carried out for Small, Medium, Larger and Catastrophic ruptures /leak and to be modeled as representative cases.Frequency/ Probability of leak per year.

        Risk needs to be quantified interms of Individual Risk Contours

        Societal risk

        F-N curves to assess against risk acceptance criteria (HSE,UK etc.).

(ix).        Plan for installation of solar power and utilization in the plant

(x).        Details of wildlife sanctuary/ESA within 10 km of the project site.

 

The proposal was therefore deferred for the needful.

29 Jun 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMISSULA V S Murthy
DesignationChiefManager
Name of Company (Applicant Name should not be given here)GAIL INDIA LIMITED
AddressGAIL INDIA LIMITED,GAIL JUBILEE TOWER,PLOT NO B-35-36 SECTOR-1,NOIDA,UP