1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Basantpur Tapin Coking coal washery | (b)Name of the Company / Organisation | Central Coalfields Limited | (c)Registered Address | DARBHANGA HOUSE, CCL, RANCHI,,Ranchi,Jharkhand-834029 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sanjeev Kumar | (b)Designation (Owner/ Partner/ CEO) | Nodal Officer | (c)Address | Basantpur-Tapin Washery, Village-Basantpur, Post- Kedla, District- Ramgarh, Jharkhand-825325,,Patratu,Ramgarh,Jharkhand-825325 | (d)Pin code | 825325 | (e)E-mail | btwashery@gmail.com | (f)STD Code. | 6546(f)Telephone No. | 232630 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 2(a) Coal washeries
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/JH/CMIN/77450/2018 | (d)Master Proposal Number(Single Window) | SW/133921/2019 | (e)EAC concerned (for category A Projects only) | Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 23,24, 25,26,27,28,29,30 31,32, 33 etc. | (b)Pincode | 825325 | (c)Bounded Latitudes (North) | | From | | Degree | 23.82 | Minutes | | Second | | From | | Degree | 23.83 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 85.56 | Minutes | | Second | | From | | Degree | 85.567 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F45B9 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 356 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 600 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Jharkhand | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Jharkhand | Ramgarh | No Data | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11015/97/2018-IA-II(M) | (b)Date of Apply of TOR | 01 Sep 2018 | (c)Date of Issue of TOR / Standard ToR | 07 Oct 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 09 Oct 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0.5 |
| Shiv Mandir in Basantpur Village, Post-Kedla Dist- Ramgarh | State : | Jharkhand | District : | Ramgarh | Tehsil : | No Data | Village : | Basantpur |
| 250 | ssues regarding pollution control measures, ground water, surface water, employment generation, CSR activities, plantation etc raised | Others | Additional Collector | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Washery | 4 MTPA in an area of 32.03 Ha | This washery is proposed on BOO Basis. | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Rejects | 1496000 | Tons per Annum | | Road | | (2.) | Washed Coal (Clean) | 1516000 | Tons per Annum | | Road,Rail | | (3.) | Washed Coal (Power) | 988000 | Tons per Annum | | Road,Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 360 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 6.85 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 5.40 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.086 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 4000000 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 4000000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Raw coal | 350000 | Tons per Annum | | Tapin South OCP | Road | | 12 | Linkage | | Copy of Linkage | (2.) | Raw coal | 1420000 | Tons per Annum | | Tapin North OCP | Road | | 15 | Linkage | | Copy of Linkage | (3.) | Raw coal | 1430000 | Tons per Annum | | Parej East OCP | Road | | 9 | Linkage | | Copy of Linkage | (4.) | Raw coal | 800000 | Tons per Annum | | Jharkhand OCP | Road | | 8 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 18 Mar 2019 To 03 Jun 2019 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 69.4 | 30.7 | 69.13 | 300 | (2.) | NOx | | Micro Gram per Meter Cube | 9.9 | 6.2 | 9.7 | 120 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 43.7 | 20.5 | 43.34 | 60 | (4.) | SO2 | | Micro Gram per Meter Cube | 24.8 | 11.2 | 24.7 | 120 | |
14.2. No. of Ground Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Others | color | | Others | Hazen | 1 | 1 | 5 | 15 | (2.) | Others | Alkalinity as CaCO3 | | mg/l | | 42 | 28 | 200 | 600 | (3.) | Others | Copper (As Cu) | | mg/l | | 0.01 | 0.01 | 0.05 | 1.5 | (4.) | Others | Copper (As Cu) | | mg/l | | 0.01 | 0.01 | 0.05 | 1.5 | (5.) | Others | Detergent | | mg/l | | 0.05 | 0.05 | 0.2 | 1 | (6.) | Others | Nitrate | | mg/l | | 3.88 | 3.23 | 45 | 45 | (7.) | Others | Copper (As Cu) | | mg/l | | 0.01 | 0.01 | 0.05 | 1.5 | (8.) | Others | Mercury (As Hg) | | mg/l | | 0.00 | 0.00 | 0.00 | 0.00 | (9.) | pH | | | Others | - | 6.64 | 6.61 | 6.6 | 8.5 | (10.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (11.) | Total Hardness | | | mg/l | | 64 | 52 | 200 | 600 | (12.) | Chlorides | | | mg/l | | 6.89 | 5.91 | 250 | 1000 | (13.) | Heavy Metals | | Fe | mg/l | | 2.76 | 0.1 | 0.3 | 0.3 | (14.) | Others | Odour | | Others | - | 0 | 0 | 0 | 0 | (15.) | Others | Phenolic Compounds | | mg/l | | 0.00 | 0.00 | 0.00 | 0.00 | (16.) | Others | Phenolic Compounds | | mg/l | | 0.00 | 0.00 | 0.00 | 0.00 | (17.) | Others | Phenolic Compounds | | mg/l | | 0.00 | 0.00 | 0.00 | 0.00 | (18.) | Others | Residual Chlorine | | mg/l | | 0.05 | 0.05 | 0.2 | 1 | (19.) | Others | Cynide | | mg/l | | 0.01 | 0.01 | 0.05 | 0.05 | (20.) | Others | Aluminum (As Al) | | mg/l | | 0.00 | 0.00 | 0.03 | 0.2 | (21.) | Others | Cadmium (As Cd) | | mg/l | | 0.00 | 0.00 | 0.00 | 0.00 | (22.) | Others | Turbidity | | Others | NTU | 0.1 | 0.1 | 1 | 5 | (23.) | Others | Copper (As Cu) | | mg/l | | 0.01 | 0.01 | 0.05 | 1.5 | (24.) | Others | Lead (As Pb) | | mg/l | | 0.31 | 0.28 | 0.01 | 0.01 | (25.) | Others | Manganese (As Mg) | | mg/l | | 0.05 | 0.05 | 0.1 | 0.3 | (26.) | Others | Selenium (As Se) | | mg/l | | 0.00 | 0.00 | 0.01 | 0.01 | (27.) | Others | Feacal Coliform | | Others | MPN/100 mL | 0 | 0 | 0 | 0 | (28.) | TDS | | | mg/l | | 266 | 246 | 500 | 2000 | (29.) | Fluoride | | | mg/l | | 0.39 | 0.32 | 1 | 1.5 | (30.) | Others | Temperature | | Others | Degree centigrade | 25.9 | 25.9 | 37 | 37 | (31.) | Others | Taste | | Others | - | 0 | 0 | 0 | 0 | (32.) | Others | Calcium as Ca | | mg/l | | 14.42 | 13.32 | 75 | 200 | (33.) | Others | Calcium as Ca | | mg/l | | 14.42 | 13.32 | 75 | 200 | (34.) | Others | Sulphate | | mg/l | | 11.57 | 9.83 | 200 | 400 | (35.) | Others | Hexavalent Chromium as Cr+6 | | mg/l | | 0.01 | 0.01 | 0 | 0 | (36.) | Others | Arsenic (As As) | | mg/l | | 0.05 | 0.03 | 0.01 | 0.05 | (37.) | Others | Boron (As B) | | mg/l | | 0.1 | 0.1 | 0.5 | 1 | (38.) | Others | Copper (As Cu) | | mg/l | | 0.01 | 0.01 | 0.05 | 1.5 | (39.) | Others | Copper (As Cu) | | mg/l | | 0.01 | 0.01 | 0.05 | 1.5 | (40.) | Others | Copper (As Cu) | | mg/l | | 0.01 | 0.01 | 0.05 | 1.5 | (41.) | Others | Copper (As Cu) | | mg/l | | 0.01 | 0.01 | 0.05 | 1.5 | (42.) | Others | Zinc (As Zn) | | mg/l | | 0.2 | 0.2 | 5 | 15 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 0 | 0 | C | (2.) | Others | Temperature°C | Others | °C | 33.4 | 29.5 | C | (3.) | pH | | Others | - | 7.59 | 7.48 | C | (4.) | Others | Sulphate | mg/l | | 124.2 | 120.5 | C | (5.) | Others | Calcium as Ca | mg/l | | 65.7 | 64.92 | C | (6.) | Others | Cadmium (as Cd) | mg/l | | 0.00 | 0.00 | C | (7.) | Others | Arsenic (as As) | mg/l | | 0.01 | 0.01 | C | (8.) | Others | Mercury (as Hg) | mg/l | | 0.01 | 0.01 | C | (9.) | Others | Zinc (as Zn) | mg/l | | 0.2 | 0.2 | C | (10.) | Others | Cynide | mg/l | | 0.01 | 0.01 | C | (11.) | Others | Total Coliform | Others | MPN/100ml | 0 | 0 | C | (12.) | Others | Color | Others | CU | 1 | 1 | C | (13.) | Others | Chloride | mg/l | | 36.5 | 32.52 | C | (14.) | Others | Fluoride | mg/l | | 124 | 121 | C | (15.) | Others | Magnesium as Mg | mg/l | | 54.4 | 53.5 | C | (16.) | Others | Manganese (as Mn) | mg/l | | 0.5 | 0.5 | C | (17.) | Others | Total Dissolved Solids | mg/l | | 864 | 759 | C | (18.) | Others | Hexavalent Chromium as Cr+6 | mg/l | | 0.01 | 0.01 | C | (19.) | Others | Copper (as Cu) | mg/l | | 0.4 | 0.4 | C | (20.) | Others | Total Suspended Solids | mg/l | | 26 | 21 | C | (21.) | Others | Nitrate | mg/l | | 2.74 | 2.56 | C | (22.) | Others | Oil & Grease | mg/l | | 1 | 1 | C | (23.) | Others | Total Hardness CaCO3 | mg/l | | 388 | 388 | C | (24.) | Others | Lead (as Pb) | mg/l | | 0.01 | 0.01 | C | (25.) | Others | IRON | mg/l | | 3.33 | 1.32 | C | (26.) | Others | Selenium (as Se) | mg/l | | 0.00 | 0.00 | C | (27.) | DO | | mg/l | | 2.74 | 2.56 | C | (28.) | BOD | | mg/l | | 4 | 2.4 | C | (29.) | Others | Odour | Others | - | 0 | 0 | C | (30.) | Others | Phenolic Compounds | mg/l | | 0.00 | 0.00 | C | |
14.4. No. of Ambient Noise monitoring locations : 6 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 72.9 | 48.9 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 66.9 | 40.1 | 70 | |
14.5. No. of Soil Sample Monitored locations : 9 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Milligram per Kilogram | | 44.6 | 28.56 | (2.) | Electric Conductivity | Others | µS/cm | 47 | 42.59 | (3.) | K(Potassium) | Kilogram per hectare | | 183.26 | 118.26 | (4.) | pH | Others | - | 7.81 | 6.34 | (5.) | P(Phosphorus) | Kilogram per hectare | | 2.05 | 2.02 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10.2 To 3.0 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 7.93 To 1.78 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 555 | 3.75 | Copy of Permission Letter | Pipeline | | Others | Pumping | 21-4/642/JH/IND/2020 | 01 Apr 2020 | 730 | (2.) | Surface | | 175 | 3.75 | Copy of Permission Letter | Pipeline | | Others | Old quarry/Pond | D/KW/PO/BTW/20-21/625 | 17 Jul 2020 | 730 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Washery | 9856 | 10000 | Effluent Treatment and water recovery from washed coal (Clean and Power) and rejects. All discharged water 9856 cum per day is reused includes 9576 cum per day actually reuse and water lost due to evaporation and other losses as 280 cum per day. | Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 9856 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 9856 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 9856 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | reject | Others | reject | 5000 | Tons | 0 | Road | | Others | Sale | (2.) | Burnt Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 20 | Kilolitre | 12 | Road | | Authorized Recyclers | | (3.) | Battery | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.2 | Tons | 5 | Road | | Authorized Recyclers | | (4.) | Oily Waste Cotton | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2 | Tons | 5 | Road | | Others | Burning and landfills | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 23.5 | 0.24 | 0.18 | 23.69 | 80 | (2.) | PM2.5 | | Microgram per Meter Cube | 29.3 | 0.24 | 1.70 | 31.01 | 60 | (3.) | PM10 | | Microgram per Meter Cube | 39.7 | 0.24 | 5.64 | 45.35 | 100 | (4.) | NOx | | Microgram per Meter Cube | 9.3 | 0.24 | 3.84 | 13.15 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | nil | nil | 0 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 8000 | (b)Source | Basantpur Substation | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 2 | (e)Stack Height (in m) | 10 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 32.03 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0.44 | Total Land (ha.) | 32.47 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 30.93 | (b)Waste/Barren Land (ha.) | 0.70 | (c)Grazing/ Community Land (ha.) | 0.40 | (d)Surface Water Bodies (ha.) | 0.00 | (e)Settlements (ha.) | 0.00 | (f)Industrial (ha.) | 0.00 | (g)Forest (ha.) | 0.00 | (h)Mangroves (ha.) | 0.00 | (i)Marine Area (ha.) | 0.00 | (j)Others (ha.) : 0 | 0.00 | Total (ha.) | 32.0300 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 14.19 | | (2.) | Green belt | | 9.39 | | (3.) | Others | Slurry Pond, Reject dumping yard | 8.45 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESZs | NA | 10 | No ESZs Within 10 KM | (2.) | Critically Polluted Area | NA | 10 | No Critically Polluted Area Within 10 KM | (3.) | NPA | NA | 10 | No NPA Within 10 KM | (4.) | ESAs | NA | 10 | No ESAs Within 10 KM | (5.) | Corridors | NA | 10 | No Corridors within 10 KM | (6.) | Wildlife Corridors | NA | 10 | No Wildlife Cooridors Within 10 KM | (7.) | WLS | NA | 10 | No WLS Within 10 KM | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 10 | No Forest | (2.) | Archaeological Sites | | NA | 10 | No Archaeological Sites within 10 km | (3.) | Defence Installations | | NA | 10 | Defence Installation within 10 km | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 32.03 | (b)Land yet to be acquired(Ha) | 0.00 | (c)Status of Land acquisition if not acquired | 0.00 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | PEACOCK (PEAFOWL) | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 32 Lakhs | (iii)Period of Implementation | 5 | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Chutua Nalla | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 0.6 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 30 | (b)Permanent Employment-During Operation | 100 | (c)Temporary Employment- During Construction | 20 | (d)Temporary Employment- During Operation | 50 | (e)No. of working days | 330 | (f)Total Manpower | 200 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 9.39 | (b)Percentage of Total Project Area | 28.92 | (c)No. of Plants to be Planted | 70800 | (d)Funds Allocated for Plantation | 8139690 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | The washery will produce environment friendly clean coal to minimize the pollution levels. It will reduce volume of coal transportation which will reduce pollution. | (2.) | Financial | The washery will produce metullurgical grade coal to be used in steel plants thus resulting in saving to national exchequer by reduction in imports. | (3.) | Social | This project will create employment opportunities both for skilled and semi skilled persons in the area. Business opportunity in secondary & Tertiary sectors will increase. The proposed washery project will also bring about enhanced socio-economic benefits to local population due to expenditure in CSR activities. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Not Applicable as it is washery | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 0 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | CS/BM/483/2020/153 | (b)Date of Approval | 25 Feb 2020 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | CCL BOARD | (e)Approved Mining Lease Area | 32.03 | (f)Approved Capacity | 4 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 0.00 | (b)Mineable Reserves (Million Ton) | 0.00 | (c)Extractable Reserves(Million Ton) | 0.00 | (d)Percent(%) of Extraction | 0.00 | (e)Grade of Coal /Ore /Mineral | 0.00 | (f)Stripping Ratio | 0 : 0 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | NA | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 18 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | Yes | (c)No. of crushers | 3 | |
|
6.1. Details of crusher: |
---|
S. No. | Crusher ID | Capacity (in PH) | Remarks |
---|
(1.) | 1 | 1000 | CRUSHING OF -1000MM SIZE COAL DOWN TO -200MM SIZEIN PRIMARY TWIN SHAFT SIZER | (2.) | 2 | 1000 | CRUSHING OF -200MM SIZE COAL DOWN TO -50MM SIZE IN SECONDARY TWIN SHAFT SIZER | (3.) | 3 | 1000 | CRUSHING OF +13MM SIZE FRACTION DOWN TO 13MM IN TERTIARY CRUSHER AND MIXING WITH -13MM SIZE FRACTION, | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 32.03 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | CBA aquired SO 2082 30.06.1981 & SO 981(E) dtd. 22 | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | CBA aquired SO 2082 30.06.1981 & SO 981(E) dtd. 22 | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | CBA aquired SO 2082 30.06.1981 & SO 981(E) dtd. 22 | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | (v)No. of year back fill up | | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | | (b)Depth (in meter) | | (c)Volume (in Million Cubic meter) | | |
|
12. | Details of Quarry: | (a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 0 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | 0 | (b)Surface to Siding/Loading | Rail and Road | (c)Transportation / Conveyor Details | - | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | AGRICULTURE LAND | | 30.93 | 0 | 30.93 | (2.) | FOREST LAND | | 0 | 0 | 0 | (3.) | WASTE LAND | | 0.70 | 0 | 0.7 | (4.) | GRAZING LAND | | 0.40 | 0 | 0.4 | (5.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (6.) | SETTLEMENTS | | 0 | 0 | 0 | |
TOTAL | 32.03 | 0 | 32.03 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXCAVATION/QUARRY | | 0 | 0 | 0 | | 0 | (2.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | (3.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (4.) | GREEN BELT | | 28 | 0 | 0 | | 28 | (5.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 2 | | 2 | (6.) | Other | road etc | 0 | 0 | 2.03 | | 2.03 | (7.) | ROADS | | 0 | 0 | 0 | | 0 | (8.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (9.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | |
TOTAL | 28 | 0 | 4.03 | 0 | 32.03 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 0 | (d)Safety Zone(in hectare) | 0 | (e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 0 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 0 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 2020 | 0 | 0 | 4 | 0 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA0092 | (ii)Name of the EIA Consultant | CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED | (iii)Address | Central Mine Planning and Design Institute Limited, Gondwana Place, Kanke Road, Ranchi, Jharkhand | (iv)Mobile No. | 8987788960 | (v)Landline No. | 0651223005 | (vi)Email Id | gmenv.cmpdi@coalindia.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 01 Oct 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Pls clarify or justify the reason for the following points
a. Area of the project as mentioned in ToR granted by Ministry and proposal submitted in Form #2 Sr. No. 8.1 and in EIA Report is not similar.
b. Pdf copy of application of CGWA clearance is enclosed in surface water permission.
c. Details of distance of GLC is not filled in Form # 2
d. Overall plan of utilization of washery rejects with quantity shall be provided
e. Data of effluent Analytical Result at table 3.3.4 (EIA Report) is mentioned as BOD-4 mg/l & COD-10 mg/l which is too lower for any treated effluent from washery plant
f. As per guidelines, Ambient Air Quality/ Baseline data collected shall be measured within 10 km of buffer zone and monitoring stations should be selected considering the representation of all buffer zone. However in this case, distance of monitoring ranges from 0.1 km to 0.24 km which clearly does not represent the buffer zone. Also, Bokaro river lies in 10 km buffer zone. Why surface water quality of bokaro river was taken for analysis.
g. Wild life conservation plan for presence of schedule- I species (all species) with fund allocated as approved by PCCF
h. As per ToR, Ground water permission from CGWA has to be obtained.
i. Environmental Impact Assessment for transportation of washed coal/rejects is not included in EIA Report
j. Water Balance Diagram with quantity of usage at each points should be submitted.
k. Incorrect details filled in Form#2 on PARIVESH Portal regarding Water Requirement at Sr. No. 15- Water Quantity required is 555 & 175 however details in EIA report and ToR granted varies. Also, uints are not mentioned about quantity
a. Quantity of wastewater generated is 9856 kl/day wherein in EIA Report it is 600 m3/hr.
b. Form # 2 Sr. No. 18.1- Baseline concentration entered is not matching with PM10/PM2.5 data given in EIA/EMP.
Kindly correct the above mentioned deficiencies in the Report and upload the correct documents so that the proposal can be appraised before the EAC. PP/Consultant has to upload the correct information. | 22 May 2020 | 2. | NA | The correction have been made as per the instruction received | 31 Jul 2020 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | The ADS have been raised inadvertently and as such it may be considered accodingly by MoEF&CC. | 09 Feb 2021 | 2. | NA | the proposal has been deferred by EAC due to shortcomings in EIA-EMP report. Please refer minutes of meeting for full compliance of observation of EAC. | 09 Feb 2021 | 3. | ADS Reply Letter | Respected Sir,
The compliance in respect of the information sought by EAC is being submitted herewith for consideration please. | 08 Jan 2021 | 4. | NA | The EAC found several inconsistencies in the proposal & submission given by project proponent w.r.t traffic management, flora fauna, pollution mitigation measures, etc. Therefore, after deliberation, EAC deferred the proposal for want following information:
i. Explore the possibility of laying conveyor belt for transportation of coal from nearest mine. PP shall provide the plan for reduction of number of trucks for transportation of coal and fleet to be redesigned.
ii. PP shall submit plan for utilization of water only from mine and no ground water shall be used.
iii. Plan of utilisation of washery rejects with MoU with FBC boilers/power plants as per the MoEF&CC notification.
iv. Impact of washery on nearby agricultural land and flora-fauna. Proper flora management plan needs to be prepared.
v. Proper Air pollution mitigation measures at site with installation of Continuous Ambient Air Quality Station during operation of project.
vi. Adherence to the compliance to Issues raised during Public Consultation with the timeline and budgetary provision.
vii. Fund allotment for greenbelt is too less and more fund should be allotted for developing peripheral plantation.
viii. Distance of Chutuwa nallah/stream near washery and impact due to washery operations shall be presented.
ix. Land of dumping of rejects shall be reduced to keep the rejects only for 2 months and accordingly greenbelt land should be increased.
x. PP shall rework on the layout of washery so that coal storage area, crushing units and rejects storage area shall not be near the villages.
The proposal was deferred on above lines for compliance by project proponent | 14 Oct 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Sanjeev Kumar | Designation | Nodal Officer | Name of Company (Applicant Name should not be given here) | Central Coalfields Limited | Address | DARBHANGA HOUSE, CCL, RANCHI |
|