1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Gujarat Dyestuff Industries (Pharma Unit) | (b)Name of the Company / Organisation | GUJARAT DYESTUFF INDUSTRIES | (c)Registered Address | "Krishna Niwas" 8 Vinayak Society, Near Natubhai Circle, Gotri Road,,Vadodara,Gujarat-390007 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Vineet Jayram Tilve | (b)Designation (Owner/ Partner/ CEO) | PlantManager | (c)Address | Plot No 133/4, 133/5, 133/6, GIDC Estate Nandesari, Di. Vadodara 391340,,,Vadodara,Gujarat-391340 | (d)Pin code | 391340 | (e)E-mail | ehs@rlggroup.co.in | (f)STD Code. | 265(f)Telephone No. | 2326673 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/133405/2018 | (d)Master Proposal Number(Single Window) | SW/133394/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 133/4, 133/5, 133/6 GIDC Nandesari, Vadodara | (b)Pincode | 391340 | (c)Bounded Latitudes (North) | | From | | Degree | 22.400089 | Minutes | | Second | | From | | Degree | 22.402567 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.096667 | Minutes | | Second | | From | | Degree | 73.097158 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43H3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 35.5 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1.4 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | SIA/GJ/IND2/28982/2018 | (b)Date of Apply of TOR | 18 Nov 2018 | (c)Date of Issue of TOR / Standard ToR | 10 Jan 2019 | (d)Date of Apply of EC | 12 Jun 2013 | (e)Date of Issue of EC | 01 Aug 2014 | (f)Previous TOR Letter | Copy of Previous TOR letter | (g)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Project Located in GIDC Nandesari | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 18-A-112/2014(SEAC)/156 | (iv)Status of Compliance | Partially Complied | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Feb 1 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Lauryl Alcohol Ethoxylates (or) | 0 | 1000 | 1000 | Others | MT per Month | Road | | (2.) | Betamethasone Dipropionate (or) | 0.5 | 0 | 0.5 | Others | MT per Month | Road | | (3.) | Oleyl Amine Ethoxylates (or) | 0 | 1000 | 1000 | Others | MT per Month | Road | | (4.) | Quinon Sulphate (or) | 20 | 0 | 20 | Others | MT per Month | Road | | (5.) | Cloxacillin Sodium (or) | 20 | 0 | 20 | Others | MT per Month | Road | | (6.) | Poly Sorbate Ethoxylates (or) | 0 | 1000 | 1000 | Others | MT per Month | Road | | (7.) | Methylcobalamine (or) | 0.5 | 0.5 | 1 | Others | MT per Month | Road | | (8.) | Di Cloxacillin Sodium (or) | 20 | 0 | 20 | Others | MT per Month | Road | | (9.) | Tridecyl Alcohol Ethoxylates (or) | 0 | 1000 | 1000 | Others | MT per Month | Road | | (10.) | Cefixime Trihydrate (or) | 10 | 0 | 10 | Others | MT per Month | Road | | (11.) | Cefpodoxime Proxetil (or) | 10 | 0 | 10 | Others | MT per Month | Road | | (12.) | Clobetasole Propionate (or) | 0.5 | 0 | 0.5 | Others | MT per Month | Road | | (13.) | Dexamethasone Sodium Phosphate (or) | 0.5 | 0 | 0.5 | Others | MT per Month | Road | | (14.) | Beclomethasone Dipropionate (or) | 0.5 | 0 | 0.5 | Others | MT per Month | Road | | (15.) | Mometasone Furoate (or) | 0.5 | 0 | 0.5 | Others | MT per Month | Road | | (16.) | Ofloxacin (or) | 20 | 0 | 20 | Others | MT per Month | Road | | (17.) | Nonyl Phenol (or) | 0 | 1000 | 1000 | Others | MT per Month | Road | | (18.) | Flucoxacillin Sodium (or) | 20 | 0 | 20 | Others | MT per Month | Road | | (19.) | Oxacillin Sodium (or) | 20 | 0 | 20 | Others | MT per Month | Road | | (20.) | Hydrogenated Castor Oil (or) | 0 | 1000 | 1000 | Others | MT per Month | Road | | (21.) | Octyl Phenol Ethoxylates (or) | 0 | 1000 | 1000 | Others | MT per Month | Road | | (22.) | Card Phenol Ethoxylates (or) | 0 | 1000 | 1000 | Others | MT per Month | Road | | (23.) | Styrunated Phenol Ethoxylates (or) | 0 | 1000 | 1000 | Others | MT per Month | Road | | (24.) | Cefuroxime Axetil (or) | 10 | 0 | 10 | Others | MT per Month | Road | | (25.) | Levofloxacin (or) | 20 | 0 | 20 | Others | MT per Month | Road | | (26.) | Poly Ethylene Glycol (or) | 0 | 1000 | 1000 | Others | MT per Month | Road | | (27.) | Stearyl Amine Ethoxylates (or) | 0 | 1000 | 1000 | Others | MT per Month | Road | | (28.) | Coco Amine Ethoxylates (or) | 0 | 1000 | 1000 | Others | MT per Month | Road | | (29.) | Ampicillin (or) | 20 | 0 | 20 | Others | MT per Month | Road | | (30.) | Amoxicillin Trydrydate (or) | 20 | 0 | 20 | Others | MT per Month | Road | | (31.) | Betamethasone Valerate (or) | 0.5 | 0 | 0.5 | Others | MT per Month | Road | | (32.) | Betamethasone Sodium Phosphate (or) | 0.5 | 0 | 0.5 | Others | MT per Month | Road | | (33.) | Metformin Hydrochloride (or) | 0 | 500 | 500 | Others | MT per Month | Road | | (34.) | Castor Oil Ethoxylates (or) | 0 | 1000 | 1000 | Others | MT per Month | Road | | (35.) | Cestostyryl Alcohol Ethoxylates (or) | 0 | 1000 | 1000 | Others | MT per Month | Road | | (36.) | Stearic Acid Ethoxylates (or) | 0 | 1000 | 1000 | Others | MT per Month | Road | | (37.) | Tallow Alcohol Ethoxylates (or) | 0 | 1000 | 1000 | Others | MT per Month | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Utilities & Storage Area | 350 | 50 | 400 | | (2.) | Plant Facilities | 720 | 495 | 1215 | | (3.) | Other Building Area (Road & Parking) | 250 | 0 | 250 | | (4.) | ETP Area | 300 | 50 | 350 | | (5.) | Green Belt | 791 | 685 | 1476 | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 29 May 2020 | (iv)Valid Upto | 30 Sep 2020 | (v)File No. | AWH108207 | (vi)Application No. | 176025 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 7 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.59 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.06 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.12 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 12000 | (b)Existing quantity of raw material/fuel | 6161 | (c)Total quantity of raw material/fuel | 18161 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Ethylene Oxide | 9996 | Tons per Annum | | Group Company | Others | Pipeline | 0.1 | Linkage | | Copy of Linkage | (2.) | Lauryl Alcohol | 4544 | Tons per Annum | | Mumbai | Road | | 456 | MoU | | Copy of Linkage | (3.) | n- Butanol | 4200 | Tons per Annum | | Nandesari Road | Road | | 20 | MoU | | Copy of Linkage | (4.) | Tri Decyl Alcohol | 4322 | Tons per Annum | | Ahmedabad | Road | | 92 | MoU | | Copy of Linkage | (5.) | Di Ethylene Glycol | 3175 | Tons per Annum | | Nandesari Road | Road | | 30 | MoU | | Copy of Linkage | (6.) | Castor oil | 4027 | Tons per Annum | | Ahmedabad | Road | | 87 | MoU | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2018 To 31 Dec 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 77.35 | 71.94 | 74.64 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 47.49 | 40.65 | 44.07 | 60 | (3.) | NOx | | Micro Gram per Meter Cube | 19.15 | 11.07 | 15.11 | 80 | (4.) | SO2 | | Micro Gram per Meter Cube | 22.19 | 13.11 | 17.65 | 80 | |
14.2. No. of Ground Water monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 1902 | 156 | 500 | 2000 | (2.) | Chlorides | | | mg/l | | 673.23 | 32.53 | 250 | 1000 | (3.) | Total Hardness | | | mg/l | | 908.04 | 34.13 | 200 | 600 | (4.) | TSS | | | mg/l | | 32 | 8 | 0 | 0 | (5.) | Others | Sulphates | | mg/l | | 199.78 | 2.51 | 200 | 400 | (6.) | Fluoride | | | mg/l | | 0 | 0 | 1 | 1.5 | (7.) | pH | | | Others | No Unit | 7.99 | 6.96 | 6.5 | 8.5 | (8.) | Heavy Metals | | Lead | mg/l | | 0 | 0 | 0.01 | 0.01 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 6.9 | 6.72 | A | (2.) | COD | | mg/l | | 12.08 | 8.45 | A | (3.) | pH | | Others | No Unit | 8.24 | 7.45 | A | (4.) | BOD | | mg/l | | 0 | 0 | A | |
14.4. No. of Ambient Noise monitoring locations : 14 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 63.9 | 46.4 | 55-65 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 60.2 | 41.4 | 45-65 | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.58 | 7.15 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 0 | 0 | (3.) | N(Nitrogen) | Milligram per Kilogram | | 0 | 0 | (4.) | K(Potassium) | Milligram per Kilogram | | 87 | 18.4 | (5.) | P(Phosphorus) | Milligram per Kilogram | | 0 | 0 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 25 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 15 To 20 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Nandesari Water & Utilities Ltd. | 247 | 2 | Copy of Permission Letter | Pipeline | | Others | Pipeline | 17.12.2018 | 17 Dec 2018 | 300 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Cooling Tower | 15.6 | 15.6 | In-House ETP | Others | ZLD | 15.2 | 0.4 | (2.) | Scrubber | 1 | 1 | In-House ETP | Others | ZLD | 1 | 0 | (3.) | Washing | 4 | 4 | In-House ETP | Others | ZLD | 4 | 0 | (4.) | Process | 19.4 | 19.4 | In-House ETP | Others | ZLD | 19.4 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 40 | (b)Total Discharged Water (Kilolitre per Day) | 0.4 | (c)Total Reused Water (Kilolitre per Day) | 39.6 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.6 | Kilolitre | 2 | Road | | Authorized Recyclers | | (2.) | Discarded Bags & Containers | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 108 | Tons | 2 | Road | | Authorized Recyclers | | (3.) | Distillation Residues | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 66 | Tons | 2 | Road | | Others | Common Hazardous Waste Incinerator | (4.) | MEE Salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 144 | Tons | 2 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (5.) | Spent Solvent for Recovery | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4368 | Tons | 0 | Road,Others | Captive In-House Recovery | Others | In-House Recovery | (6.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 12 | Tons | 2 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 17.19 | 2.09 | 0.23 | 17.43 | 80 | (2.) | SO2 | | Microgram per Meter Cube | 19.13 | 2.09 | 0.02 | 19.16 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 45.38 | 2.09 | 0.57 | 45.96 | 60 | (4.) | PM10 | | Microgram per Meter Cube | 76.01 | 2.09 | 0.57 | 76.59 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG Set 385KVA | HSD | 5 | 0.2 | Others | SO2, NO2, PM | 0.019, 0.009, 0.004 | (2.) | Thermic Fluid Heater 20 Lac K.Cal (Existing) | FO/LDO | 30 | 0.3 | Others | SO2, NO2, PM | 0.0741, 0.0207, 0.0339 | (3.) | Thermic Fluid Heater 40 Lac K.Cal (Proposed) | Natural Gas | 30 | 0.45 | Others | SO2, NO2, PM | 0.00185, 0.468, 0.0925 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 1600 | (b)Source | DGVCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 385 KVA | (e)Stack Height (in m) | 5 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0.3691 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 0.36911 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 3864.95 | (b)Waste/Barren Land (ha.) | 193.21 | (c)Grazing/ Community Land (ha.) | 1983.92 | (d)Surface Water Bodies (ha.) | 501.1 | (e)Settlements (ha.) | 285.89 | (f)Industrial (ha.) | 1024.94 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 7854.0100 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.36 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | None | 63 | Not Within 10 KMS from Site | (2.) | WLS | None | 63 | Not Within 10 KMS from Site | (3.) | NPA | None | 185 | Not Within 10 KMS from Site | (4.) | ESZs | None | 100 | Not Within 10 KMS from Site | (5.) | Critically Polluted Area | Nandesari | 0 | This is Existing Unit in GIDC Nandesari | (6.) | Wildlife Corridors | None | 63 | Not Within 10 KMS from Site | (7.) | ESAs | None | 63 | Not Within 10 KMS from Site | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | None | 0 | Not Within 10 KMS from Site | (2.) | Archaeological Sites | | None | 0 | Not Within 10 KMS from Site | (3.) | Defence Installations | | None | 0 | Not Within 10 KMS from Site | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.36 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Not Applicable | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 50 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 365 | (f)Total Manpower | 50 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | No. of Plants | 500 | 500 | 1000 | (2.) | Total Area of Green Belt | 791 | 685 | 1476 | (3.) | Percentage of Total Project Area | 21.42 | 18.55 | 39.97 | (4.) | Funds Allocated | 2.5 | 1.5 | 4 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employment Generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 5312 | (ii)Name of the EIA Consultant | ECO-CARE SOLUTIONS | (iii)Address | 306-307 Dwarkesh Complex, Sun Pharma-Atladara Road, Vadodara 390020 | (iv)Mobile No. | 9426074416 | (v)Landline No. | 0265268336 | (vi)Email Id | ecocaresolutions@rediffmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 22 Jun 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) TOR granted by SEEIA however, now application submitted at Central level please clarify
(ii) Submit action plan as per the Ministry’s office memorandum 31st October, 2019 regarding projects located in Critically Polluted Area.
(iii) Effluent treatment mechanism with plan for Zero Liquid Discharge needs to be submitted.
(iv) Proposed Green belt development programe along-with time line and budgetary allocation needs to be provided
(v) Details of Raw material linkage (S. no. 13.1 of form 2) and its mitigation measure during transportation needs to be submitted.
(vi) Consultant accreditation was valid upto 05.04.2016, copy of valid accreditation needs to be uploaded.
(vii) S No. 2 of Form 2 uploaded the authority letter of PP, however there is no date mentioned in the letter.
(viii) This is an expansion case kindly upload earlier EC details.
(ix) All old CTOs not uploaded to verify the violation, if any done by PP.
(x) In view of the above, PP/Consultant are requested to revise the application for grant of EC and accordingly revise the Form 2 alongwith EIA/EMP Report. The EIA/EMP Report shall match with the information as filled in Form 2. On examination it is observed that the Consultant has not adequately submitted the application as per the provisions of the EIA Notification, 2006. Consultant has to read the documents before uploading the information in Form 2 /EIA/EMP report. | 05 Feb 2020 | 2. | NA | The correction have been made as per the instruction received | 22 Jun 2020 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | NA |
The Committee, during deliberations, noted that the quality of the EIA/EMP report prepared by the consultant and its presentation made during the meeting was of very poor quality and not providing any scientific and technical inputs and its mitigation measures for protection of environment. The EAC also noted that the consultant is not accredited and submitted application as per Hon’ble Court Order stay. Also the values of GLC are not in line with the AAQ data.
The Committee, after detailed deliberations, has desired for following requisite information/inputs in respect of the following: -
(i) Action Taken Report on non-compliance points in the existing EC conditions which needs to be forwarded by the Regional Office of the Ministry;
(ii) Revised prediction of GLC due to the proposed project;
(iii) Revised water balance and details of waste water needs to be submitted;
(iv) Revised layout plan showing greenbelt along the periphery of the plant.
(v) Revise the EIA/EMP Report and includes the observation of the EAC as mentioned above.
The proposal was accordingly DEFERRED for the needful.
| 01 Sep 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Vineet Jayram Tilve | Designation | PlantManager | Name of Company (Applicant Name should not be given here) | GUJARAT DYESTUFF INDUSTRIES | Address | "Krishna Niwas" 8 Vinayak Society, Near Natubhai Circle, Gotri Road |
|