Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Gujarat Dyestuff Industries (Pharma Unit)
(b)Name of the Company / Organisation GUJARAT DYESTUFF INDUSTRIES
(c)Registered Address "Krishna Niwas" 8 Vinayak Society, Near Natubhai Circle, Gotri Road,,Vadodara,Gujarat-390007
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vineet Jayram Tilve
(b)Designation (Owner/ Partner/ CEO) PlantManager
(c)Address Plot No 133/4, 133/5, 133/6, GIDC Estate Nandesari, Di. Vadodara 391340,,,Vadodara,Gujarat-391340
(d)Pin code 391340
(e)E-mail ehs@rlggroup.co.in
(f)STD Code. 265(f)Telephone No. 2326673
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/133405/2018
(d)Master Proposal Number(Single Window) SW/133394/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 133/4, 133/5, 133/6 GIDC Nandesari, Vadodara
(b)Pincode 391340
(c)Bounded Latitudes (North)
From
Degree 22.400089
Minutes
Second
From
Degree 22.402567
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.096667
Minutes
Second
From
Degree 73.097158
Minutes
Second
(e)Survey of India Topo Sheet No. F43H3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 35.5
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.4
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number SIA/GJ/IND2/28982/2018
(b)Date of Apply of TOR 18 Nov 2018
(c)Date of Issue of TOR / Standard ToR 10 Jan 2019
(d)Date of Apply of EC 12 Jun 2013
(e)Date of Issue of EC 01 Aug 2014
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project Located in GIDC Nandesari
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 18-A-112/2014(SEAC)/156
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Feb 1 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Lauryl Alcohol Ethoxylates (or)010001000OthersMT per MonthRoad
(2.)Betamethasone Dipropionate (or)0.500.5OthersMT per MonthRoad
(3.)Oleyl Amine Ethoxylates (or)010001000OthersMT per MonthRoad
(4.)Quinon Sulphate (or)20020OthersMT per MonthRoad
(5.)Cloxacillin Sodium (or)20020OthersMT per MonthRoad
(6.)Poly Sorbate Ethoxylates (or)010001000OthersMT per MonthRoad
(7.)Methylcobalamine (or)0.50.51OthersMT per MonthRoad
(8.)Di Cloxacillin Sodium (or)20020OthersMT per MonthRoad
(9.)Tridecyl Alcohol Ethoxylates (or)010001000OthersMT per MonthRoad
(10.)Cefixime Trihydrate (or)10010OthersMT per MonthRoad
(11.)Cefpodoxime Proxetil (or)10010OthersMT per MonthRoad
(12.)Clobetasole Propionate (or)0.500.5OthersMT per MonthRoad
(13.)Dexamethasone Sodium Phosphate (or)0.500.5OthersMT per MonthRoad
(14.)Beclomethasone Dipropionate (or)0.500.5OthersMT per MonthRoad
(15.)Mometasone Furoate (or)0.500.5OthersMT per MonthRoad
(16.)Ofloxacin (or)20020OthersMT per MonthRoad
(17.)Nonyl Phenol (or)010001000OthersMT per MonthRoad
(18.)Flucoxacillin Sodium (or)20020OthersMT per MonthRoad
(19.)Oxacillin Sodium (or)20020OthersMT per MonthRoad
(20.)Hydrogenated Castor Oil (or)010001000OthersMT per MonthRoad
(21.)Octyl Phenol Ethoxylates (or)010001000OthersMT per MonthRoad
(22.)Card Phenol Ethoxylates (or)010001000OthersMT per MonthRoad
(23.)Styrunated Phenol Ethoxylates (or)010001000OthersMT per MonthRoad
(24.)Cefuroxime Axetil (or)10010OthersMT per MonthRoad
(25.)Levofloxacin (or)20020OthersMT per MonthRoad
(26.)Poly Ethylene Glycol (or)010001000OthersMT per MonthRoad
(27.)Stearyl Amine Ethoxylates (or)010001000OthersMT per MonthRoad
(28.)Coco Amine Ethoxylates (or)010001000OthersMT per MonthRoad
(29.)Ampicillin (or)20020OthersMT per MonthRoad
(30.)Amoxicillin Trydrydate (or)20020OthersMT per MonthRoad
(31.)Betamethasone Valerate (or)0.500.5OthersMT per MonthRoad
(32.)Betamethasone Sodium Phosphate (or)0.500.5OthersMT per MonthRoad
(33.)Metformin Hydrochloride (or)0500500OthersMT per MonthRoad
(34.)Castor Oil Ethoxylates (or)010001000OthersMT per MonthRoad
(35.)Cestostyryl Alcohol Ethoxylates (or)010001000OthersMT per MonthRoad
(36.)Stearic Acid Ethoxylates (or)010001000OthersMT per MonthRoad
(37.)Tallow Alcohol Ethoxylates (or)010001000OthersMT per MonthRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Utilities & Storage Area35050400
(2.)Plant Facilities7204951215
(3.)Other Building Area (Road & Parking)2500250
(4.)ETP Area30050350
(5.)Green Belt7916851476
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 29 May 2020
(iv)Valid Upto 30 Sep 2020
(v)File No. AWH108207
(vi)Application No. 176025
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 7
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.59
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.06
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.12
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 12000
(b)Existing quantity of raw material/fuel 6161
(c)Total quantity of raw material/fuel 18161
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Ethylene Oxide9996Tons per AnnumGroup CompanyOthersPipeline0.1 LinkageCopy of Linkage
(2.)Lauryl Alcohol4544Tons per AnnumMumbaiRoad456 MoUCopy of Linkage
(3.)n- Butanol4200Tons per AnnumNandesari RoadRoad20 MoUCopy of Linkage
(4.)Tri Decyl Alcohol4322Tons per AnnumAhmedabadRoad92 MoUCopy of Linkage
(5.)Di Ethylene Glycol3175Tons per AnnumNandesari RoadRoad30 MoUCopy of Linkage
(6.)Castor oil4027Tons per AnnumAhmedabadRoad87 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube77.3571.9474.64100
(2.)PM2.5Micro Gram per Meter Cube47.4940.6544.0760
(3.)NOxMicro Gram per Meter Cube19.1511.0715.1180
(4.)SO2Micro Gram per Meter Cube22.1913.1117.6580
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l19021565002000
(2.)Chloridesmg/l673.2332.532501000
(3.)Total Hardnessmg/l908.0434.13200600
(4.)TSSmg/l32800
(5.)OthersSulphatesmg/l199.782.51200400
(6.)Fluoridemg/l0011.5
(7.)pHOthersNo Unit7.996.966.58.5
(8.)Heavy MetalsLeadmg/l000.010.01
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.96.72A
(2.)CODmg/l12.088.45A
(3.)pHOthersNo Unit8.247.45A
(4.)BODmg/l00A
    14.4.     No. of Ambient Noise monitoring locations : 14
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))63.946.455-65
(2.)Leq(Night)A-weighted decibels(dB(A))60.241.445-65
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.587.15
(2.)Electric ConductivityMillisiemens per Centimetre00
(3.)N(Nitrogen)Milligram per Kilogram00
(4.)K(Potassium)Milligram per Kilogram8718.4
(5.)P(Phosphorus)Milligram per Kilogram00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 25
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 20
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersNandesari Water & Utilities Ltd.2472Copy of Permission LetterPipelineOthersPipeline17.12.201817 Dec 2018300
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Cooling Tower15.615.6In-House ETPOthersZLD15.20.4
(2.)Scrubber11In-House ETPOthersZLD10
(3.)Washing44In-House ETPOthersZLD40
(4.)Process19.419.4In-House ETPOthersZLD19.40
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 40
(b)Total Discharged Water (Kilolitre per Day) 0.4
(c)Total Reused Water (Kilolitre per Day) 39.6
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.6Kilolitre2RoadAuthorized Recyclers
(2.)Discarded Bags & ContainersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)108Tons2RoadAuthorized Recyclers
(3.)Distillation ResiduesHazardous Waste (as per Hazardous and Other Waste Management rules 2016)66Tons2RoadOthersCommon Hazardous Waste Incinerator
(4.)MEE SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)144Tons2RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Spent Solvent for RecoveryHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4368Tons0Road,OthersCaptive In-House RecoveryOthersIn-House Recovery
(6.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons2RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube17.192.090.2317.4380
(2.)SO2Microgram per Meter Cube19.132.090.0219.1680
(3.)PM2.5Microgram per Meter Cube45.382.090.5745.9660
(4.)PM10Microgram per Meter Cube76.012.090.5776.59100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Set 385KVAHSD50.2OthersSO2, NO2, PM0.019, 0.009, 0.004
(2.)Thermic Fluid Heater 20 Lac K.Cal (Existing)FO/LDO300.3OthersSO2, NO2, PM0.0741, 0.0207, 0.0339
(3.)Thermic Fluid Heater 40 Lac K.Cal (Proposed)Natural Gas300.45OthersSO2, NO2, PM0.00185, 0.468, 0.0925
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1600
(b)Source DGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 385 KVA
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0.3691
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.36911
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 3864.95
(b)Waste/Barren Land (ha.) 193.21
(c)Grazing/ Community Land (ha.) 1983.92
(d)Surface Water Bodies (ha.) 501.1
(e)Settlements (ha.) 285.89
(f)Industrial (ha.) 1024.94
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 7854.0100
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.36
Total (ha.) 0.36
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNone63Not Within 10 KMS from Site
(2.)WLSNone63Not Within 10 KMS from Site
(3.)NPANone185Not Within 10 KMS from Site
(4.)ESZsNone100Not Within 10 KMS from Site
(5.)Critically Polluted AreaNandesari0This is Existing Unit in GIDC Nandesari
(6.)Wildlife CorridorsNone63Not Within 10 KMS from Site
(7.)ESAsNone63Not Within 10 KMS from Site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone0Not Within 10 KMS from Site
(2.)Archaeological SitesNone0Not Within 10 KMS from Site
(3.)Defence InstallationsNone0Not Within 10 KMS from Site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.36
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not Applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)No. of Plants5005001000
(2.)Total Area of Green Belt7916851476
(3.)Percentage of Total Project Area21.4218.5539.97
(4.)Funds Allocated2.51.54
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment Generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 5312
(ii)Name of the EIA Consultant ECO-CARE SOLUTIONS
(iii)Address 306-307 Dwarkesh Complex, Sun Pharma-Atladara Road, Vadodara 390020
(iv)Mobile No. 9426074416
(v)Landline No. 0265268336
(vi)Email Id ecocaresolutions@rediffmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 22 Jun 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i) TOR granted by SEEIA however, now application submitted at Central level please clarify (ii) Submit action plan as per the Ministry’s office memorandum 31st October, 2019 regarding projects located in Critically Polluted Area. (iii) Effluent treatment mechanism with plan for Zero Liquid Discharge needs to be submitted. (iv) Proposed Green belt development programe along-with time line and budgetary allocation needs to be provided (v) Details of Raw material linkage (S. no. 13.1 of form 2) and its mitigation measure during transportation needs to be submitted. (vi) Consultant accreditation was valid upto 05.04.2016, copy of valid accreditation needs to be uploaded. (vii) S No. 2 of Form 2 uploaded the authority letter of PP, however there is no date mentioned in the letter. (viii) This is an expansion case kindly upload earlier EC details. (ix) All old CTOs not uploaded to verify the violation, if any done by PP. (x) In view of the above, PP/Consultant are requested to revise the application for grant of EC and accordingly revise the Form 2 alongwith EIA/EMP Report. The EIA/EMP Report shall match with the information as filled in Form 2. On examination it is observed that the Consultant has not adequately submitted the application as per the provisions of the EIA Notification, 2006. Consultant has to read the documents before uploading the information in Form 2 /EIA/EMP report. 05 Feb 2020
2.NAThe correction have been made as per the instruction received 22 Jun 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NA

 

The Committee, during deliberations, noted that the quality of the EIA/EMP report prepared by the consultant and its presentation made during the meeting was of very poor quality and not providing any scientific and technical inputs and its mitigation measures for protection of environment. The EAC also noted that the consultant is not accredited and submitted application as per Hon’ble Court Order stay.  Also the values of GLC are not in line with the AAQ data.

 

The Committee, after detailed deliberations, has desired for following requisite information/inputs in respect of the following: -

 

(i)       Action Taken Report on non-compliance points in the existing EC conditions which needs to be forwarded by the Regional Office of the Ministry;

 

(ii)      Revised prediction of GLC due to the proposed project;

 

(iii)     Revised water balance and details of waste water needs to be submitted;

 

(iv)    Revised layout plan showing greenbelt along the periphery of the plant.

 

(v)      Revise the EIA/EMP Report and includes the observation of the EAC as mentioned above.

The proposal was accordingly DEFERRED for the needful.

01 Sep 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVineet Jayram Tilve
DesignationPlantManager
Name of Company (Applicant Name should not be given here)GUJARAT DYESTUFF INDUSTRIES
Address"Krishna Niwas" 8 Vinayak Society, Near Natubhai Circle, Gotri Road