1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Fengel Crop Sciences (Unit –II) | (b)Name of the Company / Organisation | FENGEL CROP SCIENCES(UNIT-II) | (c)Registered Address | Survey no. 65/2, Village: Shemala, Tehsil: Gondal, District: Rajkot,,Rajkot,Gujarat-360311 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Chetanbhai Chhaganbhai Bhut | (b)Designation (Owner/ Partner/ CEO) | Partner | (c)Address | Pratiksha, 18/11 Bhojraj Para, Gondal,,Gondal,Rajkot,Gujarat-360311 | (d)Pin code | 360311 | (e)E-mail | lab.fengelcrop@gmail.com | (f)STD Code. | 2825(f)Telephone No. | 223007 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/98969/2019 | (d)Master Proposal Number(Single Window) | SW/133401/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Survey No. 65/2 | (b)Pincode | 360311 | (c)Bounded Latitudes (North) | | From | | Degree | 22.03220 | Minutes | | Second | | From | | Degree | 22.03282 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 70.7923 | Minutes | | Second | | From | | Degree | 70.7939 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F42K16 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 156 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 00 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Rajkot | Gondal | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/81/2019-IA-II(I) | (b)Date of Apply of TOR | 12 Mar 2019 | (c)Date of Issue of TOR / Standard ToR | 13 Apr 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 08 Nov 2019 | Distance of Public Hearing Venue from the Proposed Project : | 00 |
| At Project Site of M/s. Fengel Crop Sciences (Unit-II), Survey No. 65/2 | State : | Gujarat | District : | Rajkot | Tehsil : | Gondal | Village : | Shemla |
| 45 | Priority to local employment, proper management of generated waste and effluent. Detailed Issue raised during the public hearing has already addressed along with budgetary provision & timelines in Tab | Others | Resident Additional Collector and Additional District Magistrate-Rajkot | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | SS Vessel | 1.0 KL x 2 nos., 4.0 KL x 2 nos. | | (2.) | Vacuum Ejector | 2 nos. | | (3.) | Boiler | 2 TPH x 1 no. | | (4.) | Cooling Tower | 300 TR x 1 no. | | (5.) | Tray Dryer | 500 KG/cycle x 1 no. | | (6.) | Brine Chilling Unit | 50 TR x 1 no. | | (7.) | SS Reactor | 6.3 KL x 2 nos., 5.0 KL x 1 no. | | (8.) | SS Column | 0.6/9 m x 1 no. | | (9.) | Centrifuge | 48" x 1 no. | | (10.) | Fluidized bed dryer | 200 KG/hr x 1 no. | | (11.) | Condensers | 15 m3 x 3 nos., 10 m3 x 3 nos, 5 m3 x 3 nos. | | (12.) | D.G. set | 250 KVA x 1 no. | | (13.) | Tray Dryer | 500 KG/cycle x 1 no. | | (14.) | SFD | 200 kg/hrs x 1 no. | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Azoxystrobin / Thiamethoxam / Acetamiprid / Imidacloprid / Chlorpyrifos | 300 | Others | MTPM | Road | | (2.) | Bio Pesticide / Bio Fertilizer | 100 | Others | MTPM | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 3.5 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.2 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.07 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.0 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 19340 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 19340 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | As per attached file | 19340 | Tons per Annum | | Local Market | Road | | 250 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2019 To 31 May 2019 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 08 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 27.9 | 14.9 | 24.21 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 74.7 | 52.6 | 69.62 | 100 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 46.2 | 29.6 | 41.46 | 60 | (4.) | SO2 | | Micro Gram per Meter Cube | 25.8 | 12.4 | 21.45 | 80 | |
14.2. No. of Ground Water monitoring locations : 08 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 393 | 297 | 300 | 600 | (2.) | Fluoride | | | mg/l | | 0.75 | 0.54 | 1.0 | 1.5 | (3.) | pH | | | Others | pH Unit | 7.7 | 7.2 | 8.5 | 8.5 | (4.) | TSS | | | mg/l | | 15 | 5 | 00 | 00 | (5.) | TDS | | | mg/l | | 1331 | 976 | 500 | 2000 | (6.) | Chlorides | | | mg/l | | 656 | 492 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 02 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 6.2 | 6.0 | A | (2.) | BOD | | mg/l | | 9 | 6 | A | (3.) | COD | | mg/l | | 20 | 10 | A | (4.) | pH | | Others | pH Unit | 7.63 | 7.52 | A | |
14.4. No. of Ambient Noise monitoring locations : 09 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 42.1 | 40.5 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 54.3 | 51.8 | 75 | |
14.5. No. of Soil Sample Monitored locations : 08 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | pH unit | 7.9 | 7.5 | (2.) | K(Potassium) | Milligram per Kilogram | | 326 | 167 | (3.) | Electric Conductivity | Millisiemens per Centimetre | | 1.50 | 1.35 | (4.) | N(Nitrogen) | Milligram per Kilogram | | 191 | 124 | (5.) | P(Phosphorus) | Milligram per Kilogram | | 58 | 11 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 50 To 70 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 20 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 32 | 00 | Copy of Permission Letter | Pipeline | | Others | Bore well | 21-4/5573/GJ/IND/2019 | 23 Dec 2019 | 32 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 4.0 | 4.0 | Soak Pit | Others | Soak Pit | 0 | 4.0 | (2.) | Industrial | 32 | 40 | ETP-RO-MEE | Others | Reuse in Utility | 30 | 2 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 36 | (b)Total Discharged Water (Kilolitre per Day) | 6 | (c)Total Reused Water (Kilolitre per Day) | 30 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Discarded Containers | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1800 | Tons | 100 | Road | | Authorized Recyclers | | (2.) | ETP sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 180 | Tons | 170 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Salt from MEE | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 132 | Tons | 170 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (4.) | Organic Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1260 | Tons | 170 | Road | | Others | CHWIF or Co-processing at cement plant | (5.) | Distillation Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1980 | Tons | 170 | Road | | Others | CHWIF or Co-processing at cement plant | (6.) | Discarded Liners/Bags | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 6 | Tons | 25 | Road | | Authorized Recyclers | | (7.) | Used oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.5 | Kilolitre | 25 | Road | | Others | Selling to Registered Reprocess | (8.) | Used Catalyst | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 6 | Tons | 55 | Road | | Others | by back to supplier for regeneration | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 19.83 | 1.41 | 0.49 | 20.32 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 64.05 | 1.41 | 1.46 | 65.51 | 100 | (3.) | SO2 | | Microgram per Meter Cube | 16.98 | 1.41 | 0.45 | 17.44 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 37.38 | 1.41 | 1.46 | 38.85 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | D G set (250 KVA) | HSD - 56 Liter / hr | 11 | 0.22 | Others | PM, SO2, NOx | 65 mg/Nm3, 30 mg/Nm3, 40 mg/Nm3 | (2.) | Spin flash Dryer (200 Kg/Hr) | -- | 11 | 0.30 | Others | PM | 15 mg/Nm3 | (3.) | Boiler - 2 Nos. (2 TPH each) | Agro Briquetts - 5 TPD OR Furnace Oil - 2.0 KLD | 30 | 0.45 | Others | PM, SO2, NOx | 105 mg/Nm3, 40 mg/Nm3, 30 mg/Nm3 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 250 | (b)Source | PGVCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | DG Set (250 KVA, 1 No.) | (e)Stack Height (in m) | 11 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 00 | (b)Private Land (ha.) | 1.1962 | (c)Government Land (ha.) | 00 | (d)Revenue Land (ha.) | 00 | (e)Other Land (ha.) | 00 | Total Land (ha.) | 1.1962 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 21426.4 | (b)Waste/Barren Land (ha.) | 5726.8 | (c)Grazing/ Community Land (ha.) | 00 | (d)Surface Water Bodies (ha.) | 542.3 | (e)Settlements (ha.) | 00 | (f)Industrial (ha.) | 00 | (g)Forest (ha.) | 00 | (h)Mangroves (ha.) | 00 | (i)Marine Area (ha.) | 00 | (j)Others (ha.) : Built Up | 3761.6 | Total (ha.) | 31457.1 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.12 | | (2.) | Green belt | | 0.40 | | (3.) | Others | Road, parking, open area | 0.52 | | (4.) | Built Up Area | | 0.16 | Admin, Canteen, Storage area, ETP, Utility | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | None within 10 km | 00 | None within 10 km | (2.) | NPA | None within 10 km | 00 | None within 10 km | (3.) | ESZs | None within 10 km | 00 | None within 10 km | (4.) | Corridors | None within 10 km | 00 | None within 10 km | (5.) | Wildlife Corridors | None within 10 km | 00 | None within 10 km | (6.) | ESAs | None within 10 km | 00 | None within 10 km | (7.) | Critically Polluted Area | None within 10 km | 00 | None within 10 km | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | None within 10 km | 00 | None within 10 km | (2.) | Defence Installations | | None within 10 km | 00 | None within 10 km | (3.) | Forest | | None within 10 km | 00 | None within 10 km | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 00 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 1.2 | (b)Land yet to be acquired(Ha) | 00 | (c)Status of Land acquisition if not acquired | 1.2 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 00 | (b)No. of Households | 00 | (c)No. of PDFs (Project Displaced Families) | 00 | (d)No. of PAFs (Project Affected Families) | 000 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 00 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Veri Pond | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Soliya Pond | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 7.7 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 00 | (b)Permanent Employment-During Operation | 45 | (c)Temporary Employment- During Construction | 5 | (d)Temporary Employment- During Operation | 00 | (e)No. of working days | 26 | (f)Total Manpower | 50 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.40 | (b)Percentage of Total Project Area | 33.44 | (c)No. of Plants to be Planted | 900 | (d)Funds Allocated for Plantation | 300000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employment generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA0084 | (ii)Name of the EIA Consultant | San Envirotech Pvt. Ltd., Ahmedabad | (iii)Address | 401/402/423/424/324, Medicine Market, Opp. Shefali Centre, Paldi Cross Road, Ahmedabad | (iv)Mobile No. | 9825007201 | (v)Landline No. | 0792658307 | (vi)Email Id | mahendra.sepl@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 16 Mar 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) In S. No. 7.1 of Form 2, the correspondence letter from MS, SPCB on PH has not been uploaded. Also issues raised during the public hearing has not been addressed. The details of action plan on the issues raised during PH along with budgetary provisions & timelines needs to be submitted.
(ii) In S. No. 2 of Form 2, the Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency has not been submitted.
(iii) EIA report to be revised as per the terms of reference granted for the project, and shall conform to Appendix III of the EIA Notification, 2006.
(iv) All old CTOs not uploaded to verify the violation, if any done by PP.
(v) In view of the above, PP/Consultant are requested to revise the application for grant of EC and accordingly revise the Form 2 alongwith EIA/EMP Reports. The EIA/EMP Reports shall match with the information as filled in Form 2. On examination it is observed that the Consultant has not adequately submit the application as per the provisions of the EIA Notification, 2006. Consultant has to read the documents before uploading the information in Form 2 /EIA/EMP report. | 07 Jan 2020 | 2. | NA | The correction have been made as per the instruction received | 01 Feb 2020 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | We are uploading herewith clarification of points raised by honorable EAC and Final EIA report with required correction. | 16 May 2020 | 2. | ADS Reply Letter | We are uploading herewith clarification of points raised by honorable EAC and Final EIA report with required correction. | 16 May 2020 | 3. | NA |
The
EAC, after detailed deliberations decided to defer the proposal for want of requisite information as under and
have asked the PP to revise the Report alongwith following clarification/information:-
| 24 Apr 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Chetanbhai Chhaganbhai Bhut | Designation | Partner | Name of Company (Applicant Name should not be given here) | FENGEL CROP SCIENCES(UNIT-II) | Address | Survey no. 65/2, Village: Shemala, Tehsil: Gondal, District: Rajkot |
|